HomeMy WebLinkAboutBLD-2022-0796 - COMMERCIALNor—,
PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT
Mailing Address: P.O. Box 547, Anacortes, WA 98221
Office Location: 904 61h Street, Anacortes WA 98821
Phone: (360) 293-1901
COMMERCIAL OR MULTIFAMILY PERMIT APPLICATION
THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES:
Multifamily, Non -Residential, Commercial, or Industrial Development
FORM BP-1: COMMERCIAL OR MULTIFAMILY PERMIT APPLICATION
PROPERTY INFORMATION
PROJECT ADDRESS (STREET, SUITE #)
ASSESSOR PARCEL NUMBER
1300 O Avenue
P55246
SUBDIVISION/LOT#
ZONING
LOT AREA (SIZE) 48
LOTS 1 TO 10, BLOCK 55.
SQ. FT.
TYPE OF PROJECT
❑ NEW ❑ ADDITION P9 REPAIR ❑ REMODEL ❑ CHANGE OF USE
PROPOSED STRUCTURE*
PROJECT VALUATION (Materials & Labor)
Shower repair Apt 242 2nd Floor
$ 9,500.00
*If application is for a shoreline structure, please complete the Shoreline Structure Checklist.
PROJECT SUMMARY*
Due to flooding of existing shower unity new subfloor sheeting will need to be installed.
*If the project includes: 10 or more dwelling units, 12,000 sq. ft. or more of nonresidential gross floor area, or 20,000
sq. ft. or more of nonresidential site improvements, please complete the Site Plan Review Checklist
IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? YES X NO
If YES, provide the permit/application number:
PROPERTY OWNER INFORMATION
NAME
PHONE
Chandler's Square Retirement Community
360-419-4699
ADDRESS (STREET, CITY, STATE, ZIP)
EMAILADDRESS
1300 O Avenue
maintenancedirector@chandlersqua
CONTRACTOR INFORMATION
NAME* Chad Fisher Construction LLC
PHONE 360-757-0580
CONTRACTOR'S BUSINESS LICENSES - All Contractors & Subcontractors must have a valid City of Anacortes business
license prior to doing work in the City.
STATE LICENSE #
EXPIRATION
UBI #
EXPIRATION
CHADFFC906DS
3/10/2024
602806459
ADDRESS (STREET, CITY, STATE, ZIP)
EMAILADDRESS
15900 Preston Place
kristaj@cfisherconstruction.com
CONTACT PERSON - Select one person the city will contact for anything related to this project:
APPLICANT PROPERTY OWNER �X CONTRACTOR OTHER (LIST BELOW)
NAME
PHONE
ADDRESS (STREET, CITY, STATE, ZIP)
EMAILADDRESS
Page 1 of 18
Res. Building Permit Application Submittal Checklist
Updated April 20, 2021
LENDER INFORMATION
RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender
involved with your project, write "no lenders" on the Name Line below.
NAME
PHONE
N/A
ADDRESS (STREET, CITY, STATE, ZIP)
EMAILADDRESS
ACKNOWLEDGEMENTS & SIGNATURE
Read and initial each of the following statements prior to signing this application:
XI
understand that when a building permit application is taken in over the counter it does not mean
the application has been deemed technically complete and sufficient for staff review.
X
1 understand that if I submit incomplete, inaccurate, and/or erroneous information it will take the
City longer to process my permits.
X
1 understand and acknowledge that 1 could be responsible for providing as -built drawings (on paper
or electronically) as part of the project's certificate of occupancy process.
XI
understand and acknowledge that Special Inspections could be required as part of my project, and
if needed I will be required to pay for the cost of these inspections.
X
I understand and acknowledge that financial securities could be required as part of the work I am
completing and I agree to provide the items needed for the City to calculate these securities and to
provide the securities themselves.
X
1 understand that if permits are reviewed concurrently such as design review, site plan, traffic
concurrency, etc., any required revisions to one permit may affect the entire plan set and could add
costs and time to the project.
I hereby declare that 1 am either the owner of the property listed on this application or the owner of
this property has authorized me to be their representative to act for them. 1 also declare under penalty
of perjury under the laws of the State of Washington that all of the statements and answers contained
herein, and the information submitted with this application form is in all respects, true, correct, and
complete to the best of knowledge and belief.
v=�,naca risner
Krista Jewett Construction LLC, 9/29/2022
SIGNATURE DATE
Krista Jewett
PRINTED NAME
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 2 of 18
SUBMITTAL CHECKLIST
O
D
Z
r
m
v
v
m�
2
O_
D
p
70
D
M
n
m
I
Building Permit
D
T
Z
7o
m
c
m
Submittal Requirement Checklist
m
K o
0
N
0
O
v m
c
Z
v+
m
v
v
r- Z
m
�r
H
m
Commercial & Multi -Family Building Permit
X
X
X
X
X
Application Form
❑Structure
& Site Information Form
X
X
X
X
X
(FORM BP-2—attached)
❑Mechanical
& Plumbing Fixtures Form
X
X
X
X
X
(FORM BP-3—attached)
❑Architectural
Plans
X
X
X
X
X
(requirements listed on FORM BP-4 - attached)
❑Stormwater
Management Minimum Requirements
X
X
X
Determination (FORM BP-5, attached)
Stormwater Site Plan
X
X
X
❑Site
Plan & Landscape Plans - requirements listed on Form
X
X
X
X
BP-6
Parking Plan
X
X
X
Grading Plan
X
X
X
Structural Plans & Calculations
X
X
X
X
X
❑Energy
Code NREC Compliance -including Calculations,
X
X
X
X
X
Lighting, & Commissioning
Copy of recorded survey
X
X
X
X
Copy of Land Use Decision, if applicable
X
X
X
X
X
Critical Area Identification Form
X
X
X
X
X
Shoreline Structure Checklist, if applicable
X
X
X
Technical Reports, if applicable
X
X
X
Traffic Impact Analysis, if applicable
X
X
X
X
X
SUBMITTAL INFORMATION
Please send applications in PDF format to buildingpermit@citvofanacortes.org
➢ Send applications in PDF format with a file and message size no greater than 30 MB. An email
with a link to a file share site (Dropbox, Google Drive, OneDrive, etc.) is acceptable. Paper copies
may be requested after initial review.
FEES
Once application is received, staff will reach out if a deposit is required. Otherwise, permit fees are paid
prior to building permit issuance.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 3 of 18
REQUIRED SUBMITTAL INFORMATION
Additional details on certain submittal items are provided below to ensure Applicants are fully aware
what City staff will be looking for when an application is submitted to the City.
FORMS AND PLANS
• FORM BP-1: COMMERCIAL & MULTIFAMILY BUILDING PERMIT APPLICATION FORM.
Provides key information about your project, including type of permit you are applying for, and
property owner, contractor, and contact information.
• FORM BP-2: STRUCTURE AND SITE INFORMATION FORM. Provides key information about
the proposed structure, including height, floor areas, fire protection proposed, and asks questions
about site characteristics that are used to determine whether your project requires any other
information or additional permit applications to be submitted.
• FORM BP-3: PLUMBING AND MECHANICAL INFORMATION. Form BP-3 provides space for
you to fill in fixture information for plumbing and mechanical appliances and equipment that are
included as part of your project.
• FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS. Form BP-4 contains a list of all the items
required to be shown on Architectural Plans.
• FORM BP-5: STORMWATER MANAGEMENT DETERMINATION FORM. Most development
within the City of Anacortes that involves disruption of soils, or construction of buildings, streets,
parking lots, etc. requires a Stormwater review. Stormwater review requirements are based on
either the amount of soil to be disturbed (grading, vegetation removal), or the amount of hard
surface that is created or replaced on a site (building footprint, concrete, asphalt or gravel parking,
sidewalk, etc.). Form BP-5 assists you in determining the level of stormwater review (applicable
Minimum Requirements) required for your project.
• STORMWATER SITE PLAN. The Stormwater Site Plan is the comprehensive report containing all
the technical information and analysis necessary for regulatory agencies to evaluate your project
for compliance with stormwater requirements. The level of stormwater review and contents of
the Stormwater Site Plan will vary with the type and size of the project, and individual site
characteristics. Use Form BP-5 to determine the level of stormwater review and then complete
the applicable Stormwater Minimum Requirements Form on the Public Works - Engineering
Department Forms website and provide required submittal items/plans.
• FORM BP-6: SITE PLANS & LANDSCAPE PLANS. Form BP-6 contains a list of all the items
required to be shown on Site and Landscape Plans.
• PARKING PLAN. A parking study may be required to determine the parking requirements for a
specific use, adjusting minimum and maximum quantitative parking requirements, determining
times of peak demand, and determining impacts to on -street parking in the vicinity of a proposed
development. See AMC 19.64.020 for more info.
• CLEARING & GRADING PLAN. Checklist is located in the Clearing/Grading Permit application
packet. These plans are needed so that your proposal can be reviewed for conformance with AMC
19.78 Clearing and Grading.
• STRUCTURAL PLANS. Plans prepared and stamped by a State of Washington licensed
professional structural engineer drawn at a scale approved by the Building Official clearly indicating
the information required by the "Permits" section of the currently adopted International Building
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 4 of 18
Code and Chapter 19.27 RCW (State Building Code Act, Statewide amendments), and City submittal
forms including: structural members labeled as to size and spacing as well as bracing, blocking,
bridging, special connectors, and anchor bolts; cross-section details, as needed, to show typical
foundation, floor, wall, ceiling and roof construction; insulation of walls, floors and roof/ceiling; and
details of stairs, fireplaces and special construction, if any.
• STRUCTURAL CALCULATIONS: An analysis of loads, materials, etc., prepared and stamped by a
State of Washington licensed professional structural engineer.
• ENERGY CODE FORMS: The standard Washington State Energy Office form requesting the
information required under Chapter 51-11 WAC detailing building components used to comply with
the State Residential or Nonresidential Energy Code, as applicable.
• MANUFACTURER'S SPECIFICATIONS/CUT SHEETS: A document that summarized the
performance and other technical characteristics of a product, machine, component, material, or
subsystem (e.g., a power supply) in sufficient detail that allows the City to determine the product
will be incompliance with applicable codes.
• COPY OF RECORDED SURVEY. A survey of your property is needed so that conformance with
minimum setback requirements and other development standards can been confirmed and verified
on site by the inspectors. Property markers must be visible on your property. If they are not at the
time an inspection is requested, you may need to have a new survey completed.
• COPY OF LAND USE DECISION. If your project was required to be reviewed by the City's
Planning department, then a copy of the issued and approved decision is required.
• CRITICAL AREA IDENTIFICATION FORM. Use this from to determine and/or identify if critical
areas or critical area buffers are located on or within 300 ft. of the development area. If critical
areas are determined to be present, a Critical Area Permit may be required.
• SHORELINE STRUCTURE CHECKLIST. This checklist is required to supplement the building permit
application if the proposed structure or development is waterward or within 200 ft. from the
shoreline. This checklist will also assist in determining what other approvals or permits may be
required for the proposed work.
OTHER SUBMITTALS DETERMINED ON A CASE -BY -CASE BASIS
TECHNICAL REPORTS
Following is a list of technical reports that will be required to be submitted to the City when certain
circumstances exist on or near a site an Applicant is planning on making improvements to. The general
triggers for each of the listed technical reports I provided below:
A. CRITICAL AREAS REPORTS: In general, Critical Area reports are required when wetlands
and/or streams are located on or near a site. Critical area mitigation plans may also be required,
depending on the project proposal. See Anacortes Municipal Code Ch. 19.70 for additional
information.
B. GEOTECHNICAL REPORT: In general, Geotechnical Reports are required when work is
proposed on or near slopes in excess of 15% and/or known landslide hazard areas. See
Anacortes Municipal Code Ch. 19.70 for additional information.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 5 of 18
OTHER PERMITS DETERMINED ON A CASE -BY -CASE BASIS
OTHER FORMS
Following is a list of other permits that could be required in certain circumstances. The general triggers
for each of the listed permits is provided below.
A. FILL AND GRADE PERMIT: Grading (importing, exporting, and/or moving material on a site) of
more than 50 cubic yards and/or if grading modifies the existing flow of stormwater or
groundwater.
B. RIGHT-OF-WAY PERMIT: A right-of-way permit is required anytime the public right-of-way is
disturbed or obstructed in any way by private development or the general public.
C. TRAFFIC IMPACT ANAYSIS: Depending on the scope of the project, a traffic impact
analysis may be requested to ensure the proposed use would not cause adverse impacts
to the neighborhood traffic.
NOTES:
1. Handouts and standard details may be found on the City's Planning, Community, & Economic
Development website or can be obtained at city hall during normal business hours.
2. Plans, calculation, & reports prepared by state licensed architects or professional engineers must be
stamped and signed by the design professional.
3. The drainage analysis /plan & TESC Plan shall comply with the 2012 Department of Ecology's
Stormwater Management Manual for Western Washington (as amended in December 2014).
4. Within 180-days of application submittal refunds are allowed up to maximum of 80% of plan review
fee so long as no review has been performed by staff (Per IBC 109.6). The applicant must initiate this
refund request by submitting a signed letter to the Building Department.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 6 of 18
FORM 1313-2: STRUCTURE AND SITE INFORMATION
PROPERTY WHERE WORK IS OCCURRING
ADDRESS
1300 O Avenue Apartment #242
PARCEL NUMBER(S)
�'4$Avenue
DETAILED PROPOSED STRUCTURE INFORMATION
Complete the following information as it relates to your project. Mark items that are not applicable with
"N/A".
STRUCTURE HEIGHT
AREA
SQUARE FOOTAGE
OCCUPANCY GROUP
CONSTRUCTION TYPE
OCCUPANT LOAD
1ST FLOOR:
2ND FLOOR:
94.7-Bathroom
3RD FLOOR:
BASEMENT:
GARAGE:
TOTAL DECK:
TOTAL PORCH:
OTHER:
OTHER:
OTHER:
QUESTIONS ABOUT THE PROPOSED STRUCTURE
Is a fire sprinkler system being installed?
❑ YES ONO
Is a monitored fire alarm being installed?
❑YES [ NO
Are retaining wall(s) being built?
❑YES X NO
Are structural plans required?
❑YES X NO
PROJECT SITE INFORMATION
A. Is work within the City's right-of-way proposed?
If YES, you will be required to submit a right-of-way permit application.
If you have already submitted a ROW permit, list the permit number here:
El YES ❑X NO
B. Is the lot less than 5,000 sq. ft. in area?
If YES, your site and building will need to comply with the standards in AMC
19.43.010.C.
❑YES ❑NO
C. Will more than 2-acres be cleared and/or more than 5,000 board feet
(about 1 log truck load) of timber be harvested?
If YES, you may need to obtain a forest practice permit from DNR.
❑YES ❑NO
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 7 of 18
D. Is this project subject to the SEPA process? ❑ YES X NO
If YES, you will be required to submit a SEPA checklist.
If you have already completed the SEPA process, list the permit number:
REQUIRED SIGNATURE
I hereby declare that 1 am either the owner of the property listed on this application or the owner of this
property has authorized me to be their representative to act for them. I also declare under penalty of
perjury under the laws of the State of Washington that all of the statements and answers contained
herein, and the information submitted with this application form is in all respects, true, correct, and
complete to the best of knowledge and belief.
V=l.naa rlsner
Krista Jewett Construction LAC, 9/29/2022
SIGNATURE
Kri sta Jewett
PRINTED NAME
DATE
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 8 of 18
FORM BP-3: PLUMBING & MECHANICAL INFORMATION
MECHANICAL
EQUIPMENT TYPE
APPLIANCE/EQUIPMENT INFORMATION (NEW AND RELOCATED)
Indicate the number of fixtures for each equipment type
TOTAL
GAS
ELECTRIC
OTHER - Please specify
COMMENT
Furnace
Wall Heater
Water Heater
Heat Pump
Air Conditioner /Handler
Radiant /Hydronic Heating
Exhaust Fans
Range Hood
Fireplace
Clothes Dryer & Duct
Stove/Range/Oven
Refrigeration Unit
Gas Piping/ Outlet(s)
Boiler
BTUs:
Other
L TOTAL MECHANICAL OUTLETS
PLUMBING FIXTURES
FIXTURE TYPE (NEW AND RELOCATED)
TOTAL
FIXTURE TYPE (NEW AND RELOCATED)
TOTAL
Toilets
Refrigerator water supply
Kitchen Sink
Pressure Reduction Valve/ Regulator
Utility Sink
Water Service Line
Tub
Water Piping
Hand Sink
Washing Machine
Shower
Electric Water Heater: Tank -less? Yes ❑
No ❑
Dishwasher
Backflow Prevention Device
Urinal
Hose Bib
Floor Drain / Floor Sink
Drinking Fountain
Hydronic Heat in:❑Floor ❑Wall
Grease Interceptor
Other - please specify:
TOTAL PLUMBING FIXTURES
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 9 of 18
FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS
GENERAL INFORMATION
This form is intended to assist applicants in creating complete, code compliant architectural plans. Please
check the plans you wish to submit to make sure they contain each of the listed items. To the right of the
Requirements column is space for you to list the sheet number of the plan set where the listed
information is shown.
• Minimum Plan Size: 11" x 17" and drawn in an architectural scale.
• Architectural plans for structures 4,000 square feet or larger are required to be prepared and
stamped by an architect licensed in the State of Washington.
• Structural plans must be stamped by a structural engineer licensed in the state of Washington.
REQUIREMENTS FOR ALL ARCHITECTURAL PLANS
COMPLETE?
REQUIREMENTS
PAGE #
Covp�(or 1ST page) must include:
u Site address
❑ Parcel number
❑ Lot number (if applicable)
❑ Lot size
❑ Lot coverage
❑ % impervious surface coverage
Floor plans with existing (if applicable) and proposed building layout with
square footages and with the use of each room/area labeled.
Window and door sizes labeled and window ventilation area. Commercial,
Multi -Family, and Mixed -Use Structures must also include door and window
schedules.
Plumbing, duct, and electrical layout. Penetration protection must be shown.
Opening headers, size, and material.
Cross section details, showing typical foundation, floor, wall, ceiling and roof
construction and insulation.
Structural members labeled as to size and spacing as well as bracing, blocking,
bridging, special connectors, and anchor bolts.
Details documenting energy code compliance.
Exterior building elevations demonstrating compliance with applicable
structure type design standards (small lot, duplex, or ADU) and maximum
building height
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 10 of 18
Building height (see AMC 19.42.120 for measurement methods, exceptions and
modifications).
• Show a line representing, and label the elevations of, the existing
natural topography at the foundation at the front of the building.
• For corner lots and lots that slope downhill from the property line at
the front of the building: Show a labeled line representing the
elevations at the center of all exterior walls of the building.
Special details as needed (i.e., stairs, fireplaces, special construction).
Insulation and insulation values of walls, slab, floors, and roof/ceiling.
Existing and proposed grades with slope of lot shown.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 11 of 18
FORM BP-5: STORMWATER MANAGEMENT MINIMUM
REQUIREMENTS DETERMINATION
GENERAL INFORMATION
Most development within the City of Anacortes that involves disruption of soils, or construction of
buildings, streets, parking lots, etc. requires a Stormwater review. Stormwater review requirements
are based on either the amount of soil to be disturbed (grading, vegetation removal), or the amount of
hard surface that is created or replaced on a site (building footprint, concrete, asphalt or gravel
parking, sidewalk, etc.)
This form is largely targeted for small projects and single family residences. For larger projects and
more information please refer to the Anacortes Municipal Code (Chapter 19.76 Stormwater
Management) and the latest Washington State Department of Ecology Stormwater Management
Manual for Western Washington (Ecology Manual).
HARD SURFACE AREA CALCULATION
Please calculate your project's hard surface amount; guidance is provided on the next page of this
document. Use your project's total hard surface calculation to follow the flow chart(s) in this packet and
determine the level of stormwater management required for you project.
When determining your permit level or if stormwater thresholds are met or exceeded the entire project
must be considered. A project is that portion of a property, properties, or right of way subject to land
disturbing activities, new hard surfaces and replaced hard surfaces. The hard surface on your property
will determine the storm water utility fees and the stormwater general facility charge. All new or
replaced hard surfaces should be accounted for. Below are excerpts from the Anacortes Municipal Code
and Ecology Manual that may assist you in preparing this information.
"Hard surface area" means an impervious surface, a permeable pavement, or a vegetated roof.
"Impervious surface" means a non -vegetated surface area which either prevents or retards the entry of
water into the soil mantle as under natural conditions prior to development. A non -vegetated surface
area which causes water to run off the surface in greater quantities or at an increased rate of flow from
the flow present under natural conditions prior to development.
"Replaced impervious surface" means, for structures, the removal and replacement of impervious
surfaces down to the foundation. For other impervious surfaces, the removal down to bare soil or base
course and replacement.
LAND DISTURBANCE
DESCRIPTION
TOTAL (SQ. FT.)
Total Area of Land Disturbing Activity
Total Area Converted from Vegetation to
Lawn or Landscaped Area
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 12 of 18
HARD SURFACE AREA CALCULATION
Proposed
Proposed
Existing
Removed
DESCRIPTION
Replaced
New
(SF)
(SF)
(SF)
(SF)
Non Pollution Generating Hard Surface Area
(Sidewalks, paths, patios, etc.)
Pollution Generating Hard Surface Area
(Driveways, parking areas, etc.)
TOTAL HARD SURFACE
Site Size
Existing Impervious Surface Coverage %
(sq. ft. hard surface / site size)
o
MINIMUM REQUIREMENTS CALCULATIONS
Use the information in the above table to navigate the flow chart(s) on the next few pages to determine
the applicable stormwater management minimum requirements for your project.
Then complete the applicable Stormwater Minimum Requirements Form on the Public Works -
Engineering Department Forms website and provide required submittal items/plans.
❑ Minimum Requirements #1-9 ❑ Minimum Requirements #1-5 ❑ Minimum Requirement #2
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 13 of 18
FLOW CHART FOR DETERMINING REQUIREMENTS FOR NEW DEVELOPMENT
Start Here
Does the site have 35%
or more of existing
impervious coverage?
�\ n
Does the project result in
5,000 square feet, or
greater, of new plus
replaced hard surface
area?
Yes See Redevelopment Minimum
Requirements and Flow Chart
(Figure 1-2.4.2).
Does the project convert 3/4
acres or more of vegetation to
lawn or landscaped areas, or
NO convert 2.5 acres or more of
native vegetation to pasture?
No
Yes
Yes
Does the project result in 2,000
IF
square feet, or greater, of new plus
All Minimum Requirements
replaced hard surface area?
apply to the new and replaced
hard surfaces and converted
Yes
NO
vegetation areas.
Does the project have land
Minimum Requirements #1
disturbing activities of 7,000
through #5 apply to the new
Yes
square feet or greater?
and replaced hard surfaces
and the land disturbed.
IF
NO
Minimum Requirement #2
applies.
Figure 1-2.4.1
Flow Chart for Determining Requirements for
New Development
DEPARTMENT OF Revised June2015
ECOLOGY Please see http //www.ecy.wa.gov/copyright.html for copyright notice including permissions,
State of Washingtoni limitation of liability, and disclaimer.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 14 of 18
FLOW CHART FOR DETERMINING REQUIREMENTS FOR REDEVELOPMENT
Does the project result in 2,000 square feet, or more, of new plus replaced hard surface area?
OR
Does the land disturbing activity total 7,000 square feet or greater?
Yes lNo
Minimum Requirements #1 through #5
apply to the new and replaced hard Minimum Requirement #2 applies.
surfaces and the land disturbed.
Next Question
Does the project add 5,000 square feet or more of new hard surfaces?
OR
Convert Y4 acres or more of vegetation to lawn or landscaped areas?
OR
Convert 2.5 acres or more of native vegetation to pasture?
Yes
No
All Minimum Requirements apply Next Question Is this
to the new hard surfaces and the related
converted vegetation areas.
a road
project? NO
Yes
Does the project add 5,000 square feet or more of new hard surfaces?
Yes NO
Is the total of new plus replaced hard surfaces
Do the new hard
5,000 square feet or more,
surfaces add 50% or NO No additional NO
more to the existing requirements.
hard surfaces within
AND
does the value of the proposed improvements
- including interior improvements - exceed
the project limits?
50% of the assessed value (or replacement
value) of the existing site improvements?
YesE
All Minimum Requirements apply to the new and replaced
hard surfaces and converted vegetation areas.
4-1 Yes
Figure 1-2.4.2
Flow Chart for Determining Requirements for
Redevelopment
DEPARTMENT OF
Revised June2015
ECOLOGYPlease
see http b(roww.ecy.wa.gov/copyright.html for copyright notice including permissions,
State of Washington
limitation of liability, and disclaimer.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 15 of 18
FORM BP-6: SITE PLAN REQUIREMENTS
GENERAL INFORMATION
This form is intended to assist applicants in creating complete, code compliant site plans. Please check
the plans you wish to submit to make sure they contain each of the listed items. To the right of the
Requirements column is space for you to list the sheet number of the plan set where the listed
information is shown.
• Minimum Plan Size: 11" x 17" and drawn in an engineering or architectural scale.
INFORMATION REQUIRED ON ALL SITE PLANS
COMPLETE?
REQUIREMENTS
PAGE #
ON PLANS
COVER SHEET:
❑ Vicinity Map
❑ Name of the project
❑ Name, address, and telephone number of owner and agent(s)
❑ Name, address, and telephone number of Applicant (if different from the
owner)
❑ Zoning designation of the site
❑ Area, in square feet and acreage, of the project site
❑ Reference to the Building Code used
❑ Proposed use
❑ Occupancy group
❑ Construction type
❑ Square footage and height of each individual building
❑ Percent lot coverage
❑ Percent impervious surfaces
Scale and North Arrow
Property features
Location, identification, and dimensions of all property lines and easements.
All easements shown on the title report, Record of Survey, or plat must be
dimensioned and shown.
Location and dimensions of existing critical areas (wetlands, streams, steep
slopes) and their associated buffers.
Location of Ordinary High Water Mark and shoreline jurisdiction limits (i
adjacent to a shoreline).
Existing and proposed contours and site elevations (i.e. finished grades) at 5-
foot minimum increments. The horizontal and vertical control datum must be
clearly shown.
Structures
Location, identification, dimensions and size of all existing and proposed
buildings and other structures.
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 16 of 18
Location of existing and proposed retaining walls, rockeries, and fences.
Location, identification, and dimensions of all setbacks.
Show proposed projections into required setbacks, including dimensions (see
AMC 19.44.140)
Utilities & Easements
Location and dimensions of existing and proposed stormwater, sanitary
sewer, potable water, and fiber lines/facilities. All wells and septic systems
located on or near the project site must also be identified.
Location of all existing and proposed fire hydrants within 300 feet of the
boundary of the project site.
Location and dimensions of existing and proposed freestanding lighting
fixtures, utility junction boxes, public utility transformers.
Stormwater
Proposed Temporary Erosion and Sediment Control Measures, if not located
on other plans.
Proposed permanent stormwater management BMPs.
Access, Circulation & Parking
Location, identification, and dimensions of all existing and proposed on -site
and adjacent streets and alleys, including the location and dimensions of all
existing and proposed curbs, gutters, sidewalks, median islands, and street
trees.
Show existing and proposed vehicular access to the site, including the size
and location of driveways and curb cuts.
Show existing and proposed parking spaces, including surface material and
dimensions of spaces.
Open Space (ADUs, Small Lots, and Duplexes)
Show calculations, location, dimensions and provided square footage of
required open space area per AMC 19.43.010.C, E, or AMC 19.47, as
applicable.
Landscaping
Show the location and design of landscape areas to be preserved and
planted, and a plant list to include the location, number, size and type of
plant material by botanical and common name.
Location of irrigation system if a permanent or temporary system is
proposed.
Show the location of existing trees to be retained in conformance with AMC
16.50, and tree protection measures to be implemented, when applicable.
Provide a maintenance plan for any infiltration -based stormwater best
management practices (BMPs) built as part of the landscaping design,
including the specifications and maintenance procedures of any soil
amendments.
Show new trees to be planted and tree unit credit calculations, in
conformance with AMC 16.50 Tree preservation, when applicable
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 17 of 18
A table similar to the following with project specific information provided,
must be placed on the site plan:
Required Landscaping
For Example
Calculations
Site Area
7,500 sq. ft.
% of site area to be landscaped (per
20% - R2A zone
AMC Tables 19.42.020-.030)
1,500 sq. ft. required
1,850 sq. ft. provided
Compliance with AMC Ch. 16.50
Tree unit credits required:
Tree Preservation.
• 8 tree units required
Tree unit credits retained:
• 2 trees 6" dbh = 4 tree unit
credits retained
Tree unit credits provided:
• 2 new deciduous trees (min. 2"
caliper @ 6" above ground)
• 2 new evergreen trees (8' in
height)
Number of required street trees
1 per 30' of frontage
60 lineal feet of frontage = 3 street
trees
Commercial & Multifamily Building Permit Application
Updated December 2021
Page 18 of 18