December 20, 2021
Greg VanZandt
5301 Doon Way
Anacortes, WA 98221
Re: City of Anacortes Permit SDP-2021-0010 - Approved
Greg VanZandt - Applicant
Shoreline Substantial Development Permit (SDP) #2021-NWRO-5850
Dear Greg VanZandt:
On December 9, 2021, the Department of Ecology received notice that the City of Anacortes
approved your application for an SDP. Your permit is for the replacement of (3) existing joint
use docks, occurring at (3) locations within the skyline subdivision. Each of the proposed floats
would allow for 62% light permeability due to the FRP grated decking. The subject properties
are all located within the shoreline jurisdiction of Flounder Bay.
Location 1 (2003 & 2005 Cove PI) proposes the removal of (2) single use docks to be replaced
with (1) joint use dock; said dock will be a total of 336 sq. Ft and include: (2) 12" steel pilings, 8
ft. by 42 ft. float, and a new 4 ft. by 40 ft. grated gangway ramp.
Location 2 (2004 & 2006 Cove PI) proposes the removal of the existing 324 sq. Ft. joint use dock
to be replaced with a 299 sq. ft. joint use dock; said dock will include: (2) 12" steel pilings, 8 ft.
by 46 ft. float (the width will taper from 8 ft. to 5 ft.), and a new 4 ft. by 42 ft. Grated gangway
ramp.
Location 3 (5301 & 5303 Doon Way) proposes the removal of the existing 288 sq. ft. joint use
dock to be replaced with a 299 sq. ft. joint use dock; said dock will include: (2) 12" steel pilings,
8 ft. by 46 ft. float (the width will taper from 8 ft. to 5 ft.), and a new 4 ft. by 32 ft. grated
gangway ramp.
By law, local governments must review all SDPs for compliance with:
• The Shoreline Management Act (Chapter 90.58 RCW)
• Ecology's Substantial Development Permit approval criteria (Chapter 173-27-150 WAC)
• The City of Anacortes Local Shoreline Master Program.
Greg VanZandt
December 20, 2021
Page 2 of 2
Local governments, after reviewing SDPs for compliance, are required to submit them to
Ecology. Your approved SDP has been received by Ecology.
What Happens Next?
Before you begin activities authorized by this permit, the law requires you wait at least 21 days
from December 9, 2021, the "date of filing." This waiting period allows anyone (including you)
who disagrees with any aspect of this permit to appeal the decision to the state Shorelines
Hearings Board. You must wait for the conclusion of an appeal before you can begin the
activities authorized by this permit.
We recommend contacting the Shorelines Hearings Board at (360) 664-9160 before beginning
permit activities to ensure that no appeal has been filed. Information on appeals is also posted
at http://www.eluho.wa.gov/Decision/Search Cases. Select "Shorelines Hearings Board" from
the drop down menu labeled "Board" and enter "Search." The most current appeal will appear
on top.
If you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC) at
the Shorelines Hearings Board website above. They are also posted on the website of the
Washington State Legislature at: http://apps.leg.wa.gov/wac.
Other federal, state, and local permits may be required in addition to this shoreline permit.
If you have any questions about this letter, please contact Chris Luerkens at (360) 410-4807.
Sincerely,
"ic
Amber Johnson, Administrative Assistant 3
Shorelands and Environmental Assistance Program
ec: Emily Morgan City of Anacortes
Tyler Zimmerman, TZ Engineering
Chris Luerkens, Department of Ecology