Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit File BLD-2023-0024 4405 E Avenue
A. C> City of Anacortes Invoice/Permit#: BLD-2023-0024 904 6th Street Applied date: 01/10/2023 P.O.Box 547 Issue date: 01/10/2023 Anacortes, WA 98221-0547 Expire date: 07/08/2024 "¢- (360) 293-1901 Job Address: 4405 E AVE Permit Type: PV Solar Permit ANACORTES WA 98221-2636 Project: APN: P32130 Remarks: Install a solar PV system,4.5 kW roof mounted 10 panels 1 array. Owner: DEBORAH AAYRS Contractor: REVOLUTION ENERGY SYSTEMS INC Address: 4405 E AVE Address: 13937 SPRAGUE LN STE 300 ANACORTES WA 98221-2636 DRAPER UT 84020 Phone: (425)471-3912 Phone: (801)664-8893 License#: General Information: Fees: Building Valuation 1125 Building Permit Fee 44.85 Plan Review Fee 29.15 State Building Code Fee Resi 6.50 Total Calculated: 80.50 Deposits/Receipts: 0.00 Total Due: 80.50 The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law, or of any order, proclamation,guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation,guidance or decision of the Governor. This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSU Y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 c�oR Office Location: 904 61h Street, Anacortes WA 98821 Phone: (360) 293-1901 RESIDENTIAL BUILDING PERMIT APPLICATION THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES: Single-Family Residences (SFR), Duplexes, Additions & Remodels, Accessory Structures (i.e. garages, carports), Accessory Dwelling Units, Manufactured Homes, Residential Decks & Retaining Walls, and Docks& Pilings. FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY INFORMATION PROJECT ADDRESS(STREET,SUITE#) ASSESSOR PARCEL NUMBER 4405 E Ave 35012501320000 SUBDIVISION/LOT# ZONING LOT AREA(SIZE) SQ. FT. TYPE OF PROJECT NEW ADDITION REPAIR REMODEL CHANGE OF USE SFR Lj Duplex ❑Deck/Porch Accessory Dwelling Unit: ❑Detached ❑Attached ❑Retaining Wall ❑ Manufactured Home ❑Accessory Structure ❑ Shoreline Structure(dock, pilings,floats etc.) * ❑X Other: residential solar array *If application is for a shoreline structure, please complete the Shoreline Structure Checklist. IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? I YES ✓ NO f YES, provide the permit/application number: PROJECT SUMMARY: PROJECT VALUATION grid tied; roof mounted 4.5 KW residential solar array (Cost of Materials & Labor) $ 1125.00 PROPERTY OWNER INFORMATION NAME PHONE Deborah Ayrs 4254713912 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 4405 East Avenue Anacortes, WA 98221 debayrs@gmail.com CONTRACTOR INFORMATION Revolution Solar PHONE 8016648893 CONTRACTOR'S BUSINESS LICENSES STATE LICENSE# EXPIRATION *All Contractors&Subcontractors must have a valid City REVOLES7881_7 06/22/2024 of Anacortes business license prior to doing work in the UBI# EXPIRATION City. 604915746 06/22/2024 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 13937 Sprague Lane Suite 300 Draper, UT 84020 permits.wa@revolutionsolar.com Page 1 of 17 Res.Building Permit Application Submittal Checklist Updated April 20,2021 CONTACT PERSON -Select one person the city will contact for anything related to this project: EC APPLICANT []PROPERTY OWNER []CONTRACTOR ❑OTHER(LIST BELOW) NAME PHONE Alyssa Samways 8016648893 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 13937 Sprague Lane Suite 300 Draper, UT 84020 permits.wa@revolutionsolar.com LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender involved with your project, write "no lenders"on the Name Line below. NAME PHONE Enium Capital Group 844-500-9695 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 1064 S North County Blvd Suite 200 Pleasant Grove,UT 84062 info@enium.com ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: X1 understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. XI understand that if 1 submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. XI understand and acknowledge that I could be responsible for providing as-built drawings(on paper or electronically)as part of the project's certificate of occupancy process. X1 understand and acknowledge that Special Inspections could be required as part of my project, and if needed 1 will be required to pay for the cost of these inspections. X 1 understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. X I understand that if permits are reviewed concurrently such as design review, site plan, traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that 1 am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects, true, correct, and complete to the best of knowledge and belief. c v4 . .� SIGNATURE DATE Alyssa Samways PRINTED NAME Res.Building Permit Application Submittal Checklist Updated December 2021 Page 2 of 17 SSLING CONSULTING 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Coleman D. Larsen, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com January 3, 2023 Revolution Solar 9981 West 190th Street Unit K, Mokena, IL Re: Engineering Services Ayrs Residence 4405 East Avenue, Anacortes, WA 4.500 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Prefabricated wood trusses at 24" on center. All truss members are constructed of 2x4 dimensional lumber. Roof Material: Metal Roof Slope: 28 degrees Attic Access: Accessible Foundation: Permanent �QFORCODEC' C. Loading Criteria Used n • Dead Load m o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf s o TOTAL = 10 PSF �RCOR�� � • Live Load = 20 psf(reducible)—0 psf at locations of solar panels LLD Cl? • Ground Snow Load = 20 psf • Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 98 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2018 Washington State Residential Code(2018 lRC), including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105%for gravity elements and 110%for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent S-5! installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2 System will be attached to the metal roofing material utilizing the patented S-5! connection. Installation of the connections shall be in accordance with the manufacturer's recommendations. 3. Considering the wind speed, roof slopes, size and spacing of rafters, and condition of the roof, the panel supports shall be placed no greater than 48" on centers. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2018 Washington State Residential Code, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. V =1y your Scott E.Wyssli PE Washington License 111163 VVYSSLING CONSULTING AERIAL VIEW: MAP VIEW: RE veiffo* + , nd PI Revolution Energy Systems Inc. . .� ',� _ 9981 West 190th St .�. Unit K Mokena IL 60448 T: 708-995-1643 J. IF amp • estw.qo. • SITE INFORMATION . '3 DEBORAH ANNE AYRS 4405 E AVE oft �mule ANACORTES,WA 98221 AC System Size:3.25 kW AC/3.25 kVA * DC System Size:4.50 kW DC a Lat,48.48544 Long,-122.63078 (10)CANADIAN SOLAR CS3W-4501VS(450W) CL PV Modules (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) PUDGET SOUND ENERGY GENERAL NOTES PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS �0 1. INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE EQUIPMENT: h SHEET INDEX: 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING AC System Size: 3.25 kW AC/ 3.25 kVA PV01 COVER PAGE 50 kW DC 2. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL DC SYSTEM SIZE: 4. PV02 SITE PLAN EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110 (10) CANADIAN SOLAR CS3W-450MS (450W) PV M le °o 111ta� ,°` PV03 ROOF ATTACHMENTS (10) ENPHASE IQ8M-72-2-US (240V) Inverters 13T� ti 3. ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM 0NAL. PV04 MOUNTING DETAIL RACKING: S-5 MINI/S BRACKET - 48 O.C. PV05 LINE DIAGRAM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 Signed 1/03/2023 PV06 ELECTRICAL CALCS 4. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER PV07 LABELS UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS PV08 PLACARD 5. ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 2020 NEC OCCUPANCY: R-3 PV09 SITE PHOTOS 6. DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 2018 IRC ZONING: RESIDENTIAL DRAWN BY: B CUTANDA 7. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE 2018 IMC DATE: 2018 I FGC 12/30/2022 COVER PAGE - PV01 N ARRAY DETAILS: MOUNTING PLANE: AZIMUTH: TILT: M P1 270° 28° CLOSE UP OF HOUSE 5 L A R ICES MSP Revolution Energy Systems Inc. PROPERTY LINE —179'-9" 9981 West 190th St Unit K Mokena IL 60448 T: 708-995-1643 I 1 1 I `-� I SITE INFORMATION DEBORAH ANNE AYRS DRIVEWAY 1 CO 4405EAVE 0 I � U M O Q'iDSLCODEC ANACORTES,WA 98221 1IV Y O�'0�2 AC System Size:3.25 kW AC/3.25 kVA W = G C DC System Size:4.50 kW DC rrs r Z n Lat,48.48544 Z J fll o v N�o�,R ��� z Long, 122.63078 t ® C0 ��� (10)CANADIAN SOLAR CS3W-450MS(450W) Ww ` �rOFIELD�NSe� PV Modules o m � (10) ENPHASE IQ8M-72-2-US(240V) �, Inverter(s) pjI I a N PUDGET SOUND ENER I I w N rY PROPERTY LINE —179'-9" v ZDI 1w B GP r>a (E)SKY LIGHT 1VAL Signed 1/03/2023 EQUIPMENT LEGEND: VISIBLE, LOCKABLE, DRAWN BY: B CUTANDA UTILITY METER AC VISIBLE, LOCKABLE, LABELED wv INVERTER ❑ ❑ SERVICE SMART SWITCH FIRE ACCESS LABELED AC DISCONNECT DATE: AC DISCONNECT sue SUB PANEL SD DISCONNECT SS (IQ System Controller) a PV MODULES PATHWAY(3-TYP) 12/30/2022 LOCATED WITHIN 10 MSP MAIN SERVICE Pv METER SOCKET c PANEL COMBINER BOX N Lc ( ) N LOAD CENTER GATT BATTERY IES JB TRANSFER SWITCH JUNCTION BOX ATS AUTOMATIC i PROPERTY LINE OF UTILITY METER N (For utility PV meter) N N N , SITE PLAN - PV02 NFACE MSP �pR CODE� 5 L A R 4 ,0 Revolution Energy Systems Inc. tz ' 9981 West 190th St a 'i-, 3"TYP Unit K Mokena IL 60448 a T: 708-995-1643 COD � 4 C Q ° 7'OFff✓LD SI? SITE INFORMATION DEBORAH ANNE AYRS 4405 E AVE ANACORTES,WA 98221 HOUSE ELEVATION ° AC System Size:3.25 kW AC/3.25 kVA DC System Size:4.50 kW DC Lat,48.48544 46'-10" ® 58'-10" Long,-122.63078 (10)CANADIAN SOLAR CS3W-4501VIS(450W) PV Modules 33' (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) 3'TYP PUDGET SOUND ENE RC 1B 30'-10" v, ; EQUIPMENT INFORMATION: ROOF INFORMATION PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: OxsT1� �� r RAIL MANUFACTURER: UNIRAC ROOF TYPE: METAL ROOF PV MODULE COUNT: 10 `�10)NAI ANC' RAIL PART NUMBER: SM ROOF FRAMING: MANUFACTURED TRUSS ARRAY AREA: MODULE COUNT* 23.63 ft2=236.30 ATTACHMENTS S-5 MINI/S BRACKET RAFTER/TOP CHORD SIZE: 2"X 4" ROOF AREA: 2585.8006 ft2 Signed 1/03/2023 ATTACHMENT CITY: 46 RAFTER/TOP CHORD SPACING: 24" PERCENT OF ROOF COVERED: 9% DRAWN BY: B CUTANDA SPLICE CITY: 4 ATTACHMENT SPACING: 48" ARRAY WEIGHT: MODULE COUNT* 54.9 Ibs=549.00 Ibs DATE: MIDCLAMP CITY: 14 POINT LOAD: ARRAY LBS/ATTACHMENTS= 11.93 12/30/2022 ENDCLAMP CITY: 12 DISTRIBUTED LOAD: (Ibs/ft2) (ARRAY) WEIGHT/AREA=2.3 Ibs/ft2 ROOF ATTACHMENTS- PV03 UNIRAC PRO SERIES UNIRAC PRO SERIES PV MODULE END CLAMP MID CLAMP 1 2 RAIL EvEi M \', PV MODULE PV MODULE 5 Z A R FN 1'-8" MAX 48"MAX SPAN Revolution Energy Systems Inc. RAIL RAIL 9981 West 190th St FRONT VIEW (E) RAFTER/TOP CHORDS 995-Unit K Mo IL 60448 T: 708995-1643 �� END CLAMP DETAILS ( 2 1 MID CLAMP DETAILS Back Left M8-1.25 Threaded Top RAIL SITE INFORMATION DEBORAH ANNE AYRS S-5 MINI/S BRACKET 1.50in 4405 E AVE 10" MIN - 3 ANACORTES,WA 98221 .59 in 1 411 AC System Size:3.25 kW AC/3.25 kVA 1.50in— �-1.1 a'n--� MAX DC System Size:4.50 kW DC 7 5 i n 10" MIN - Lat,48.48544 j-2 2 ` 2'-8" MIN- — 1 1-41f Long,-122.63078 3'-10" MAX MAXT (10)CANADIAN SOLAR CS3W-450MS(450W) General Notes: PV Modules 1 1. S—S—S Mini Clamp `� 0 (10) ENPHASE IQBM-72-2-US(240V) ��� 2. M8-1.25 Stainless Steel Hex 3 3 Flange Bolt (13mm Socket) (E) RAFTER/TOP CHORD Inverter(s) 3. 3/8-24 Stainless Steel Round 2'-8" MIN - 4 4 Point Setscrew (3/16 Hex Drive) 3'-10" MAX 4. Example roof PUDGET SOUND ENERC 3 DETAIL, MOUNTING , , fl. W SIDE VIEW ' 0 ; EQUIPMENT INFORMATION: ROOF INFORMATION PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: O'�$ 013TER RAIL MANUFACTURER: UNIRAC ROOF TYPE: METAL ROOF PV MODULE COUNT: 10 NAI. ANC' RAIL PART NUMBER: SM ROOF FRAMING: MANUFACTURED TRUSS ARRAY AREA: MODULE COUNT* 23.63 ftz=236.30 ATTACHMENTS S-5 MINI/S BRACKET RAFTER/TOP CHORD SIZE: 2"X 4" ROOF AREA: 2585.8006 ftZ Signed 1/03/2023 ATTACHMENT CITY: 46 RAFTER/TOP CHORD SPACING: 24" PERCENT OF ROOF COVERED: 9% DRAWN BY: B CUTANDA SPLICE CITY: 4 ATTACHMENT SPACING: 48" ARRAY WEIGHT: MODULE COUNT* 54.9 Ibs=549.00 Ibs DATE: MIDCLAMP CITY: 14 POINT LOAD: ARRAY LBS/ATTACHMENTS= 11.93 12/30/2022 ENDCLAMP CITY: 12 DISTRIBUTED LOAD: (Ibs/ft2) (ARRAY) WEIGHT/AREA=2.3 Ill MOUNTING DETAIL- PV04 CANADIAN SOLAR CS3W-450MS 450 Specs ENPHASE:IQ8M-72-2-US(240V)Specs Equipment Schedule Conduit&Conductor Schedule POWER MAX(PMAX): 450W MAX INPUT VOLTAGE: 480 V TYPE: QTY: DESCRIPTION: RATING: TAG CITY WIRE GAUGE DESCRIPTION CONDUIT SIZE OPEN CIRCUIT VOLTAGE(VOC): 49.1V MAX INPUT CURRENT: 20A MODULES: (10) CANADIAN SOLAR CS3W-450MS 450 450 W (2) 12 AWG(90°C) Q-CABLE,COPPER(L1,L2) 1 12AWG(90°C) THWN-2COPPER-(GROUND) N/A-FREE AIR MAX POWER-POINT CURRENT(IMP): 10.96A NOMINAL DC INPUT VOLTAGE: 400 V INVERTERS: (10) ENPHASE IQ8M-72-2-US(240V) 325 W (1) MAX POWER-POINT VOLTAGE(VMP): 41AV MAXIMUM OUTPUT POWER: 325 W AC DISCONNECTS: (1) PV AC Disconnect,240V,2-Pole w/20A fuses 60 A (2) 12 AWG(90°C) THHN/THWN-2,COPPER-(1-1,L2) SHORT CIRCUIT CURRENT(ISC): 11.6A NOM.OUTPUT VOLTAGE: 240 V COMBINER BOX: (1) ENPHASE COMBINER 4 125 A 2 (1) 12 AWG(90°C) THWN-2 COPPER-(GROUND) 3/4"PVC SERIES FUSE RATING: 20A MAX OUTPUT CURRENT: 1.35 A (3) 10 AWG(90°C) THHN/THWN-2,COPPER-(L1,L2,NEUTRAL)3 3/4"PVC 1-Phase,60 HZ,UL 1741 Listed (1) 10 AWG(90°C) THWN-2 COPPER-(GROUND) 5 L A R 4 (3) 6 AWG(75°C) THHN/THWN-2,COPPER-(L1,L2,NEUTRAL) 3/4"PVC (1) 6 AWG(75°C) THWN-2 COPPER-(GROUND) Revolution Energy Systems Inc. 9981 West 190th St Unit K Mokena IL 60448 T: 708-995-1643 SITE INFORMATION DEBORAH ANNE AYRS 4405 E AVE CONNECTION AS A LINE/SUPPLY LINE SIDE TAP ANACORTES,WA 98221 SIDE CONNECTION-NEC USING INSULATION 705.12(A) PEIRCING 705.12(A) AC System Size:3.25 kW AC/3.25 kVA DC System Size:4.50 kW DC (N)240V/125A PV ENPHASE 120/240 VAC PV LOAD CENTER, (E)200A MAIN SERVICE PANEL TO UTILITY GRID Let,48.48544 AC COMBINER WITH PV AC DISCONNECT Long,-122.63078 INTEGRATED MONITORING, 60A VISIBLE,LOCKABLE, NEMA 3R RATED LABELED,OPEN (E)200A-2� (10)CANADIAN SOLAR CS3W-450MS(450W) ENVOY-IQ 240V,2-POLE PV Modules MONITOR WITH 20A FUSES (E)LOADS (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) L21�_I�OAF' STRING(1):20.0 A DC (E)LOADS 690.12 RAPID (E) SHUTDOWN COMPLIANT PUDGET SOUND ENERGY 10 MODULES — 00 41, --" 2P-20A N N I L---------J_ _L——— -- -- —i— -- --------- — ———7 1 3 4 r � J-BOX L- —-CGND}—— L_ 1 z LTJ I (E)UTILITY METER (E)GROUNDING ELECTRODE VISIBLE, LOCKABLE, DRAWN BY: B CUTANDA LABELED AC DISCONNECT DATE: LOCATED WITHIN 10' 12/30/2022 OF UTILITY METER LINE DIAGRAM - PV05 STRING CALCULATIONS SYSTEM OCPD CALCULATIONS ENPHASE:IQ8M-72-2-US(240V) STRING#1 INVERTER MODEL(5): ENPHASE IQ8M-72-2-US(240V) MAX AC CURRENT 16.9A #OF INVERTER(S): 10 MICRO INVERTER(S)IN SERIES: 10 MAX OUTPUT CURRENT: 1.35A NOMINAL VOLTAGE/RANGE 211V-264V (#OF INVERTERS)X(MAX OUTPUT CURRENT)X 125%<=OCPD RATING MAX AC OUTPUT POWER: 3250W (10 X 1.35A X 1.25)=16.93A<=20A,OK ARRAY DC POWER: 450OW 5 L A R PV LOAD CALCULATIONS:SUPPLY SIDE TIE-IN TOTAL MAX AC CURRENT: 13.54A FEEDER WIRE RATING: 200A Revolution Energy Systems Inc. NUMBER OF CURRENT CARRYING CONDUCTORS PERCENT OF VALUES ALLOWABLE SOLAR CALCULATION 160.000OA(FEEDER WIRES ALLOWABLE SOLAR) 4-6 .80 (FEEDER RATING-1.25) 9981 West 190th St 7-9 .70 160.000OA(AVAILABLE FOR PV) Unit K Mokena IL 60448 10-20 .50 T: 708-995-1643 Conduit&Conductor Schedule TAG CITY WIRE GAUGE DESCRIPTION CONDUIT SIZE CONDUCTOR RATING CONDUCTOR TEMP.RATE AMBIENTTEMP TEMP.DERATE #OF CONDUCTORS CONDUCTOR RATING CONDUIT FILL DERATE W/DERATES 1 (2) 12 AWG Q-CABLE,COPPER(L1,L2) N/A-FREE AIR 20A 90°C 22°C 0.96 N/A-FREE AIR 19.2A N/A-FREE AIR (1) 12 AWG THWN-2 COPPER-(GROUND) SITE INFORMATION (2) 12 AWG THHN/THWN-2,COPPER-(Ll,L2) 2 3/4"PVC 20A 90°C 22°C 0.96 1.0 19.2A 7.24% DEBORAH ANNE AYRS (1) 12 AWG THWN-2 COPPER-(GROUND) (3) 10 AWG THHN/THWN-2,COPPER-(L1,L2,NEUTRAL) 4405 E AVE 3 3/4"PVC 40A 90°C 22°C 0.96 1.04 39.9A 15.27% (1) 10 AWG THWN-2 COPPER-(GROUND) ANACORTES,WA 98221 4 (3) 6 AWG THHN/THWN-2,COPPER-(L1,L2,NEUTRAL) 3/4"PVC 65A 75°C 22°C 0.94 1.05 64.15A 35.49% AC System Size:3.25 kW AC/3.25 kVA (1) 6 AWG THWN-2 COPPER-(GROUND) DC System Size:4.50 kW DC Lat,48.48544 Long,-122.63078 (10)CANADIAN SOLAR CS3W-45OMS(450W) PV Modules (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) PUDGET SOUND ENERGY GROUNDING&GENERAL NOTES: INTERCONNECTION NOTES: 1. PV INVERTER IS UNGROUNDED,TRANSFORMER-LESS TYPE. 1. INTERCONNECTION SIZING, LIMITATIONS AND COMPLIANCE DETERMINED IN ACCORDANCE WITH[NEC 2. DC GEC AND AC EGC TO BE SPLICED TO EXISTING ELECTRODE 705.121,AND[NEC 690.64]. 2.GROUND FAULT PROTECTION IN ACCORDANCE WITH[NEC 215.9], [NEC 230.95]AND[NEC 690.5] 3.ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO 3.ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. PV BREAKER TO BE POSITIONED AT THE OPPOSITE END OF THE BUSBAR RELATIVE TO THE MAIN BREAKER. 4.JUNCTION BOX QUANTITIES,AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD- JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE DISCONNECT NOTES TRANSITIONS. 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS DRAWN BY: B CUTANDA 5.AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED"LINE SIDE"(TYPICALLY THE UPPER TERMINALS) DATE: AC DISCONNECTING MEANS IS LOCATED WITHIN 10'OF SERVICE DISCONNECT. 2.AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE,AND BE A 12/30/2022 VISIBLE-BREAK SWITCH ELECTRICAL CALCS- PV06 ! WARNING LABEL 1 WARNING: PHOTOVOLTAIC AT AT DIRECT-CURRENT EXPOSED RACEWAYS,CABLE TRAYS,COVERS AND FOR PV DISCONNECTING MEANS WHERE THE LINE AND ENCLOSURES OF JUNCTION BOXES,AND OTHER WIRING METHODS;SPACED ELECTRIC SHOCK HAZARD LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POWER SOURCE AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES,WALLS, POSITION. PARTITIONS,CEILINGS,OR FLOORS. TERMINALS ON BOTH LINE AND [NEC690.13(B)] [NEC 690.31(G)(3&4)] LOAD SIDES MAY BE ENERGIZED IN 1MVEffA THE OPEN POSITION SOLAR PV SYSTEM EQUIPPED LABEL7 S L A R WITH RAPID SHUTDOWN FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: Revolution Energy Systems Inc. SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE gY Y WARNING LABEL 2 DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND PLACED ADJACENTTO THE BACK-FED BREAKER FROM TURN RAPID SHUTDOWN SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN 9981 West 190th St ! SWICH TO THE"OFFPVP"Ne s SWITCHES IF NOT AT THE SAME LOCATION. THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE [NEC 690.56(C)(1)(A)] Unit K Mokena IL 60448 THIS EQUIPMENT IS FED BY MULTIPLE CONNECTION TO BUSBAR. POSITION TO SHUT DOWN T: 708-995-1643 [NEC 705.12(13)(2)(3)(b)] PV SYSTEM AND REDUCE SOURCES. TOTAL RATING OF ALL SHOCK HAZARD IN ARRAY OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED SOLAR . ..ED LABEL8 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS AMPACITY OF BUSBAR. - LEAVING THE ARRAY: SITE INFORMATION SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY DEBORAH ANNE AYRS TURN RAPID SHUTDOWN FROM SERVICE DISCONNECTING MEANS TO WHICH THE © PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE 4405 E AVE t WARNING LABEL 3 SWITCH TO THE"OFF' _• I LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN PLACED ADJACENTTO THE BACK-FED BREAKER POSITION TO SHUT DOWN I— SWITCHES IF NOT AT THE SAME LOCATION. ANACORTES,WA 98221 FROM THE INVERTER IF TIE IN CONSISTS OF LOAD CONDUCTORS OUTSIDE [NEC 690.56(C)(1)(b)] AC System Size:3.25 kW AC/3.25 kVA INVERTER OUTPUT CONNECTION SIDE CONNECTION To BUSBAR. THE ARRAY.CONDUCTORS [NEC 705.12(13)(2)(3)(c)] WITHIN THE ARRAY REMAIN DC System Size:4.50 kW DC DO NOT RECOLCATE ENERGIZED IN SUNLIGHT THIS OVERCURRENT Lat,48.48544 DEVICE Long,-122.63078 RAPID ■ , SHUTDOWN • LABEL 9 (10)CANADIAN SOLAR CS3W-450MS(450W) SIGN LOCATED AT RAPID SHUT DOWN PV Modules SWITCH DISCONNECT SWITCH[NEC 690.56(C)(3)]. ■ (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) i WARNING EQUIPMENT CONTAINING OVERCURRENT SOLAR PV SYSTEM DEVICES IN CIRCUITS SUPPLYING POWER TO A DUAL POWER SUPPLY BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO MAIN SERVICE PANEL SOURCES: UTILITY GRID AND PV INDICATE THE PRESENCE OF ALL SOURCES L PUDGET SOUND ENERGY SOLAR ELECTRIC SYSTEM [NEC 705.12(B)(3)] LABELING DIAGRAM: Ol O2 EXISTING SUB PANEL PV COMBINER INVERTER(S) (IF WHERE POINT OF SUBPANEL- LABELS O O4 INTERCONNECTION IF USED TO COMBINE PHOTOVOLTAIC AC DISCONNECT AT POINT OF INTERCONNECTION,MARKED AT IS MADE) AC DISCONNECT PV OUTPUT CIRCUITS AC DISCONNECTING MEANS. RATEDOUTPUT CURRENT: 13.54 A [NEC 690.54,NEC 690.13(B)] ❑ O O O O O NOMINALOPERATING AC VOLTAGE: 240 V O O O O0 3 O JUNCTION BOX OR COMBINER BOX LABELING NOTES: oc 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS.ELECTRICIAN TO DETERMINE EXACT O O REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS.2.LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE,OSHA STANDARD 19010.145,ANSI (ONLY IF PV (ONLY IF PV ❑ O O Z535. INTERCONNECTION INTERCONNECTION o 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. CONSISTS OF LOAD CONSISTS OF LOAD O O 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED[NEC 110.21(B)(3)] SIDE BREAKER) SIDE BREAKER) DRAWN BY: B CUTANDA 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8",WHITE ON RED BACKGROUND;REFLECTIVE,AND INTEGRATED DC DISCONNECT PERMANENTLY AFFIXED[IFC 605.11.1.11 DATE: *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY.NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED.LABEL LOCATIONS 12/30/2022 PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON THE ELECTRICAL DIAGRAM PAGE. LABELS - PV07 5 L A R CAUTION Revolution Energy Systems Inc. 9981 West 190th St POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR Unit K Mokena IL 60448 ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: T: 708-995-1643 N COMBINER BOX LAC DISCONNECT MAIN DISTRIBUTION UTILITY METER SITE INFORMATION UTILITY DISCONNECT DEBORAH ANNE AYRS 4405 E AVE ANACORTES,WA 98221 AC System Size:3.25 kW AC/3.25 kVA DC System Size:4.50 kW DC Lat,48.48544 Long,-122.63078 (10)CANADIAN SOLAR CS3W-450MS(450W) PV Modules ® (10) ENPHASE IQ8M-72-2-US(240V) Inverter(s) PV ARRAY PUDGET SOUND ENERGY 4405 E AVE, ANACORTES, WA 98221 DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.101) DRAWN BY: B CUTANDA DATE: 12/30/2022 PLACARD- PV08 r• 3. , r IY. x rT til •• F' • ..e - - � it/'� '.' ���� k -i-��Q� ��' 4� T Revolution Energy Systems Inc. 9981 West 190th St SITE INFORMATION ANACSITE PHOTOS: DC System Size:4.50 kW DC ti 1 Long,-122.63078 CANADIAN SOLAR ModulesPV •• 40 PUDGET SOUND D• . D. 12/30/2022 SITE PHOTOS- 1. 1 ENGINEERING DRAWING(mm) CS3W-435MS I I-V CURVES Ailikk �r CanadianSolar Rear View Frame Cross SectionA-A n 12. 30 ° W. pc 9 9 9 8 e 11°c] I 5 5 ■ � N � 4 no,o,m - 4 - 3 3 I Mounting Hale a , I1O� _ ° s 10 15 20 25 So- 35 40 45 so-° 5 ,0 ,5 20 25 So-33 M Z So Y ■ eau wrm �s9c■ H' ■ ■ ■ uou w!m• 639 ■ ■ you wlm SUPER HIGH POWER MONO PERC MODULE 430 W - 455 W ��� ELECTRICAL DATA STC* MECHANICAL DATA CS3W-430 1 435 1 440 1 445 1 450 1 455MS � � CS3W 43OMS 435MS 440MS 445MS 45OMS 455MS Specification Data Nominal Max.Power(Pmax) 430 W 435 W 440 W 445 W 450 W 455 W Cell Type Mono-crystalline Opt,Operating Voltage(Vmp)403 V 40.5 V 40.7 V 40.9 V 41.1 V 413 V Cell Arrangement 144[2 X(12 X 6)] Opt.Operating Current(Imp) 10.68 A 1 D.75 A 10.82 A 10.89 A 10.96 A 11.02 A 2108 X 1048 X40 mm Open Circuit Volta MORE POWER P Voltage a(Voc) 483 V 4133 V 48.7 V 48.9 V 49.1 V 493 V Dimensions (83.0 X41.3 X 1.57 in) ■� Short Circuit Current(Isc) 1 137 A 11 A2 A 11 A8 A 11.54 A 11.6D A 11.66 A Weight 24.9 kg(54.9 Ibs) 26'A more power than . Module Efficiency 19.5% 19.7% 19.9% 20.1% 20A% 20.6% Front Cover 3.2 mm tempered glass conventional modules Operating Temperature -40°C-+85°C Frame Anodized aluminium alloy, Max.System Voltage 1500V(IECIUL)or 100DV(IECIUQ crossbar enhanced 25 linear power output warran * TYPE 1(UL 1703)or J-Box IP68,3 bypass diodes Up to 4.5%lower LCOE P P tY Module Fire Performance ``J� f U to 2.7%lowers stem cost years CLASS C(IEC 61730) Cable 4 mml pEC),12 AWG(UL) p y Portrait:500 mm(19.7 in){+)I350 Max.Series Fuse Rating 20 A Cable Length mm(13.8 in)(-);landscape:1400 mm Application Classification Cli (Including Connector 55.1 in lea fro connection:167D Low N MOT:42 t 3°C g ) ( )%leap-frog enhanced product warranty on materials mm(65.7 in)* 42°[ Low temperature coefficient(Pmax): 2 and workmanshi * Power Tolerance D-+1 D W ears P Connector T4 series or H4 UTX or MC4EV02 -D.3 5'A/°C *Under Standard Test Conditions;S5TC}of irradiance of 1000 Wlm�,spectrum AM 1.5 and cell tel of2s`C. Per Pallet 27 pieces *Accordingto theapplicable Canadian Solar Limited Warranty Statement. Per Container(40'HQ) 594 pieces + Better shading tolerance •••••••••••••••••••••••••••••••••••••••••-••••••••••••••••••••••••••••••-•••••-•••••-•••••-................. .... .... ..... ELECTRICAL DATA I NMOT* *For detailed information,please contact your local Canadian Solar sales and MANAGEMENT SYSTEM CERTIFICATES* CS3W 43OMS 435MS 44OMS 445MS 45OMS 455MS technical representatves. I50 9001 2015 1 Quality management system Nominal Max.Power(Pmax) 321 W 325 W 328 W 332 W 336 W 339 W ISO 14001:201515tandarcisfor environmental management system Opt.Operating Voltage 37.6 V 37.6 V 37.9 V 38.1 V 383 V 38.5 V TEMPERATURE CHARACTERISTICS MORE RELIABLE OHSAS18001:2007/Internationalstandardsforoccupationalhealth&safety P• P 9 9 (VmP) Opt.Operating Current(Imp) 8.54 A 8.59 A 8.65 A 8.71 A 8.76 A 8.82 A Specification Data PRODUCT CERTIFICATES* Open Circuit Voltage(Voc) 45A V 45.6 V 45.6 V 46.0 V 46.2 V 46A V Temperature CDefficient(Pmax) -0.35%I°C Lower internal� current, IEC 61215I IEC 61730:VDE I CE I MCS I INMETRO_ UL 1703:CSAI IEC 61701 ED2:VDE/IEC 62716:VDE I IEC 6 00 68-2-66:Si Short Circuit Current(Isc) 9.17 A 9.21 A 9.26 A 9.31 A 9.36 A 9.41 A Temperature Coefficient(Voc) -0,27%I'C ++ lower hot spot temperature UNI 9177 Reaction to Fire:Class lTake-e-way •Under Nominal Module Operating Temperature(NMGT},irradiance of 3W W1mxspectrum AM 1.5, Temperature Coe$IClent(ISc) 10S%11C ambient temperature 20`G wind speed ibis. �' a.. cEar Nominal Module Operating Temperature 42 t 3°C �E �sA�gt +E �e� -,=�.=- - Minimizes micro-crack impacts +As there are different certlficatl on requirements in different markets,please contact your local Canadian Solar sales representative for the specific certificatesapplicabletothe PARTNER SECTION products in the region in which the products areto be used. ......................................._...._....._----_----_----._...._....._---._---------_....._---- * Heavy snow load up to 5400 Pa, .................._...._........................................................._......................._...._... i wind load up to 3600 Pa* CANADIAN SOLARINC.is committed to providing high quality solar products,solar system solutions and services to cus- tomers around the world.No.1 module supplier for quality 3 *Thespecificat'onsand keyfeatures contained In this datasheet may deviateslightyfrom our actual and performancelprice ratio in IHS Module Customer Insight products duetotheon-going Innovation and product enhancement Canadian SolarInc.reservesthe Survey.As a leading PV project developer and manufacturer rightto make necessaryadjustmentto the information described herein atanytime withoutfurther notice. of solar modules with over 40 GW deployed around the world Please bekindlyad✓ised that PJmodulesshouldbehandledandinstalledby qualified peoplewhohave i ! since 2001. professional skillsand please carefully read the safety and installation instructions before using our PV 3 modules. *For d etail information,please refer to Installabon Manual. ................................................................................................................................................................_............................-.....-............................-.....-.......................... CANADIAN SOLAR INC. CANADIAN SOLARINC. 545 S peedva le Aven ue West,Guelph,0ntariDN1K 1E6,Canada,www.can a than solar.com,support@canadiansolar.com 545 Speedvale Avenue West,Guelph,Ontario IN K 1 E6,Canada,www.canadiansolar.com,support@canadiansolar.com May 2020.All rights reserved.PV Module Product Dalasheet V5.59_EN ENPHASE IQ$ Series Microinverters INPUT 1 I Q8 ,1 A: Ai Ai A: 1 A: li Commonly used module pairingsz W 235-350 235-440 260-460 295-500 320-540+ 295-500, Module compatibil Ity 60-cell/120 half cell 60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPr voltage range V 27-37 29-45 33-45 36-45 38-45 38-45 Operating range V 25-48 25-58 Min/max start voltage V 30148 30/58 Max input DC voltage V 50 60 Max DCcurrent'[module Ise] A 15 - Overvoltage class DC port II DC part backfeed cur rent MA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT I A, 1 A: A: A: A: I A• I: Peak output power VA 245 30C 330 366 384 366 Max continuous output power VA 240 290 325 349 380 36C Nominal(L-L)vcltage/range° V 240/211-264 208/183-250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 IQ8 Series Microinverters Extended Hz fi0 Easy to install Extended frequency range Hz 50-68 Our newest 108 Microinverters are the industry's first microgrid-forming,software- Lightweight and compact with AC short circuit fault currentover 2 4.4 3 cycles Arms defined microinverters with split-phase power conversion capability to convert DC plug-n-play connectors power to AC power efficiently.The brain of the semi con ductor-basedmicroinverter Max units per2oA(L-L)brancncircuits is >3 n n 10 9 • Power Line Communication is our proprietary application-specific integrated circuit(ASIC)which enables the (PLC)between components Total harmonic distortion <5% microiinverter to operate in grid-tied or off-grid modes.This chip is built in advanced Overvoltage class AC part HI 55nm technologywith high speed digital logic and has super-fast re spon se times Faster installation with simple to changing loads and grid events,alleviating constraints on battery sizing for home two-wire cabling AC part backfeed current mA 30 energy systems. Power factor setting 1.0 High productivity and reliability Grid-tied powerfactor(adjustable) 0.85 leading-0.85 lagging • Produce power even when the Peak effici ency N 97.5 97.6 97.6 97.6 97.6 97.4 Eni grid is down" CEC we!ghtedefficiency N 97 97 97 97.5 97 97 • More than one million cumulative Night-time power consumption mW 60 25 hours of testing MECHANICAL DATA • Class lldouble-insulated Ambienttemperaturerange -40°Cto+60°C(A0°Fto+1401F) Part of the Enphase Energy System,IQ8 Series IQS Series Microinverters redefine reliability enclosure Relative humidity range 4/to100%(condensirig) MI aroinverters integrate with the Enphase IQ Battery, standards with more than one milli oncumulative Optimixedforthelatesthigh- Enphase IQ Gateway,and the EnphaseApp monitoring hours of power-on testing,enabling an industry- DC Connector type MC4 and analysis software. leading limited warranty of upto 25 years. powered PV modules Dimensions(HxWxD) 212 mm(8.31 x 175 m m(6.9")x 30.2 mm p.2'9 Microgrid-forming Weight 1.08 kg(2.38IIns) Complies with the latest Cooling Natural convection-na fans • up=:c CERTIFIED advanced grid sul Approved forwet locations Yes SAFM Remote automatic updates for Pollutiandegree PD3 the latest grid requirements Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Connect PV modules quickly and easily tolQBSeries IQB Series Microinverters are UL Listed as Configu Table to support a wide Environ.category/UV exposure rating NEMA Type 6/outdoor Mlcroinvertersusingthe Included Q-DCC-2adapter PV Rapid Shut Down Equipment and conform with cable with plug-n-play MC4connectors. various regulations,when installedaccordingt❑ range of grid profiles 1 manufacturer's instructions. Meets CA Rule 21(UL 1741-SA) CA Rule21(UL1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 requirements Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC2017,and N€C2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DCoonductors,when installed accordingto manufacturer's instructions. 02022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQB Microinverters,and other Only when installedwith IQ System Controller 2,meets (1)The IQBH-20Bvariant will be operating in grid-tied mode only at 208VAC.(2)No enforced DC/AC ratio.See names aretrademarks of Enphase Energy,Inc.Data subjectto change. UL1741.IQBH-208V operates only in grid-tied mode. the compatibility calculator at https://Iink.anphase.com/module-compatlbllity 13)Maximum continuous input IQB Series Microinverters supports split phase,240V. DC current is 10.6A(4)Nam!nal voltage range can be ed ended beyond nominal if required by the uti I Ity.(5) IQBSE-DS-0001-01-EN-US-2022-03-T7 IQBH-208 supports split phase,208V only. Limits may vary.Refer to local requirements to definethe number of microinverters per branch inyour area. IQBSE-DS-0001-01-EN-US-2022-03-TI Enphase 10 Combiner 4/4C The Enphase IQ Combiner 414C with Enphase MODEL NUMBER Enphase IQ Carnbiner 4 (it-1Q-AU1-2.40-4) IQ Gambirer 4 wNh Enphwm illQ Gatersry pdnud circuit hoard fw Imkgrmlyd m-mnue grade PV pro.rctmn malulryp"SI �` IQ Gateway and integrated LTE-Ml cell C12.20+".SV and�um�,anmcn1wni 4(+t-M%.lnr�rdr®eeihrery larshieldwmitcI,dm1,0Ba�,myson. I � �I� 1 � f IQ Spstbam fi+vntrrabsr 2 and no deliect heat. ff4 modem (included onlyWith IQ Combiner4C) IQ Combiner 4C(X-IQ-AM1-244-4C) IQCzrnbiner4Cw1th Enphase IQaairva}Printed clrcuhboard4hu Integrated revenue grade PVprn6xtlonnieter^rg ll� r+}} �-yy— (ANSI C1220•I-0-5%j and consumptionmonitoring(+F-2.5%).Includes Enphase Mobile Camecice;_ilarmodem —I _ IYB�—L td consolidates t interconnection�r�rl tlQnequipment (CELLMODEM-M1-06-SP-O5),apluq•and•play ndusinal-grade Dell maiem°oasys terns upID60micronverters. (Available in the US,Canada,Mwlco,PuartD Alco,and the LFS'Ylrgn Islands,v.heae there is adequate cellular sarvica in the Installation area.)Includes a silver solarshleld to match the ID Battery and IQ System Conwxoller and to de€lecl heat. -� '- �- - + into single en l'aslJr and streamlines IQ ACCESSORIES AND REPLACEMENT PARTS (not included.order separateVj microinverters and storage installations by EnsembleCommunlcetlonsKit -includes COMMS-IUT-01 and CEUMODEk1 l-O&SP-05wkh5-yearSprintdata plan far COMMS-CELLMOD;EM-Mi-06 Ensemble sites providing a consistent, pre-wired solution for CELIMCIDEMA41-06-SP-05 4G based LTE-kit cellular modern with 5yrcar Sprint data plan CELLMODE1.i l-06-AT05 -4G based LTE-kit cellular modern with 5-year AT&T date plan rest denti al apt i catlo rs- it offers u p to zo u r Circuit Breakers Supports Eaton BR210,BR215,BR22D,SR230,BR240,BR250,and BR26Dcircuit breake•s. BRK-1 DA-2-24DV Clrc u it breaker,2 pole.10&Eaton B R210 2-pole Input circuits and Eaton BIR series BRK-15A-2-240V Clrcuilbr Laker,2 pole,15A,Eaton 8R215 BRK-20A-2P-240V Clrcue breaker,2 pok,20A,Eaton QR220 :9 ENPHASE t BRK-15A-2P-24OV-E Clrc Li rt breaker,2 pole.1 SA,Eaton B R2158 with hold dawn kit support b�usbar assembly. BRK-20A-215-24OV-8 Circuitbr Laker,2 pole.20A,Eaton QR220Bwithhotd down kilsuppart EPL C-01 Power line carrier(cornrrrunlcation bridge pair),quantity-one pair %A-a4LARSHIELD-ES Replacement solar shield far IQ Combiner 44C Smart %A-PLUG-124-3 Accessory receptacle far Pawror Una C arrier In IQ Comb finer 4e4C(required for EPLC-D1) XA-ENV-PCBA-3 Replacement IQ Gatewayprintedclrcuit I:-0ard CP:D to Com`iner 414C • Includes IQ Gate-Kay'or:ommunicationand control x-IQ-NA-HD-125A FiDSd down kit for Eatoncilroullbreakarwithscrews. • Includes Enphase Nlobile Connect.cellular modem ELECTRICAL SPECIFICATIONS CELL MOD EM-Ml-46-SP-.)5i:inc uded on wish IQ Retlnpl carrare,nerduty CDm bi ner 4D System rahage 12O/240 VACS 6014z • includies solar shield to match Enphase IQ El,attery Eaton BRserlrsbusbarrating 125A aesthetics and deflect heat Max.cerrtinuaus crrrert rating 65 A Flexible networking supports M-Fi. Max-aantnuous current ra"(Input rremPV'Jstarm* 64A Ethernet,or cellular Mar..FLseiclrcultrating(output} 4GA • Optional AC receptacle available fur PLC bridge Branch circuits(solar andrar enrage) Up to four 2-pole Eaton IBR series Distributed Generation(DG)br®ke s only(nat Included) • PnyAdes production metering and oonsumptiGn Mawr,total branch circuit breaker rating(Input) BOA al distributed generation 05A with IC aatewaybreaker included innorkar ng PrDductlon rrreiereng CT 200 A solid care pre Installed and wired to IQ Gateway Consumption monitoring CT(CT-20D-SPUT) A pas of 200 A split core current transFoemers Sirrlple MECHANICAL DATA Dimanslon s(WaWxD) 37.5 a 49.5 0<16.e errn(14:75 x i9.5 x 6.63p.Halghrt is 21.46 ;53.5 c mi wide nmuncing brackets. • Centered mount`ng brackets support single Weight 7.5kg(16.5lbs) stud mount-in g Arrrblent tenpe•raturc range -404 C 50+46°C(404 to 7154 F) • Supports bottom,back and side conduit entry Coaling Natural convmtian,plus heat shleId • Op to 'rcur 2-pole branch circuits for 240,VAC Encdasureern-iran men tnl rating 6utdear,IiIRTL-certified,ME"type 3R,palycarbonate cnnstructtm plug-in breakers(not included) Aire sizes •20.A to 50 A breniker Inputs:14 to 4A14G copper conductor s X4Cl-4M1_24D4-C - I30 I.total P1I or storage branch circuits •60A breaker branch lnput:4to110AWG copper conductors - I • loan lu9cambned oulpLrL 10ta VOAWG capper conductors r, • Neutral and ground:141a 110 capper conrtucters Atrvays fallow local cock requiementsivr conductor sizing. Reliable Altitude To MOO meters(6.560 feet) Curable NRTL-oertifled NEI IA type 3R enclosure INTERNET(CONNECTION OPTIONS Free-y+ear l invited warranty Integrated Wi-Fi 6D2-111SAWn • Two years labDr reimbursement program coverage Cellular CELLMODEM-Mi-D6-SP-45,CELLMODEkikit-06-AT-05(4GbasedLTE-kil cellular modem). No**waiEmhase included'or bath the IQ Gumbiner SKLI's Mobile Canned cellular modem a requred fw all Ensvnble installations. I�_L I'4ta� Ethemet Optional,pO2.3,CatSE(or Cat 6)LITP Ethernet cable (not included) . COMPLIANCE Cnrnpllance,IQ Combiner J L 1741,CAN rCSA C22.2 No.107.11.47 C'FR,Part 15s Class B,IC 6.S OD3 Production mewrinq:ANSI C12.20 accuracycfess D.5(PV prDduvilon) Consumption metering:accuracy class 2.5 Compliance,IQ Gateway uL 60601.1/CANCSA22.2 No.61010-1 LIS?ED �I�iI��III �_ To 1 3"' `a::r �I rt En l la �e offerings,visit t e.eom " ' To learn more abut Enphase offerings,visit emhase.co e E N P H r E- 0 2021 erwha::e Energy.Al righls rem-vrsd.wnah ue.the Cnikuue k,rp.IQ CL-mire-44C,am ulhei narrc.axe I aJw r rk;oI Er:d-ase Errr,yy.Inc-Data su'ije&talfnange. 10-21-2021 r .E The strength of the S-5-S clamp is in its simple design. The patented setscrews;will S=510 leaving slightly dimple but not roof RightThe 540 6 The S-5-S and S-5-S Mini clamps are each furnished with S—J—S Clamp the hardware shown to the right.Each box also includes RightThe r a bit tip fortightening setscrews using an electric screw MB-1.25X16.00mm gun.A structural aluminum attachment clamp,the S-5-S Hex Flange Bolt is compatible with most common metal roofing materials excluding copper.All included hardware is stainless h' steel.Please visit www.S-5.com for more information S-5-S Clamp including CAD details,metallurgical compatibilities and clampThe S-5-S was created specificallyspecifications. for popular snap-together profiles— The S-5-S clamp has been tested for load to failure including residential profiles ■ ■ ( results on most major brands and profiles of standing a E o Metals ■ ■ ■ ■ - o E (2x)MB-1.25 ' seam roofing.The independent lab test data found at horizontalFor .- • All Threaded Hole www.S-5.com can be used for load-critical designs and Firestone(like the - or applications.S-5!®holding strength is unmatched in the406 S-5-S Mini can be o / / avoid industry.Profiles that are shaped as illustrated below will • / crimping the work with the S-5-S and S-5-S Mini.In order for the S-5-S simpleIts design an/ size make it or S-5-S Mini to fit these types of seams,the finished seam a perfect /r use with S-5!11 snow retentionmust: � Two 3l8-24 X 0.80" ■ ■/ ■ ■ ■ � Beat least 1 A0"high. Round-Paint Setscrews E as setting the patented round-point applications.Installation simple Have a height distance less than or equal to 0.25" � between the male portion of the panel and female clamp,setscrews into the placing 1�0them to the portion of the panel. S-5-S Mini Clamp clamp . ■ tightening specified tension. ancillary items using - bolt provided Example Profiles with the product.Go t. www.S-5.com/tools for information and tools .. properly CU and tensioning S-51 clamps. • d • UfiI4 E S-5-S Mini Clamp • 0 C4 kindsThe S-5-S Mini is a bit shorter than the U� S-5-S and has one setscrew rather than M two.The mini is the choice for attaching W all of ■■ ■. . ■ries:signs CU walkways,satellite dishes,antennas, ,gyp. solar.0 rooftop lighting,lightning protection The S-5-S clamp was - • specifically for CU bracing,conduit, mechanical equipment—just about • • • snap-together Please note:All measurements are rounded to the second decimal place. anythil • • 04 S-5!®Warning!Please use this product responsibly! Distributed by *S-5!mini clamps are not •• products are protected by multiple U.S.and foreign patents.Visa the websae at www.5-5.com for compatible complete information on patents and trademarks.For maximum holding strength,setscrews should be /• be tensioned and re-tensronedasthe seam materialcompresses.Clamp setsaewtension should he W retention systems. verified using a ca librated torque wre nx h betwee n 164 and 184 i nch pounds whe n used on22ga steel, •• and between 134and 154 inch pourdsforalVothermetal sand thinner gar ugesofsteel.Consuhthe S-R websiteatwww.5-5.com for published data regarding holding strength. CopyrightXZ Meal Roof Inno Mtcns,L9f.S 5T produasare parent protecrnd. S-5!aggressivelyprotect5lt5patents,tmda rk5andcopyright5.4ersim481721 ► ' _ SOLARMOUNT son .. U N I RAC OPTIMIZED COMPONENTS • 1 1 = ' 1 1 1 1 1 1 1 ' ' ' 1 • 1 1 '1 i 1 INTEGRATED BONDING&PRE-ASSEMBLED PARTS 1 • 1 • •1 , , 1 1 • , 1 •• 1 1• • •1 , Components are pre-assembled and optimized to reduce installation steps and save labortime.Our new grounding&banding process eliminates copperwire and grounding INTEGRATED BONDING 1 1 1 ' 1 ,• i. ,•• 1 1 1• , •, •I ', •1•• 1 , •1 I , 1 1 ' straps or bondingjumpers to reduce costs.Utilize the microinverter mount with a wire MIDCLAMP management clip for an easier installation. END VERSATILITY ;E CAPS ONE PRODUCT-MANY APPLICATIONS Quickly set modules flush to the roof or at a desired tilt angle. Change module INTEGRATED BONDING orientation to portrait or landscape while securing a large variety of framed modules on SPLICE BAR flat,low slope or steep pitched roofs.Available in mill,clear and dark anodized finishes to outperform your projects financial and aesthetic aspirations. AUTOMATED DESIGN TOOL DESIGN PLATFORM AT YOUR SERVICE t4 _ Creating a bill of materials is just a few clicks away with U-Builder,a powerful online ® INTEGRATED BONDING tool that streamlines the process of designing a code compliant solar mounting system. ® L-FOOT w/T-BOLT Save time by creating a user profile,and recall preferences and projects automatically when you log in.You will enjoy the ability to share projects with customers;there's no need to print results and send to a distributor,just click and share. FRONT INTEGRATED BONDING TRIM MICROINVERTER MOUNT w/ 9� �• � WIRE MANAGEMENT BONDING&GROUNDING LU 11-- MECHANICAL LOADING tA E c UL2703SYSTEM FIRE CLASSIFICATION UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT • ' i I I ' I I I UNMATCHED CERTIFIED ENGINEERING BANKABLE PERMIT EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION TECHNICAL SUPPORT CERTIFIED QUALITY PROVIDER BANKABLE WARRANTY Unirac's technical support team is dedicated to answering Unirac is the only PV mounting vendor with ISO certifications Don't leave your project to chance, Unirac has the financial questions & addressing issues in real time. An online for 90012015, 14001:2015 and OHSAS 18001:2007, strength to back our products and reduce your risk Have peace library of documents including engineering reports, which means we deliver the highest standards for fit, of mind knowing you are receiving products of exceptional FAST INSTALLATION. SUPERIOR AESTHETICS stamped letters and technical data sheets greatly form, and function. These certifications demonstrate our quality.SOLARMOUNT is covered by a twenty five(25)year simplifies your permitting and project planning process. excellence and commitment to first class business practices. limited productwarranty and a five(5)year limited finish warranty. OPTIMIZED COMPONENTS • VERSATILITY • DESIGN TOOLS • QUALITY PROVIDER PROTECT YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN PUBA]IFE1328 PRINTED