HomeMy WebLinkAboutPermit File BLD-2019-0629 1211 6th Street (4)CITY OF
G�'C Y O.sY O.s�
yN�I,t`�y
9C04
ANACORTES
DO NOT REMOVE
CORRECTIONS REPORT
❑ Building codes 293-1901
❑ Fire codes 293-1925
❑ Public Works 293-1920
The corrections listed below are hereby ordered and must be completed within days.
OWNER/ CONTRA OR ` /, PERMIT NUMBER
DATE
(2 �%
ADD '5 2 �� a 1 2-L--
❑ NOT APPROVED FOR COVER
❑ NOT APPROVED FOR OCCUPANCY OR USE
CORRECTIONS NEEDED
r
NOTIFY INSPECTION OFFICE
WHEN READY FOR REINSPECTION
❑ STOP WORK
1 2 l l L-1 �—� 1- TO L 0 -- 201 ! -- a 6 z q
PAP -Accredited
Vt
2020
AILLIARD'S LANDING, NURSERY
%K HARBOR RD 3068
V HARBOR, WA 98277
boratory #: 520-20525
Potassium
NH4OAc
mg/kg
Boron
DTPA
mg/kg
Zinc
DTPA
mg/kg
Manganese
DTPA
mg/kg
Copper
DTPA
mg/kg
Iron
DTPA
mg/kg
Calcium
NH4OAc
meq/100g
Magnesium
NH4OAc
meq/100g
Sodium
NH4OAc
meq/100g
Lime Req
Tons/Acre
Buffer pH
SMP
Cation Exchange
CEC
meq/100g
Total Bases
N114OAc
meq/100g
Base Saturation
NH40Ac
%
ESP
ESP
%
Other Tests:
Cation % of CEC:
Bray Phosphorus
S z Ites t
IIrd f PMoI H
'npror+
1202 P
..
!'lIriti Consultants, inc.
20Pl OR€4f Ot„ NotCl lfke, l7N N95P Micw.9ollUttintl.wm
411fce: tSt191i0!•{[J2 faz:t'�I705-071i f3tl9i:M1G12
Aar" ......
Ln4ar Irrey
Date Received:
10/12/2020
Grower:
MAILLIARDS LANDING NURS
Sampled Bv:
Field: SOIL
Customer Account #:
Soil Test Results Customer Sample ID;
542
0.40
2.9
78.3
0.6
67
4.7
2.3
0.25
0.0
6.9
9.2
8.6
94.2
2.7
Ca=51
pH 1:1 6.4 CaC12 pH 6.2
E.C.1:1 m.mhos/cm 0.24
Est Sat Paste E.C. m.mhos/cm 0.62
Effervescence
Ammonium - N mg/kg 15.3
Organic Matter W.B. % 3.9
Depth
Nitrate-N
Sulfate-S Moisture 'y
inches
mg/kg
mg/kg Inches
0 - 12
0.7
29
Totals
0.7
29
Mg=25.3 Na=2.7 K- 15.1
72.25 mg/kg
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will mpeat tests, but because offacto". beyond our control
in sampling procedures and the inherent variability ofsoil. our liability is limited to the price of tlts. tests. Recommendations are to be used its general
guides and should be modified for speeitic liold conditions and situations. Note: "it" indicates that the element was analyzed for but not detected
This is your Invoice #: S20-20525 Account #: 5205 Reviewed by: B.Thyssen, CP List Cost: $54.00
Energy Prograrn
Residential Building Air Leakage _
(Blower Door) Test Results
House address or lot number:
H
City, ZtP
- c?S 2
Cond. Floor Area (sf):
,
Age of house:
Source (circle one):
Plans Estimated Measured
Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) kn shall be calculated as follows:
ACH50 = (CFM50 x 60)/ Volume
Where:
CFM50 = Blower door fan flow at 50 Pascal pressure difference
Volume = Conditioned Floor Area of the housing unit x ceiling height
Blower Door Test Result: .. 1 ACH50
rv3 CFM@50Pa
Ring (circle one if applicable): Open A B C
Blower Door Fan Location: r
Weather Conditions: .�
t eertifv that these blower door results are accurate and determined usinci standard industry protocol:
Company Name:
" tO i e
Technician:
n..
Technician Signature:
Date:
Phone Number:
- 9
2018 WSEC reference:
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 5 ACH50. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals).
For this test only, the volume of the home shall be the conditioned floor area on ft2 (mz) multiplied by 8.5 feet (2.6 m).
Where required by the code official, testing shall be conducted by an approved third party. A written
report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal
envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and
doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended
weatherstripping or other infiltration control measures;
2. Dampers including exhaust, intake, makeup air, backdraft and flue shall be closed, but not sealed beyond
intended infiltration control measures;
3. Interior doors, if installed at the time of the test, shall be open. Access hatches to conditioned crawl spaces
and conditioned attics shall be open;
4. Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed, sealed;
5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and
6. Supply and return registers, if installed at the time of the test, shall be fully open.
_ >a
N
N
O C
m
0
?'
N
M
in
d'
0
0
M
m
bA
rn
u
C