Laserfiche WebLink
z Storm Water Drainage Report <br /> Minimum Requirements 1 through 5 <br /> ,c4� Minimum Requirement 1 through 9 <br /> ENGINEERING DEPARTMENT <br /> . �.,." 904 6th Street Anacortes, WA 98221 <br /> www.anacorteswa.qov <br /> Official Use Only: (Information to Inspectors) <br /> Required Storm Water Facility and other related requirements: <br /> a'-..3-)'m$rr T .1-S 4Poe-1- <br /> mP"ice.C?i <br /> i4 59.t_1._ fraes) - rAa-#2- L g <br /> x Dii T G�S.1}JC-ZIT' Si -, • vYle--ins IS 5{>T)s F(t <br /> Project Address: 1010 19th Street Submittal Date: 4/14/2021 <br /> Parcel Number: P55172 Revision Number: 2- <br /> Permit Number: Reviewer: L.4- L7C <br /> Acceptance Date (COA): •D7.242 f <br /> FRONT OF REPORT: <br /> Submittal Checklist: (All items listed below are required for a complete submittal) <br /> o Cover Sheet(Preparer to Provide): Project title, Location, Revision dates, Engineer's.Stamp <br /> o TAB 1: Minimum Requirement#1 - Preparation of Stormwater Site Plans <br /> o TAB 2: Minimum Requirement#2- Construction Stormwater Pollution Prevention (SWPP) <br /> o TAB 3: Minimum Requirement#3-Source Control of Pollution <br /> o TAB 4: Minimum Requirement#4- Preservation of Natural Drainage Systems and Outfalls <br /> o TAB 5: Minimum Requirement#5-On-site Stormwater Managements <br /> o TAB 6: Minimum Requirement#6 - Runoff Treatment <br /> o TAB 7: Minimum Requirement#7- Flow Control <br /> o TAB 8: Minimum Requirement#8 -Wetland Protection <br /> o TAB 9: Minimum Requirement#9-Operation and Maintenance <br /> o APPENDIX 1 - Survey performed by a Professional Land Surveyor <br /> o APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) <br /> o APPENDIX 3 - Model Soil Management Plan for BMP T5.13 <br /> o APPENDIX 4 - Determining Construction Site Sediment Damage Potential (Appendix 7) <br /> o APPENDIX 5 - Site Plan with all applicable information (Minimum Size 11x17-30 scale) <br /> o APPENDIX 6 - Documented Site Photos (North, South, East and West) <br /> o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the <br /> Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. <br /> Stormwater Management Requirements: <br /> o Refer to the 2012\14 Department of Ecology Manual, as amended in 2014 for further required <br /> information. <br /> o See also, City of Anacortes Municipal Code 19.76 for additional information <br /> o See also, current Engineering Development Standards, Chapter 2- Storm Drainage for additional <br /> information. <br /> Version Date: October 7, 2019 Previous Version Date: February 20, 2019 <br />