Laserfiche WebLink
Contract k tuber 09-011 -TRN-004 <br /> If C.) • o—,6, Modification 04 <br /> 9 Date July 27,2010 <br /> %1000. Modification No. 04 <br /> Page 1 of 3 Pages <br /> Contract Number 09-011-TRN-004 <br /> Contract Title 6th Street Reconstruction Project <br /> Prime Contractor Schweiz Construction, Inc. <br /> PREAMBLE <br /> This modification adds Line Items 53 through 64 to the Bid Schedule and adjusts some quantities to existing Line Items to <br /> account for changes to the Work. City's Project Manager Reference Numbers Ref 7, Ref 13—21, and Ref 23 are subject to this <br /> change order. This modification increases the contract price from$447,891.52 by$19,923.71 to$467,815.23 and adds 21 <br /> working days to reach physical completion. <br /> Accordingly,the Contract is modified as follows: <br /> ARTICLE I. WORK <br /> Under the second paragraph, add the following items: <br /> New Bid <br /> Item Type of Description of Work [Ref No] Line Item <br /> No. Change <br /> (8) ADD Two handrail type sign posts and signs per Exhibit K. 7 53 <br /> (9) REVISE At Intersections L, M, and N remove broken concrete and asphalt and replace <br /> with contract material for final restoration to address the substandard asphalt 13 N/A <br /> that was adjacent to curb replacements. See Exhibit L. <br /> (10) ADD Excavate deeped for the 10-inch storm line at CB #3468 to align with the 12- 14 54 <br /> inch DI waterline in 6th Street <br /> (11) ADD Remove and replace existing 8" clay storm line at 1103 6th Street with 8" PVC 15 55 <br /> between CB#233 and SDMH #78 <br /> (12) ADD Between Station 4+00 and 4+68, excavate around the 6-inch asbestos 16 56 <br /> concrete watermain. Subgrade deemed unsuitable. <br /> (13) ADD At 1619 6'h Street connect 2 property drains to the City's existing storm 17 57 <br /> drainage system. Drains were discovered after excavation. See Exhibit M. <br /> (14) ADD Connect 3"storm pipe at 1607 6th Street to City's existing storm drainage 18 58 <br /> system. See Exhibit N. <br /> (15) ADD Install infiltration trenching and piping between Station 4+05 to 5+25 to provide <br /> properties 1505 and 1507 6th Street access to storm system behind the 19 59 <br /> sidewalk. See Exhibit O. <br /> (16) ADD Install new curb inlet and catch basin at Station 13+00. See Exhibit P. 20 60 <br /> (17) ADD/ Install 10 new trees that will be provided by the City in City's ROW. Reinstall <br /> REVISE irrigation systems at 1404 6th Street and 1119 6th Street then test the systems. 21 61-63 <br /> (18) ADD Realign the driveway grade and drain at 1103 6th Street to the new sidewalk 23 64 <br /> alignment <br />