Loading...
HomeMy WebLinkAboutPermit File BLD-2020-0387 5012 Channel View Lane (3)EXISTING RESIDENCE TO REMAIN THE SAME DECK FRAMING DETAIL NTS r2�DECK FRAMING DETAIL EXISTING 3/4" T&G SUBFLOOR EXISTING 2X6 FRAME EXTERIOR WALL EXISTING 11 7/8" FLOOR JOIST NEW 3/4" T&G EXTERIOR DECK SHEATHING EXIST. 6X6 DF POST — POLYISO CUT TO SLOPE EXISTING 2X12 RIM JOIST 2X10 BLOCKING UNDER CONCRETE BALISTRADES EXISTING CONCRETE COL NEW 3/4" T&G EXTERIOR DECK SHEATHING NEW 2X10 RIM JOIST EXISTING CONCRETE BALESTRADES NEW 9.5"BCI DECK JOIST @16" O.C. EXISTING 4X10 BEAMS (2) (2) FULL BEARING 9.5" BCI DECK JOIST UNDER CONCRETE BALISTRADES EXISTING CONCRETE BALISTRADES NEW 3/4" T&G EXTERIOR DECK SHEATHING NEW 2X10 9.5" BCI DECK JOIST 2X10 BLOCKING UNDER CONCRETE BALISTRADES NEW 2X10 RIM JOIST EXISTING DOUBLE 2X6 TOP PLATE EXISTING 2X6 EXTERIOR FRAME WALL BELOW 2X10 BLOCKING UNDER CONCRETE BALISTRADES 2X10 BLOCKING UNDER CONCRETE COLUMNS NEW 6X12 BASKET DOWNSPOUT EXISTING CONCRETE COLUMNS EXISTING CONCRETE COLUMNS TYP. .�r 11 ,,� SIP► EXISTING (2) 4X10 DF BEAM NEW DECK SSEMBLY POLYUREA WATE PROOF MEMBRANE OVER3/4" T&G i ON p _ EXTERIOR PLYW OVER. POLYISO TAPPERED FOAM z OVER 3/4" T&G EXTERIOR LU PLYWD OVER 9.5" BCI DECK JOIST 16" O.C. 1'7 9.5"BOI DECKIIJOIST 016" O w PROVIDE ICKE- AROUND LUMN CREATES PE SCODe of Work: c m 0 0 X "s OF ARW r&BE REPAIRE154py R 9.5'$CI DECK JOIST @16" O.C. WCk lY y2-491 PROVIDE CRICKET AROUND COLUMN TO EXISTING TA RW Y TO REMAIN CREATE SLOPE A2. Scope of work will require removal of existing roof/deck joist and redirect direction of joist layout to address water drainage issue currently associated with existing layout, structural post and beams will remain the same without any disturbance, new 9.5 BCI deck joist will replace existing 9.5 BCI deck joist. DECK FRAMING PLAN 1 /2"=1 '-U" EXIST. 6X6 DF POST CARRY POYLUREA t:. WATERPROOF MEMBRANE 12" ' MIN. UP SIDE OF EXTERIOR WALL (2) FULL BEARING 9.5" BCI DECK JOIST UNDER CONCRETE BALISTRADES A n NEW 6X12 BASKET DOWNSPOUT EXISTING CONCRETE COLUMNS • sue+ A 1 �' � 1 ti i �. • • � t � • • • l a� 3 LU J CN <m i �U N 4_0 �L O m LO Document Date: J U LY, 2020 Document Phase: Construction Documents rev. date remark 1 00/00/20 plan revision X NTS The use of these plans and specifications is restricted to the original site for which they were prepared. Re -use, reproduction or publication by any method in whole or in part is prohibited, unless authorized by Michael Trafton. Ownership of the design, plans and specifications is solely with Michael Trafton.