HomeMy WebLinkAboutBLD-2022-0964 - SOLAR PERMIT �T C) City of Anacortes
Invoice/Permit#: BLD-2022-0964
904 6th Street
Applied date: 12/22/2022
P.O.Box 547
4 � Issue date: 12/22/2022
Anacortes, WA 98221-0547
Expire date: 06/19/2024
(360) 293-1901
Job Address: 2707 OAKES AVE Permit Type: PV Solar Permit
ANACORTES WA 98221 Project:
APN:
Remarks: Install new rooftop solar system, 3 panels on south side of roof.
Owner: CODDIWOMLE LLC Contractor: ECOTECH SOLAR
Address: 3018 COMMERCIAL Address: 1331 MEADOR AVE
SUITE 103
ANACORTES WA 98221 BELLINGHAM WA 98229
Phone: (360) 708-2354 Phone: (360)318-7646
License#:
General Information: Fees:
Building Valuation 500 Building Permit Fee 23.50
Plan Review Fee 15.28
State Building Code Fee Resi 6.50
Total Calculated: 45.28
Deposits/Receipts: 0.00
Total Due: 45.28
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of
the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or
granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or
federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be
valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation,guidance advice or decision of
the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,
inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or
decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is
suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and a this application and know the same to
be true and correct.
SIGNATURE OF OWNER OR AUTHORIZED AGENT IS E
� ■�� , � ' .
4? ,
op . , � .
� . .
p� �
,
, 2
��• .
. . .. f \
dof do
�' \1: / � •
.�
, . . /
% d d.6.
. E $
Q .
•,
, 0
2 �
Ex " A '
2 ./ e !
L\ � Jo� � • | . ,
, •� . ��- � ^ � � , f . �� .
. .
A . ' � •
` '
� �. .
/
r dF
OP
� .
. qF
I)JO \ ' do
-
.
. III-1111
PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT
Mailing Address: P.O. Box 547, Anacortes, WA 98221
c�oR Office Location: 904 61h Street, Anacortes WA 98821
Phone: (360) 293-1901
RESIDENTIAL BUILDING PERMIT APPLICATION
THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES:
Single-Family Residences (SFR), Duplexes, Additions & Remodels, Accessory Structures (i.e. garages,
carports), Accessory Dwelling Units, Manufactured Homes, Residential Decks & Retaining Walls, and
Docks& Pilings.
FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION
PROPERTY INFORMATION
PROJECT ADDRESS(STREET,SUITE#) ASSESSOR PARCEL NUMBER
32707 Oakes Ave, Anacortes, WA P58268
SUBDIVISION/LOT# ZONING LOT AREA(SIZE)
SQ. FT.
TYPE OF PROJECT
NEW ADDITION REPAIR REMODEL CHANGE OF USE
SFR Lj Duplex ❑Deck/Porch
Accessory Dwelling Unit: ❑Detached ❑Attached ❑Retaining Wall
❑ Manufactured Home ❑Accessory Structure
❑ Shoreline Structure(dock, pilings,floats etc.) * ❑X Other: Rooftop solar electric system
*If application is for a shoreline structure, please complete the Shoreline Structure Checklist.
IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? I YES HNO
f YES, provide the permit/application number:
PROJECT SUMMARY: PROJECT VALUATION
Install new rooftop solar electric system (Cost of Materials & Labor)
$500
PROPERTY OWNER INFORMATION
NAME PHONE
Nate Scott / Mitzi Murray 1 360 708 2354
ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS
CONTRACTOR INFORMATION
Ecotech Solar PHONE 360-318-7646
CONTRACTOR'S BUSINESS LICENSES STATE LICENSE# EXPIRATION
*All Contractors&Subcontractors must have a valid City ECOTEES951 RG 12-28-23
of Anacortes business license prior to doing work in the UBI# EXPIRATION
City.
602-441-974 10-31-23
ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS
1331 Meador Ave STE 103, Bellingham, 98229 Andys@ecotechsolar.com
Page 1 of 17
Res.Building Permit Application Submittal Checklist
Updated April 20,2021
CONTACT PERSON -Select one person the city will contact for anything related to this project:
EC APPLICANT ❑PROPERTY OWNER ❑CONTRACTOR ❑OTHER(LIST BELOW)
NAME PHONE
Andy Schene- Ecotech Solar 360-318-7646 x709
ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS
see above andys@ecotechsolar.com
LENDER INFORMATION
RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender
involved with your project, write "no lenders"on the Name Line below.
NAME PHONE
ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS
ACKNOWLEDGEMENTS & SIGNATURE
Read and initial each of the following statements prior to signing this application:
AS1 understand that when a building permit application is taken in over the counter it does not mean
the application has been deemed technically complete and sufficient for staff review.
ASI understand that if 1 submit incomplete, inaccurate, and/or erroneous information it will take the
City longer to process my permits.
ASI understand and acknowledge that I could be responsible for providing as-built drawings(on paper
or electronically)as part of the project's certificate of occupancy process.
AS1 understand and acknowledge that Special Inspections could be required as part of my project, and
if needed 1 will be required to pay for the cost of these inspections.
AS 1 understand and acknowledge that financial securities could be required as part of the work 1 am
completing and I agree to provide the items needed for the City to calculate these securities and to
provide the securities themselves.
AS I understand that if permits are reviewed concurrently such as design review, site plan, traffic
concurrency, etc., any required revisions to one permit may affect the entire plan set and could add
costs and time to the project.
1 hereby declare that 1 am either the owner of the property listed on this application or the owner of
this property has authorized me to be their representative to act for them. I also declare under penalty
of perjury under the laws of the State of Washington that all of the statements and answers contained
herein, and the information submitted with this application form is in all respects, true, correct, and
complete to the best of knowledge and belief.
12/20/22
SIGNATURE DATE
Andy Schene
PRINTED NAME
Res.Building Permit Application Submittal Checklist
Updated December 2021
Page 2 of 17
tzY o City of Anacortes Photovoltaic System Permit
7 �
Q�o�s Submittal Requirements
Permit Required: A building permit is required for the installation or replacement of
solar/photovoltaic (PV) systems, including roof top arrays, ground-mounted arrays and PV
water heaters. An electrical permit is required from the State Department of Labor &
Industries.
Single family residence rooftop installations meeting the criteria in the attached checklist are
eligible to obtain a building permit over-the-counter at the permit center in City Hall.
CODES: International Residential Code (Current Edition)
International Building Code (Current Edition)
International Fire Code (Current Edition)
National Electrical Code (Current Edition)
FEES: Building Permits for installations are based on the material cost of the support system
and labor for the installation.
SUBMITTAL REQUIREMENTS FOR PV (OTHER THAN ONLINE OR OVER-THE-COUNTER PERMITS):
1) Permit Application Form A.
2) Site plan showing location of house and array/equipment on lot, with setback
dimensions to property lines.
3) Roof plan showing the array.
4) Manufacturer specifications or the PV panels and mounting hardware. Include the
weight of the equipment.
5) For rooftop systems not conforming to all of the criteria in the attached checklist,
provide a roof framing plan and either:
a) Structural calculations by a WA State Licensed Engineer or other competent person
showing the adequacy of the existing roof structure to support the additional load,
or
b) Documentation showing that the roof structure was substantially overbuilt
compared to prescriptive code requirements.
6) For ground mounted systems provide structural calculations by a WA state licensed
engineer or other competent person showing how the structure meets wind design
requirements for the structure and footings. Note that ground mounted equipment
greater than 36 inches in height must adhere to minimum required property line
setbacks of the applicable zoning district.
NOTE: The purpose of this handout is to assist the public in complying with detailed permit
submittal requirements. It is NOT a complete list of permit or code requirements and
should NOT be used as a substitute for applicable laws and regulations. It is the
responsibility of the owner/design professional to review the submittal for completeness
and applicability to other codes. Only complete applications will be accepted by the City for
review.
To Be Completed By the Applicant
Project Address: 2707 Oakes Ave, Anacortes, WA 98221, USA
Project Applicant:_ Andy Schene
Applicant Email: _ AridyS(a,.ecotechsolar.com Phone No.: 160-118 7646
Site Owner Name: Nate Scott/Mitzi Murray,
PV system Description: Rooftop solar electric system ,3 panels)
Determine if your project is eligible for an over-the-counter Permit(Check Yes or No) Yes No
1. PV System is designed and proposed for a detached single-family house,duplex or X ❑
townhome.
2. PV System is designed for rooftop of house in general compliance with applicable EX ❑
codes.
3. Mounting system is engineered and designed for PV. ❑
4. Rooftop is made from light weight material such as shingles. X ❑
5. PV system will be permitted and pre-approved by Labor& Industries Electrical Ex ❑
division.
6. To address uplift, panel are mounted no higher than 18"above the surface of the EK ❑
roofing to which they are affixed. Except for flat roofs, no portion of the system
may exceed the highest point of the roof.
7. Total deal load of panels,supports, mountings, race ways,and all other E�C ❑
appurtenances weight no more than one of the following. IF Yes, indicate which:
❑ No more than three and one half(3.5 pounds per square foot(PSF)
❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and
one-half(4.5) PSF
❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0)
PSF
8. Supports for solar panels are installed to spread the dead load across as many ❑x ❑
roof-framing members as needed to ensure that no point loads in excess of fifty
(50) pounds are created.
9. Attachment to the roof is specified by the mounting system manufacturer. EK ❑
10. Panels are mounted no higher than the roof ridge or apex of roof(applies only to Ek ❑
pitched roofs).
Comments:
k By Checking this box, I certify that all of the information provided on this form is correct.
If you answered yes to all of the above questions,your PV installation is eligible for an over-the-counter
building permit. To apply please bring in this completed form to our permit center at City Hall for an
over-the-counter permit.
To be Completed By Staff
Project is eligible for over-the-counter permit? 7 Yes ❑ No
powered by jy
Quality
. . • = , Controlled PV
A,
0
TUVRheinland
•
• , ID 1111232615
� YR 'q ,r , .,
TOP BRAND PV
' •D
Warranty o CELLS
Pma,cts Peff—ance Yield Securit
a BREAKING THE 21%EFFICIENCY BARRIER
nn/II Illlnllll�III Q.ANTUM DUO Z Technology with zero gap cell layout
boosts module efficiency up to 20.9%.
THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY
Q CELLS is the first solar module manufacturer to pass the most compre-
hensive quality programme in the industry:The new"Quality Controlled
PW of the independent certification institute TUV Rheinland.
INNOVATIVE ALL-WEATHER TECHNOLOGY
Optimal yields,whatever the weather with excellent
low-light and temperature behaviour.
ENDURING HIGH PERFORMANCE
Long-term yield security with Anti LID Technology,Anti PID
Technology',Hot-Spot Protect and Traceable Quality Tra.QTM.
EXTREME WEATHER RATING
High-tech aluminium alloy frame,certified for
high snow(5400 Pa)and wind loads(4000 Pa).
A RELIABLE INVESTMENT
Inclusive 25-year product warranty and 25-year
"_YEARS—i/ linear performance warranty2.
6 BUSBAR
CELLTECHNOLOGY
'APT test conditions according to IEC/TS 62804-1:2015,method A(-1500V,96h)
2 See data sheet on rear for further information.
THE IDEAL SOLUTION FOR:
6nRooftop arrays residential buildings
Engineered in Germany Q CELLS
MECHANICAL SPECIFICATIONS
Format 67.6 in x 41.1 in x 1.26 in(including frame) 6]6'(1]1]mm)
(1717mm x 1045mm x 32mm) _ 38.6'(980mm) 14.5"1368.5mm)
Weight 43.8 1 bs(19.9 kg)
Front Cover 0.13in(3.2mm)thermally pre-stressed glass
with anti-reflection technology 4xcm ndmeaams0o.la'(4.5mm) P,eme
z45.3'(1150 mm)
Back Cover Composite film 39.5'(1002,5 mm)
Frame Black anodized aluminum
411"(1045 mm)
Cell 6 x 20 monocrystalline Q.ANTUM solar half cells
Junction Box 2.09-3.98 x 1.26-2.36 x 0.59-0.71in(53-101 x 32-60 x 15-18mm), eye t45.3"(.50 mm)
Protection class IP67,with bypass diodes
4 x Mounting slots 8 x Dreinege holes
Cable 4mm2 Solar cable;(+)>45.3in(1150mm),(+)>45.3in(1150mm) y (DETAILA)
Connector Staubli MC4;IP68 I
�rL26"(32 mm) DETAILA 0.63"(l6mm)
F-i
0.837'(2L25 mm)I-(�10,33"(8.5 mm)
ELECTRICAL CHARACTERISTICS
POWER CLASS 350 355 360 365 370
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+SW/-0 W)
Power at MPP' PMPP [W] 350 355 360 365 370
Short Circuit Current' Isc [A] 10.97 11.00 11.04 11.07 11.10
E
Open Circuit Voltage' Voc IV] 41.11 41.14 41.18 41.21 41.24
5 Current at MPP IMPP [A] 10.37 10.43 10.49 10.56 10.62
Voltage at MPP VMPP IV] 33.76 34.03 34.31 34.58 34.84
Efficiency' q [%] >_19.5 >_19.8 >_20.1 >>>20.3 >>>20.6
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2
Power at MPP PMPP [W] 262.6 266.3 270.1 273.8 277.6
E Short Circuit Current Isc [A] 8.84 8.87 8.89 8.92 8.95
'c
Open Circuit Voltage Voc IV] 38.77 38.80 38.83 38.86 38.90
2 Current at MPP IMPP [A] 8.14 8.20 8.26 8.31 8.37
Voltage at MPP VMPP IV] 32.24 32.48 32.71 32.94 33.17
1Measurement tolerances PMPP±3%;Isc;Voc±S%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5
Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE
00
z _°ocs��eb�l wa,�e� At least 98%of nominal power during u0
first year.Thereafter max.0.5% o
degradation per year.At least 93.5% 12 100 _1____±____I_
w of nominal power up to 10 years.At - 1 1
LL
z least 86%of nominal power up to
w
w
a eo 25 years. >
10 F so -t----r--------+----.I
D g I
c a All data within measurement toleranc- I I a
es.Full warranties in accordance with I I z
a so
the warranty terms of the Q CELLS 200 400 goo goo loon
o so sales organisation of your respective IRRADIANCE[W.9
0 10 U
zo country.
o
o g ammaa,a 1oPY oma se YEARS Typical module performance under low irradiance conditions in
w[,°mans a,,w ,o eP w sola,esmaa„em�,sola comparison to STC conditions(25°C,1000W/m2). 10
0
TEMPERATURE COEFFICIENTS
0
m
Temperature Coefficient of lac a [%/K] +0.04 Temperature Coefficient of Voc (i [%/K] -0.27 .
Temperature Coefficient of PMPP y [%/K] -0.35 Nominal Module Operating Temperature NMOT [°F] 109±5.4(43±3°C) 10
6
PROPERTIES FOR SYSTEM DESIGN °
a
w
Maximum System Voltage V.Y. IV] 1000(IEC)/1000(UL) PV module classification Class II a
N
Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 m
Max.Design Load,Push/Pulls [Ibs/ft2] 75(3600 Pa)/55(2660 Pa) Permitted Module Temperature -40°Fupto+185°F a
Max.Test Load,Push/Pulls [Ibs/ft2] 113(5400 Pa)/84(4000 Pa) on Continuous Duty (-40eCupto+85eC)
m
3See Installation Manual
M
QUALIFICATIONS AND CERTIFICATES
0
Quality Controlled PV-TOV Rheinland;
IEC 61215:2016;IEC 61730:2016.
This data sheet complies C e US ♦ ® 0
with DIN EN 50380. r /\\ rUvsnelnla0a
C.m6ed _
UL61730 ID t11t1330?]] .D
cL
Hanwha 0 CELLS America Inc.
400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiryQus.q-cells.com I WEB www.q-cells.us
2707 Oakes Avenue(#1085563) A0k IRONRIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Project Details
Name 2707 Oakes Avenue Date 12/20/2022
Location 2707 Oakes Avenue,Anacortes,WA 98221 Total modules 3
Module Hanwha Q.Cells: Q.PEAK DUO BLK-G10+ 365 (32mm) Total watts 1,095
Dimensions Dimensions: 67.6" x 41.14"x 1.26" (1717.Omm x 1045.Omm x 32.Omm) Attachments 6
ASCE 7-10 Rails per row 2
System Weight Load Assumptions
Total system weight 156.8 Ibs Wind exposure B
Weight/attachment 26.1 Ibs Wind speed 110 mph
Racking weight 25.2 Ibs Ground snow load 25 psf
Distributed weight 2.6 psf Attachment spacing portrait 4.0'
Roof Information
Roof Material Family Comp Shingle Roof material Comp Shingle
Building height 15 ft Roof attachment FlashVue
Staggered attachments No
Roof slope 9 o Attachment hardware T Bolt
Risk category II
Span Details XR1O0 - Portrait Reaction Forces XR1OO - Portrait
Zone Down Uplift Lateral
Zone Max span Max cantilever (Ibs) (Ibs) (Ibs)
1 7' 11" 3' 1 272 90 42
2 7' 11" 3' 2 272 189 42
3 7' 11" 3' 3 272 301 42
Last updated by Andy Schene on 12/20/22 01:26 PM Page 1 of 6
2707 Oakes Avenue(#1085563) A0k IRONRIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Roof Section 1
Details Weights
Panels: 3 Provided rail: 28' [2 x 168"] Total weight: 156.8 Ibs
Rail orientation: East-West Attachments: 6 Weight/attachment: 26.1 Ibs
Panel orientation: Portrait Splices: 0 Total Area: 59.2 sq ft
Entry type: Graphical Clamps: 4 Distributed weight: 2.6 psf
Diagram
W
101611
Segments
Identifier Columns Row length Rail length Cantilever Rail Attachments Splices Clamps
A 3 10' 6" 10' 6" 1' 3" 28' [2 x 168"1 6 0 4
Last updated by Andy Schene on 12/20/22 01:26 PM Page 2 of 6
2707 Oakes Avenue(#1085563) ZOk IRONRIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Side View (portrait)
9°
PV MODULE
RAI L
FLASHVUE
ROOF MEMBRANE
BUILDING STRUCTURE
Front View (portrait)
4.0'
ATTACHMENT SPAN
�PV MODULE
RAIL
FLASHVUE
ROOF MEMBRANE
BUILDING STRUCTURE
77!7RAF-FER
Last updated by Andy Schene on 12/20/22 01:26 PM Page 3 of 6
2707 Oakes Avenue(#1085563) ZOk IRONRIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Splice Details
TOP-FACING SLOT
XR100 RAIL
INTERNAL SPLICE r BONDING SPRING
z� �XR100 INTERNAL SPLICE
SIDE-FACING SLOT Splice Connection
4—
XR100
Clamp Detail
PV MODULE UNIVERSAL
FRAME FASTENING PV MODULE
OBJECT FRAME f PV MODULE
FRAME
------- - - ----- UNIVERSAL
FASTENING PV MODULE RAIL C
---_--_ OBJECT FRAME d O
CAMO
CAMO
RAIL
' RAIL
Mid Clamp,Plan Mid Clamp,Front CAMO End Clamp,Plan CAMO End Clamp,Front
FlashVue Detail
8"
1.87"
0
2.74"
12'
2.07"
Plan View Side View Perspective View Front View
Last updated by Andy Schene on 12/20/22 01:26 PM Page 4 of 6
2707 Oakes Avenue(#1085563) 40k IRONRIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Grounding Diagram
- - - - - - - - - - - - - - - - - - - - - - - - - - 0
T- - - �,- - - - - - - - - - - -
T
0
- - - - - - - - - - - -
- - - - - -
- - - - - - 0
- - - - - - - - - - - - - -
T T
0 - - - - - - - - + - - - - - - - - - - - - - - - - - 0
OUFO Clamp • Grounding Lug
Fault Current Ground Path Min 10 AWG Copper Wire
m Bonded Splice (Rail Connection)
*Grounding Lugs and Wire are not required in systems using Enphase microinverters.
Last updated by Andy Schene on 12/20/22 01:26 PM Page 5 of 6
2707 Oakes Avenue(#1085563) /lr IRON RIDGE
pitched roof 28357 INDUSTRIAL BLVD.,HAYWARD,CA 94545
Bill of Materials
Part Spares Total Qty
Rails& Splices
XR-100-168B 0 2
XR100,Rail 168"(14 Feet)Black
Clamps&Grounding
UFO-CL-01-B1
0 4
Universal Module Clamp,Black
CAMO-01-M1 0 4
Hidden End Cam(universal clamp)
XR-LUG-03-Al 0 1
Grounding Lug,Low Profile
Attachments
FV-01-B1 0 6
FlashVue,Black
BHW-TB-02-Al 0 6
T-Bolt Bonding Hardware
Last updated by Andy Schene on 12/20/22 01:26 PM Page 6 of 6