Loading...
HomeMy WebLinkAboutPermit File BLD-2019-0629 1211 6th Street (4)CITY OF G�'C Y O.sY O.s� yN�I,t`�y 9C04 ANACORTES DO NOT REMOVE CORRECTIONS REPORT ❑ Building codes 293-1901 ❑ Fire codes 293-1925 ❑ Public Works 293-1920 The corrections listed below are hereby ordered and must be completed within days. OWNER/ CONTRA OR ` /, PERMIT NUMBER DATE (2 �% ADD '5 2 �� a 1 2-L-- ❑ NOT APPROVED FOR COVER ❑ NOT APPROVED FOR OCCUPANCY OR USE CORRECTIONS NEEDED r NOTIFY INSPECTION OFFICE WHEN READY FOR REINSPECTION ❑ STOP WORK 1 2 l l L-1 �—� 1- TO L 0 -- 201 ! -- a 6 z q PAP -Accredited Vt 2020 AILLIARD'S LANDING, NURSERY %K HARBOR RD 3068 V HARBOR, WA 98277 boratory #: 520-20525 Potassium NH4OAc mg/kg Boron DTPA mg/kg Zinc DTPA mg/kg Manganese DTPA mg/kg Copper DTPA mg/kg Iron DTPA mg/kg Calcium NH4OAc meq/100g Magnesium NH4OAc meq/100g Sodium NH4OAc meq/100g Lime Req Tons/Acre Buffer pH SMP Cation Exchange CEC meq/100g Total Bases N114OAc meq/100g Base Saturation NH40Ac % ESP ESP % Other Tests: Cation % of CEC: Bray Phosphorus S z Ites t IIrd f PMoI H 'npror+ 1202 P .. !'lIriti Consultants, inc. 20Pl OR€4f Ot„ NotCl lfke, l7N N95P Micw.9ollUttintl.wm 411fce: tSt191i0!•{[J2 faz:t'�I705-071i f3tl9i:M1G12 Aar" ...... Ln4ar Irrey Date Received: 10/12/2020 Grower: MAILLIARDS LANDING NURS Sampled Bv: Field: SOIL Customer Account #: Soil Test Results Customer Sample ID; 542 0.40 2.9 78.3 0.6 67 4.7 2.3 0.25 0.0 6.9 9.2 8.6 94.2 2.7 Ca=51 pH 1:1 6.4 CaC12 pH 6.2 E.C.1:1 m.mhos/cm 0.24 Est Sat Paste E.C. m.mhos/cm 0.62 Effervescence Ammonium - N mg/kg 15.3 Organic Matter W.B. % 3.9 Depth Nitrate-N Sulfate-S Moisture 'y inches mg/kg mg/kg Inches 0 - 12 0.7 29 Totals 0.7 29 Mg=25.3 Na=2.7 K- 15.1 72.25 mg/kg We make every effort to provide an accurate analysis of your sample. For reasonable cause we will mpeat tests, but because offacto". beyond our control in sampling procedures and the inherent variability ofsoil. our liability is limited to the price of tlts. tests. Recommendations are to be used its general guides and should be modified for speeitic liold conditions and situations. Note: "it" indicates that the element was analyzed for but not detected This is your Invoice #: S20-20525 Account #: 5205 Reviewed by: B.Thyssen, CP List Cost: $54.00 Energy Prograrn Residential Building Air Leakage _ (Blower Door) Test Results House address or lot number: H City, ZtP - c?S 2 Cond. Floor Area (sf): , Age of house: Source (circle one): Plans Estimated Measured Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) kn shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height Blower Door Test Result: .. 1 ACH50 rv3 CFM@50Pa Ring (circle one if applicable): Open A B C Blower Door Fan Location: r Weather Conditions: .� t eertifv that these blower door results are accurate and determined usinci standard industry protocol: Company Name: " tO i e Technician: n.. Technician Signature: Date: Phone Number: - 9 2018 WSEC reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 ACH50. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). For this test only, the volume of the home shall be the conditioned floor area on ft2 (mz) multiplied by 8.5 feet (2.6 m). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open. Access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed, sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. _ >a N N O C m 0 ?' N M in d' 0 0 M m bA rn u C