My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Storm Water 1-5 BLD-2018-0286 1205 19th Street
>
BUILDING CONSTRUCTION AND MODIFICATION PERMIT FILES (VALID)
>
Active
>
1205 19th Street
>
Storm Water 1-5 BLD-2018-0286 1205 19th Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 8:09:12 AM
Creation date
2/16/2019 7:00:37 PM
Metadata
Fields
Template:
PL_PermitFile
Street Name
19th Street
Street Number
1205
Permit Number
BLD-2018-0286
Document Type
Storm Water 1-5
Address
1205 19th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
FILE COPY <br /> Y o Planning, Community, & Economic Development Department <br /> PO Box 547, Anacortes, WA 98221 <br /> PH: 360.299.1984 <br /> 4L 47 <br /> -4coR 13 Elements of SWPPP <br /> (Construction Stormwater Pollution Prevention Plan) <br /> Please check off boxes to show that each element has been read and understood. Provide details where <br /> applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements <br /> and the correlating BMPs are listed on Pg. '36 of the 2014 Stormwater Management Manual for <br /> Western Washington (SWMMWW).A link is provided on the City of Anacortes website, under Planning, <br /> Community, & Economic Development Department, as well as under Stormwater on the Engineering <br /> Division of Public Work's page. <br /> Owner Name: tIttLP' <br /> Site Address: lid t %►- �b) W+'c REV-0-1 <br /> Prepared By: 44At47 L . ( ts7-I1t l <br /> The Stormwater checklist or building permit determined that: <br /> ❑ The 13 elements must be addressed for 1 (These elements must be addressed for <br /> construction activity adding under 2,000 construction activity adding 2,000 sq.ft. <br /> sq.ft. of hard surface area. or more of hard surface area. This means <br /> that an attached narrative and site plan <br /> are required with this document. <br /> Under each element, explain the best management practices(BMPs) used or iustifv reasoning <br /> for those that will not be used. If needed, please attach a narrative to further explain plans or <br /> justification. <br /> ELEMENT 1: Preserve Vegetation/Mark Clearing Limits <br /> lkf Before beginning land disturbing activities, including clearing and grading, clearly mark all <br /> clearing limits,sensitive areas and their buffers,and trees that are to be preserved within the <br /> / construction area. <br /> M Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the <br /> maximum degree practical. <br /> 41 t t431.3. . tHett f( agAce- fl•er I191'jivar <br /> Acgro, vau46. C ► MP <br /> U r IP OVIt �o it llkr(0 Witt ; �V� 6 0(eaC1ti <br /> f R1/ Chi- ) A3 Lu x Z Wen) 61 QG, P (',tD3 itiAtt VI*(e11xiy <br /> Page 1 of 8 <br /> March,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.