Loading...
HomeMy WebLinkAboutPermit File BLD-2022-0002 2415 Sutton PlaceWilliam Obrock, Architect ph (206) 557-0226 Carlie Anne Berard, PE ph (907) 389-9971 022— — N VV L �� N`46"fL� DESIGN �.� ENGINEERS ARCHITECTS � PLANNERS 606 COMMERCIAL AVENUE STE D ANACORTES, WASHINGTON 98221 MEMORANDUM Project: Pollard Date: January 19, 2023 From: Carlie Anne Berard Office: Burlington Inspire Homes David Danton Project Manager Dear David, The exterior continuous footing is sufficient at 16"x8" with 2 #4 rebar as shown in engineering calculation package. Please let us know if you require any further assistance. Yours truly, Carlie Anne Berard, PE ANNE 5516® 'k&:10Nal ��� Lp - 2022- 05-s3 MARINE STRUCTURES ENGINEERING, INC. 1r.� 1004 Commercial Avenue, #361 Anaco rtc , WA 98221 (360) 406-862; Fax: (3611) 230-23W 02 December 2022 Anacortes Marina Bill Douvier, Marina Manager P.O. Box 846 Anacortes, WA 98221 RE: C-Dock Pile Installation Dear Bill: At your request, I performed the on -site inspection for the driving of the 12" and 16" diameter, steel pipe float anchor piles. This inspection occurred on 13, 14 and 17 October 2022 and involved on -site measurements of pile embedment, observation of vibration driving and review of contractor -provided pile driving logs. I am satisfied that the piles have been supplied in accordance with the Sitts and Hill, C-Dock Replacement plans are installed within the tolerances specified. Sincerely, MARINE STRUCTURES ENGINEERING, INC. L Kelly D. LaFave, PE, President D.Lip ��• o`� w `t' yj Q� �r b 30745R�4Z '.STD �Ss10NAL~� v QL1,111h Eli; ineerin;; fc.cr \lac1ufarttarerS - En;inr'ers - CcmhractOrs �O)-_ -102z-0002 1 - 'Pt 0-2022-03�q .MARINE STRUCTURES ENGINEERING, INC. 1004 Commercial Avenue, #364 18 January 2023 Anacortes Marina Doug Gran, Marina Manager P.O. Box 846 Anacortes, WA 98221 RE: Anacortes Marina Breakwater Dear Doug: Anacortes, WA 98221 (360) 466-8627 Fax: (360) 230-2110 At your request, I have reviewed the plans and installation requirements of the Anacortes Marina Breakwater, specifically East Wall Combi-wall and the North Exit Slotted wall. The installation of the east wall occurred on 13, 14, 15, 16 and 19 December 2022 and the installation of the North Exit slotted wall occurred on 21, 22 and 23 December 2022. The East wall involved vibro driving of both 36" diameter pipe piles and partial depth sheet piles while the North Entrance slotted wall required vibro driving of only 36" steel pipe piles. Based on my own site observations and discussions with the pile driving contractor, I am satisfied that, with some minor deviations, the piles have been supplied in accordance with the COWI Anacortes Marina Breakwater plans, dated 24 July 2018, and are all piles have been installed with the minimum penetrations and within the tolerances specified by COWL Sincerely, MARINE STRUCTURES ENGINEERING, I Kelly D. LaFave, PE, President D. WAg�,�'9L `��ONAL ECG QhlalitY Engineering for - M1111ufactURY, FlIgint'el's • ContractorS