Loading...
HomeMy WebLinkAboutPermit File BLD-2023-0075 1308 34th Street 1 C} City of Anacortes Invoice/Permit M BLD-2023-0075 904 6th Street Applied date: 02/07/2023 P.O.Box 547 Issue date: 02/08/2023 _, Anacortes, WA 98221-0547 Expire date: 08/06/2024 (360) 293-1901 Job Address: 1308 34TH ST Permit Type: Single Family Interior Only Alteration Permit ANACORTES WA98221-3321 Project: APN: P112696 Remarks: Interior remodel to demo existing stairs to upper level and relocate them. Owner: HILL SARAH Contractor: BIGFOOT BUILDERS LLC Address: 1308 34TH ST Address: 5882 BOW ST ANACORTES WA 98221-3321 BOW WA 98232 Phone: Phone: (360)298-1708 License M General Information: Fees: Building Valuation 40000 Building Permit Fee 543.25 Plan Review Fee 353.11 State Building Code Fee Resi 6.50 Total Calculated: 902.86 Deposits/Receipts: 0.00 Total Due: 902.86 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY Ojd design HILL REMODEL JIM DUNLAP (360) 982-0535 JIM@JDDESIGNDRAFTING.COM 1308 34th STREET ANACORTES, WASHINGTON PARCEL ID# P1 12696 PROJECT DESCRIPTION: INTERIOR REMODEL FOR EXISTING TWO-STORY FAMILY ROOM SINGLE-FAMILY RESIDENCE. REMODEL TO INCLUDE RELOCATING THE STAIRCASE. ZONING DESIGNATION: R3 PROPERTY INFO. SITE ADDRESS: 1308 34TH STREET ANACORTES, WA 98221 J PARCEL: P112(o96 ASSESSORS TAX#: 3192-004-005-0000 W QTR: NE, SEC: 25, TWN: 35, RNG: 01 KITCHEN CITY OF ANACORTES PARCEL SIZE: XX S.F. 0 w PROPERTY OWNER: PLANNING AND BUILDING DEPT: SARAN HILL w U) 1305 34TH STREET APPROVED PLANS ANACORTES, WA 98221 O I__ 0 REVIEWED FOR CODE COMPLIANCE u ui PERMIT#: BLD-2023-0075uj co co z MOVE OPENING OVER ADDRESS: 1308 34TH ST 0 � U) ol TO ACCOMMODATE N STAIRCASE APPROVED BY: L N � SUBJECT TO FIELD INSPECTION.APPROVED PL S SHALL NOT zEL LL PROJECT INFO. BE ALTERED WITHOUT AL THORIZA ON. J 0 U Q 0 W Lu Of EXISTING _ z a ABOVE GRADE LIVING SPACE 3422 S.F. __---_---- GARAGE 624 S.F. 4-9 III � II MOVE WASHER DRYER JI' DEMO NOTE: SQUARE FOOTAGE WILL NOT CHANGE. PROJECT IS UNDER STAIRS 1' INTERIOR REMODEL ONLY AND WILL NOT Cs0 BEYOND CURRENT BUILDING FOOTPRINT. LAUNDRY 1' BEARING WALL FOR STRINGERS BEAM Q LIVING ROOM BUILDING CODES s W cq BUILDING ; STRUCTURAL 2018 IRC 3 0 MECHANICAL 2018 IRC a PLUMBING 2015 UPC BATH I ENERGY VENTILATION 2015 WSEG =-J C-,1 \r' ALIGN POSTS I_ DEMO II c, + I . ENTRY Z I I I I I I I I I I I I I II a Fes________ ___J I I I I I I r I I I I 4/-eii I I I I I I I I I I I I I I I I I I I I I a I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ADD (2)4'-0` V OPENINGS I I I I I I I I I I I uj II II FLOOR PLAN LEGEND Q 0 MUD ROOM EXISTING STAIRCASE a 0 TO BE REMOVED J EXIST. STUD WALL LL >3oNus W 0 NEW STUD WALL z E EE u > OLD/REMOVED WALL OR OTHER NLu 0 FLOOR PLAN ELEMENT o Q D RAW I N G INDEX ® NEW POST 0 Al COVER PAGE PROPOSED MAIN FLOOR PLAN DRAWN BY JAD A2 PROPOSED UPPER FLOOR PLAN � FOUNDATION SCALE 1/4" = II-0" UNO JD JOB# 1377RE22-HILL MAIN FLOOR FRAMING PLAN DATE 11/08/2022 A3 UPPER FLOOR FRAMING PLAN ; DETAILS PROPOSED MAIN FLOOR PLAN REVISIONS A4 EXISTING MAIN ; UPPER FLOOR PLANS NORTH SCALE: 1/4" = 1'-0" SI STRUCTURAL PLANS 52 STANDARD STRUCTURAL SPECIFICATIONS Al SHEET I OF 4 r jd design JIM DUNLAP (360) 982-0535 JIM@JDDESIGNDRAFTING.COM J ` � I � I lob ° I I I 1 I I BATH 2 l a 1 OFFICE I I I I \ \ (FLOOR JOISTS NOT J \ DEPICTED IN THIS SECTION) / \ 1 / 1 1 ell — 1 a a - - - - - - - - - - - 1 , L I I \ \ I I � 1 CLOSET (POSTS/F Gs OOTINS NOT 1 EPIZTE°rN THIS sECTI°N� / ° J BEDROOM 1 J // Lu a x MOVE EXIST. O w N EXISTING STEM WALLS DOOR OVER J w 1 11 1 1 1 FOOTINGS (SIZES ASSUMED) w p0 2 z 1 cA 1-- O Lu ui REMOVE DOOR H w p = ,p 1 Q 1 ' < o 1 11 1 1 EXISTING BLOCK WALL 1 1 1 Lu � N ^ - - - — - - - - J ° L - - - - - - - - - - EXPANDHALLWAY z wcn w .. L — — — - - - - - - - - - ADDCLOSEt oI— # w J aow 1 1 T wa J I1 _kE)� � L - - — — - - - - - - - - - - - - - - - - - - 1 O i ~ z � I I X XISTING PENIN IN EXISTING 4 X 4 POSTS ON J l " ILJ X I 5LOGK WALL 12" X 12" PIER BLOCKS TYP. L s 1 HLVS. TPERI L2x \ o 1--- - 1 1 ENCsIr(IEERIt(1Cs w 2d 1 \ 1 z —————— — ————— NEW POS SPA S �• �015t5 I 5T5 XI5?. \ ADD MATCHING WINDOW 04 II II II 1 Narrow point of i o m ST. 2 6 J I I II II II II II II w I I r -1 F -1 (E)4 ro r--1 r r- I U ao winder tread to be — — I � — — — GU DRAIL I L t-i L J L J L J II L J 11 1 1 not less than 6° I �/ II al 11 a1 II al J 1 jtt I BEDROOM 2 HMV 4'-0' 4'-0' 4'-0' 61 I-6 I/4" I I - J EXISTING WINDOW 1 ME SUREMENTS ARE ALL+/- r -� r — / III--------- HLVS. Z 1/ --------- 14' 2 1/4' (+/-) L - ro'-II /4" L Jt -------,� 3"-5„ 1 1 -6 , II II NEW �'OStS/ DS PE ENCsIt�EERINCs 1 1 1 I INEW t osT/ AD R + 1 1 1 ---------- EN cv CxINEE I Cx ,'-, O 1 L11 ---------- II ATTIC ACCESS RELOCATED � � �� � � m - 4 - 4 - k � � I � � (E)6 X 8 — — — TO THIS SPADE STORAGE I I �� �---------- ——L O �IE�Ir - - - - - j ----f,--- ! -S, J / LL — � I � — } f _ EXISTING BLOCK WALL z I 11 I e'-0'(I ' s vG� LOW STAGE I I 1 r II ,II ,,II � � _ N W I I .. EXISTING ro X ro POSTS ON J EXISTING BLOCK WALL GONG. PADS (Iro" X Iro" ASSUMED) I - loz I I ° I (FLOOR JOISTS NOT IaI FLOOR PLAN LEGEND j3 O a DEPICTED IN THIS SECTION) G BEDROOM 3 U�I5T5 2 O. ui exi T. 06�- x 6 1 I I I I I I I I 1 1 II EXIST. STUD WALL O N � aLOUNGE 1 I a I I I z O o z J NEW STUD WALL 11 11 11 II II 11 u a z CIO `\ `\ OLD/REMOVED WALL OR OTHER p O Q \ - - - - - - - - - - J - - - - � L - - - \ FLOOR PLAN ELEMENT w O - - - - - _ — � L - - - - - - - - _ — ° — _ _ —_ - - - - j FOUNDATION & FLOOR o NEW POST 0 a LL LL FRAMING LEGEND DRAWN BY JAD EXISTING FOUNDATION STEM WALL SCALE 1/4" = I'-0" UNO FOUNDATION & MAIN JD JOB# 1377RE22-HILL EXISTING FOUNDATION BLOCK WALL DATE 11/08/2022 FLOOR FRAMING PLAN EXISTING FOUNDATION FOOTING PROPOSED UPPER FLOOR PLAN REVISIONS NORTH SCALE: I/4" = I'-0" NORTH SCALE: 1/4" = I'-0" NEW BEAM/GIRDER EXISTING BEAM/GIRDER EXISTING FLOOR JOIST OUTLINE OF WALLS OF SUPPORTED FLOOR ® NEW POST ® EXISTING POST A2 SHEET 2 OF 4 Ojd design JIM DUNLAP (360) 982-0535 STAIR NOTES GUARDRAIL NOTES JIM@JDDESIGNDRAFTING.COM • STAIRS TO BE FRAMED WITH MIN. (3)2 X 12 • ALL UNENCLOSED FLOORS, LANDINGS, BALCONIES OR STRINGERS, ONE AT EACH SIDE AND ONE AT CENTER. PORCHES THAT ARE MORE THAN 30 ABOVE PROVIDE FIRE BLOCKING BETWEEN STRINGERS AT GRADE OR FLOOR BELOW SHALL BE PROTECTED BY TOP, MIDDLE AND BOTTOM, AND BETWEEN STUDS A GUARDRAIL THAT IS MIN. HEIGHT OF 3fo". ALONG THE RUN OF THE STAIRS. • OPEN GUARDRAILS SHALL HAVE INTERMEDIATE RAILS • MINIMUM HEADROOM CLEARANCE TO BE 6"-5" SUCH THAT A 4° DIA. SPHERE CANNOT PASS VERTICALLY ABOVE TREAD NOSING TO NEAREST THROUGH AT ANY POINT. OBJECT ABOVE. • GUARDRAILS SHALL BE ATTACHED TO THE • STAIRS TO HAVE MAX. RISE OF 1-3/4" AND MIN. RUN STRUCTURE IN SUCH A MANNER TO WITHSTAND A OF 10" WITH NOSING OF 3/4" TO 1-1/4". NO RISER TO SINGLE CONCENTRATED LOAD OF 200 LBS. APPLIED BE LESS THAN 4". DIMENSIONS BETWEEN RISE AND IN ANY DIRECTION AT ANY POINT ALONG THE TOP. RUN ARE NOT TO VARY MORE THAN 3/5". ENCLOSED USABLE SPACE UNDER STAIRS TO BE I I 1-HR. FIRE-RESISTIVE GONST. 5/5" TYPE "X GWB. I I HANDRAIL NOTES • HANDRAILS SHALL BE PROVIDED ON NOT LESS THAN (FLOOR JOISTS NOT ONE SIDE OF EACH CONTINUOUS RUN OF TREADS OR FLIGHT WITH (4)OR MORE RISERS. I DEPICTED IN THIS SECTION) • HANDRAIL HEIGHT, MEASURED VERTICALLY FROM THE SLOPED PLANE ADJOINING THE TREAD NOSING SHALL BE NOT LESS THAN 34" AND NOT MORE THAN 35". • HANDRAILS FOR STAIRWAYS SHALL BE CONTINUOUS FOR THE FULL LENGTH OF THE FLIGHT, FROM A POINT DIRECTLY ABOVE THE TOP OF THE RISER OF THE FLIGHT TO A POINT DIRECTLY ABOVE THE LOWEST RISER OF THE FLIGHT. • HANDRAILS SHALL BE OF THE REQUIRED GRIP-SIZE PER R311.1.8.3. I � I I J W EXISTING 2 X 10 FLOOR JOISTS @ 16 O.G. 0 w PLYWOOD HANGERBOARD J FASTENED TO CARRIAGES w cn TO HEADER o = z (FLOOR JOISTS NOT z O DEPICTED IN THIS SECTION) I ui co FIRE BLOCKING o = ol I FILL IN WITH NEW FLOOR JOISTS TO FILL _O r_n n o IN STAIRWELL HOLE: 2 X 10 JOISTS (TO � Q w NON MATCH EXISTING)(a 12 O.G. z J w � LL BRG WALL ~ # HDR BRG W L w Q 0 w 1/2" GWB TYP. - w Q O J Itz < CL cn Q CL BEARING WALL m (3)2 X 12 STRINGERS lt. 5/5" TYPE °X" GYP. BOARD ON I II p ALL SURFACES OF USABLE HANG EXISTING FLOOR Z SPACE UNDER STAIRS JOISTS FROM NEW BEAM U = i I 10 O1ST @ 16 2 1 STAIRS @ LANDING )_sc ALE: 3 �ELD P _ p I I I I I I I I I I I I it BRG WALL HEL DOW T / u CD STAIR NOSINGN11/4"'PER IRG R311. TOP OF HANDRAIL FLOOR FRAMING- LEGEND Q Q wI I I I I I II - NEW GIRDER/BEAM OW O.G. EXTEND TO TOP EXIST 2 X 10 JOISTS _ J Q BOTTOM RISER I — EXISTING GIRDER/BEAMLIM RETURN TO WALL s I I I I I NEW FLOOR JOIST z Q I I EXISTING FLOOR JOIST Z O 5/5' TYPE "X` GYP. BOARD Q OUTLINE OF WALLS BENEATH W Z ON ALL SURFACES OF USABLE 10' MIN. SPACE UNDER STAIRS 70, I I I I I I ® NEW POST af U N am Lu C3)2 X 12 STRINGERS EXISTING 2 X 10 JOISTS u JOIST OR BEAM HANGER w a It X @ 16° O.G. FIREBLOGKING AT TOP L F - - IL AND BOTTOM ACROSS STRINGER B/W STUDS 2X THRUST BLOCK FILL IN WITH NEW FLOOR JOISTS TO FILL IN STAIRWELL HOLE: 2 X 10 JOISTS (TO 1777- MATCH EXISTING)(a 12" O.G. DRAWN BY JAD JD JOB# 1377RE22-HILL DATE 11/08/2022 EXISTING INSULATION EXISTING DBL. 2 X 6 UPPER FLOOR FRAMING PLAN REVISIONS ASSUMED FLOOR JOISTS @ 24"" O.G. NORTH SCALE: 1/4" = 1'-0" z S @ FLOOR . 3/7 I'-0A3 SHEET 3 OF 4 r Zjd design JIM DUNLAP (360) 982-0535 JIM@JDDESIGNDRAFTING.COM BATH 2 OFFICE FAMILY ROOM I 1 I 1 I 1 CLOSET � I I I I I BEDROOM I J KITCHEN Lu I O w I I o 2 � [-- o = uj Li � co z Q o �o coo• 10 zw - Q I I J NON W oLu # U _ J LLJQow ------- 0 T 1-- z < i via r J I I EXISTING ATTIC ACCESS I LAUNDRY IS IN THIS SPACE I lu I I Q DOwN SITTING LIVING ROOM O BEDROOM Z I d� 1 W1 1 BATH I a I a ENTRY L :L:3 1 i N I Z I I II MUD ROOM BEDROOM 3 BONUS LOUNGE Z o OI cl) o U W W J I LL DRAWN BY JAD SCALE 1/4" = 1'-0" UNo JD JOB# 1377RE22-HILL DATE 11/08/2022 EXIST. UPPER FLOOR PLAN EXIST, MAIN FLOOR PLAN REVISIONS NORTH SCALE: I/4" = I'-0" NORTH SCALE: 1/4" = 1'-0" A4 SHEET 4 OF 4 Foundation and 1st Floor Framing 1/4" = 1' -All new interior floor sheathing is 12FD,typ. - New stair framing: DPA and code. r s I I I I I I I I I I I I I I I I 53B u I I — J L - - - - - - - - J — TimKGarrison.com L — -- - - - >I �Q �, ! 528 Tim K. Garrison, P.E. Structural Callouts — Copyright ConstructionCalc, Inc (CCI) Headers ��) I of 2316 Antone Way Default header material is Doug Fir No. 2 or better l uP -A 1 Anacortes, WA 98221 General: All construction shall be per current building code and Standard Structural Specifications herein. 2x headers must be in tall orientation with flat 2x nailed at bottom in "L" configuration 360-708-1865 0 PA Per Architect or Designer j I timg@timkgarrison.com * Default Trimmer, use 1, 2x; or 20H or 21 H use LUC; larger header use HUC or HUCQ, UNO. `fY Structural Item: This item and related connectors shall be per architect or designer. £ 12 FD FloorDia hra m Default King Stud, opening 6-feet wide and less use 1, full height stud each end (plate to plate.) -� AS , (' T �r r-� --1P g --- E3 — --�-a- ------- �--- Sheathing: Withjoists at 24 or 19.2 OC, use min., , APA Sturd-I-Floor; either 3/4 species Trimmer, each end Kin Stu each -J °)ZF J L-� L-� L_� L_� L_24 oc rated g � ('j Aou 1 or 7/8"s ecies o 4. Ma be OSB or 1 ood. Callout Min use Alt 1 min. use Alt 2 min. use (if blank use default end(ifblank use io' �►• ,p p Y PY� VdASSheathing: Withjoists at 16"OC, use min., 16 oc rated, APA Sturd-l-Floor, min., 19/32"thick. Maybe above.) default above.) 6 OSB or plywood. Good for 245 psfTL @ L/360 defl. 20H 2x6, "L" config 4x6 ,j * Sheathing Layout: Case 1 per IBC 2306.2.1(1) Beams `4 x �ZI+ P - Orient sheets continuous over two or more spans, with the long dimension across supports. Qw 93� * . . Temporary Support: Installing some of the following involves temporary support in conjunction with E )-ryp M 3 Nailing: Glue, and connect with 8d ring shank nails or screws, at 6 edges, 12 field. C * bearing wall or beam demo. Such temporary support is not designed herein, and is the responsibility - -- — — — - — — — — — (— — 12/20/22 kNVAL Blocking: not required except at supports (beams) and connections to shear walls below. _ �._., 92 FP Footing, Pad of the contractor. Tim Garrison, PE, the engineer of record, maybe retained for assistance in temporary _ _ _ _ _ _ - �_ _ �., L _1 * Footing: Use min., 16"square x 6"tall. support design: 360-708-1865. i E7 Pf" VW 24 FootingRebar: Use 2, #4 each way, 3"from bottom. Default sawn material is Doug Fir No 2 or better. 7Yf, i / * Post: Use 74P. Bottom post connector, use J57 or JP44 for future adjustment if necessary. Top post TKG Job No.a22090 Default glulam (gl), LVL, PSL materials -see Standard Structural Specs herein. Default LSL is 1.5E, p connector use Post Table defaults herein. Date: 12/20/22 2,300 psi, min Fb. 93 FP Footing, Pad Default wall connection: 3" bearing in pocket or on plate with min. 2 studs below. Rev: * Footing: Use min., 20"square x 8"tall. Lower Walls and 2nd Floor Framing 1/4" = 1' Default end post connection: LCE, ACE, EPCZ, ECCQ, or similar. - Footing Rebar• Use 3, #4 each way, 3"from bottom. -Temporary support:see Standard Structural Specifications, S2 of 2 lI Default corner post connection with mitered beams over: LCE4, LCE4Z, or RTC44. Rev: * Post: Use 74P. Bottom post connector, use J57 or JP44 for future adjustment if necessary. Top post p -All new interior floor sheathing is 12F17,typ. connector use Post Table defaults herein. Default mid-post connection: LPCZ, PCZ, CCQ, or similar. - New stair framin g' OPA and code. Client: Sarah Hill Default beam to beam connection: Hanger: HU, HUC, HUCQ or similar. Bear on top, 2, A23 and -Wall infill: per Arch and current code. screws. Architectural Design: Jim P Callout Min., use Alt 1 min., use Alt 2 min., use Connector(if blank Notes Dunlap 0 use default, above) g 6 30B 4x6 �- 31 B 4x8 32B 4x6 �oS 40B 2, 2x10 4x10 possible point load from low west I C�-'"� ! roof hip to temporarily support 606 ` 06 ( .� 41 B 2, 2x10 4x10 ; t/1 42B Min., 2x10, bear backspan on wall top plate and connect with 5" screw at 12" spacing up �° through top plate into bottom of of this beam. 43 43B 2, 2x10 4x10 44B 2, 2x10 4x10 V 45B 2x10 4tB 46B 2xl0 4x6 2, 2x6 l 47B 3.5x9 glulam 48B 3.5x9 glulam 49B 2, 2xl0 4x8 50B Use 4x6 in floor cavity, approx 5' long. Support south end on 54B. 51 B 4x6 Di(c 4�>3 52B 4x6 73P 53B 4x6 54B 4x8 °_T l M Joists and Rafters Default sawn material is Doug Fir No 2 or better. Exposed to weather shall be Pressure Treated (PT) 0 Default sawn face mount hanger is U, LU, LUS, or if sloped rafter use LRUZ. Upper Walls and Upper Ceiling Framing 114" = V M Default sawn top flange hanger is JBA, LB, BA, or B (welded app, use LB, BA, or B) -Temporary support:see Standard Structural Specifications, S2 of 2 - Bearing walls are indicated with diagonal hatching. Callout Min., use Alt 1 min., use Alt 2 min., use Connector(if blank Notes -Wall infill: per Arch and current code. use default, above) 60J 2x10 @ 12" old stairs infill Q� Posts Default material is Doug Fir No 2 or better. O Default bottom connection on plate: 2, A34 with TECO or screws, or 4, 16d face nails. Default bottom connection on beam: 2, A34 with TECO or screws, or PCZ. I ' Default bottom connection on concrete: PB, or AB, or ABU, or ABW, or CBSQ 303 Connector(if blank 2 « i Callout Min., use Alt 1 min., use Alt 2 min., use Notes use default, above) i - --- 70P 2- 2x4 4x4 73P 4x6 3, 2x6 74P 4x6 PT r~1 `� Structural Plans i C@ 318 3?_6 '1oP of 2 Standard Structural pccifl eations' - C op�Tight, Tim K. Garrison, P.E. Structural Fill: -Structural Fill" shall be granular material conform- to local or state highway Discontinuous Top Plate.11-`here-mAl top plates are cut;omitted, or othenkise discontinuous at a header, the specifics#ions for imported foal base or sub base; or use sand or other clean granular no larger end of the header shall be connected to the remaining top plate beyond itith ahorizontal CS20 strap with than pea gravel. All structural fill must be compacted per the following section_ minimum 12"length on the header and 127- length on the top plate beyond_ Strap may be on tap,inside, or ARRRF.N9ATIONS: outside of wall_ Compaction:Place all fill materials 'in lifts not exceeding 8-inches- Compact using mechanical (vibratory of A:Area IBC:Inte-i3-icnal FIF:?t a���iQ„Mjt impact) methods. In paved areas and under sUnctures,use structural backfill compacted to 95%relative Pressure Trea[�d Lumber_ Use pressure treated lumber in contact with concrete and i or soil, and when T i m K G a r r i s a n.co m C:Asphalt Concrete IGF:I=7u:z'.:. -::=:_:_ F-Q RequiredIn non- axed or non-footing areas use structural directly exposed to weather. Pressure treating chemicals shall be inert, or other-Lise non-reactive"ith metal BE ByInwpection IEBC:IY:-:r.a.t:_:.-.:_:,:__::___•.zAngC=ode F.:: ,igb2Qf��ay compaction 1� � l back ill or native back#i11 nil rocks,lamps BRNG:Bearmg{aallumally) IRC:Iutera:,cf:al:e_,a-n�.i3u rt:F r-U and organic matter„ compacted to 92 X4 relati�a compaction_ connectors (including nails,bolts,framing connectors, etc_) of structural steel members_ E=Eladm modulus ar Electrical K:Kip(I.C-DO[be-) S:Section m dins (Ey E.xis LVL:Lamnated Ven,eerLumber SC:see Callout When roots,rocks, or other undesirable materials cause over-excavation,fill over-excavation and compact In certain cases non-pressure treated lumber may butt against concrete_ In these cases use a layer of heavy: Tim K. Garrison, P.E. E-OR-Emgineerof Record LSL:Laminated StrandLutnbef SD-.Sturm I}= per the above_ asphaltic-treated construction paper between wood and concrete_ 2316 Antone Way ACI: Inc. Lt Lett SIP:Sttuebural Insulated Panel Anacortes WA 98221 M:Cast in place concrete NA_Not.'Applicable SK:&kgch Blocking Bridging. Provide continuous blocking at all bearin locations. Provide full d bridging �,�_CouUe�h,��,tit :��BaaEing SOCK su��� Foundations,Footings on Soil: A11 footings and foundations to bear on undisturbed existing soil or � g g g of 360-708-1865 CO:Callout or Cleanout NIC:Not Included SPF:Spruce Pine Fir structural fill_All organic and deleterious material beneath footings and foundations to be removed and blocking at 8 OC max_ itn joist or rafters without continuous plywood diaphragm connection on the#� CD=-.C0ac-et- CC: Cent wing SS:S y Se'ET re laced with structural fill_ Bottom of footings to be belovr locally prescribed frost zone,not less than 12" timg@timkgarrison.com vr-:Cc:t:irl•�us OSB:Oriented SbmLd Board STAD:shear Tranear Around Opamg p g Framed floors t�hich support posts shall be solidly blocked Within the floor ca�"1#G#o positively transfer DF:Dauer--':.r PCF:Po mds per cubic foot SP:SIRE shear urali CORROSION RESISTANCE: post,column, or other concentrated loads through the floor to the supports beneath_ FP:Fireplace PLF:Pounds perUi 1 Foot T'YP:T3Tical CW:CITOM Shear Mall Ply:P133Nvad U-D:upside-nL=.ha—t v-11y Fails: Nails called out herein are "common"sizes,i.e. 16d, led, l Od, 8d_ Smaller diameter_ similar length Fasteners. Framing Hard���are.Use gal��anized, epoxy coated, or stainless steel for all nails, screws.bolts, Gyp:Gypm wall.board PSL:Parallel Strand Lumber UNO:Unleee.C}r}1P„i q spe6fiedeLwwhere lags,���ashers,nuts, framing hardware, etc_ for ALL exterior a lice#ions_ nail gun nails may be substituted provided 50°D move nails are used_ For�if,8, 16d are called out, �ARC GL or GLB:G1ulam Bmm PSF:Pounds per Square Foat V ar v:Shear fig)or unit shear( am n g * — �� WAS,y�r�1' HF_Hem Fir PSI:Pounds per Square Inch respectively the number of similar length .131 diameter nail gun nails required is 8 1.5= 12._As another example if 16d � p� 0 HV_�C_Heating,Ventilation,and Air PT:Presnue TmatedwAh pre=_er.'aty-r W.A�all„full length Structural Steel_ Coating for structural steel shall be per that section herein_ nails are called out at 4�'spacing,the spacing of similar length,narro-wer nail gun nails shall be 4f1.5 =2._T'_ L'.andibMME P%' Phr%V00d or OSB shearnall 'A7%IW'F:Welded V6ire Fabric STANDARD CONCRETE:L"tti4cmEnt ,f InPsta RC:Rel=-e Compachoa Scree: cre k-s may be substituted for nails in all applications. Screw diameter shall be VL4 or 910,UNO. Standard Concrete_ Concrete for footings, slabs, and�xalls shall attain a minimum 2Lday strength of f= Scrmy length shall be sufficient for min, 1.5-'penetration into all members being connxti.,d_ LOADS 2,500 psi unless other noted on Plans_-Minimum cement content=5 sacks per cubic and .aximnm ' _ 1 P p �'' Simpson SDS Wood Screws- These are max_ diameter lag bolts_Any similar type or brand maybe �p��73,�.0 Folloi%ring are the loads used for the subject design 1 analysis: iAmtericement ratio shall be 0.45-All materials shall be in accordance with ACI 318, latest.edition_A'Sixing substituted including SDIVS, SDWi L UdggW&Sig Screws, or similar_Length shall be sufficient far and placing of all concrete to be in accordance with IBC and ACI 304, latest edition_ 1.5-'min_ penetration into all members being connected, UNO_ Mtn distance from centerline of SDS too 12/20/22 kNVAL o Roof lid: 20 psf a Floor dead: 15 c ` ���ood member �ed a or another SDS = 1.25",LJO_ o Roof+ceiling dead, includes 3 pc `for o Stairs and exits,residential, live: 40 o A dmixnrres. Industr3 recognized and approved admixtures affecting set time, flowability,and/of g , �it+w�Ei d/3W 24 fiiture solar panels+ 1 layer of comp or o Exterior v%all dead_ 10 vwra#erproofung may be used provided the strength and durability of the concrete is not adversely affe-#ed_ Lag Bolts_ All lag bolts greater in diameter than lf4"shall have pilot holes pre-drilled- Size of pilot hole in metal roofing: 15 psf o Interior wall dead: 7 Id Ail Entrainment_Provide 5%air entraining in all concrete exposed to the earth or weather_ threaded portion shall be 70%of the unthreaded shank diameter(or alternatively, 90%of the root diameter o Roof snow.: 25 pg c Assumed allo-ki�able soil bearing pressure: Fl��As -high quality fly as of the threaded portion)_Pilot hole diameter of unthreaded portion shall be the same di,amet�er as the TKG Job No.:t22090 h T o Floor live:40 �' 2.,000 psf- or other natural pozrolan may be used 'in accordance with AST C18 Frith a unthreaded shank.Use nun., 4*diameter for end, edge, and center-to-oent;er distances,[JNO. corresponding reduction in cement content_Any such concrete shall obtain at least the strength and Date: 12/20/22 durability characteristics as Standard Concrete listed above_ Bolts.Use washers on all bolts. Tighten all bolts to a very snug-�AYench tight condition. Use standard A307 BASIS OF DESIGN-APPLICABLE CODES: bolts,UNO. For bolts in wood, drill the same diameter hole as the bolt; for bolts in steel drill holes 1116- Rev: CONCRETE REINFORCING: larger than the bolt diameter_ Provide the folloiing minimum edge distances between centerline of bolt and Coda The designs herein are prepared in the appf accordance Yth the 2015 IBC_ Construction shall conform �Yth Strength: Standard Footings, Stem walls, Slabs on Grade. Reinforcing bars (rebar)for standard footings, all edges of bolted wood, and between centerline of multiple bolts: the most recent building code adopted by the appro�"uig jurisdiction_ Rev: stem walls,and slabs on grade shall be grade 40 ( =4�0 kW or better,unless otherwise specified in the 5/8 inch diameter bolts ------------------- 2-5 inches Structural Strstey_ See page C1, Structural Calculations_ Plans. Calculations_ The calculations included herein are only those required to ensure compliance-%Kith code_ We Splicing,Eleinding_All reinforcing shall be spliced, detailed,bent, and supported in accordance with the 314 inch diameter bolts ------------------- 3 inches Client: Sarah Hill do not intend to compute every structural element nor every load combination_ Much of our analysis is "BI" most recent ACI code adopted by the jurisdiction_ Minimum distance between centerline of bolt and any edge of steel plate (angles,gussets, flanges,webs- (By Inspection-) etc.) shall be 1.25'-. Architectural Design: Jim BOLTS AND DOWELS IN CURED CONCRETE: Dunlap Alterations_ The project includes alterations to an existing structure and shall be in conformmee-kAYth the PRE-FABRICATED FRA_NMi G CONNECTORS: IESC, Chapters 7-9_All new materials and methods shall be per current Code_Any graxrity-resisting General_ This section shall apply to bolts and dowels installed in cured concrete using� structural element affected 5 is or more of its demand-capacrt}�ratio shall be brought up to current Code_ techniques_'Minimum concrete embedment=4-inches unless otherwise specified_Alinimum distance to and anufac-tu w: Simpson brand is specified_howe%per any other nationally recognized brand may be used Any lateral-resisting structural element affected 10%or more of its demand-capacity ratio shall be brought edge or end of concrete= 3"from hole cerAerline unless othen,6rise specified. prmided that they are equivalent in their ability to carry all applied loads in all orientations_ up to current Code. Existing structural elements affected less than the above need not be upgraded_ Existing Reinforcing. It is important that no existing rebars are drilled or cut during operations_ Installation: The Contractor shall install all prefabricated items in strict accordance With the manufacturers LIAIIT'ED SCOPE OF CONSULTANT'S WORK: Location ofexistung reinforcing bars may be by non-destructive methods{hVJgZMgq,radar,or similar). recommendations and requirements_ If installation risks cracking of wood.predrill pilot holes. Consultant The consultant ffi responsible charge of the work indicated herein is Tim _ Garrison P_E_, Washers- Use 3" i 229-'washers on all wood mud sill anchor bolts_ Such washers may be slotted,with PREFABRICATED WOOD PRODUCTS: do in Inc.,hereafter indicated as`JCL" plate washer under the nut as alloy ed by the IBC_At non-mud sill iota#ions, smaller washers may be used_ g bus iness as��' Use a steel plate or malleable iron washer under nuts and the heads of all bolts that connect wood_ Engineered Wood-General. These products must be pfo�"ided, stored,and installed in accordance with manufacturer's recommendations_Failure to do this may void the ir-arranty and diminish load carry.ung Scope of Consultant's Work. The scope of work of CCI is limited to structural analysis ofa remodel to an 61\ existing single-family residence_ CCI takes responsibility only for items specifically addressed in our Non-Epoxy Systems_Use Simpson��HD wh sh(mn in the Plans_ These anchors may be used to capacity-Any nationally-recognized brand that meets the below specifications is acceptable_ � _Insl ^ 1 dra��-iigs and calculations_ Constructed-tenons not specifically addressed herein resist tension loads and shear loads manufacturers recommendations_shall be built per current Glue-Laminated Timbers. Unless othenrise noted, all pinion beams shall be 24F-�T4 DF:DF. glUt4g14 for `V building code_ Epoxy Sy.stems_For bolts,use Simpson epoxy41e bolt system v ith ET-HP or SET high strength epoxy, use as beams shall have camber built in per manufacturer's recommendation_Use industrial appearance �I CCI has not analyzed any-other portion of the existing building,including but not limited to: foundations, -%%ith zinc plated,A307 -all-thread' bolts as shcr An in the sketches_ For d-owels, use ET-HP or SET high grade,unless visually exposed to interior living space use architectural appearance grade. All gtWAM�-,,shall beams,coliununs, �,As, floors,.floor framinng systems,roof framing system,connections, etc_ strength epoxy and rebar as specified on the Plans and Callouts. Drilling of holes and installation shall be in be manufacxured b� an AITC approved fabricator_ S#rife and install m accordance Frith rnanufacxurers O strict accordance v4-i#ln epoxy manufac-tufer's recommendation. recommendations_+ CCI has not been retained to perforinn construction inspection_ CCI takes no liability or responsibility for V erw=g constructed items are built in accordance�%1-di these structural analyses, and..or the building code. CONS EN,I IONAL WOOD FRAMING: ct Further, CCI does not specify Special Inspection per the IBC,IRC, or other local or national building codes_ General Cznstruction: Predrill all nail, screw, and lag holes where required to avoid splitting_ Connect all Special Inspection requirements are the responsibility of the approving jurisdiction and the Contractor_ ivood members per the Plans and applicable building code_ Where Sutctural Plains do not specifically SINGLE PROJECT: address a structural element, construct said element per minimum building code. Framing Material_All sa%%m framing lumber, not including beams,posts, and columns, shall be Spruce Pine The calculations,drawings,notes, specifications, and?'or tables prepared by CCI are valid oinl}F for the � project indicated herein These documents are not "slid, are not applicable to, and shall not be used for an', Fir, Hem Fir, or Douglas Fir-Larch,Number 2 or better, unless otherwise shoe-m_All sa,�%m wood shall other proj e�ct at am,other location- � have moisture content less than 25°4. COMPETENT CONSTRUCTION PERSONNEL!SAFETY: Studs_ Studs 'in exterior walls shall be a single member(not spliced not discontinuous) from horizontal V 1 diaphragm to horizontal diaphragm (horizontal diaphragms are roots and floors that connect to exterior Only competent personnel familiar with construction and safety practices germane to the project shoiAm. v�alls_)L se balloon framing at stainw,11s, openings in floor diaphragms_ etc_ Stud size,material, and herein should be employed to assemble and construct the work. max. dill length behy-een diaphragms is sho-%N n in shear wall table. �I Contractor shall be responsible to comply with all OSHA and State,Labor and Industries Standards_ Seams and Posts_ All saALm structural beams,headers,and posts shall be Doug Fir Larch No 2 or better. Contractor assumes full responsibility as to construction methods used, safety provisions employed,and the except iAfiere exposed to w eather and specified as PT (Pressure Treated)may be Hem Fir No_ 2.or better_ finished as-built condition of the structure and related s%,s#ems_ QLaNgg�PSLs,LVLs,etc_ shall be per Prefabricated Wood Products section helm _ MM HAZARDOUS 14IATERIA.LS: Multiple Ply Members_ w Construction may expose workers and other people on of near theaobsi#e to asbestos,lead, silica, Trimmers, King Studs, Leaders_ Where more than one 2.x is placed against another and used as a multiple 0 hydrocarbons, andfor other hazardous materials_ CCI is not an expert in these matters and hereby disclaims ply king stud,trimmer, or header,connect all plies with 16d at 4" OC, staggered. M all liability for injury or death from said exposure_ CCI recommends that a hazardous materials expert be consulted prior to all oonstruction proj ec#s. Beams, Columns. Where more than one 2x, or LVL,or L SL is placed against another and used as a multiple r� ply beam or columns connect all plies,6-6th glue and 2, 16d at 4-'spacing; or no glue and 2 screkr-s at 12:' IA MATERLS ANDIJETHODS: max spacing_ Provide and install all materials 'in accordance,;Kith manufacturer's requirements and recommendations_It is Glue,Epoxy_ Where specified, wood to vmod glue shall be commercial grade with minimum shear strength `V the contractor's responsibility to ensure all field personnel understand and adhere to this_ of 450 psi at 28 days_Use Liquid Mails LN-940 or similar_For wood to steel, use Liquid Nails DW It or TEMPORARY SUPPORT AND BRACING: similar with min_,400 psi shear strength at 28 days_ Prep and apply per manufacturer's recommendations_ General_ Provide adequate temporary support to all walls,roofs, beams, columns, aitd floors during Epoxy used with�-ood dowels or drift in shall be Simpson ET-HP, or other brand intended for wood use_ construction- Design of same is not included herein Contractor or orkA er should check all temporary- lVood and dowel shall be clean and dry prior to epoxy installation. O supporting devices-%%ith a qualified person_ Contractor shall be responsible for the adequacy of all Window and Door Openings. temporary andlor permanent support systems_ �I Header-Use minimum size as called out on Plans_All headers shall be installed with their tall dimension ��II FOOTINGS,FOUNDATIONS,SLABS O'-N GRADE: vertical_ If header is less than 3 inches ride Ili.a single 2x or single LV'Q use a flat 2x nailed to the Geotechnical Report: CCI is not aware of a geotechnical report for this project_ CCI strongly recommend bottom of header in an"I:- configuration,r-ith 16d at 4"max spacing. If no header is specified,the wall is that a geotechnical report be performed by a qualified geotechnical engineer for all construction projects_ assumed non-load bearing and wall top plate may serve as the header- Soils-analysis and geotechnical engineering are not a specialty of CCI_ CCI depends on others for the TrFmnws, aka,Tack Studs_ Use side(or larger)per Structural Callouts_ Concealed flange hanger of similar pi-masion of soils data,-which includes but is not limited to: alloi.%mble bearing capacity, liquefaction bearing length and capacity may be substituted for trimmer_ potential,slope stability,active and passive lateral pressures, internal friction angle,and cohesion_In the absence of a geoted uical report CCI Will make assumptions regarding soil parameters,ho�Nm ar,CCI takes King turfs_Unless o#hemise shown on Plans use-the following- These must be full-height,bottom plate to im responsibility or liability for future settlement, or damage or injury due to earth movement or failure of top plate, LE diaphragm to diaphragm. Standard any kind- * Opening less than 6' wide-use min_,one king stud each end of header- * Opening 6.1' iAide to 9' vLride-use min-,two king studs each end of header_ Structural * Opening 9.1' iAide to 16' wide,use min-,three king studs each end of header_ Specifications 2 of 2 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 c�oR Office Location: 904 61h Street, Anacortes WA 98821 Phone: (360) 293-1901 RESIDENTIAL BUILDING PERMIT APPLICATION THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES: Single-Family Residences (SFR), Duplexes, Additions & Remodels, Accessory Structures (i.e. garages, carports), Accessory Dwelling Units, Manufactured Homes, Residential Decks & Retaining Walls, and Docks& Pilings. FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY INFORMATION PROJECT ADDRESS(STREET,SUITE#) ASSESSOR PARCEL NUMBER 1308 34th Street P 112696 SUBDIVISION/LOT# ZONING LOT AREA(SIZE) 0.29 SQ. FT. TYPE OF PROJECT NEW ADDITION REPAIR X REMODEL CHANGE OF USE SFR Lj Duplex ❑Deck/Porch Accessory Dwelling Unit: ❑Detached ❑Attached ❑Retaining Wall ❑ Manufactured Home ❑Accessory Structure ❑ Shoreline Structure(dock, pilings,floats etc.) * ❑X Other: Interior remodel *If application is for a shoreline structure, please complete the Shoreline Structure Checklist. IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? I YES ✓ NO f YES, provide the permit/application number: PROJECT SUMMARY: PROJECT VALUATION Interior remodel to demo existing stairs to upper level and (Cost of Materials & Labor) relocate them. S PROPERTY OWNER INFORMATION NAME PHONE Sarah Hill n/a ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 1308 34th Street Anacortes, WA 98221 n/a CONTRACTOR INFORMATION NAME* PHONE BigFoot Builders, LLC (360) 298-1708 CONTRACTOR'S BUSINESS LICENSES STATE LICENSE# EXPIRATION *All Contractors&Subcontractors must have a valid City B I G FO B L853 N4 12/21/23 of Anacortes business license prior to doing work in the UBI# EXPIRATION City. 603528521 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 5882 Bow Street Bow, WA 98232 Shelley@bigfootbuilders.com Page 1 of 17 Res.Building Permit Application Submittal Checklist Updated April 20,2021 CONTACT PERSON -Select one person the city will contact for anything related to this project: EC APPLICANT ❑PROPERTY OWNER ❑CONTRACTOR ❑OTHER(LIST BELOW) NAME PHONE Jodi Boyden (360) 941-8656 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 8629 Pinelli Road Sedro Woolley, WA 98284 Jodimboyden@gmail.com LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender involved with your project, write "no lenders"on the Name Line below. NAME PHONE n/a ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: JB 1 understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. JB I understand that if 1 submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. JB I understand and acknowledge that I could be responsible for providing as-built drawings(on paper or electronically)as part of the project's certificate of occupancy process. JB 1 understand and acknowledge that Special Inspections could be required as part of my project, and if needed 1 will be required to pay for the cost of these inspections. JB 1 understand and acknowledge that financial securities could be required as part of the work 1 am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. J B I understand that if permits are reviewed concurrently such as design review, site plan, traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. 1 hereby declare that 1 am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects, true, correct, and complete to the best of knowledge and belief. 02/05/23 SIGNATURE DATE Jodi Boyden PRINTED NAME Res.Building Permit Application Submittal Checklist Updated December 2021 Page 2 of 17 SUBMITTAL CHECKLIST v v D m v 0 M 3 3 X D C y O r V n O 70 �n Residential Building Permit � �- v o O 3 3 Submittal Requirement Checklist Q ,' °' o '� n c o O fD '* 7 N O Residential Building Permit Application Form X X X X X (FORM BP-1—attached) Structure &Site Information Form X X X X X (FORM BP-2—attached) Mechanical & Plumbing Fixtures Form X X X (FORM BP-3—attached) Architectural Plans X X X X X (requirements listed on FORM BP-4-attached) ❑ Stormwater Management Minimum Requirements X X X X Determination (FORM BP-s,attached) Stormwater Site Plan X X X X ❑ Site Plan & Landscape Plans- requirements listed on Form X X X X X BP-6 ✓� Structural Plans&Calculations X X X X X ❑ Energy Code Plans& Forms X X Manufacturer's Specifications/Cut Sheets X ITCopy of recorded survey X X X X ❑ Critical Area Identification Form X X X X X ❑ Shoreline Structure Checklist, if applicable X X ❑ Technical Reports X X X X ❑ Other Required Permits, if applicable X X X X X ❑ I ADU Affidavit of Owner Occupancy(signed) X SUBMITTAL INFORMATION Please send applications in PDF format to buildingpermit@citvofanacortes.org ➢ Send applications in PDF format with a file and message size no greater than 30 MB.An email with a link to a file share site (Dropbox, Google Drive, OneDrive, etc.) is acceptable. Paper copies may be requested after initial review. FEES Once application is received, staff will reach out if a deposit is required. Otherwise, permit fees are paid prior to building permit issuance. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 3 of 17 REQUIRED SUBMITTAL INFORMATION Additional details on certain submittal items are provided below to ensure Applicants are fully aware what City staff will be looking for when an application is submitted to the City. FORMS AND PLANS • FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION FORM. Provides key information about your project, including type of permit you are applying for, and property owner, contractor, and contact information. • FORM BP-2: STRUCTURE AND SITE INFORMATION FORM. Provides key information about the proposed structure, including height, floor areas, fire protection proposed, and asks questions about site characteristics that are used to determine whether your project requires any other information or additional permit applications to be submitted. • FORM BP-3: PLUMBING AND MECHANICAL INFORMATION. Form BP-3 provides space for you to fill in fixture information for plumbing and mechanical appliances and equipment that are included as part of your project. • FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS. Form BP-4 contains a list of all the items required to be shown on Architectural Plans. • FORM BP-5: STORMWATER MANAGEMENT DETERMINATION FORM. Most development within the City of Anacortes that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater review. Stormwater review requirements are based on either the amount of soil to be disturbed (grading,vegetation removal), or the amount of hard surface that is created or replaced on a site (building footprint, concrete, asphalt or gravel parking, sidewalk, etc.). Form BP-5 assists you in determining the level of stormwater review(applicable Minimum Requirements) required for your project. • STORMWATER SITE PLAN. The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate your project for compliance with stormwater requirements. The level of stormwater review and contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. Use Form BP-5 to determine the level of stormwater review and then complete the applicable Stormwater Minimum Requirements Form on the Public Works- Engineering Department Forms website and provide required submittal items/plans. • FORM BP-6: SITE PLANS& LANDSCAPE PLANS. Form BP-6 contains a list of all the items required to be shown on Site and Landscape Plans. • STRUCTURAL PLANS: Plans prepared and stamped by a State of Washington licensed professional structural engineer drawn at a scale approved by the Building Official clearly indicating the information required by the "Permits" section of the currently adopted International Building Code and Chapter 19.27 RCW (State Building Code Act, Statewide amendments), and City submittal forms including: structural members labeled as to size and spacing as well as bracing, blocking, bridging, special connectors, and anchor bolts; cross-section details, as needed,to show typical foundation,floor, wall, ceiling and roof construction; insulation of walls, floors and roof/ceiling; and details of stairs,fireplaces and special construction, if any. • STRUCTURAL CALCULATIONS: An analysis of loads, materials, etc., prepared and stamped by a State of Washington licensed professional structural engineer. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 4 of 17 • ENERGY CODE FORMS: The standard Washington State Energy Office form requesting the information required under Chapter 51-11 WAC detailing building components used to comply with the State Residential or Nonresidential Energy Code, as applicable. • MANUFACTURER'S SPECIFICATIONS/CUT SHEETS: A document that summarized the performance and other technical characteristics of a product, machine, component, material, or subsystem (e.g., a power supply) in sufficient detail that allows the City to determine the product will be incompliance with applicable codes. • COPY OF RECORDED SURVEY. A survey of your property is needed so that conformance with minimum setback requirements and other development standards can been confirmed and verified on site by the inspectors. Property markers must be visible on your property. If they are not at the time an inspection is requested,you may need to have a new survey completed. • CRITICAL AREA IDENTIFICATION FORM. Use this from to determine and/or identify if critical areas or critical area buffers are located on or within 300 ft. of the development area. If critical areas are determined to be present, a Critical Area Permit may be required. • SHORELINE STRUCTURE CHECKLIST.This checklist is required to supplement the building permit application if the proposed structure or development is waterward or within 200 ft.from the shoreline.This checklist will also assist in determining what other approvals or permits may be required for the proposed work. OTHER SUBMITTALS DETERMINED ON A CASE-BY-CASE BASIS TECHNICAL REPORTS Following is a list of technical reports that will be required to be submitted to the City when certain circumstances exist on or near a site an Applicant is planning on making improvements to. The general triggers for each of the listed technical reports I provided below: A. CRITICAL AREAS REPORTS: In general, Critical Area reports are required when wetlands and/or streams are located on or near a site. Critical area mitigation plans may also be required, depending on the project proposal. See Anacortes Municipal Code Ch. 19.70 for additional information. B. GEOTECHNICAL REPORT: In general, Geotechnical Reports are required when work is proposed on or near slopes in excess of 15%and/or known landslide hazard areas. See Anacortes Municipal Code Ch. 19.70 for additional information. OTHER PERMITS DETERMINED ON A CASE-BY-CASE BASIS OTHER FORMS Following is a list of other permits that could be required in certain circumstances. The general triggers for each of the listed permits is provided below. A. FILL AND GRADE PERMIT: Grading (importing, exporting, and/or moving material on a site) of more than 50 cubic yards and/or if grading modifies the existing flow of stormwater or groundwater. B. RIGHT-OF-WAY PERMIT: A right-of-way permit is required anytime the public right-of-way is disturbed or obstructed in any way by private development or the general public. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 5 of 17 FORM 1313-2: STRUCTURE AND SITE INFORMATION PROPERTY WHERE WORK IS OCCURRING ADDRESS 1308 34th Street Anacortes, WA 98221 PARCEL NUMBER(S) P112696 DETAILED PROPOSED STRUCTURE INFORMATION Complete the following information as it relates to your project. Mark items that are not applicable with "N/A". STRUCTURE HEIGHT Existing (will not change) AREA SQUARE FOOTAGE OCCUPANCY GROUP CONSTRUCTION TYPE OCCUPANT LOAD 1ST FLOOR: 1816 Residential 2ND FLOOR: 1606 Residential 3RD FLOOR: BASEMENT: GARAGE: 624 Residential TOTAL DECK: TOTAL PORCH: OTHER: OTHER: OTHER: QUESTIONS ABOUT THE PROPOSED STRUCTURE Is a fire sprinkler system being installed? ❑YES ❑NO Is a monitored fire alarm being installed? YES ❑NO Are retaining wall(s) being built? ❑YES ❑NO Are structural plans required? I ❑YES ONO PROJECT SITE INFORMATION A. Is work within the City's right-of-way proposed? ❑YES ONO If YES, you will be required to submit a right-of-way permit application. If you have already submitted a ROW permit, list the permit number here: B. Is the lot less than 5,000 sq. ft. in area? ❑YES ONO If YES, your site and building will need to comply with the standards in AMC 19.43.010.C. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 6 of 17 C. Is your project involving an accessory dwelling unit? ❑YES 0 NO If YES, your site and building will need to comply with the standards in AMC 19.47.030. D. Will more than 2-acres be cleared and/or more than 5,000 board feet ❑YES ONO (about 1 log truck load) of timber be harvested? If YES, you may need to obtain a forest practice permit from DNR. E. Is this project subject to the SEPA process? OYES C NO If YES, you will be required to submit a SEPA checklist. If you have already completed the SEPA process, list the permit number: REQUIRED SIGNATURE 1 hereby declare that 1 am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. 1 also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects, true, correct, and complete to the best of knowledge and belief. 02/05/23 SIGNATURE DATE Jodi Boyden PRINTED NAME Res.Building Permit Application Submittal Checklist Updated December 2021 Page 7 of 17 FORM BP-3: PLUMBING & MECHANICAL INFORMATION MECHANICAL APPLIANCE/EQUIPMENT INFORMATION (NEW AND RELOCATED) EQUIPMENT TYPE Indicate the number of fixtures for each equipment type TOTAL GAS ELECTRIC OTHER-Please specify COMMENT Furnace Wall Heater Water Heater Heat Pump Air Conditioner/Handler Radiant/Hydronic Heating Exhaust Fans Range Hood Fireplace Clothes Dryer& Duct Stove/Range/Oven Refrigeration Unit Gas Piping/Outlet(s) Boiler BTUs: Other L TOTAL MECHANICAL OUTLETS PLUMBING FIXTURES FIXTURE TYPE(NEW AND RELOCATED) TOTAL FIXTURE TYPE(NEW AND RELOCATED) TOTAL Toilets Refrigerator water supply Kitchen Sink Pressure Reduction Valve/ Regulator Utility Sink Water Service Line Tub Water Piping Hand Sink Washing Machine Shower Electric Water Heater:Tank-less? Yes❑ No❑ Dishwasher Backflow Prevention Device Urinal Hose Bib Floor Drain/Floor Sink Drinking Fountain Hydronic Heat in:❑Floor ❑Wall Grease Interceptor Other-please specify: TOTAL PLUMBING FIXTURES Res.Building Permit Application Submittal Checklist Updated December 2021 Page 8 of 17 FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant architectural plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11" x 17" and drawn in an architectural scale. • Architectural plans for structures 4,000 square feet or larger are required to be prepared and stamped by an architect licensed in the State of Washington. • Structural plans must be stamped by a structural engineer licensed in the state of Washington. REQUIREMENTS FOR ALL ARCHITECTURAL PLANS COMPLETE? REQUIREMENTS PAGE# Cover or 1st page) must include: X Site address X Parcel number Lot number(if applicable) Lot size Al Lot coverage impervious surface coverage Floor plans with existing(if applicable) and proposed building layout with Al/A2 square footages and with the use of each room/area labeled. Window and door sizes labeled and window ventilation area. Commercial, Multi-Family, and Mixed-Use Structures must also include door and window n/a schedules. Plumbing, duct, and electrical layout. Penetration protection must be shown. n/a Opening headers, size, and material. Al/A2 Cross section details, showing typical foundation,floor, wall, ceiling and roof n/a construction and insulation. Structural members labeled as to size and spacing as well as bracing, blocking, n/a bridging, special connectors, and anchor bolts. Details documenting energy code compliance. n/a Exterior building elevations demonstrating compliance with applicable structure type design standards (small lot, duplex, or ADU) and maximum n/a building height Res.Building Permit Application Submittal Checklist Updated December 2021 Page 9 of 17 Building height (see AMC 19.42.120 for measurement methods, exceptions and modifications). • Show a line representing, and label the elevations of, the existing natural topography at the foundation at the front of the building. • For corner lots and lots that slope downhill from the property line at the front of the building: Show a labeled line representing the elevations at the center of all exterior walls of the building. • For ADUs only, include elevations demonstrating compliance with the height/setback plane (see AMC 19.47.030(C)(6)). Special details as needed (i.e., stairs,fireplaces, special construction). A3 Insulation and insulation values of walls, slab, floors, and roof/ceiling. n/a Existing and proposed grades with slope of lot shown. n/a Res.Building Permit Application Submittal Checklist Updated December 2021 Page 10 of 17 FORM BP-5: STORMWATER MANAGEMENT MINIMUM REQUIREMENTS DETERMINATION GENERAL INFORMATION Most development within the City of Anacortes that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater review. Stormwater review requirements are based on either the amount of soil to be disturbed (grading,vegetation removal), or the amount of hard surface that is created or replaced on a site (building footprint, concrete, asphalt or gravel parking, sidewalk, etc.) This form is largely targeted for small projects and single family residences. For larger projects and more information please refer to the Anacortes Municipal Code (Chapter 19.76 Stormwater Management) and the latest Washington State Department of Ecology Stormwater Management Manual for Western Washington (Ecology Manual). HARD SURFACE AREA CALCULATION Please calculate your project's hard surface amount; guidance is provided on the next page of this document. Use your project's total hard surface calculation to follow the flow chart(s) in this packet and determine the level of stormwater management required for you project. When determining your permit level or if stormwater thresholds are met or exceeded the entire project must be considered. A project is that portion of a property, properties, or right of way subject to land disturbing activities, new hard surfaces and replaced hard surfaces. The hard surface on your property will determine the storm water utility fees and the stormwater general facility charge. All new or replaced hard surfaces should be accounted for. Below are excerpts from the Anacortes Municipal Code and Ecology Manual that may assist you in preparing this information. "Hard surface area"means an impervious surface, a permeable pavement, or a vegetated roof. "Impervious surface"means a non-vegetated surface area which either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non-vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. "Replaced impervious surface"means,for structures, the removal and replacement of impervious surfaces down to the foundation. For other impervious surfaces, the removal down to bare soil or base course and replacement. LAND DISTURBANCE DESCRIPTION TOTAL(SQ. FT.) Total Area of Land Disturbing Activity n/a (interior remodel) Total Area Converted from Vegetation to Lawn or Landscaped Area n/a (interior remodel) Res.Building Permit Application Submittal Checklist Updated December 2021 Page 11 of 17 HARD SURFACE AREA CALCULATION Existing Removed Proposed Proposed DESCRIPTION (SF) (SF) Replaced New (SF) (SF) Non Pollution Generating Hard Surface Area (Sidewalks, paths, patios,etc.) Pollution Generating Hard Surface Area (Driveways, parking areas, etc.) TOTAL HARD SURFACE Site Size Existing Impervious Surface Coverage% o (sq.ft. hard surface/site size) MINIMUM REQUIREMENTS CALCULATIONS Use the information in the above table to navigate the flow chart(s) on the next few pages to determine the applicable stormwater management minimum requirements for your project. Then complete the applicable Stormwater Minimum Requirements Form on the Public Works - Engineering Department Forms website and provide required submittal items/plans. ❑ Minimum Requirements#1-9 ❑ Minimum Requirements#1-5 ❑ Minimum Requirement#2 Res.Building Permit Application Submittal Checklist Updated December 2021 Page 12 of 17 FLOW CHART FOR DETERMINING REQUIREMENTS FOR NEW DEVELOPMENT Start Here Does the site have 35% Yes See Redevelopment Minimum or more of existing 0, Requirements and Flow Chart impervious coverage? (Figure 1-2.4.2). No Does the project convert 3/4 acres or more of vegetation to Does the project result in lawn or landscaped areas,or 5,000 square feet,or NO convert 2.5 acres or more of greater,of new plus native vegetation to pasture? replaced hard surface area? No ZYesYesDoes the project result in 2,000 IF square feet,or greater,of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted Yes NO vegetation areas. Does the project have land Minimum Requirements#1 disturbing activities of 7,000 through#5 apply to the new Yes square feet or greater? and replaced hard surfaces and the land disturbed. NO IF Minimum Requirement#2 applies. Figure 1-2.4.1 Flow Chart for Determining Requirements for New Development DEPARTMENT OF Revised June2015 ECOLOGY Please see http//www.ecy.wa.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 13 of 17 FLOW CHART FOR DETERMINING REQUIREMENTS FOR REDEVELOPMENT Does the project result in 2,000 square feet,or more,of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet or greater? Yes lNo Minimum Requirements#1 through#5 apply to the new and replaced hard Minimum Requirement#2 applies. surfaces and the land disturbed. Next Question Does the project add 5,000 square feet or more of new hard surfaces? OR Convert Y4 acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? Yes No All Minimum Requirements apply Next Question Is this a road to the new hard surfaces and the related project? NO converted vegetation areas. Yes Does the project add 5,000 square feet or more of new hard surfaces? Yes NO Is the total of new plus replaced hard surfaces Do the new hard 5,000 square feet or more, surfaces add 50%or NO No additional NO AND more to the existing requirements. does the value of the proposed improvements hard surfaces within -including interior improvements-exceed the project limits? 50%of the assessed value(or replacement value)of the existing site improvements? YesE All Minimum Requirements apply to the new and replaced 4-1 hard surfaces and converted vegetation areas. Yes Figure 1-2.4.2 Flow Chart for Determining Requirements for Redevelopment DEPARTMENT OF Revised June2015 ECOLOGYPlease see http b(roww.ecy.wa.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 14 of 17 FORM BP-6: SITE PLAN REQUIREMENTS GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant site plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11"x 17" and drawn in an engineering or architectural scale. INFORMATION REQUIRED ON ALL SITE PLANS COMPLETE? REQUIREMENTS PAGE# ON PLANS COVER SHEET: Vicinity Map Name of the project Name, address, and telephone number of owner and agent(s) ❑ Name, address, and telephone number of Applicant (if different from the owner) Zoning designation of the site Area, in square feet and acreage, of the project site Reference to the Building Code used Proposed use Occupancy group Construction type Square footage and height of each individual building Percent lot coverage Percent impervious surfaces Scale and North Arrow Property features Location, identification, and dimensions of all property lines and easements. All easements shown on the title report, Record of Survey, or plat must be dimensioned and shown. Location and dimensions of existing critical areas (wetlands, streams, steep slopes) and their associated buffers. Location of Ordinary High Water Mark and shoreline jurisdiction limits (i adjacent to a shoreline). Existing and proposed contours and site elevations (i.e. finished grades) at 5- foot minimum increments. The horizontal and vertical control datum must be clearly shown. Structures Location, identification, dimensions and size of all existing and proposed buildings and other structures. Res.Building Permit Application Submittal Checklist Updated December 2021 Page 15 of 17 Location of existing and proposed retaining walls, rockeries, and fences. Location, identification, and dimensions of all setbacks. Show proposed projections into required setbacks, including dimensions(see AMC 19.44.140) Utilities & Easements Location and dimensions of existing and proposed stormwater, sanitary sewer, potable water, and fiber lines/facilities. All wells and septic systems located on or near the project site must also be identified. Location of all existing and proposed fire hydrants within 300 feet of the boundary of the project site. Location and dimensions of existing and proposed freestanding lighting fixtures, utility junction boxes, public utility transformers. Stormwater Proposed Temporary Erosion and Sediment Control Measures, if not located on other plans. Proposed permanent stormwater management BMPs. Access, Circulation & Parking Location, identification, and dimensions of all existing and proposed on-site and adjacent streets and alleys, including the location and dimensions of all existing and proposed curbs, gutters, sidewalks, median islands, and street trees. Show existing and proposed vehicular access to the site, including the size and location of driveways and curb cuts. Show existing and proposed parking spaces, including surface material and dimensions of spaces. Open Space (ADUs, Small Lots, and Duplexes) Show calculations, location, dimensions and provided square footage of required open space area per AMC 19.43.010.C, E, or AMC 19.47, as applicable. Landscaping Show the location and design of landscape areas to be preserved and planted, and a plant list to include the location, number, size and type of plant material by botanical and common name. Location of irrigation system if a permanent or temporary system is proposed. Show the location of existing trees to be retained in conformance with AMC 16.50, and tree protection measures to be implemented, when applicable. Provide a maintenance plan for any infiltration-based stormwater best management practices (BMPs) built as part of the landscaping design, including the specifications and maintenance procedures of any soil amendments. Show new trees to be planted and tree unit credit calculations, in conformance with AMC 16.50 Tree preservation,when applicable Res.Building Permit Application Submittal Checklist Updated December 2021 Page 16 of 17 A table similar to the following with project specific information provided, must be placed on the site plan: Required Landscaping For Example Calculations Site Area 7,500 sq.ft. %of site area to be landscaped (per 20%- R2A zone AMC Tables 19.42.020-.030) 1,500 sq.ft. required 1,850 sq.ft. provided Compliance with AMC Ch. 16.50 Tree unit credits required: Tree Preservation. • 8 tree units required Tree unit credits retained: • 2 trees 6"dbh =4 tree unit credits retained Tree unit credits provided: • 2 new deciduous trees(min.2" caliper @ 6" above ground) • 2 new evergreen trees(8' in height) Number of required street trees 1 per 30'of frontage 60 lineal feet of frontage=3 street trees Res.Building Permit Application Submittal Checklist Updated December 2021 Page 17 of 17