Loading...
HomeMy WebLinkAboutPermit File BLD-2023-0107 1711 Quail Drive C3 _ City of Anacortes Invoice/Permit#: BLD-2023-0107 G � 904 6th Street Applied date: 02/21/2023 1 P.O.Box 547 Issue date: 02/21/2023 U� Anacortes, WA 98221-0547 Expire date: 08/19/2024 rra_ r (360) 293-1901 Job Address: 1711 QUAIL DR Permit Type: PV Solar Permit ANACORTES WA 98221-3500 Project: APN: P32307 Remarks: Install a 2-array rooftop solar system. Owner: MUNCE IAN S Contractor: BANNER ELECTRIC INC. DBA BANNER POWER S Address: 1711 QUAIL DR Address: 130 E HAZEL AVE ANACORTES WA 98221-3500 BURLINGTON WA 98233 Phone: Phone: (360)770-2185 License M General Information: Fees: Building Valuation 4000 Building Permit Fee 97.25 Plan Review Fee 63.21 State Building Code Fee Resi 6.50 Total Calculated: 166.96 Deposits/Receipts: 0.00 Total Due: 166.96 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation,guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read amined this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT 1 ED_15Y ,TY o City of Anacortes Photovoltaic System Permit Submittal Requirements Permit Required: A building permit is required for the installation or replacement of solar/photovoltaic (PV) systems, including roof top arrays, ground-mounted arrays and PV water heaters. An electrical permit is required from the State Department of Labor & Industries. Single family residence rooftop installations meeting the criteria in the attached checklist are eligible to obtain a building permit over-the-counter at the permit center in City Hall. CODES: International Residential Code (Current Edition) International Building Code (Current Edition) International Fire Code (Current Edition) National Electrical Code (Current Edition) FEES: Building Permits for installations are based on the material cost of the support system and labor for the installation. SUBMITTAL REQUIREMENTS FOR PV (OTHER THAN ONLINE OR OVER-THE-COUNTER PERMITS): 1) Permit Application Form A. 2) Site plan showing location of house and array/equipment on lot, with setback dimensions to property lines. 3) Roof plan showing the array. 4) Manufacturer specifications or the PV panels and mounting hardware. Include the weight of the equipment. 5) For rooftop systems not conforming to all of the criteria in the attached checklist, provide a roof framing plan and either: a) Structural calculations by a WA State Licensed Engineer or other competent person showing the adequacy of the existing roof structure to support the additional load, or b) Documentation showing that the roof structure was substantially overbuilt compared to prescriptive code requirements. 6) For ground mounted systems provide structural calculations by a WA state licensed engineer or other competent person showing how the structure meets wind design requirements for the structure and footings. Note that ground mounted equipment greater than 36 inches in height must adhere to minimum required property line setbacks of the applicable zoning district. NOTE: The purpose of this handout is to assist the public in complying with detailed permit submittal requirements. It is NOT a complete list of permit or code requirements and should NOT be used as a substitute for applicable laws and regulations. It is the responsibility of the owner/design professional to review the submittal for completeness and applicability to other codes. Only complete applications will be accepted by the City for review. To Be Completed By the Applicant Project Address: 1711 Quail Drive Anacortes,WA,98221 Project Applicant: Tanner Knoblich Applicant Email: Tk.bannerelectric@gmail.com Phone No.: (360)755-3030 Site Owner Name: Ian Munce PV System Description: Flush mounted rooftop PV system with no storage. Determine if your project is eligible for an over-the-counter Permit(Check Yes or No) Yes No 1. PV System is designed and proposed for a detached single-family house,duplex or [X ❑ townhome. 2. PV System is designed for rooftop of house in general compliance with applicable X ❑ codes. 3. Mounting system is engineered and designed for PV. 19 ❑ 4. Rooftop is made from light weight material such as shingles. ® ❑ 5. PV system will be permitted and pre-approved by Labor& Industries Electrical IN ❑ division. 6. To address uplift, panel are mounted no higher than 18"above the surface of the X ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. 7. Total deal load of panels,supports, mountings, race ways,and all other IN ❑ appurtenances weight no more than one of the following. IF Yes, indicate which: w No more than three and one half(3.5 pounds per square foot(PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5) PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0) PSF 8. Supports for solar panels are installed to spread the dead load across as many IN ❑ roof-framing members as needed to ensure that no point loads in excess of fifty (50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. ❑ 10. Panels are mounted no higher than the roof ridge or apex of roof(applies only to ® ❑ pitched roofs). Comments- ® By Checking this box, I certify that all of the information provided on this form is correct. If you answered yes to all of the above questions,your PV installation is eligible for an over-the-counter building permit. To apply please bring in this completed form to our permit center at City Hall for an over-the-counter permit. To be Completed By Staff Project is eligible for over-the-counter permit? ❑Yes ❑ No _ '*_ �: - , ,. i � _ �' ❑ - . ~ �7 �. `� h• . `! ;.M' C / - ��. -------------- 5 - - -- - klOtORCODECO r �•w� G1T Y O� C�2 -_ _ - - _--- _-_- - - _--- __ _--- -- _- -- --__ _ �To FlhLD iNSe� �Q,�Ott CODE c0490 ���✓��4 C O �r0 FIELD 1NSe� ® a ® a m ® � o 0 QC D6sm nn" A ' 6 i3/16« �Q,�Og CODE COCA Wes' 1� y M �TO FIELD�NSQ �OtQR CODE CO,�A O R,S4��o� PTO FI ELD 1N54� Munce(#1114498) AOkIRONRIDGE pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545 Project Details Name Munce Date 02/16/2023 Location 1711 Quail Drive,Anacortes,WA 98221 Total modules 27 Module Silfab: SIL-370HC (35mm) Total watts 9,990 Dimensions Dimensions: 69.37"x 40.83" x 1.38" (1762.Omm x 1037.Omm x 35.Omm) Attachments 52 ASCE 7-10 Rails per row 2 System Weight Load Assumptions Total system weight 1,332.6 Ibs Wind exposure B Weight/attachment 25.6 Ibs Wind speed 110 mph Racking weight 171.9 Ibs Ground snow load 15 psf Distributed weight 2.5 psf Attachment spacing portrait 4.0' Roof Information Roof Material Family Comp Shingle Roof material Comp Shingle Building height loft Roof attachment None Staggered attachments No Roof slope 26 ° Attachment hardware Square Risk category II Span Details XR100 - Portrait Reaction Forces XR100 - Portrait Zone Down Uplift Lateral Zone Max span Max cantilever (Ibs) (Ibs) (Ibs) 1 8' 4" 3' 1 188 94 62 2 8' 4" 3' 2 188 195 62 3 7' 11" 3' 3 188 310 62 Last updated by Guy Knoblich on 02/16/23 07:33 AM Page 1 of 5 Munce(#1114498) AOkIRONRIDGE pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545 Roof Section 1 Details Weights Panels: 27 Provided rail: 224' [8 x 84", 12 x 168"] Total weight: 1,332.6 Ibs Rail orientation: East-West Attachments: 52 Weight/attachment: 25.6 Ibs Panel orientation: Portrait Splices: 10 Total Area: 540.9 sq ft Entry type: Graphical Clamps: 64 Distributed weight: 2.5 psf Diagram Segments Identifier Columns Row length Rail length Cantilever Rail Attachments Splices Clamps A 5 17'4" 17' 4" 8" 42' [2 x 84", 2 x 168"] 10 2 12 Row segment totals (x 3) - 126' [6 x 84", 6 x 168"] 30 6 36 B 9 31' 31' 1' 6" 70' [2 x 84", 4 x 168"] 16 4 20 C 3 10- 5" 10- 5" 1' 3" 28' [2 x 168"] 6 0 8 Last updated by Guy Knoblich on 02/16/23 07:33 AM Page 2 of 5 Munce(#1114498) A0kIRONRIDGE pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545 Splice Details TOP-FACING SLOT XR100 RAIL INTERNAL SPLICE r BONDING SPRING XR100 INTERNAL SPLIC SIDE-FACING SLOT Splice Connection XR100 Clamp Detail PV MODULE UNIVERSAL RAIL STOPPER FRAME FASTENING 1„ 1„ SLEEVE OBJECT PV MODULE UNIVERSAL ------- - - ----- UNIVERSAL FRAME FASTENING ______ FASTENING PV MODULE OBJECT -_____- OBJECT FRAME UNIVERSAL FASTENING OBJECT r RAI L RAIL STOPPER PV MODULE SLEEVE FRAME Mid Clamp, Plan Mid Clamp, Front End Clamp, Plan End Clamp, Front Last updated by Guy Knoblich on 02/16/23 07:33 AM Page 3 of 5 Munce(#1114498) A0kIRONRIDGE pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545 Grounding Diagram - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - T 04- - - - - - - - - - - - - - OUFO Clamp • Grounding Lug Fault Current Ground Path Min 10 AWG Copper Wire Bonded Splice (Rail Connection) *Grounding Lugs and Wire are not required in systems using Enphase microinverters. Last updated by Guy Knoblich on 02/16/23 07:33 AM Page 4 of 5 Munce(#1114498) AOkIRONRIDGE pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545 Bill of Materials Part Spares Total Qty Rails & Splices XR-100-168B XR100,Rail 168"(14 Feet)Black 0 16 *4 x 168"rail to be cut on-site into 84"sections. XR100-BOSS-01-M1 0 10 Bonded Splice,XR100 Clamps & Grounding UFO-CL-01-B1 0 64 Universal Module Clamp,Black UFO-STP-35MM-B1 0 20 Stopper Sleeve,35MM,Black XR-LUG-03-Al 0 5 Grounding Lug,Low Profile Attachments BHW-SQ-02-Al 0 52 Square-Bolt Bonding Hardware Last updated by Guy Knoblich on 02/16/23 07:33 AM Page 5 of 5 SILFAB PRIME SILFAB ' SOLAR° SIL-370 HC •� RELIABLE ENERGY. DIRECT FROM THE SOURCE . Introducing Silfab Prime. Designed to outperform. Dependable, durable, high-performance solar panels engineered for North American homeowners. SILFABSOLAR.COM C E ETA�s ETA E° i EC � % Fraunhofer C:I-I u B B° Intertek Intertek • ISE *Chubb provides error and omission insurance to Silfab Solar Inc. ELECTRICAL SPECIFICATIONS Test Conditions STC NOCT Module Power(Pmax) Wp 370 276 Maximum powervoltage(Vpmax) V 34.95 32.48 Maximum powercurrent(Ipmax) A 10.60 8.50 Open circuit voltage(Voc) V 41.75 39.16 Short circuit current(Isc) A 11.25 9.07 Module efficiency % 20.2% 18.9% Maximum system voltage(VDC) V 1000 Series fuse rating A 20 Power Tolerance Wp 0 to+10 Measurement conditions:STC 1000 W/m'•AM 1.5•Temperature 25°C•NOCT 800 W/m'•AM 1.5•Measurement uncertainty<_3% Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by 0 to+10W. MECHANICAL PROPERTIES/COMPONENTS METRIC Module weight 19.5kg±0.2kg 43lbs±0.4lbs Dimensions(H x L x D) 1762 mm x 1037 mm x 35 mm 69.4 in x 40.8 in x 1.37in Maximum surface load(wind/snow)* 5400 Pa rear load/5400 Pa front load 112.8 Ib/ft2 rear load/112.8 Ib/ft2 front load Hail impact resistance o 25 mm at 83 km/h o 1 in at 51.6 mph Cells 120 Half cells-Si mono PERC 120 Half cells-Si mono PERC 9 busbar-83 x 166 mm 9 busbar-3.26 x 6.53 in Glass 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, DSM antireflective coating DSM antireflective coating Cables and connectors(refer to installation manual) 1350 mm,o 5.7 mm,MC4 from Staubli 53.15 in,o 0.22 in(12AWG),MC4 from Staubli Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet Frame Anodized Aluminum(Black) Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box UL 3730 Certified,IEC 62790 Certified,IP68 rated TEMPERATURE RATINGS WARRANTIES EW Temperature Coefficientlsc +0.064%/°C Module product workmanship warranty 25 years** Temperature Coefficient Voc 0.28%/°C Linear power performance guarantee 30years Temperature Coefficient Pmax -0.36%/°C >_97.1%end 1st yr NOCT(±2°C) 45°C >_91.6%end 12th yr >_85.1%end 25th yr Operating temperature -40/+85°C >_82.6%end 30thyr CERTIFICATIONS SHIPPING SPECS ULC ORD C1703,UL1703,CEC listed,UL 61215-1/-2,UL 61730-1/-2,IEC 61215-1/-2.IEC Modules Per Pallet: 26 or 26(California) Product 61730-1/-2,CSA C22.2#61730-1/-2,IEC 62716 Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed,ILL Fire Rating:Type 2 Pallets Per Truck 34or32(California) Factory 150900 1:2015 Modules Per Truck 884 or 832(California) A Warning.Read the Safety and Installation Manual for mounting specifications and before handling,installing and operating modules. 12 year extendable to 25 years subject to registration and conditions outlined under"Warranty"at si lfabsolar.com PAN files generated from 3rd party performance data are available for download at:silfabso[ar.com/downloads 69.4"[1762mm] E "v E 14"[356mm] 41.3"[1050mm] 14"[356mm] ounting Hole(x4) SILFAB SOLAR INC. Uf 0.5" 800 Cornwall Ave [12mm] Bellingham WA98225 USA T+1360.569.4733 cD info@silfabsolar.com SILFABSOLAR.COM E E rE E 1770 Port Drive ih 1.4"[35mm] E _ E n C o 0) Mo Burlington WA 98233 USA ih T+1360.569.4733 N 0i cc) c) 0 240 Courtneypark Drive East c _ Mississauga ON L5T 2Y3 Canada 3 0.06" 53.15" N T+1 905.255.2501 ��[1.5mm] [1350mm] Q c F+1905.696.0267 Cable Length 1- o .U Silfab-SIL-370-HC-20220701 O No reproduction of any kind is allowed without rainage Hole(x8) O 0 permission.Data and information issubjectto modifications without notice.©Silfab Solar Inc., 2022.Silfab Solar®is a registered trademark of �2.4"[60mm][60mm] o 8"[200mm] SilfabSolarinc. ENPAll- c�E PH SE ...............t.- IQ8 Series Microinverters Easy to install Our newest I108 Microinverters are the industry's first microgrid-forming,software- Lightweight and compact with defined microinverters with split-phase power conversion capability to convert DC plug-n-play connectors power to AC power efficiently.The brain of the semiconductor-based microinverter power Line Communication is our proprietary application-specific integrated circuit(ASIC)which enables the (PLC)between components microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times Faster installation with simple to changing loads and grid events,alleviating constraints on battery sizing for home two-wire cabling energy systems. High productivity and reliability Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated Part of the Enphase Energy System,I08 Series IQ8 Series Microinverters redefine reliability enclosure Microinverters integrate with the Enphase IQ Battery, standards with more than one million cumulative Optimized for the latest high- Enphase IQ Gateway,and the Enphase App monitoring hours of power-on testing,enabling an industry- powered PV modules and analysis software. leading limited warranty of up to 25 years. Microgrid-forming • Complies with the latest advanced grid support** 6W=:C CERTIFIED Remote automatic updates for L_ SAFETY -A the latest grid requirements Connect PV modules quickly and easily to IQ8 Series I08 Series Microinverters are UL Listed as Configurable to support a wide Microinverters using the included Q-DCC-2 adapter PV Rapid Shut Down Equipment and conform with cable with plug-n-play MC4 connectors. various regulations,when installed according to range of grid profiles manufacturer's instructions. Meets CA Rule 21(UL 1741-SA) requirements ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters,and other *Only when installed with IQ System Controller 2,meets names are trademarks of Enphase Energy,Inc.Data subject to change. UL 1741.IQ811-208V operates only in grid-tied mode. **IQ8 Series Microinverters supports split phase,240V. I08SE-DS-0001-01-EN-US-2022-03-17 IQ8H-208 supports split phase,208V only. IQ8 Series Microinverters INPUT DATA IDCI ,: .1 , ,: , ,: 1 , 1: Commonly used module pairings' W 235-350 235-440 260-460 295-500 320-540+ 295-500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 33-45 36-45 38-45 38-45 Operating range v 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC current'[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT 1' Q .1 ,: 1: 1:' ,: 1 ,: 1: Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal(L-L)voltage/range4 V 240/211-264 208/183-250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50-68 AC short circuit fault current over 2 4.4 3 cycles Arms Max units per 20 A(L-L)branch circuits 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency % 97 97 97 97.5 97 97 Night-time power consumption mw 60 MECHANICAL DATA Ambient temperature range -400C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type MC4 Dimensions(HxWxD) 212 mm MY)x 175 mm(6.9")x 30.2 mm(1.2") Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor 1 CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)The I08H-208 variant will be operating in grid-tied mode only at 208V AC.(2)No enforced DC/AC ratio.See the compatibility calculator at https://Iink.enphase.com/module-compatibility(3)Maximum continuous input DC current is 10.6A(4)Nominal voltage range can be extended beyond nominal if required by the utility.(5) Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8SE-DS-0001-01-EN-US-2022-03-17 IRONRIDGE XR100 Rail See Des Lion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 in .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-axis) 0.390 in Moment of Inertia (Y-axis) 0.085 in T9- Torsional Constant 0.214 in Polar Moment of Inertia 0.126 in 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 1.25 Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 7.50 lbs. XR-100-168A XR-100-168B XR100, Rail 168"(14 Feet) Alum-Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204"(17 Feet) Aluminum 11.60 lbs. v1.1 SUNM*09h:7 We've Got Your Rack! 1. Nano Mount 1.97 (Rafter) [s0.01 0 1 0.31 [11 [7.8] _ I EF © �M T � �n 04.00 —� Material:Aluminum [0101.6] Finish: Black Powder Coati I — ------------------------------------ I I I 2. o.za [6.0] I I 3.66 —— [093.0] Material: USWR Silicone Foam Gasket with Adhesive ------------------------------------ 3. Hex Lag Bolt M8X115, DIN 571,304SS .. i.3� n15.01 •of 18ia3z81 I Part Description: Nano Rafter Mount, Black Part No.: K50044-BK1 05 It3.% u Material:Jtalnless Jteel Finish:Clear Item Description Qty in No. Kit 4. Sealing Washer.331D X.75X.157 1 Nano Rafter Mount Assembly • Nano Rafter Mount • Nano Gasket ` qo.73 119.0 + 119.0] ] 2 Lat Bolt Assembly • Hex Lag Bolt M8X115, DIN 571, 304S • Sealing Washer.33 ID X.75 X.157 �`� ; 00.33 I8.51 Material: EPDM+ Stainless Steel D10213-VO01 Dimensions shown are inches(and millimeters) Details are subjed to change without notice SUNMIOONX We've Got Your Rack! 1. Nano Mount 1.97 (Decking) [s0.0] 0 1 0.31 [11 [7.8] _ I AIM oC .� 04.00 Material:Aluminum [0101.6] Finish: Black Powder Coati ------------------------------------ [ [ [ 2. 024 1 � ¢3.66 [093.0] Material: USWR Silicone Foam Gasket with Adhesive ------------------------------------ 3. Self-Drilling Screw,#6.3 X 76 3.00 [76.3[ Part Description: Nano Deck Mount, Black Part No.: K50044-BK2 !N.3 Material:Stainless Steel Finish:Clear Item Description Qty in No. Kit 4. Sealing Washer.261D X.50X.125 1 Nano Deck Mount Assembly • Nano Deck Mount00.2 • Nano Gasket i �' R] I I � � 00.59 1 00.63 [75.01 [16.01 [ + [ 2 Decking Screw Assembly 4 • Self-Drilling Screw, #6.3 X 76 • Sealing Washer.261D X.50X.125 D10214-VO01 Dimensions shown are inches(and millimeters) Details are subject to change without notice