HomeMy WebLinkAboutPermit File BLD-2020-0387 5012 Channel View Lane (4)EXISTING RESIDENCE TO REMAIN THE SAME
DECK FRAMING DETAIL
NTS
r2�DECK FRAMING DETAIL
EXISTING 3/4" T&G SUBFLOOR
EXISTING 2X6 FRAME EXTERIOR WALL
EXISTING 11 7/8" FLOOR JOIST
NEW 3/4" T&G EXTERIOR DECK SHEATHING
EXIST. 6X6 DF POST —
POLYISO CUT TO SLOPE
EXISTING 2X12 RIM JOIST 2X10 BLOCKING UNDER
CONCRETE BALISTRADES
EXISTING CONCRETE COL
NEW 3/4" T&G EXTERIOR DECK SHEATHING
NEW 2X10 RIM JOIST
EXISTING CONCRETE
BALESTRADES
NEW 9.5"BCI DECK JOIST @16" O.C.
EXISTING 4X10 BEAMS (2) (2) FULL BEARING 9.5"
BCI DECK JOIST UNDER
CONCRETE BALISTRADES
EXISTING CONCRETE BALISTRADES
NEW 3/4" T&G EXTERIOR DECK
SHEATHING
NEW 2X10 9.5" BCI DECK JOIST
2X10 BLOCKING UNDER
CONCRETE BALISTRADES
NEW 2X10 RIM JOIST
EXISTING DOUBLE 2X6 TOP PLATE
EXISTING 2X6 EXTERIOR FRAME WALL
BELOW
2X10 BLOCKING UNDER
CONCRETE BALISTRADES
2X10 BLOCKING UNDER
CONCRETE COLUMNS
NEW 6X12 BASKET
DOWNSPOUT
EXISTING CONCRETE COLUMNS
EXISTING CONCRETE
COLUMNS TYP.
.�r 11 ,,� SIP►
EXISTING (2) 4X10 DF BEAM
NEW DECK SSEMBLY
POLYUREA WATE PROOF
MEMBRANE OVER3/4" T&G i ON
p _ EXTERIOR PLYW OVER.
POLYISO TAPPERED FOAM
z OVER 3/4" T&G EXTERIOR
LU PLYWD OVER 9.5" BCI DECK
JOIST 16" O.C.
1'7
9.5"BOI DECKIIJOIST 016" O
w
PROVIDE ICKE-
AROUND LUMN
CREATES PE
SCODe of Work:
c
m
0
0
X
"s OF ARW r&BE REPAIRE154py
R
9.5'$CI DECK JOIST @16" O.C.
WCk lY y2-491
PROVIDE CRICKET
AROUND COLUMN TO
EXISTING TA RW Y TO REMAIN CREATE SLOPE
A2.
Scope of work will require removal of existing
roof/deck joist and redirect direction of joist
layout to address water drainage issue
currently associated with existing layout,
structural post and beams will remain the
same without any disturbance, new 9.5 BCI
deck joist will replace existing 9.5 BCI deck
joist.
DECK FRAMING PLAN
1 /2"=1 '-U"
EXIST. 6X6 DF POST
CARRY POYLUREA
t:.
WATERPROOF MEMBRANE 12"
'
MIN. UP SIDE OF EXTERIOR
WALL
(2) FULL BEARING 9.5"
BCI DECK JOIST UNDER
CONCRETE BALISTRADES
A
n
NEW 6X12 BASKET
DOWNSPOUT
EXISTING CONCRETE COLUMNS
•
sue+
A 1
�' �
1 ti i �.
•
• �
t
�
• •
•
l
a�
3
LU
J
CN
<m
i
�U
N
4_0
�L
O
m
LO
Document Date:
J U LY, 2020
Document Phase:
Construction Documents
rev. date remark
1 00/00/20 plan revision X
NTS
The use of these plans and specifications is restricted to the original site for which they were prepared. Re -use, reproduction or publication by any method
in whole or in part is prohibited, unless authorized by Michael Trafton. Ownership of the design, plans and specifications is solely with Michael Trafton.