Loading...
HomeMy WebLinkAboutBLD-2022-0932 - OVER OR IN WATER STRUCTURE 1 C} City of Anacortes Invoice/Permit M BLD-2022-0932 904 6th Street Applied date: 12/08/2022 P.O.Box 547 Anacortes, WA 98221-0547 Issue date: 01/19/2023 _� t►�: (360) 293-1901 Expire date: 07/19/2024 Job Address: 1400 4TH ST Permit Type: Commercial Alteration/Repair Permit ANACORTES WA 98221 Project: APN: P55673 P55679 P55366 P31513 P31514 P31515 P31516 P31517 P31518 Remarks: Repair and maintenance of 77 support pilings beneather warehouse. SLX-2021-0018 applies. ' '*'Contractor will need a City of Anacortes business license endorsement on their WA State license prior to work************** Owner: TRIDENT SEAFOOD CORP Contractor: ENVIRO-TECH DIVING INC Address: 5303 SHILSHOLE AVE NW Address: 3970 BERRY BLVD SEATTLE WA 98107-4021 CAMANO ISLAND WA 98282 Phone: (360)220-7488 Phone: (206)257-7250 License M General Information: Fees: Building Valuation 500000 Building Permit Fee 3,233.75 Plan Review Fee 2,101.94 State Building Code Fee Comm 25.00 Total Calculated: 5,360.69 Deposits/Receipts: 0.00 Total Due: 5,360.69 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY CITY OF ANACORTES G-,,I y BUILDING DEPARTMENT INSPECTION CARD (360)293-1901 ��' (Card to be on job site at all times) Job Address: 1400 4TH ST APN: P55673 Permit#: BLD-2022-0932 Issue date: 01/19/2023 P55679 P55366 P31513 P31514 P31515 P31516 P31517 P31518 Permit Type: Commercial Alteration/Repair Permit Expire date: 07/19/2024 Remarks: Repair and maintenance of 77 support pilings beneather warehouse. SLX-2021-0018 applies. ***********Contractor will need a City of Anacortes business license endorsement on their WA State license prior to work************** Applicant: Contractor: Owner: Lender: THOMPSON ENVIRONMENTAL SERVICE; ENVIRO-TECH DIVING INC TRIDENT SEAFOOD CORP 17994 COBAHLID RD 3970 BERRY BLVD 5303 SHILSHOLE AVE NW LA CONNER,WA 98257 CAMANO ISLAND WA 98282 SEATTLE WA 98107-4021 (360)302-0120 (206)257-7250 (360)220-7488 License#: Inspec(or Inspector Inspec(or Inspection Date Inspection Date Inspection Date Initial hiitial Initial Provide special inspection approval p rior to final inspection. N Y � T' 0 O� PLANNING,COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 7, ti Mailing Address:P.O. Box 547,Anacortes, WA 98221 ?coR� Office Location:904 6th Street,Anacortes WA 98821 Phone: (360)293-1901 COMMERCIAL OR MULTIFAMILY PERMIT APPLICATION THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES: Multifamily,Non-Residential,Commercial,or Industrial Development FFORm BP-1: COMMERCIAL OR MULTIFAMILY PERMIT APPLICATION OPERTY INFORMATION OJECT ADDRESS(STREET,SUITE#) ASSESSOR PARCEL NUMBER 00 4th Street, Anacortes, WA 98221 P31513 SUBDIVISION/LOT# ZONING LOT AREA(SIZE) 21,780 LT1 TO 5 TB 3 P8 &VAC RR AVE ADJ Commercial SQ. FT. TYPE OF PROJECT ❑ NEW ❑ ADDITION 29 REPAIR ❑ REMODEL ❑ CHANGE OF USE PROPOSED STRUCTURE* PROJECT VALUATION(Materials&Labor) Trident Seafoods Existing Anacorters Warehouse $ $500,000 *If application is for a shoreline structure,please complete the Shoreline Structure Checklist. PROJECT SUMMARY* SLX-2021-0018 Repair and maintenance of 77 support pilings beneath the warehouse. *If the project includes:10 or more dwelling units,12,000 sq.ft.or more of nonresidential gross floor area,or 20,000 sq.ft.or more of nonresidential site improvements,please complete the Site Plan Review Checklist IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? ___ YES X NO If YES,provide the permit/application number: PROPERTY OWNER INFORMATION NAME PHONE Trident Seafood Corporation (360) 220-7488 ADDRESS(STREET,CITY,STATE,ZIP) EMMA�I ADDRESS 5303 Shilshole Ave NW, Seattle, WA 98107 )ettl trldentseafoods.com CONTRACTOR INFORMATION NAME* Enviro-Tech Diving, Inc. ---- PHONE (206) 257-7250601599552 CONTRACTOR'S BUSINESS LICENSES-All Contractors&Subcontractors must have a valid City of Anacortes business license prior to doing work in the City. �STATE LICENSE# EXPIRATION UBI# EXPIRATION A 601 599552 601 559552 June 2023 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS PO Box 490, Stanwood, WA 98292 AP@Etdiving.com CONTACT PERSON-Select one person the city will contact for anything related to this project: APPLICANT [E]PROPERTY OWNER CONTRACTOR OTHER(LIST BELOW) NAME PHONE (360) 220-7488 Jeff Johnson ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 1400 4th Street, Anacortes, WA 98221 jeffj@tridentseafoods.com Res.Building Permit Application Submittal Checklist Page 1 of 18 Updated April 20,2021 LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender involved with your project, write "no lenders"on the Name Line below. NAME PHONE NA ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS ACKNOWLEDGEMENTS&SIGNATURE Read and initial each of the following statements prior to signing this application: x :the derstand that when a building permit application is taken in over the counter it does not mean ap lication has been deemed technically complete and sufficient for staff review. x I understand that if I submit incomplete,inaccurate, and/or erroneous information it will take the City longer to process my permits. x 1 understand and acknowledge that I could be responsible for providing as-built drawings(on paper or electronically)as part of the project's certificate of occupancy process. x I understand and acknowledge that Special Inspections could be art as required of m q p y project, and if needed I will be required to pay for the cost of these inspections. x I understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. x I understand that if permits are reviewed concurrently such as design review,site plan, traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects, true, correct, and complete to the best of knowledge and belief. 12/6/2022 1 Ev SIGNA URE DATE Doug Thompson PRINTED NAME Commercial&Multifamily Building Permit Application Updated December 2021 Page 2 of 18 DEPARTMENT OF THE ARMY '1 U.S.ARMY CORPS OF ENGINEERS,SEATTLE DISTRICT 4735 EAST MARGINAL WAY SOUTH,BLDG 1202 SEATTLE,WA 98134-2388 Regulatory Branch November 17, 2022 Mr. Lynford Barnes Trident Seafoods Corporation 1400 4t" Street Anacortes, Washington 98221 Reference: NWS-2021-1005 Trident Seafood Corporation (Anacortes Plant Piling Repairs) Dear Mr. Barnes: We have reviewed your application to repair 77 creosote-treated timber piles, 325 linear feet of associated pile caps, and up to 6,350 square feet of timber stringers of an existing overwater warehouse in the Guemes Channel near Anacortes, Snohomish County, Washington. Based on the information you provided to us, Nationwide Permit (NWP) 3, Maintenance (Federal Register December 27, 2021 Vol. 86, No. 245), authorizes your proposal as depicted on the enclosed drawings dated 24 September 2021. In order for this authorization to be valid, you must ensure the work is performed in accordance with the enclosed NWP 3, Terms and Conditions and the following special conditions: a. In order to meet the requirements of the Endangered Species Act (ESA) and the Magnuson Stevens Fishery Conservation and Management Act (MSA), you must implement and abide by the applicable terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" and the applicable Essential Fish Habitat Conservation Recommendations as set forth in the Salish Sea Nearshore Programmatic (SSNP) Biological Opinion (BO) (National Marine Fisheries Service (NMFS) Reference Number WCRO-2019-04086) dated June 29, 2022. The specific General Construction Measures, Project Design Criteria, Essential Fish Habitat Conservation Measures, and monitoring and/or reporting requirements applicable to this permit are identified in the enclosed Notification Summary Sheet dated October 17, 2022 (NMFS Reference Number WCRO-2019-04086) and SSNP verification email dated October 27, 2022. The BO is available on the U.S. Army Corps -2- of Engineers (Corps) website (https://www.nws.usace.army.miI/Missions/Civil- Works/Regulatory/Permit-Guidebook/Endangered-Species/). You must provide the Corps and NMFS the information requested in the enclosed SSNP Verification email dated October 27, 2022. All information must prominently display the reference number NWS-2021-1005. Failure to comply with these requirements constitutes non-compliance with the ESA and your Corps permit. The NMFS and USFWS is the appropriate authority to determine compliance with the terms and conditions of their BO and with the ESA. If you cannot comply with the terms and conditions of this programmatic consultation, you must, prior to commencing construction, contact the Corps, Seattle District, Regulatory Branch for an individual consultation in accordance with the requirements of the ESA and/or the MSA. b. You must implement and abide by the Endangered Species Act (ESA) requirements and/or agreements set forth in the Phase I Programmatic Endangered Species Act Consultation, Piling Replacement Specific Information Form (SPIF) dated, and the addendum dated October 25, 2021, in its entirety. The U.S. Fish and Wildlife Service (USFWS) provided the enclosed LOC with a finding of "may affect, not likely to adversely affect" based on this document on April 28, 2022 (USFWS Reference Number 2022-0035143). USFWS will be informed of this permit issuance. Failure to comply with the commitments made in this consultation constitutes non-compliance with the ESA and your U.S. Army Corps of Engineers permit. The USFWS is the appropriate authority to determine compliance with ESA. c. In order to meet the requirements of the Endangered Species Act you may conduct the authorized activities from July 16 through February 15 in any year this permit is valid. You shall not conduct work authorized by this permit from February 16 through July 15 in any year this permit is valid. We have reviewed your project pursuant to the requirements of the Endangered Species Act, the Magnuson-Stevens Fishery Conservation and Management Act and the National Historic Preservation Act. We have determined this project complies with the requirements of these laws provided you comply with all of the permit general and special conditions. Please be reminded that Special Condition "a" of your permit requires that you implement and abide by the Endangered Species Act (ESA) requirements set forth in the programmatic Biological Opinion (BO) for this project. In particular, note that the BO requires you submit the enclosed Certificate of Compliance with Department of the Army Permit, submit documentation that all required credits/offsets were purchased prior to the impacting project's construction start date, submit the disposal receipts and a picture of the dump truck on the scale for any creosote piles removed. All documents -3- must be submitted to the Corps at nws.compliance@usace.army.miI and NMFS at ssnp-wa.wcr@noaa.gov. Failure to comply with the commitments above constitutes non-compliance with the ESA and with this authorization. The authorized work complies with the Washington State Department of Ecology's (Ecology) Water Quality Certification (WQC) requirements and Coastal Zone Management (CZM) consistency determination decision for this NWP. No further coordination with Ecology for WQC and CZM is required. You have not requested a jurisdictional determination for this proposed project. If you believe the U.S. Army Corps of Engineers does not have jurisdiction over all or portions of your project you may request a preliminary or approved jurisdictional determination (JD). If one is requested, please be aware that we may require the submittal of additional information to complete the JD and work authorized in this letter may not occur until the JD has been completed. Our verification of this NWP authorization is valid until March 14, 2026, unless the NWP is modified, reissued, or revoked prior to that date. If the authorized work for the NWP authorization has not been completed by that date and you have commenced or are under contract to commence this activity before March 14, 2026, you will have until March 14, 2027, to complete the activity under the enclosed terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP verification invalidates this authorization and could result in a violation of Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all local, State, and other Federal permits that apply to this project. Upon completing the authorized work, you must fill out and return the enclosed Certificate of Compliance with Department of the Army Permit. All compliance reports should be submitted to the U.S. Army Corps of Engineers, Seattle District, Regulatory Branch electronically at nws.compliance@usace.army.mi1. Thank you for your cooperation during the permitting process. We are interested in your experience with our Regulatory Program and encourage you to complete a customer service survey. Referenced documents and information about our program are available on our website at www.nws.usace.army.mil, select "Regulatory Permit Information". -4- A copy of this letter with enclosures will be furnished to Mr. Douglas Thompson at thomp_dst@wavecable.com. If you have any questions, please contact me at kristin.l.mahen@usace.army.mil or (206) 550-5670. Sincerely, Kristin Mahen, ESA Coordinator Regulatory Branch Enclosures o~ .� Anacortes Planning, Community & Economic Development Department ��. 904 6T" Street/P.O. Box 547, Anacortes, WA 98221 gQoB� (360) 299-1984-Office Hours: Mon-Fri 8:00 AM—5:00 PM LETTER OF EXEMPTION From the Requirement for a Shoreline Substantial Development Permit File Number SLX-2021-0018 Application Date September 30, 2021 Project Title Trident Seafood Piling Repair Report Date November 8, 2021 Project Locations 1400 4tn Street, Anacortes, WA 98221 The agent on behalf of the property owner is requesting the repair and maintenance of Request (77)existing creosote support pilings for the Trident Seafoods warehouse, located on and over Guemes Channel. Trident Seafood Corporation Property Owner 5303 Shilshole Ave NW Seattle, WA 98107 Thompson Environmental Services Agent Attn: Douglas Thompson 17994 Cobahud Rd. La Conner, WA 98257 Pursuant to WAC 197-11-800(3), Repair, remodeling, and maintenance activities. the proposed project is exempt from SEPA Review as the project is for the repair, remodeling, maintenance, or minor alteration of existing private or public structures, facilities or equipment, including utilities, recreation, and transportation facilities involving no material SEPA Review expansions or changes in use beyond that previously existing; except that, where undertaken wholly or in part on lands covered by water, only minor repair or replacement of structures may be exempt(examples include repair or replacement of piling, ramps, floats, or mooring buoys, or minor repair, alteration, or maintenance of docks) SMP 2.4(E)(2) & WAC 173-27-040(2)(b), Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance"includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair"means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, Shoreline Exemption configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline Type resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. Pursuant to Appendix "A" of the Shoreline Master Program (SMP) regulating critical Critical Areas areas, the subject development was reviewed for proximity to critical areas. The subject property is subject to the following: SLX-2021-0018—Trident Seafood Piling Repair Page 1 of 4 SMP A-1: Frequently Flooded Areas Based on FEMA's National Flood Hazard Mapping, the project location is within FIRM panel 5303170040A; this area is identified as Zone AE. Comment received from the City's Floodplain Administrator and Building Department states that a Floodplain Development Permit (FDP) is required for the proposed work if pilings are between low-low water mark and top of flood zone; the need for a FDP would be determined at time of building permit review; a survey with elevations would be required as part of submittal. SMP A-3: Geologically Hazardous Areas Based on the City mapping system, the project locations are in an identified area of tsunami hazard; however, the proposed pilings are to be installed waterward/outside of the identified hazard area. Therefore, this section would not apply to the proposed piling replacement project. SMP A-5: Fish &Wildlife Habitat Conservation Areas Based on the City mapping system, the project location is adjacent to identified Dungeness Crab habitat. To minimize impacts, all work would be required to be conducted during the low water window. SHORELINE1 ' 1 Shoreline The project location is identified as Urban Maritime shoreline environment designation Environment with all work occurring within the Aquatic shoreline environment designation. Water Body Guemes Channel 1.{' _ .0 71 i a _-. i 1] / A , LZt I �L . Jr - i .JEW - , 1,.-71155 An low SLX-2021-0018—Trident Seafood Piling Repair Page 2 of 4 FINDINGS OF 1. The agent, on behalf of the property owner, has requested a Shoreline Exemption for the repair of existing creosote support pilings for the Trident Seafood warehouse structure. The proposed repairs are to occur in two phases over a period of 5 years. 1.1. Phase 1 of the project would entail the repair of 33 piles and Phase 2 would entail the repair of 44 piles, for a total of 77 repaired pilings. 2. During repair, each pile will be hand excavated to expose the timber below the mudline. Depending on the level of deterioration, the pile would be reinforced either by wrapped in galvanized wire mesh/Kevlar or cut off below the mudline. 2.1. If the existing pile has more than 50% of the original timber, the wire mesh or Kevlar would be installed to reinforce the diameter of the pile. 2.2. If the existing pile has less than 50% of the original timber diameter,the deteriorating timber would be cut off at the mudline and a new 12 in. ACZA timber pile would be installed. 3. Once the piling is reinforced, a fiberglass sleeve would be installed around the piling, approximately 2 ft. below the mudline. The fiberglass sleeve would then be filled with non-shrink grout to provide structural stabilization. 3.1. After the grout has been placed,the excavated material would be backfilled by hand around the reinforced base. 3.2. Water or debris that was displaced (trapped within fiberglass jacket) would be pumped out to an upland receptacle; no contaminated water would be discharged into the surface waters. 3.3. Once grout has cured, an epoxy seal would be installed at the top end of the pile to prevent water infiltration into the reinforced piling;the epoxy plug would be sloped to allow drainage away from the piling. 4. Piling caps would either be replaced or repaired, to secure the repaired piling to the existing pier stringers; existing stringers and decking timber would not be including in the proposed repairs. 5. The proposed work would not result in a new impact or overwater coverage. 1. The proposed maintenance project, as conditioned, are consistent with SMP 2.4(E)(2) &WAC 173-27- 040(2)(b). 2. As conditioned, the proposal is consistent with the policies of the Shoreline Management Act. 3. As conditioned, the proposal is consistent with the Shoreline Master Program. DECISION ® Approved for: November 8, 2021 VIA- F-1 Denied Don M asamer, Shoreline Administrator Date CONDITIONS OF APPROVAL 1. Pursuant to WAC 173-27-040(1)(e), the applicant must comply with all work as described within the provided narrative, JARPA, and site plan, or as modified by other agency requirements. 1.1. This exemption is based only on the plans and application materials, noted within the file of record, received from the applicant. Any changes shall be reviewed by the City of Anacortes Planning Department to ensure that the exemption is still valid. SLX-2021-0018—Trident Seafood Piling Repair Page 3 of 4 2. The applicant must adhere to the applicable policies and development regulations contained in the City of Anacortes's 2010 Shoreline Master Program including but not limited to those in: Chapter 5, Shoreline Environment&Associated Policies & Regulations; Chapter 6, Environmental Protection General Regulations; and other applicable provisions of the Shoreline Master Program. 3. Pursuant to SMP 2.4(B), this exemption shall expire 5 years from the above date of issuance. 4. Pursuant to SMP DR-9.5.5(d), treated wood materials may be utilized on pilings in repair projects for timber structures, provided the BMPs for the use of Treated Wood in Aquatic and Sensitive Environments, Western Wood Preservers Institute/Wood Preservation Canada/Southern Pressure Treaters'Association/Timber Piling Council, are specified and met. 5. Pursuant to SMP DR-9.5.14, if cumulative repairs to the existing structure-supporting pier over three years would make a proposed repair exceed the threshold of said section, the proposal shall be reviewed as a new pier. 6. Pursuant to RCW 27.53.020 and COASMP 6.4 for Archaeological/Historic/Cultural Impacts, if any artifacts or human remains are found upon excavation, the Samish Indian Nation; the City of Anacortes' Department of Planning, Community, & Economic Development; the City of Anacortes' Police Department; and the State of Washington's Department of Archaeology and Historic Preservation (DAHP)shall be immediately notified and the work in the immediate area cease. 6.1. Pursuant to RCW 27.53.060 it is unlawful to destroy any historic or prehistoric archaeological resources. 7. Best Management Practices (BMPs) must be implemented at all times during the proposed maintenance and repair activities. 8. All applicable local, state, and federal permits and authorizations must be secured prior to work beginning on the site. Copies shall be provided to the city. 8.1. The need for a Floodplain Development Permit (FDP) shall be determined at time of building permit review. 9. The applicant /landowner must comply with federal statutes including but not limited to: The Endangered Species Act, Clean Water Act, Marine Mammal Protection Act, and other federal statutes. 10. Pursuant to WAC 173-27-040(1)(e), a copy of this exemption and attached conditions must be kept on-site and provided to the applicant or contractor and all others working within the shoreline area at all times. The applicant, contractor, machinery operators and all others working within the shoreline area shall have read this exemption and attached conditions and shall follow its conditions at all times. Note: An exemption from the Substantial Development Permit requirements does not constitute an exemption from the policies and use regulations of the Shoreline Management Act, the provisions of the Shoreline Master Program, or other applicable City, state, or federal permit requirements. APPEALS Per AMC Table 19.20.030-1 and 19.20.210, the Administrator's decision may be appealed to the Hearing Examiner. Appeals must be delivered to the City Clerk by mail or personal delivery before 5:00 PM on the last business day of the appeal period (14 days).Appeals received by mail after 5:00 PM on the last day of the appeal period will not be accepted, regardless of when such appeals were mailed or postmarked. Contents of any appeal shall contain the information and items as listed in AMC 19.20.210(F). CITY STAFF CONTACT Name: Title: Phone: E-mail: Emily Morgan Senior Planner (360)298-4350 emilym@cityofanacortes.org SLX-2021-0018—Trident Seafood Piling Repair Page 4 of 4 PLANNING,COMMUNITY, &ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address:P.O. Box 547,Anacortes, WA 98221 Office Location:904 61 Street,Anacortes WA 98821 • w Phone: (360)299-1984 SHORELINE STRUCTURE CHECKLIST APPLICABILITY This checklist is to supplement a Building Permit Application for projects that are located within shoreline jurisdiction,meaning the project is occurring within 200 ft. or waterward of the shoreline. Most projects that occur near or in water require shoreline permitting from not only the City of Anacortes, but other shoreline agencies as well.This checklist should assist with what is needed to move forward with the proposed project. PROJECT INFORMATION WATERBODY: Is your structure new construction or expanding in size? ❑Yes El No If YES,you may need a Shoreline Exemption or a Shoreline Substantial Development Permit,issued by the City of Anacortes. Does your project involve the repair and/or maintenance of an existing structure Byes ❑ No within 200 ft.of the shoreline? If YES, you may qualify for a Shoreline Exemption per SMP 2.4.E.2 -See "normal repair& maintenance"criteria verbiage on Pg. 2 PLEASE NOTE, legally established non-conforming structures may be continued or maintained,so long as the modifications do not increase the non-conformity—See non-conforming verbiage on Pg.2-3. Is your structure to occur over or in water? Dyes ❑ No If YES, you may need permits from City of Anacortes, WA Dept. of Fish& Wildlife, US Army Corps of Engineers, and/or WA Dept. of Natural Resources. PLEASE NOTE, the project may require SEPA Review. Inquire with Planning staff to determine if the project is or is not exempt from SEPA Review Please provide copies of any issued and/or approved shoreline permits from the City and other shoreline agencies—Use below checklist to determine other required agency permits. SCOPE OF WORK-Check all that apply REQUIRED AGENCY PERMITS Project located on, over, through, under, or otherwise impacts WA DNR Aquatic Use state owned aquatic lands.Aquatic lands are defined as tidelands, Authorization shorelands, harbor areas,and the beds of navigable waters. Projects that use, divert, obstruct, or change the natural flow or WDFW Hydraulic Project bed of salt or fresh state waters Approval(HPA) Application for federal license or permit that could affect water DOE Section 401 Water quality. Under the Clean Water Act, states have authority to Quality Certification Shoreline Structure Checklist Updated December 2021 Page 1 of 3 approve,deny,or condition any project in wetlands or other state waters Excavating, land clearing, or discharging dredged or fill material USACE Section 404 Permit: into wetlands or other U.S.waters. Discharge of Dredge or Fill Material Any project that creates an obstruction or alteration in, over, or USACE Section 10 Permit:Work under navigable U.S. waters. Includes construction and or Structures in maintenance of piers, pilings,wharfs,and bulkheads. Navigable Waters All private aids to navigation (fixed or floating) within navigable US Coast Private Aids to ❑ U.S.waters must be reviewed by U.S.Coast Guard. Guard Navigation(PATON) CITY OF ANACORTES SHORELINE MASTER PROGRAM SMP 2.4.E.2 - Normal maintenance or repair of existing structures or developments, including damage by accident, fire, or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition within one year after decay or partial destruction except where repair causes substantial adverse effects to the shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. SMP 3.3 - Nonconforming development, includes shoreline uses and structures which were lawfully constructed, established, or created prior to the effective date of the Act or the Master Program, or amendments thereto, but which do not conform to present regulations or standards of the Master Program or policies of the act. SMP 3.4.1-Nonconforming uses,includes shoreline uses which were lawfully established prior to the effective date of the Act or the Master Program, or amendments thereto, but which do not conform to present regulations or standards of the Master Program or policies of the Act.Any nonconforming use may be continued subject to the following standards: a. Change of ownership,tenancy,or management of a nonconforming use shall not affect its nonconforming status; provided,that the use does not significantly change or intensify. b. Additional development of any property on which a nonconforming use exists shall require that all new uses conform to this Master Program and the Act. c. If a nonconforming use is converted to a conforming use, no nonconforming use may be resumed. d. A nonconforming use which is moved any distance must be brought into conformance with the Master Program and the Act. e. If a nonconforming use is discontinued for a period of 365 or more consecutive calendar days,it shall lose its nonconforming status, and the continued use of the property shall be required to conform to the provisions of this Master Program and the Act. SMP 3.4.2-A nonconforming use,which is destroyed or substantially damaged by fire or other act of nature (or accident)may be resumed provided that any structure occupied by the nonconforming use may be rebuilt to the same or smaller configuration existing immediately prior to the time the structure was destroyed. Shoreline Structure Checklist Updated December 2021 Page 2 of 3 SMP 3.5 -Nonconforming structures, include shoreline structures which were lawfully constructed or placed prior to the effective date of the Act or the Master Program,or amendments thereto,but which do not conform to present bulk, height, dimensional, setback, or density requirements. Nonconforming structures may continue even though the structures fail to conform to the present requirements of the environment designation in which they are located.A nonconforming structure may be maintained as follows: 1. A nonconforming structure which is destroyed by fire or other act of nature(or accident)may be rebuilt to the same or smaller configuration existing immediately prior to the time the structure was destroyed, provided that such rebuilding shall be completed within two years of destruction,unless an extension for just cause is granted,and the replacement structure does not warrant new shoreline armoring. 2. A nonconforming building or structure may be repaired and maintained as provided in and as limited by this section. The maintenance of such building or structure shall include only necessary repairs and incidental alterations,which alterations, however,shall not increase the nonconformity of such building or structure in any direction;provided,that necessary alterations may be made as required by other law or ordinance. 3. The Shoreline Administrator shall determine the replacement cost of a structure. 4. A building or structure,nonconforming as to the bulk,dimensional and density requirements of this title, may be added to or enlarged if such addition or enlargement conforms to the regulations of the shoreline environment in which it is located. In such case, such addition or enlargement shall be treated as a separate building or structure in determining conformity to all of the requirements of this title. 5. A structure for which a variance has been issued shall be considered a legal nonconforming structure and the requirements of this section shall apply as they apply to preexisting nonconformities. SHORELINE AGENCY CONTACT INFORMATION AGENCY PHONE EMAIL/WEBSITE WA Department of Ecology NW Regional Office—Bellingham 360-255-4400 Email:chris.luerkens@ecy.wa.gov Website:https://ecology.wa.gov Chris Luerkens, NW Region Contact WA Department of Natural Resources 360-825-1631 Email:aguaticleasing.shoreline@dnr.wa.gov Shoreline District WA Department of Fish&Wildlife Email:marcus.reaves@dfw.wa.gov Aquatic Protection Permitting 360-466-4345 Website: Marcus Reaves,Marine Biologist https://wdfw.wa.aov/licenses/environmental US Army Corps of Engineers 206-764-3750 Email:paoteam@nws02.usace.army.mil Northwestern Division—Seattle District Website:https://www.nws.usace.army.mil US Coast Guard 503-861-6380 Website:https://www.news.uscg.mil/Astoria/ 13th District Headquarters Shoreline Structure Checklist Updated December 2021 Page 3 of 3 TIDAL INFORMATION N s CANADA ANACORTES WASHINGTON a _5 B g, ELLINGHAM U. S. A. LAT. 48' 31' N LONG. 122' 37' W EXTREME HIGH WATER (EHW) _ +11.0' $9 MEAN HIGHER HIGH WATER (MHHW)= +8.2' � PROJECT MEAN HIGH WATER (MHW)- +7.4' °q%� p SITE MEAN LOW WATER (MLW)- +2.5' q MEAN LOWER LOW WATER (MLLW) = 0.0' S ANACORTES MOUNT VERNON EXTREME LOW WATER (ELW) _ -4.5' cP OF JUAN 3 EVERETT M 0 I� c N] 1-5 PROJECT SEATTLE o SITE PACIFIC Ci OCEAN ANACORTES J�����V LAT 48' 31' 14" N AIRPORT GG�P TACOMA P�Gy VICINoIT YLMAP SCA CITY OF ANACORTES Qp�P BISLANDS L—l �\ I � ALAND 4s J FIDALGO ISLAND (SKAGIT COUNTY) 0 ANACORTES AND FIDALGO ISLAND 0 2 1 2 3 MI 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED:TIBERPI , PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 1 of 9 DATE: 08/21 APPLICATION: G UEMES CHANNEL CD 09/30/2021 S LX-2021-0018 N N Z O PROJECT LAT 48° 31' 14" NSITE ` TRIDENT PIER �'= =`� V d- _ z � P31513 TRIDENT y - SEAFOODS r� P55673 4TH STREET a 5TH STREET QVICINITY- MAP _ _ F� 0 50 100 200 300 FT. Y 724 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED: PILE, PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 2 of 9 DATE: 08/21 APPLICATION: ow A —10 / B 0 0 0 0 0 oo 0 ° /° ° °°° ° ° ° ° C60 L CHANNEL 0 0 0 0 o o 0 0 0 0 o 0o o 0 000 o O o/ m O o o o o0 0 0 0 _O o _ _ —10 J _c I o 0 0 o m o 0 0 o m G o ®o m� 000 o ox� ® o 0 00 ••0•J ® d770•C•o W•DO• o 0 EXISTING • a oo oo/o 0 0 •0 o� moo o o) oo TIMBER PIER N C/) o!�/m m o • o•o•° 08, O°o •O ° / —5 LL 00 004-3A• 00 m 000 m•J o 0 W o o O O o 0 Q 0 0I ® o 00 • o 0 00 0 0o M o 00 00 m ® o 0 0 00 0 0 • o0 0 0 0 0 0 B —5— o®® ® ®o m000000 o o o c000 B 0 00 ® ®o om m •° . o m o . o m o 0 0 0 o m ® oo �o ado ® o 0 0 0 0 0 0 0 0 0 0 0 0 2 0• m 0 oso. (6 0 000 00 2 0 o Bm®ln d�o aa�® o 0 o 00 o 0 0 0 MLLW o �'8 8 • 0 MLLW o o • o 0 0 0 00 0 • o 0 0 0 0 0 0 0 00 0 0 0 0 0 ® ® • ° o 0 0 0 • o 0 0 • o 0 0 o ° ® o ® p o 0 0 0 om o 0 0 0 0 0 Cn ® o 0 0 0 0 • o o • • o 00 0 W Iy ° ® o 0 0 ® • a•o •o 0 00 o • o Z Q ° 8 • +5 � p o • o 0 00 o 0 0 0 o qA 0 0 I N ° °o• • co • o 00 0 0 00 0 0 0 0 LL LJ— 8 0 om• o 00 0 0 0 0 0 0 00 o ° o ° ° o 0 0 00 o 0 0 0 0 0 0 o AA 0 0 0 0 00 0 0 0 • o 0 0® o 00 0 0 +8.0 (MHHW 0 0 �• •o 0 0 0 •o 00 0 1 0 0 8 o 00 00 ° 1 EXISTING SEAWALL -O -O -p 0 ° 0 0 0 0 0 0 0 000 0 o °° o = EXISTING TIMBER PILE, TO REMAIN AS—IS 0 o e o ° °° o° • = EXISTING TIMBER PILE, TO BE REPAIRED 0 0 0 ° o ° +s ° ° ° ° ° ° PHASE 1 = 33 PILES 0 ° ° ° PHASE 2 = 44 PILES O ° ° o p ° ° 77 PILES ° 0 0 0 0 0 0 0 0 0 ° ° OUTLINE OF EXISTING 0 0 0 0 0 ° WAREHOUSE BUILDING OVERALL +8.0 (MHHW o 0 o PILE REPAIR PLAN 0 20 40 60 100 FT. A 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED: TIMBER PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 3 of 9 DATE: 08/21 APPLICATION: 0 MLLW 0 MLLW --------- ---- O O WO@ 00 0 O OOD ® O O 0 00 O O O 0 MLLW T 0 MLLW O ° ° ® O O O O O MD O O ® 0 0 O 0 00 O 0 0 0 0 ° O o 0 0 0 ® o 0 0 ® o GUEMES CHANNEL 0 o° TIMBER TIMBER PIER 0 8 8 0 0 0 0 0 000 O 0 O ccoo 0 o °�-o--o-� ® O 0 ® ® 0 li 00 0 ° 0 i 0 8 m c2io0 0 0 ® 0 ® o Z 0L0 0 ® 0 0 0 ® 0 0 0 0 o AA 0 0 ° AK AK 00 ® 0 00 0 0 0® o o a O O 8 +5 O O OJ® 0 00 O O O O O O O O 0 0 ° O O O O ® O O O O O O O O O O O O 0 00 O O 0 ® O O 0m O O O O O ° � O O O ® 0 O ° EXISTING SEAWALL 0 8 OO 00 00 0 1 _._._._._. .----9----------- ------------ --------------- - 2 +5 OUTLINE OF EXISTING WAREHOUSE BUILDING 0 = TIMBER PILE, TO REMAIN ® = PHASE 1 PILE REPAIR (33) ® = PHASE 2 PILE CAP REPAIR (210 LIN. FT.) = PHASE 2 STRINGER REPAIR (450 SQ. FT.) PHASE 1 REPAIRS 0 10 20 30 50 FT. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS TIMBER PILE,, PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 4 of 9 DATE: 08/21 APPLICATION: Cl/IVZS 0V4NMZ_ / -- ---10 O O O 0 0 0 0 0 0 O O O O 0/0 O 0 00 O O O O O o 0 0 0 0 00 O O O 0 00 O O 000 O O o 0 00 O O O 0 00 O O O O O -10 / O O O 0 00� O O O OJ ® G O 0 OJO O 0 00 COD O O O O -- ---- � 0**0 **5 o• O 0 • 00 00/O 0--0 <**--0--� ® * 0 00 EXISTING �j O �O O O �I TIMBER PIER O OJ OJ O • • -CT--6----- O -5 O O O 000 00 OJ 0 00 OJ<*) O 0 O O O O O O ® 0 00 �i o 0 00 0 0o M ---------- r------ I I O 00 00/ OJ ® O O O 00 0 O O O O m O O O O I I I I O OJ COD ® COD O OJ O O O 0 00 O O O C 00 0 L------------- i O C 00 00 0 O 0 00 O O O 00 O O O 0 I I I O * ® j 0 O O 00 O O O QO O O O 0 I I ® GDP_0 0 O O O 00 O O O O O 2 -------------- ------------------- ---- - ----- --- 2 0 MLLW 0 MLLW OUTLINE OF EXISTING WAREHOUSE BUILDING 0 = TIMBER PILE, TO REMAIN 0 = PHASE 2 PILE REPAIR (44) ® = PHASE 2 PILE CAP REPAIR (115 LIN. FT.) ,i = PHASE 2 STRINGER REPAIR (5,900 SQ. FT.) PHASE 2 REPAIRS 0 10 20 30 50 FT. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS TIMBER PILE,, PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 5 of 9 DATE: 08/21 APPLICATION: EXISTING WAREHOUSE EXISTING TIMBER PILE DAMAGE/DECAY EXISTING TIMBER BUILDING NOT SHOWN MA LINE PILE, TYP. (LOCATION VARIES) DECK, (EL. +16't) +20' +20' (MHHW)+8.0 +10' +10' a rt I (MLLW ) +0 +D (MLLW) r F IIII IIII IIII II II II II II II IIII II II II II II II II IIII II II II II II II II II IIII II II III II II II IIII II II IIII II I I II II II u u I� —10' IIIII IIII IIII II II II II III I I II II II II II II J —10' II II II II uuI] III II 1 �� —20' —20' MATCH APPROX. EXISTING LINE EXISTING PIER GROUND PROFILE (VARIES) ELEVATION A-A (ONSHORE) 0 5 10 20 40 60 FT. EXISTING WAREHOUSE PILE DAMAGE/DECAY TO BEA BUILDING NOT SHOWN EXISTING TIMBER DECK AND REPAIRED (LOCATION VARIES) STRINGERS TO REMAIN MATCH LINE+20' +20' (MHHW)+8.0 +10' +10' (MLLW) +0 +0 (MLLW) r• II II II —10' � aii II I li II II II� .. 1 II II II II II —10' F II II I II II II F—20' II II III I IIJI I�Iul �I a 20' EXISTING TIME lii MATCH APPROX. EXISTING LINE EXISTING PIER PILE, TYP. GROUND PROFILE (VARIES) ELEVATION A-A (OFFSHORE) 0 5 10 20 40 60 FT. PILE DAMAGE/DECAY TO BE EXISTING WAREHOUSE ER BUILDING NOT SHOWN EXISTING TIMBER DECK AND REPAIRED (LOCATION VARIES) STRINGERS TO REMAIN +20' +20' (M.H.H.W)+8.0 +10' v +10' (MLLW) +0 - +0 (MLLW) a II II III —10' I c e, —10' � � II II II II II II II II II IIII II II II II II II II II II I II —20' J ul JI LI ul ul III II L —20' EXISTING TIMBER APPROX. EXISTING PILE, TYP. EXISTING PIER GROUND PROFILE (VARIES) CROSS SECTION B-B 0 5 10 20 40 60 FT. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED: TIMBER , PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 6 of 9 DATE: 08/21 APPLICATION: EXISTING TIMBER EXISTING TIMBER DECK STRINGER EXISTING DRIFT—PIN CONNECTION m TO PILE CAP TO REMAIN UNLESS III PILE CAP IS REPLACED OR REPAIRED III III III III EXISTING 12 X 14 III REPAIR PROCEDURE (EXISTING PILE TO REMAIN) III TIMBER PILE CAP BEAM III EPDXY PLUG AT TOP OF W 1) HAND EXCAVATE AROUND PILE TO BE REPAIRED JACKET, SLOPED TO DRAIN TO EXPOSE EXISTING TIMBER PILE BELOW MUDLINE. EL. +10.Ot 2) REMOVE ALL MARINE GROWTH AND ALL DECAYED WOOD FROM PILE WITH PRESSURE WASHER. DRILL HOLES IN ,i NEW FIBERGLASS JACKET TOPS OF VOID AREAS FOR VENTING. b �OR SLEEVE NOTE: DRILL 1"0 ANGLED VENT 3) IF DECAYED DIAMETER OF PILE IS LESS THAN 75%OF HOLES AT TOPS OF ALL HOLLOW ORIGINAL DIAMETER, INSTALL WIRE MESH CAGE AROUND PILE AREAS TO ENSURE GROUT COMPLETELY THAT EXTENDS AT LEAST 2' ABOVE AND BELOW DECAY. r EXISTING (DECAYED) FILLS ALL VOIDS IN PILES 4) PLACE FIBERGLASS JACKET AROUND PILE WITH BOTTOM TIMBER PILE I OF JACKET A BELOW MUDLINE AND TOP OF JACKET AT I NEW GALV. WIRE MESH OR KEVLAR ELEV. +10't. INSTALL SPACERS INSIDE JACKET TO MAINTAIN REINFORCING IF DIAMETER OF PILE ANNULAR SPACE BETWEEN JACKET AND PILE. SCREW EDGES IS REDUCED BY MORE THAN 25% OF JACKET TOGETHER WITH SS SCREWS AND EPDXY. INSTALL N FIBERGLASS STRAPS AROUND JACKETS APPROXIMATELY 4' ON ``' CENTER. (ifFILL ANNULUS OF JACKET W/ NON—SHRINK GROUT PUMPED IN 5) PUMP—IN NON—SHRINK GROUT USING INJECTION PORT IN FROM BOTTOM (1 1/2" MIN. THICKNESS) BOTTOM OF JACKET UNTIL GROUT IS WITHIN ONE TO TWO INCHES OF TOP OF JACKET. NEW FIBERGLASS JACKET OR SLEEVE (18"0, MAX.) 9) REPLACE SOIL AROUND BOTTOM OF JACKET TO ORIGINAL I' SOIL PROFILE. EXISTING REPLACE NATIVE BACKFILL MUDLINE 10) AFTER GROUT CURES, REMOVE WATER FROM TOP OF ;j AFTER SLEEVE GROUTING JACKET AND FILL FLUSH TO TOP WITH EPDXY WITH SLOPED TOP SO THAT WATER DRAINS AWAY FROM PILE. I:. APPROXIMATE LIMITS OF TEMPORARY EXCAVATION FOR USE WITH PILES HAVING GREATER THAN 50% OF ORIGINAL GROUT INJECTION PORT AT SECTION REMAINING BOTTOM OF JACKET, TYP. (LOCATION VARIES) PILE REPAIR ELEVATION EXISTING TIMBER PILE 0 1/2 1 2 3 FT. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED: TIMBER PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 7 of 9 DATE: 08/21 APPLICATION: EXISTING TIMBER EXISTING TIMBER DECK STRINGER _x x OO OO ® EXISTING 12 X 14 PILE REPAIR PROCEDURE W/ COMPETENT PILE STUB: ® TIMBER PILE CAP BEAM 1) INSTALL TEMPORARY SHORING TO SUPPORT OR LIFT SHIM WITH TREATED PLYWOODOR CEDAR WEDGES, TYP. PILE CAP AS NECESSARY DURING PILE REPAIR. EL. +10.0t 2) HAND EXCAVATE AROUND PILE TO BE REPAIRED � NEW 4" X 3/8" STEEL BAR WITH TO EXPOSE COMPETENT TIMBER BELOW MUDLINE. F (2) 5/8"0 X 5" LAG BOLTS EACH 3) CUT OFF PILE IN COMPETENT TIMBER AND REMOVE r; SIDE OF PILE IN NEW PILE AND DAMAGED PILE ABOVE CUT. EXISTING PILE CAP, TYP. 4) PLACE FIBERGLASS JACKET OR SLEEVE AROUND CUT PILE STUB WITH BOTTOM OF JACKET 2't BELOW CUT END OF PILE STUB. TOP OF JACK TO BE AT LEAST 4' ABOVE PILE SPLICE AND UP TO +10't w 5) INSTALL NEW TIMBER PILE (TIGHT—FIT) BETWEEN NEW ACZA TIMBER PILE CUT PILE STUB AND BOTTOM OF PILE CAP BEAM. (12" DIA. MAX.) w 6) BACKFILL SOIL AROUND JACKET OR SLEEVE a FILL W/ EPDXY OR TO KEEP CENTERED ON PILE SPLICE. EPDXY—GROUT 7) ON OUT—GOING TIDE, POUR OR PUMP JACKET AROUND PILES TO TOP WITH EPDXY OR EPDXY—GROUT, r FULLY FILLING AREA AROUND PILES AND FINISH TOP r NEW FIBERGLASS JACKET WITH CROWN TO DRAIN AWAY FROM PILES. I: OR SLEEVE (18"0, MAX.) i 8) INSTALL STEEL SIDE BARS AND LAG BOLTS TO SECURE TOP OF NEW PILE TO PILE CAP. NATIVE +i r BACKFILL a EXISTING a � MUDLINE m r: i / N N w \ APPROXIMATE LIMITS \ w OF TEMPORARY EXCAVATION FOR USE WITH PILES HAVING — TRIM STUB FLAT AND LEVEL LESS THAN 50% OF ORIGINAL TO ACCEPT NEW PILE SECTION REMAINING STUB OF EXISTING TIMBER PILE ALTERNATE (TRIMMED AT COMPETENT TIMBER PILE REPAIR ELEVATION BELOW MUDLINE) 0 1/2 , 2 3 FT. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS PROPOSED: TIMBER PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 8 of 9 DATE: 08/21 APPLICATION: CL PILE TO CL PILE (VARIES) EXISTING EXISTING TIMBER TIMBER DECK STRINGER, TYP. NEW 12 X 14 ACZA EXISTING TIMBER NEW GALV. SPIKES TIMBER PILE CAP PILE CAP TO REMAIN AND TIMBER SHIMS (MATCH EXISTING) AS REQUIRED EXISTING OR REPAIRED TIMBER PILE, TYP. PILE CAP REPLACEMENT PROCEDURE 1) INSTALL TEMPORARY SHORING TO SUPPORT OR LIFT PILE C A P STRINGERS AS NECESSARY DURING PILE CAP REPLACEMENT. REPLACEMENT ELEVATION 2) CUT OFF AND REMOVE DRIFT PINS AND DAMAGED PILE 0 1 2 4 6 FT. CAPS OVER TOP OF EXISTING OR REPAIRED TIMBER PILE 3) INSTALL NEW PILE CAP TIMBER (TIGHT-FIT) BETWEEN TOP OF PILE AND BOTTOM OF STRINGERS. 4) SPIKE AND SHIM NEW PILE CAP TO TOP OF PILE. MINOR PILE CAP DECAY EXITEXISTING EXISTING EXISTING TIMBER TIMBER TIMBER DECK STRINGER, TYP. EXISTING TIMBER STRINGER, TYP. EXISTING TIMBER PILE CAP, TYP. . SPIKES i L NEW GALV. SPIKES EXISTING OR RER SHIMSTIMBER PILE CIRED LAS REQUIRED NEW 12 X 14 ACZA OR REPAIRED TIMBER PILE CAP TIMBER PILE 2't 2't EXISTING OR REPAIRED PILE CAP REPAIR PROCEDURE PILE TIMBER PILE 1) INSTALL TEMPORARY SHORING TO SUPPORT OR LIFT STRINGERS AS NECESSARY DURING PILE CAP REPAIR. 2) CUT OFF DRIFT PIN FROM TOP OF EXISTING TIMBER PILE PILE C A P AND CUT OFF PILE FOR TIGHT FIT BELOW NEW CAP. REPAIR ELEVATION 3) INSTALL NEW PILE CAP TIMBER (TIGHT-FIT) BETWEEN TOP OF PILE AND BOTTOM OF EXISTING PILE CAP.. 0 1 2 4 6 FT. 4) SPIKE AND SHIM NEW PILE CAP TO EXISTING PILE CAP. 24 SEP 2021 PURPOSE: REPAIR DETERIORATED TRIDENT SEAFOODS TIMBER PILE,, PILE CAP AND TIMBER PILES, CAPS AND STRINGERS UNDER EXISTING WAREHOUSE PIER ANACORTES PLANT STRINGER REPAIRS TIMBER PILE REPAIRS IN: GUEMES CHANNEL DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO. ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M. 1) TRIDENT SEAFOODS APPLICATION BY: 2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY 1400 4TH STREET ANACORTES, WA 98221 SHEET 9 of 9 DATE: 08/21 APPLICATION: