Document Title
RELATING TO PUBLIC WORKS; MAKING FINDINGS PURSUANT TO RCW 39.04.280; DECLARING AN EMERGENCY AND AUTHORIZING THE PUBLIC WORKS DIRECTOR AND FINANCE DIRECTOR, UNDER THE SUPERVISION OF THE MAYOR, TO REPAIR DAMAGE TO THE 36” MAIN TRANSMISSION WATERLINE AT 1085
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ANACORTES <br />RESOLUTION NO. 1951 <br />A RESOLUTION of the City of Anacortes, Washington, relating to public works; making fmdings <br />pursuant to RCW 39.04.280; declaring an emergency and authorizing the Public Works Director <br />and Finance Director, under the supervision of the Mayor, to repair damage to the 36" main <br />transmission waterline at 10859 Drawbridge Lane, without solicitation of bids; and authorizing the <br />Public Works Director, Finance Director and Mayor to carry out this authorization. <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANACORTES, <br />WASHINGTON, AS FOLLOWS: <br />Section 1. Recitals and Findings. The City Council of the City of Anacortes hereby makes the <br />following findings: <br />1.1 On night of March 3, 2016, City Water Maintenance was notified of a line break that <br />occurred on the redundant 36" water transmission line. On the morning of March 4, 2016 <br />the City restored water service for those homes effected by the break. The water force from <br />the break eroded a hole over a 10-feet deep and the capacity of the City's equipment wasn't <br />sufficient to dewater the site and make the repair. On March 7, 2016, the City contacted a <br />local contractor to provide the necessary equipment to assist the City to repair the pipe. <br />1.2 The originally install 36" water transmission line provides a redundancy to the City's water <br />system and until the line is repaired the City operates without redundancy; a potential for <br />total failure causing property damage and becoming a risk to human health. <br />1.3 Repairing the damage to the 36" water transmission line is "public work" as defined by <br />RCW 39.04.010 (4). <br />1.4 RCW 39.04.280 provides that the City, by resolution, may waive competitive bidding <br />Page 1of2 <br />Resolution No. 1951 <br />requirements for public works in the event of an emergency. For purposes of RCW <br />39.04.280, an "emergency" is any unforeseen circumstance beyond the control of the <br />municipality that either (a) presents a real, immediate threat to the proper performance of <br />essential functions; or (b) will likely result 'in material loss or damage to property, bodily <br />injury, or loss of life if immediate action is not taken. The loss of the City's redundant <br />36" Water Transmission Line Repair@ 10859 Orav.tirldge Lane