Loading...
HomeMy WebLinkAboutPermit File BLD-2023-1096 3909 Rock Ridge ParkwayCODES E CODE PROJECT INFORMATION SS IGN NE 11 G.COM 502 L, PE SHEET INDEX 0 .S-1 -2 3 1.1 D-3.1 -4.1 CO V E R S- 0 SH E E T PROJECT NAME DRAWN BY CHECKED BY - SHEET DATE DE S C R I P T I O N SCALE REVISIONS DESCRIPTION DATE BY MRT - 2 PROJECT NUMBER COVER SHEET....S-0 STRUCTURAL GENERAL NOTES....S-1 SITE & FOUNDATION PLAN....S-2 FOUNDATION DETAILS....SD-1.1 3909 Rockridge Parkway Anacortes Residence S23-XR CLIENT BENCSIK KATIE BENCSIK TAMAS 3909 ROCKRIDGE PARKWAY ANACORTES, WA 98221 PROJECT ADDRESS 3909 ROCKRIDGE PARKWAY ANACORTES, WA 98221 STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 13150 91ST PL NE KIRKLAND, WA 98034-5901 PHONE: (425) 636-3313 CONTACT: MANS THURFJELL, PE ENGINEERED PER: 2018 (IRC) INTERNATIONAL RESIDENTAL CODE 2018 (IBC) INTERNATIONAL BUILDING CODE S230421-4XR JT 06/29/2023 3909 ROCKRIDGE PARKWAY ANACORTES WA 98221 CITY OF ANACORTES PLANNING AND BUILDING DEPT: APPROVED PLANS REVIEWED FOR CODE COMPLIANCE PERMIT #:______________________________ ADDRESS:______________________________ APPROVED BY:__________________________ SUBJECT TO FIELD INSPECTION. APPROVED PLANS SHALL NOT BE ALTERED WITHOUT AUTHORIZATION. BLD-2023-1096 3909 ROCK RIDGE PARKWAY GENERAL STRUCTURAL NOTES DESIGN CRITERIA CODE: 2015 IBC/IRC & AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. ROOF ........................................25 PSF SNOW (GROUND) FLOORS RESIDENTIAL.....................40 PSF BALCONY/DECK................60 PSF .1.253 .0.481 ......D E E E ARGER OLUMNS ON UD WALL. E WALL. R, U.N.O. E L S VIEW FOR: SES RED ENGTH. . GE N E R A L S T R U C T U R A L N O T E S S- 1 SH E E T PROJECT NAME DRAWN BY CHECKED BY - SHEET DATE DE S C R I P T I O N SCALE REVISIONS DESCRIPTION DATE BY MRT - 2 PROJECT NUMBER GENERAL CONDITIONS 1.THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 2.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK. THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 3.ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 4.IN CASE OF CONFLICT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER THE "GENERAL NOTES" AND/OR "STANDARD DETAILS". 5.IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION SHALL BE THE SAME AS FOR SIMILAR WORK. 6.WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE DRAWINGS. 7.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE. 8.THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBL FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCT 9.ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE INTERNATIONAL BUILDING CODE, AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER ANY PORTION OF THE WORK. 10.SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE STRINGENT REQUIREMEN SHALL APPLY. 11.REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES OR THE STRUCTURAL DRAWINGS. 12.NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. 13.DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. 14.ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE "INTERNATIONAL BUILDING CODE" (IBC), AND STANDARDS REFERENCED THEREIN. 0.35 AB ANCHOR BOLT ABV ABOVE AFF ABOVE FINISH FLOOR ALT ALTERNATE ALUM ALUMINUM APPROX APPROXIMATE AYC ALASKAN YELLOW CEDAR BB BOX BEAM BF BOTTOM FLUSH BLDG BUILDING BLKG BLOCKING BM BEAM BOT BOTTOM BP BOTTOM PLATE BRG BEARING BTWN BETWEEN BSMT BASEMENT B/W BOTTOM OF WALL CANT CANTILEVER CJ CONTROL JOINT CLG.CEILING CLJ CEILING JOIST CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CTR CENTER DET DETAIL DF DOUGLAS FIR (SOUTH) DFL DOUGLAS FIR LARCH DIM DIMENSION DJ DOUBLE JOIST DIA DIAMETER DN DOWN DS DOWN SPOUT EA EACH EF EACH FACE EJ EXPANSION JOINT ELEV ELEVATION EN EDGE NAILING (PANEL) EQ EQUAL ES EACH SIDE EW EACH WAY FB FLUSH BEAM FIN FINISH FL FLOOR FLSHG FLASHING FND FOUNDATION FP FIREPLACE FT FOOT FTG FOOTING GA GAUGE GALV GALVANIZED GLB GLULAM BEAM GR GRADE GYP GYPSUM WALL BOARD HDG HOT-DIPPED GALVANIZED HDR HEADER HF HEM FIR HGT HEIGHT HT HEIGHT IN INCH JT JOINT MAX MAXIMUM MIN MINIMUM MISC MISCELLANEOUS NB NON-BEARING NO NUMBER OC ON CENTER PSF POUNDS PER SQUARE FOO PSI POUNDS PER SQUARE INC PT PRESSURE TREATED RAF RAFTER REF REFERENCE REINF REINFORCEMENT REQD REQUIRED SF SQUARE FOOT SIM SIMILAR SPF SPRUCE PINE FIR STD STANDARD SYP SOUTHERN YELLOW PINE T/TOP OF T/C TOP OF CONCRETE T/P TOP OF PLATE T/S TOP OF STEEL T/W TOP OF WALL TF TOP FLUSH TJ TRIPLE JOIST T/BM TOP OF BEAM T/SLABTOP OF SLAB TP TOP PLATE TYP TYPICAL UNO UNLESS NOTED OTHERWI UPA UNDER POST ABOVE UWA UNDER WALL ABOVE VERT VERTICAL VIF VERIFY IN FIELD W/WITH WC WESTERN CEDAR WP WATERPROOF WWF WELDED WIRE FABRIC ABBREVIATIONS 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES EXCAVATIONS, COLUMNS, EQUIPMENT LOADS, MATERIAL LOADS, AND OTHERS. OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT INCLUDE INSPECTIONS OF TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. ALTERNATES: 1.ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW. ENGINEER MAY REQUEST PAYMENT FOR REVIEW; CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONA COST TO OWNER. 1.THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR TO MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM HIS WORK. THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR, SUBCONTRACTORS SUPPLIERS OR THEIR EMPLOYEES, OR FOR ACCESS, VISITS, USE, WORK, TRAVEL, OR OCCUPANCY BY ANY PERSON. JOBSITE SAFET STRUCTURAL AND MISC. STEEL 1.REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AN 2.MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED WF BEAMS - ASTM A572-50 (Fy = 50,000 PSI) HSS ROUND COLUMNS - ASTM A500 Gr. B (Fy = 42,000 PSI) HSS RECTANGULAR COLUMNS - ASTM A500 Gr. B (Fy = 46,000 PSI) ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) STRUCTURAL STEEL WELDING 1.CONFORM TO THE AWS CODES D1.1 AND D1.3., AND USE ONLY CERTIFIED WELDERS. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER-APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2015 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER’S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO-HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. PROOF TESTING SHALL BE IN ACCORDANCE WITH ASTM STANDARD D 1143-81. GEOTECHNICAL SPECIAL INSPECTOR SHALL BE CONTINUOUSLY PRESENT DURING PILE INSTALLATION AND LOAD TESTING. PROOF TESTING SHALL BE APPLIED TO EACH OF THE LOAD CONFIGURATIONS SPECIFIED IN THE PILE SPACING & LOAD REQUIREMENTS TABLE. MINIMUM ONE (1) PILE PER LOAD CONFIGURATION SHALL BE TESTED. CONCRETE ANCHORS 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. 16. MINIMUM ASSUMED SOIL BEARING CAPACITY............... 3,000 PSF SPECIAL INSPECTIONS SCHEDULE SPECIAL INSPECTIONS TABLES PER THE 2018 IBC. ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN MARKED WITH A "-". ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN "X". CODE: 2018 IRC/IBC & AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. S230421-4XR JT 06/29/2023 3909 ROCKRIDGE PARKWAY ANACORTES WA 98221 S- 2 SH E E T PROJECT NAME DRAWN BY CHECKED BY - SHEET DATE DE S C R I P T I O N SCALE REVISIONS DESCRIPTION DATE BY MRT - 2 PROJECT NUMBER S230421-4XR JT 06/29/2023 3909 ROCKRIDGE PARKWAY ANACORTES WA 98221 SITE PLANNOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. SI T E P L A N NOTES: a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE MANUFACTURER. THE MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TO ACHIEVE THE REQUIRED BEARING CAPACITY LOADING, INCLUDING A SAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PART OF THE PILE ASSEMBLY. MAXIMUM INSTALLATION TORQUE RATING OF 8,300FT*LBS FOR A 2-7/8 INCH DIAMETER HELICAL PILE WITH 0.203 INCH SHAFT WALL THICKNESS PER ESR-3750. b. FOR HELICAL PILES, PER IDEAL GROUP DWG NO.: 278TFG, THE ALLOWABLE STRUCTURAL CAPACITY FOR THE 2 7/8" TRU-FORCE UNDERPINNING BRACKET IS LIMITED TO 30 KIPS. c. HELICAL ASSEMBLIES AS MANUFACTURED BY IDEAL MANUFACTURING, INC., IN ACCORDANCE WITH ESR-3750. d. PILE OR ANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITY AS DETERMINED BY THE MANUFACTURER FOR ANY PART OF THE ASSEMBLY. e. MAXIMUM ON-CENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN. SITE PLAN LEGEND EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE AREA OF PROPOSED WORK * PROPERTY LINE APPROXIMATE DIMENSION HELICAL PILE FOUNDATION NOTES 1. VERIFY ALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER R&R LEVEL SURVEY. 3. REFER TO THE FOLLOWING DETAILS FOR ADDITIONAL INFORMATION: HELICAL PILE .......... 1/SD-1.1 4. REFER TO STRUCTURAL CALCULATIONS PACKAGE DATED FEBRUARY 9TH, 2023, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND REQUIREMENTS. 5. LEVEL SURVEY PER R&R REPAIR PLAN DATED JUNE 29TH, 2023. REFER TO STRUCTURAL CALCULATIONS PACKAGE FOR MODIFICATIONS AND ADDITIONAL REQUIREMENTS FOR REPAIR PLAN. 6. MINIMUM PILE DIAMETER SHALL BE 2-7/8”. 7. IT IS ACCEPTABLE TO INSTALL PILES AT THE SPACING SHOWN WITH ± 0'-6" TOLERANCE TO ALLOW FOR UNEXPECTED OBSTRUCTIONS ENCOUNTERED DURING PILE INSTALLATION PROVIDED THAT NO TWO ADJACENT SPANS EXCEED THE SPACING LIMITATION AS INDICATED ON LEVEL SURVEY. 8. FIELD VERIFY ALL EXISTING STEM WALLS AT AND BETWEEN PILE ATTACHMENT LOCATIONS ARE 8" THICK MINIMUM WITH 2'-8" HEIGHT (MEASURED FROM B/FTG TO T/CONC) MINIMUM. 9. PARCEL AND RESIDENCE LOCATING DIMENSIONS (WITH ASTERISK, *) APPROXIMATED PER SKAGIT COUNTY iMAP. NOT TO BE USED FOR LEGAL PURPOSES. 10. SITE FEATURES AND EXISTING STRUCTURES ON ADJACENT PARCELS NOT SHOWN FOR CLARITY. 11. PILES SHALL BE INSTALLED TO A MINIMUM EMBEDMENT OF 5'-0'' (UNO PER GEOTECHNICAL REPORT). HELICAL PILE REFUSAL CRITERIA: TORQUING OF THE PILE SHALL CONTINUE UNTIL A HYDRAULIC PRESSURE IS ACHIEVED TO PROVIDE THE SPECIFIED MINIMUM VERTICAL CAPACITY WITH A SAFETY FACTOR OF NO LESS THAN TWO. ADVANCEMENT SHALL BE HALTED IMMEDIATELY IF THE STRUCTURE BEGINS TO EXPERIENCE UPLIFT FLEXURE. 49'-6'' 49 ' - 0 ' ' 24'-6'' 28 ' - 6 ' ' 6' - 0 ' ' 9'-0'' 13 ' - 6 6 6 18'-0'' 21 ' - 6 ' ' ROCKRIDGE P K W Y PR I M A R Y AC C E S S DR I V E W A Y AC C E S S 71'-0" * PROPERTY LINE 11 6 ' - 0 " * PR O P E R T Y L I N E 1 2 0 ' - 0 " * PR O P E R T Y L I N E 66'-0" *PROPERTY LINE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4'-0'' 6' - 0 ' ' 12'-0'' 25 ' - 6 ' ' 4' - 6 ' ' RESIDENCE 3909 ROCKRIDGE PARKWAY ANACORTES, WA 98221 PARCEL NO. P127672 LEGAL DESCRIPTION LOT 2, PLAT OF ROCK RIDGE SOUTH, PHASE 3, AS PER PLAT RECORDED ON JUNE 30, 2008 UNDER AUDITOR'S FILE NO. 200806300185, RECORDS OF SKAGIT COUNTY, WASHINGTON. OWNER NAME & ADDRESS BENCSIK KATIE BENCSIK TAMAS 3909 ROCKRIDGE PARKWAY ANACORTES, WA 98221 R&R LEVEL SURVEY See Structural Calculation Package for Additional Requirements SH E E T PROJECT NAME DRAWN BY CHECKED BY - SHEET DATE DE S C R I P T I O N SCALE REVISIONS DESCRIPTION DATE BY MRT - E PROJECT NUMBER FO U N D A T I O N D E T A I L S SD - 1 . 1 HELICAL PILE INSTALLATION DETAIL HELICAL PILE INSTALLATION DETAIL NOT USED NOT USED NOT USED 1 2 3 4 5 6 HELICAL PILE INSTALLATION DETAIL S230421-4XR JT 06/29/2023 3909 ROCKRIDGE PARKWAY ANACORTES WA 98221 STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 13150 91st PL NE KIRKLAND, WA 98034-5901 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 Prepared for: R&R Foundation Specialist 3409 McDougall Ave, suite 204 Everett, WA 98201 P: 425.760.5077 Calculation Package for Foundation Stabilization/Lift 3909 Rockridge Parkway Anacortes, WA 98221 Project No: S230421-4XR June 29th, 2023 1 of 19 S-2 SHEET PR O J E C T N A M E DR A W N B Y CH E C K E D B Y - SH E E T D A T E DESCRIPTION SC A L E RE V I S I O N S DES C R I P T I O N DA T E BY MR T - 2 PR O J E C T N U M B E R S2 3 0 4 2 1 - 4 X R JT 06 / 2 9 / 2 0 2 3 39 0 9 R O C K R I D G E PA R K W A Y AN A C O R T E S W A 9 8 2 2 1 SI T E P L A N NO T E : T H E P R O J E C T W I L L N O T R E S U L T I N C H A N G I N G O F S I T E T O P O G R A P H Y O R E X I S T I N G D E V E L O P E D A R E A S . SITE PLAN NO T E S : a. M I N I M U M A N D M A X I M U M I N S T A L L A T I O N T O R Q U E F O R H E L I C A L A S S E M B L I E S S H A L L B E S P E C I F I E D B Y T H E P I L E M A N U F A C T U R E R . T H E M I N I M U M I N S T A L L A T I O N T O R Q U E S H A L L B E H I G H E N O U G H T O A C H I E V E T H E R E Q U I R E D B E A R I N G C A P A C I T Y L O A D I N G , I N C L U D I N G A S A F E T Y F A C T O R N O L E S S T H A N 2 . T H E M A X I M U M I N S T A L L A T I O N T O R Q U E S H A L L N O T E X C E E D T H E A L L O W A B L E T O R S I O N A L C A P A C I T Y O F T H E P I L E S H A F T S O R A N Y P A R T O F T H E P I L E A S S E M B L Y . M A X I M U M I N S T A L L A T I O N T O R Q U E R A T I N G O F 8 , 3 0 0 F T * L B S F O R A 2 - 7 / 8 I N C H D I A M E T E R H E L I C A L P I L E W I T H 0 . 2 0 3 I N C H S H A F T W A L L T H I C K N E S S P E R E S R - 3 7 5 0 . b. F O R H E L I C A L P I L E S , P E R I D E A L G R O U P D W G N O . : 2 7 8 T F G , T H E A L L O W A B L E S T R U C T U R A L C A P A C I T Y F O R T H E 2 7 / 8 " T R U - F O R C E U N D E R P I N N I N G B R A C K E T I S L I M I T E D T O 3 0 K I P S . c. H E L I C A L A S S E M B L I E S A S M A N U F A C T U R E D B Y I D E A L M A N U F A C T U R I N G , I N C . , I N A C C O R D A N C E W I T H E S R - 3 7 5 0 . d. P I L E O R A N C H O R L O A D S N O T T O E X C E E D M A X I M U M C A P A C I T Y A S D E T E R M I N E D B Y T H E M A N U F A C T U R E R F O R A N Y P A R T O F T H E A S S E M B L Y . e. M A X I M U M O N - C E N T E R S P A C I N G L I S T E D F O R T Y P I C A L P I L E I N S T A L L A T I O N U N L E S S N O T E D O T H E R W I S E O N P L A N . SIT E P L A N L E G E N D EX I S T I N G R E S I D E N C E S T R U C T U R E EX I S T I N G A D J A C E N T S T R U C T U R E AR E A O F P R O P O S E D W O R K * PR O P E R T Y L I N E AP P R O X I M A T E D I M E N S I O N H E L I C A L P I L E FO U N D A T I O N N O T E S 1. V E R I F Y A L L D I M E N S I O N S O N S I T E . 2. F O U N D A T I O N D I M E N S I O N S A R E T O O U T S I D E F A C E O F C O N C R E T E S T E M W A L L PE R R & R L E V E L SU R V E Y . 3. R E F E R T O T H E F O L L O W I N G D E T A I L S F O R A D D I T I O N A L I N F O R M A T I O N : H E L I C A L P I L E . . . . . . . . . . 1 / S D - 1 . 1 4. R E F E R T O ST R U C T U R A L C A L C U L A T I O N S P A C K A G E D A T E D F E B R U A R Y 9 T H , 2 0 2 3 , FO R A D D I T I O N A L IN F O R M A T I O N , S P E C I F I C A T I O N S , AN D R E Q U I R E M E N T S . 5. L E V E L S U R V E Y P E R R & R R E P A I R P L A N D A T E D J U N E 2 9 T H , 2 0 2 3 . R E F E R T O ST R U C T U R A L CA L C U L A T I O N S P A C K A G E FO R M O D I F I C A T I O N S A N D AD D I T I O N A L R E Q U I R E M E N T S F O R R E P A I R P L A N . 6. M I N I M U M P I L E D I A M E T E R S H A L L B E 2 - 7 / 8 ” . 7. I T I S A C C E P T A B L E T O I N S T A L L P I L E S A T T H E S P A C I N G S H O W N W I T H ± 0 ' - 6 " TO L E R A N C E T O A L L O W F O R U N E X P E C T E D O B S T R U C T I O N S E N C O U N T E R E D DU R I N G P I L E I N S T A L L A T I O N P R O V I D E D T H A T N O T W O A D J A C E N T S P A N S EX C E E D T H E S P A C I N G L I M I T A T I O N A S I N D I C A T E D O N L E V E L S U R V E Y . 8. F I E L D V E R I F Y A L L E X I S T I N G S T E M W A L L S A T A N D B E T W E E N P I L E A T T A C H M E N T L O C A T I O N S A R E 8 " TH I C K M I N I M U M W I T H 2 ' - 8 " H E I G H T ( M E A S U R E D F R O M B / F T G T O T / C O N C ) M I N I M U M . 9. P A R C E L A N D R E S I D E N C E L O C A T I N G D I M E N S I O N S ( W I T H A S T E R I S K , * ) A P P R O X I M A T E D P E R S K A G I T C O U N T Y i M A P . N O T T O B E U S E D F O R L E G A L P U R P O S E S . 10. S I T E F E A T U R E S A N D E X I S T I N G S T R U C T U R E S O N A D J A C E N T P A R C E L S N O T S H O W N F O R C L A R I T Y . 11. P I L E S S H A L L B E I N S T A L L E D T O A M I N I M U M E M B E D M E N T O F 5 ' - 0 ' ' ( U N O P E R G E O T E C H N I C A L R E P O R T ) . HE L I C A L P I L E R E F U S A L C R I T E R I A : T O R Q U I N G O F T H E P I L E S H A L L C O N T I N U E U N T I L A H Y D R A U L I C P R E S S U R E I S A C H I E V E D T O P R O V I D E T H E S P E C I F I E D M I N I M U M V E R T I C A L C A P A C I T Y W I T H A S A F E T Y F A C T O R O F N O L E S S T H A N T W O . AD V A N C E M E N T S H A L L B E H A L T E D I M M E D I A T E L Y I F T H E S T R U C T U R E B E G I N S T O E X P E R I E N C E U P L I F T FL E X U R E . 49 ' - 6 ' ' 49'-0'' 24 ' - 6 ' ' 28'-6'' 6'-0'' 9'- 0 ' ' 13'-666 18 ' - 0 ' ' 21'-6'' RO C K R I D G E P K W Y PRIMARY ACCESS DRIVEWAY ACCESS 71 ' - 0 " * PR O P E R T Y L I N E 116'-0" * PROPERTY LINE 120'-0" *PROPERTY LINE 66 ' - 0 " * PR O P E R T Y L I N E 1 2 3 4 5 6 7 8 910111213 14 15 4'- 0 ' ' 6'-0'' 12 ' - 0 ' ' 25'-6'' 4'-6'' RE S I D E N C E 39 0 9 R O C K R I D G E P A R K W A Y AN A C O R T E S , W A 9 8 2 2 1 PA R C E L N O . P1 2 7 6 7 2 LE G A L D E S C R I P T I O N LO T 2 , P L A T O F R O C K R I D G E S O U T H , PH A S E 3 , A S P E R P L A T R E C O R D E D ON J U N E 3 0 , 2 0 0 8 U N D E R A U D I T O R ' S FIL E N O . 2 0 0 8 0 6 3 0 0 1 8 5 , R E C O R D S O F SK A G I T C O U N T Y , W A S H I N G T O N . OW N E R N A M E & A D D R E S S BE N C S I K K A T I E BE N C S I K T A M A S 39 0 9 R O C K R I D G E P A R K W A Y AN A C O R T E S , W A 9 8 2 2 1 R& R L E V E L S U R V E Y Se e S t r u c t u r a l C a l c u l a t i o n P a c k a g e f o r A d d i t i o n a l R e q u i r e m e n t s 2 of 19 PROJECT SUBJECT BY DATE PROJECT NO.SHEET NO. L120 ENGINEERING & DESIGN Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as-built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl-space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post-base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast-in-place concrete stem wall and concrete strip footings. Below the footings, piles are to be spaced at a distance no larger than 6'-0" o.c. as indicated on the attached Level Survey. - End piles shall not exceed the maximum corner offset as specified on the attached Level Survey. - A maximum allowable loading of 1,640 plf was utilized in this analysis. This was determined through inspection of building geometry and conservative span/tributary loading assumptions based on standard construction practices - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement: Helical Pile #1-3 @ 6'-0" o.c. .......…… 9.0 kip minimum vertical capacity (allowable load) Helical Pile #4-8 @ 6'-0" o.c. .....…..… 8.0 kip minimum vertical capacity (allowable load) Helical Pile #9-15 @ 6'-0" o.c. .....…… 10.0 kip minimum vertical capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. - Structural recommendations contained in this package are based on site photographs dated February 9th, 2023, provided by R&R. To the knowledge of L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume adequate soil conditions to obtain the required pile capacities. Please inform L120 of site-specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings Refer to the following pages for pile and connection specifications. S230421-4XR Foundation Stabilization/Jacking JT 3909 Rockridge Parkway Anacortes WA 98221 06/29/2023 3 of 19 GENERAL NOTES HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER-APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2018 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER’S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 SEATTLE BUILDING CODE (SBC). THE MAXIMUM TEST LOAD SHALL BE TWO-HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 4 of 19 GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON-SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2018 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS.......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB-ON-GRADE...EXPOSED WEATHERING SURFACES......3,000 PSI AIR-ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG-TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. 5 of 19 PROJECT SUBJECT BY DATE PROJECT NO.SHEET NO. L120 ENGINEERING & DESIGN S230421-4XR Foundation Stabilization/Jacking JT 3909 Rockridge Parkway Anacortes WA 98221 06/29/2023 6 of 19 PROJECT SUBJECT BY DATE PROJECT NO.SHEET NO. L120 ENGINEERING & DESIGN S230421-4XR Foundation Stabilization/Jacking JT 3909 Rockridge Parkway Anacortes WA 98221 06/29/2023 7 of 19 SCOPE OF WORK Thursday, February 9, 2023 Crew will install 3" Helical Piles, as well as Bi-Directional Carbon Fiber, and lift home to maximum practical recovery. Crew will drive piles to a maximum 25’ after there will be a $20 a foot charge per pile. Crew will remove and replace concrete holes. Crew will drill 3/8" holes and inject Polyurethane Foam to lift and support slab. Crew will pump a maximum amount of 320lbs, after there will be a $7 charge per lb. Whomever represents home will need be onsite for crew arrival and or job completion. Homeowner to pay 25% deposit, then 25% 1 month before project starts, & 50% due upon job completion. Homeowner will be charged for permit after it is obtained. ELEVATION MAP NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of interior elements, exterior decks, and deck supporting elements are outside of L120's contract and scope and are not addressed in this package. - L120 L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed with a maximum pile spacing of 6'-0" o.c. per the attached SSK-01. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation provided that no two adjacent spans exceed the spacing limitation of 6'-0" o.c. UNO. 2. End piles are to be placed within 3'-0" from corner as specified below UNO. (4 ) P I L E S @ 6 ' - 0 " O C M A X (3 ) P I L E S @ 6 ' - 0 " O C M A X CENTER PILE BETWEEN CORNERS (5 ) P I L E S @ 6 ' - 0 " O C M A X LOCATE PILE WITHIN 1'-0" FROM OPENING/CORNER 8 of 19 Southwest interior wall, Pile 14 will be installed here. Crew will remove and replace concrete hole. Crew will drill 3/8" holes here and inject Polyurethane Foam to lift and support slab. Northeast interior wall, Piles 9-13 will be installed here. Crew will remove and replace concrete holes. Crew will drill 3/8" holes here and inject Polyurethane Foam to lift and support slab. Northeast side of home, Piles 1-8 will be installed here. Crew will install Bi-Directional Carbon Fiber on cracks. Thursday, February 9, 2023 JOB PHOTOS Crew will drill 3/8" holes here and inject Polyurethane Foam to lift and support slab. Pile 15 will be placed here left of door. Carpet will need to be removed and replaced by homeowner. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 9 of 19 PROJECT SUBJECT BY DATE PROJECT NO.SHEET NO. L120 ENGINEERING & DESIGN Installation Detail - Ideal Helical Pile SSK-01 (E) WOOD FRAMEDFLOOR SYSTEM,FIELD VERIFY T/FIN GRADE =VARIES T/CONC FTG =FIELD VERIFY (E) CONTINUOUSCONC FOOTING (E) CONC STEM WALL 2' - 2 " M I N H E I G H T , CO N T R A C T O R TO V E R I F Y (E) FTG TO BE CUT FLUSHWITH FACE OF STEM WALLWITH A 12" MAX WIDTH FORINSTALLATION POCKET IDEAL HELICAL PILE & REPAIRBRACKET ASSEMBLY PER R&R FOUNDATION SPECIALISTTO CONFORM TO ESR-3750 8" MIN THICKNESS, CONTRACTOR TO VERIFY T/STEM WALL =FIELD VERIFY NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATIONDIMENSIONS PRIOR TO INSTALLATION. ENGINEER-OF-RECORD TO BENOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET.2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY ACORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUTENDS AND DRILLED HOLES. CORROSION PREVENTION COATINGSYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATIONPER ASTM 153/A123.3. AT CUT INSTALLATION POCKET ALL EXPOSED STEELREINFORCEMENT SHALL BE SEALED OR COATED TO PREVENTCORROSION. NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER-OF-RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. 4. REFER TO GENERAL NOTES FOR GEOTECHNICAL PILE EMBEDMENT REQUIREMENTS. NOTE THAT THESE SHALL BE ACHIEVED PRIOR TO THE APPLICATION OF THE REFUSAL CRITERIA. 5. REFER TO GENERAL NOTES FOR PILE FIELD TESTING REQUIREMENTS. IDEAL HELICAL PILE & REPAIR BRACKET ASSEMBLY PERR&R FOUNDATION SPECIALISTTO CONFORM TO ESR-37502-7/8" SHAFT W/ 10" DIAMDOUBLE HELIX W/ 3 PITCH S230421-4XR JT 3909 Rockridge Parkway Anacortes WA 98221 06/29/2023 10 of 19 2 7/8" TRUFORCE BRKT T-BRKT GALV. FRONT 2 7/8 TRUFORCE BRKT BASE GALV. FRONT" 2 7/8" TRUFORCE BRKT BASE GALV. TOP 2 7/8" TRUFORCE BRKT T-BRKT GALV. TOP 1 1 2 2 3 3 4 4 A A B B 4/22/2020 4/23/2020 LRS CHECKED DRAWN AP IDEAL MANUFACTURING, INC. 999 PICTURE PARKWAY WEBSTER, NY 14580 800-789-4810 | WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 DWG NO 278TFG SIZE B REV 0 NOTES: 1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI. 2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS. 5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7). 6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194. 7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY. 8. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. TRUFORCE UNDERPINNING BRACKET FOR 2 7/8" PILE SHAFT 6 10 712 1 1/2 X 1 SLOT (TYP) 1 1/2 X 1 SLOT (TYP) 1238 14 18 712 11 of 19 EXTENSION (EX: 278203EXT[L]G) FLIGHTED EXTENSION SINGLE HELIX (SH) (EX: 278203FESH[L][Dï]X[T]G) FLIGHTED EXTENSION DOUBLE HELIX (DH) (EX: 278203FEDH[L][DïDð]X[T]G) SINGLE HELIX (SH) LEAD (EX: 278203SH[L][Dï]X[T]G) TRIPLE HELIX (TH) LEAD (EX: 278203TH[L][DïDðDñ]X[T]G) DOUBLE HELIX (DH) LEAD (EX: 278203DH[L][DïDð]X[T]G) QUAD HELIX (QH) LEAD (EX: 278203QH[L][DïDðDñDນ]X[T]G) BOLT HOLE DETAIL HELIX FORMED BY PRESS DIE TYPICAL PILE ASSEMBLY 1 1 2 2 3 3 4 4 A A B B 4/3/2020 4/7/2020 LRS CHECKED DRAWN AP IDEAL MANUFACTURING, INC. 999 PICTURE PARKWAY WEBSTER, NY 14580 800-789-4810 | WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 DWG NO 278203 SIZE B REV 0 NOTES: 1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI. 2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50. 3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE TAPERED TO IMPROVE INSTALLATION CAPABILITIES. 4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX. SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT. 5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX THICKNESS IS 3/8". 6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325 AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H). 9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. MAXIMUM TORQUE NOT TO EXCEED 8,300 FT-LBS. ULTIMATE CAPACITY IS 74.7 KIPS BASED ON A CAPACITY TO TORQUE RATIO OF kt = 9 FT-1 2 7/8" O.D. X 0.203" W.T. HELICAL LEADS & EXTENSIONS ICC-ES AC358 - REPORT #ESR-3750 IDEAL PART # ABREVIATIONS: 278 = SHAFT DIAMETER 203 = SHAFT WALL THICKNESS EXT = EXTENSION FE = FLIGHTED EXTENSION SH, DH, TH, QH = SINGLE, DOUBLE, TRIPLE, OR QUAD. HELIX [L] = SHAFT LENGTH IN FEET (EXAMPLE: 7' = 7) [D] = HELIX DIAMETER(S) IN INCHES (EXAMPLE: 10" = 10) X = X (SEPARATES HELIX DIAMETER(S) AND HELIX THICKNESS) [T] = HELIX THICKNESS (EXAMPLE: 3/8" = 38) G = GALVANIZED [L] Dï DïDð Dï Dï Dï Dð 578 (TYP) 2 4 3 PITCH (TYP) [T] P1516 278 O.D. X 0.203 W.T. EXTENSION SINGLE HELIX EXTENSION TRIPLE HELIX LEAD TIP CUT AT 45ƒ [L] DïDð DðDñ DñDນ COUPLING BOLTS & NUTS 12 of 19 PROJECT SUBJECT BY DATE PROJECT NO.SHEET NO. L120 ENGINEERING & DESIGN Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem-wall (grade-beam) at an on-center (o.c.) spacing no greater than 6’-0” o.c.. Maximum loading on grade beam determined based on building geometry, and through conservative assumptions regarding span lengths and support walls/foundation. Basically, all concrete walls assumed full tributary span of floor members and roof members. 6'-0" MAX Pile and connection requirements per Pile and connection requirements per 3'-11 5/16"26" (18" + 8")2'-2" (18" + 8") L/2 L/2 contractorcontractor 6'-0" MAX Design code: IBC 2018 Roof LL (snow ground): 25 psf Floor LL: 40 psf Patio/Deck LL: 60 psf Floor/Roof DL: 15 psf Wall DL: 12 psf Conc Wall DL: 150pcf x 240 in2 = 250 plf * see following pages for area calc Pile #1-3 Roof Trib = 0.5*20' = 10' Floor Trib = 0.5*20' = 10' Typical Flr Ht = 20' Pile #4-8 Roof Trib = 2' trib + 2' overhand = 4' Floor Trib = 0.5*20' = 10' Typical Flr Ht = 20' Pile #9-15 Roof Trib = 0.5*30' = 15' Floor Trib = 0.5*20' = 10' Typical Flr Ht = 20' Pile #1-3 Case 1: Point Load (6' Span) Pile Reaction = 1190 plf * 6' = 7.2 k Pile Reaction w/ SW = 1440 plf * 6' = 8.7 k Case 2: Uniform Load - DL = 12*20+15*(10+10) = 540 plf - LL = 40*10 = 400 plf - SL (snow) = 25*10 = 250 plf Total load = DL+LL+SL = 1190 plf Total load w/ SW = DL+LL+SL = 1440 plf Refer to attached calculations for analysis. Pile #4-8 Case 1: Point Load (6' Span) Pile Reaction = 950 plf * 6' = 5.7 k Pile Reaction w/ SW = 1200 plf * 6' = 7.2 k Case 2: Uniform Load - DL = 12*20+15*(4+10) = 450 plf - LL = 40*10 = 400 plf - SL (snow) = 25*4 = 100 plf Total load = DL+LL+SL = 950 plf Total load w/ SW = DL+LL+SL = 1200 plf Refer to attached calculations for analysis. Pile #9-15 Case 1: Point Load (6' Span) Pile Reaction = 1390 plf * 6' = 8.4 k Pile Reaction w/ SW = 1640 plf * 6' = 10.0 k Case 2: Uniform Load - DL = 12*20+15*(15+10) = 615 plf - LL = 40*10 = 400 plf - SL (snow) = 25*15 = 375 plf Total load = DL+LL+SL = 1390 plf Total load w/ SW = DL+LL+SL = 1640 plf Refer to attached calculations for analysis. S230421-4XR Foundation Stabilization/Jacking JT 3909 Rockridge Parkway Anacortes WA 98221 06/29/2023 13 of 19 Sheet Number: Date: 6/29/23 DEMAND CALCULATION number of stories #2 stories span L 6.0 ft [max on-center pile spacing] concrete area A 216 in2 *see attached concrete self weight SW 225 plf [Includes total height w/o ACI14 §14.5.1.7 redux] w DL DL 615 plf [2-story loading] w LL LL 400 plf [2-story loading] w LLr LLr 375 plf [2-story loading] **Assuming a single span between 2 piles - in reality continuous spans between piles will have reduced moments** moment from DL MDL 3,780 lb-ft 45.4 k-in moment from LL MLL 1,800 lb-ft 21.6 k-in moment from SL MLLr 1,688 lb-ft 20.3 k-in shear from DL VDL 2,520 lb 2.52 k shear from LL VLL 1,200 lb 1.20 k shear from SL VLLr 1,125 lb 1.13 k factored moment MLRFD 63.5 k-in 1.4DL MLRFD 99.1 k-in 1.2DL + 1.6LL + 0.5SL MLRFD 108.4 k-in 1.2DL + 1.6SL + LL controlling factored moment Mu 108.4 k-in factored shear VLRFD 3.5 k 1.4DL VLRFD 5.5 k 1.2DL + 1.6LL + 0.5SL VLRFD 6.0 k 1.2DL + 1.6SL + LL controlling factored shear Vu 6.0 k controlling factored bearing Bu 6.0 k STRENGTH CALCULATION concrete strength f'c 2.5 ksi assumed light wt concrete mod. factor λ 1 normal weight concrete flexure strength red. factor φflex 0.6 ACI 318-14 [Table 21.2.1] shear strength red. factor φshear 0.6 ACI 318-14 [Table 21.2.1] bearing strength red. factor φbearing 0.6 ACI 318-14 [Table 21.2.1] *Note that per ACI 318-14 Ch. 27.3.2 a phi factor of 0.8 can be used if dimensions and material properties are confirmed. moment of ineritia Ixx 11,016 in4 *see attached elastic section modulus Sm 1,001 in3 *see attached tens fiber to NA c 13.0 in *see attached nom flexure strength (T controls)Mn 250.3 k-in CONTROLS ACI 318-14 [Eq. 14.5.2.1a] nom flexure strength(C controls)Mn 2,127.1 k-in ACI 318-14 [Eq. 14.5.2.1b] RESIDENTIAL CONCRETE Mn 375.4 k-in X ACI 332-14 [Eq. 8.2.1.1] - not utilized flexure strength φMn 150.2 k-in > Mu OK D/C=72.22% nom shear strength Vn 14.4 k ACI14 [Table 14.5.5.1 (a)] shear strength φVn 8.6 k > Vu OK D/C=69.72% loaded bearing area A1 74 in2 [IDEAL 2-7/8" Tru-Force Underpinning Bracket] supporting surface bearing area A2 74 in2 [If the supporting surface is > than loaded area] nom bearing strength Bn 156.6 k ACI14 [Table 14.5.6.1 (c)] bearing strength φBn 94.0 k > Bu OK D/C=6.41% Additional Verification Calc: max concrete tensile strength fr 375 psi ACI 318-14 [Eq. 19.2.3.1] max beam tensile stress Ft 128 psi fr > Ft OK JT 26" Unreinforced Conc Beam S230421-4XR 3909 Rockridge Parkway Anacortes Engineer:Subject: Project Number: Plan Name: 𝑀𝑚=5𝜆𝑓′𝑐𝑆𝑚 𝑉𝑚=4 3𝜆𝑓′𝑐∗𝐴 𝑓𝑟=7.5𝜆𝑓′𝑐 𝐹𝑡=ൗ(𝑀∗𝑐)𝐼𝑤𝑤 𝑀𝑚=7.55𝜆𝑓′𝑐𝑆𝑚 𝑀𝑚𝑎𝑤=1 8𝑤𝐿2 𝐴𝑚𝑎𝑤=𝑉𝑚𝑎𝑤 𝑉𝑚𝑎𝑤=1 2𝑤𝐿 14 of 19 Sheet Number: Subject:Date: 6/29/23JT26" Unreinforced Conc Beam S230421-4XR 3909 Rockridge Parkway Anacortes Engineer: Project Number: Plan Name: 15 of 19 Appendix (425) 636 3313 L120Engineering.com Parcel Details Photographs 16 of 19 Owner Information BENCSIK KATIE BENCSIK TAMAS 3909 ROCKRIDGE PARKWAY ANACORTES, WA 98221 Site Address(es) . 3909 ROCK RIDGE PARKWAY Anacortes, WA (Jurisdiction, State) Zip Code Lookup | Site Address Information Map Links Open in iMap Assessor's Parcel Map: PDF | DWF | DWG *Assessment Use Code (111) HOUSEHOLD, SFR, INSIDE CITY WAC 458-53-030 Neighborhood (21AVIEW) ANACORTES VIEW RESIDENTIAL Levy Code 0900 Fire District School District SD103 Exemptions Utilities *SEW, PWR, WTR-P Acres 0.20 Improvement 1 Attributes Summary Building Style 1 STRY FIN BSMT Year Built 2015 Foundation HILLSIDE - MODERATE Above Grade Living Area 1,944 Square Feet Exterior Walls SIDING Finished Basement 1144 Square Feet Roof Covering COMP *Total Living Area 3,088 Square Feet Heat/Air Conditioning FORCED AIR Unfinished Basement Fireplace DIRECT VENT *Total Garage Area 576 Square Feet Bedrooms 3 Bathrooms 2 FULL BATHS, 1 3/4 BATH For additional information on individual segments see Improvements tab Details for Parcel: P127672 Jurisdiction:ANACORTES Zoning Designation:Please contact the city of ANACORTES for ANACORTES zoning information. Recorded Documents Excise Affidavits Documents scanned and recorded by the Auditor's office Document scans of excise affidavits Parcel Number XrefID Quarter Section Township Range P127672 4960-000-002-0000 NW 26 35 01 Current Legal Description Abbreviation Definitions (0.2000 ac) LOT 2, PLAT OF ROCK RIDGE SOUTH, PHASE 3, AS PER PLAT RECORDED ON JUNE 30, 2008 UNDER AUDITOR'S FILE NO. 200806300185, RECORDS OF SKAGIT COUNTY, WASHINGTON. 2022 Values for 2023 Taxes*Sale Information 2023 Property Tax Summary Building Market Value $681,300.00 Land Market Value +$216,300.00 Total Market Value $897,600.00 Assessed Value $897,600.00 Taxable Value $897,600.00 Deed Type WARRANTY DEED Sale Date 2021-09-14 Taxable Selling Price $975,000.00 2023 Taxable Value $897,600.00 General Taxes $6,650.25 Special Assessments/Fees +$5.00 Total Taxes $6,655.25 Pay Property Taxes Online * Effective date of value is January 1 of the assessment year (2022)Legal Description at time of Assessment * Assessment Use Code is for assessment administration purposes and has no relation to zoning or allowable land use. * Total living area includes above grade living area and finished basement area. * Garage square footage includes all garage areas; basement garages, attached garages, detached garages, etc. Assessment data for improvements is based on exterior inspections. Please contact the Assessor's office if the information does not accurately reflect the interior characteristics. 17 of 19 3909 Rockridge Parkway Anacortes WA 98221 Legend County Boundary City Names Road Labels Hydro Labels Regional Labels Copyright 2021 0 0.015 0.030.0075 mi 0 0.03 0.060.015 km 1:1,128 0 0.015 0.030.0075 mi Data Accuracy Warning:All GIS data was created from availablepublic records and existing map sources. Map features have beenadjusted to achieve a best-fit registration. While great care wastaken in this process, maps from different sources rarely agree as tothe precise location of geographic features. Map discrepancies canbe as great as 300 feet. 18 of 19 Property Images Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120 19 of 19