Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit File BLD-20220772 4515 Blakely Drive
{ C City of Anacortes Invoice/Permit M BLD-2022-0772 G 904 6th Street Applied date: 09/28/2022 P.O.Box 547 Issue date: 09/28/2022 Anacortes, WA 98221-0547 Expire date: 03/26/2024 (360) 293-1901 '0 Job Address: 4515 BLAKELY DR Permit Type: PV Solar Permit ANACORTES WA 98221-1161 Project: APN: P111877 Remarks: Install 8 solar panels on roof top. Owner: STEPHEN &VELDA BROWN Contractor: BANNER ELECTRIC INC. DBA BANNER POWER S Address: 4515 BLAKELY DR Address: 130 E HAZEL AVE ANACORTES WA 98221-1161 BURLINGTON WA 98233 Phone: (360) 395-5716 Phone: (360) 770-2185 License#: General Information: Fees: Building Valuation 3152 Building Permit Fee 97.25 Plan Review Fee 63.21 State Building Code Fee Resi 6.50 Total Calculated: 166.96 Deposits/Receipts: 0.00 Total Due: 166.96 The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation,guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examine this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 c�oR Office Location: 904 61h Street, Anacortes WA 98821 Phone: (360) 293-1901 RESIDENTIAL BUILDING PERMIT APPLICATION THIS APPLICATION PACKET IS USED FOR THE FOLLOWING PROJECT TYPES: Single-Family Residences (SFR), Duplexes, Additions & Remodels, Accessory Structures (i.e. garages, carports), Accessory Dwelling Units, Manufactured Homes, Residential Decks & Retaining Walls, and Docks& Pilings. FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY INFORMATION PROJECT ADDRESS(STREET,SUITE#) ASSESSOR PARCEL NUMBER 4515 Blakely Drive P111877 SUBDIVISION/LOT# ZONING LOT AREA(SIZE) 5300 SQ. FT. R2 TYPE OF PROJECT NEW ADDITION REPAIR REMODEL CHANGE OF USE SFR Lj Duplex ❑Deck/Porch Accessory Dwelling Unit: ❑Detached ❑Attached ❑Retaining Wall ❑ Manufactured Home ❑Accessory Structure ❑ Shoreline Structure(dock, pilings,floats etc.) * ❑X Other: V-%f%IAtor *If application is for a shoreline structure, please complete the Shoreline Structure Checklist. IS THIS WORK ASSOCIATED WITH ANOTHER PROJECT? I YES ✓ NO f YES, provide the permit/application number: PROJECT SUMMARY: PROJECT VALUATION Installation of 8 photo voltaic panels on the roof (Cost of Materials & Labor) of the home. $9,152 PROPERTY OWNER INFORMATION NAME PHONE Steve Brown (360) 395-5716 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 4515 Blakely Drive Anacortes srcb57@gmx.com CONTRACTOR INFORMATION NAME* PHONE Banner Electric 3607553030 CONTRACTOR'S BUSINESS LICENSES STATE LICENSE# EXPIRATION *All Contractors&Subcontractors must have a valid City EC BAN N E E 1965 RP 1/05/2023 of Anacortes business license prior to doing work in the UBI# EXPIRATION City. 602453660 1/05/2023 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 130 E Hazel Ave. Burlington, ' gk.bannerelectric@gmail.com Page 1 of 17 Res.Building Permit Application Submittal Checklist Updated April 20,2021 CONTACT PERSON -Select one person the city will contact for anything related to this project: ❑APPLICANT ❑PROPERTY OWNER ❑■ CONTRACTOR ❑OTHER(LIST BELOW) NAME PHONE Tanner Knoblich 3607553030 ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS 130 E HAZEL AVE tk.bannerelectric@gmail.com LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lender involved with your project, write "no lenders"on the Name Line below. NAME PHONE ADDRESS(STREET,CITY,STATE,ZIP) EMAILADDRESS ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: TKI understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. TKI understand that if 1 submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. TKI understand and acknowledge that I could be responsible for providing as-built drawings(on paper or electronically)as part of the project's certificate of occupancy process. TKI understand and acknowledge that Special Inspections could be required as part of my project, and if needed 1 will be required to pay for the cost of these inspections. TK 1 understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. TK I understand that if permits are reviewed concurrently such as design review, site plan, traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that 1 am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects, true, correct, and complete to the best of knowledge and belief. 9/27/2022 SIGNATURE DATE Tanner Knoblich PRINTED NAME Res.Building Permit Application Submittal Checklist Updated December 2021 Page 2 of 17 ,TY o City of Anacortes Photovoltaic System Permit Submittal Requirements Permit Required: A building permit is required for the installation or replacement of solar/photovoltaic (PV) systems, including roof top arrays, ground-mounted arrays and PV water heaters. An electrical permit is required from the State Department of Labor & Industries. Single family residence rooftop installations meeting the criteria in the attached checklist are eligible to obtain a building permit over-the-counter at the permit center in City Hall. CODES: International Residential Code (Current Edition) International Building Code (Current Edition) International Fire Code (Current Edition) National Electrical Code (Current Edition) FEES: Building Permits for installations are based on the material cost of the support system and labor for the installation. SUBMITTAL REQUIREMENTS FOR PV (OTHER THAN ONLINE OR OVER-THE-COUNTER PERMITS): 1) Permit Application Form A. 2) Site plan showing location of house and array/equipment on lot, with setback dimensions to property lines. 3) Roof plan showing the array. 4) Manufacturer specifications or the PV panels and mounting hardware. Include the weight of the equipment. 5) For rooftop systems not conforming to all of the criteria in the attached checklist, provide a roof framing plan and either: a) Structural calculations by a WA State Licensed Engineer or other competent person showing the adequacy of the existing roof structure to support the additional load, or b) Documentation showing that the roof structure was substantially overbuilt compared to prescriptive code requirements. 6) For ground mounted systems provide structural calculations by a WA state licensed engineer or other competent person showing how the structure meets wind design requirements for the structure and footings. Note that ground mounted equipment greater than 36 inches in height must adhere to minimum required property line setbacks of the applicable zoning district. NOTE: The purpose of this handout is to assist the public in complying with detailed permit submittal requirements. It is NOT a complete list of permit or code requirements and should NOT be used as a substitute for applicable laws and regulations. It is the responsibility of the owner/design professional to review the submittal for completeness and applicability to other codes. Only complete applications will be accepted by the City for review. To Be Completed By the Applicant Project Address:4515 Blakely Drive Anacortes,WA,98221 Project Applicant:Tanner Knoblich Applicant Email:_Tk.bannerelectric@gmail.com Phone No.:(360)755-3030 Site Owner Name:Steve Brown PV System Description: (8) 370 Watt panels installed on the roof of the home. Determine if your project is eligible for an over-the-counter Permit(Check Yes or No) Yes No 1. PV System is designed and proposed for a detached single-family house,duplex or x ❑ townhome. 2. PV System is designed for rooftop of house in general compliance with applicable x ❑ codes. 3. Mounting system is engineered and designed for PV. x ❑ 4. Rooftop is made from light weight material such as shingles. x ❑ 5. PV system will be permitted and pre-approved by Labor& Industries Electrical x ❑ division. 6. To address uplift, panel are mounted no higher than 18"above the surface of the x ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. 7. Total deal load of panels,supports, mountings, race ways,and all other ❑ x appurtenances weight no more than one of the following. IF Yes, indicate which: ❑ No more than three and one half(3.5 pounds per square foot(PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5) PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0) PSF 8. Supports for solar panels are installed to spread the dead load across as many x ❑ roof-framing members as needed to ensure that no point loads in excess of fifty (50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. x ❑ 10. Panels are mounted no higher than the roof ridge or apex of roof(applies only to x ❑ pitched roofs). Comments: ❑ By Checking this box, I certify that all of the information provided on this form is correct. If you answered yes to all of the above questions,your PV installation is eligible for an over-the-counter building permit. To apply please bring in this completed form to our permit center at City Hall for an over-the-counter permit. To be Completed By Staff Project is eligible for over-the-counter permit? ❑ Yes ❑ No -0,4r .3 7/8rr 0tCOD 0 � n rn coo PO LD { SII? � AC commw ft 0r m _. J „ �, Ali�•' . �i 9 -'ti . .� :. j Ytl ` h l IRONRIDGE XR100 Rail See Des Lion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 in .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-axis) 0.390 in Moment of Inertia (Y-axis) 0.085 in T9- Torsional Constant 0.214 in Polar Moment of Inertia 0.126 in 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 1.25 Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 7.50 lbs. XR-100-168A XR-100-168B XR100, Rail 168"(14 Feet) Alum-Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204"(17 Feet) Aluminum 11.60 lbs. v1.1 SUNM*09h:7 We've Got Your Rack! 1. Nano Mount 1.97 (Rafter) [s0.01 0 1 0.31 [11 [7.8] _ I EF © �M T � �n 04.00 —� Material:Aluminum [0101.6] Finish: Black Powder Coati I — ------------------------------------ I I I 2. o.za [6.0] I I 3.66 —— [093.0] Material: USWR Silicone Foam Gasket with Adhesive ------------------------------------ 3. Hex Lag Bolt M8X115, DIN 571,304SS .. i.3� n15.01 •of 18ia3z81 I Part Description: Nano Rafter Mount, Black Part No.: K50044-BK1 05 It3.% u Material:Jtalnless Jteel Finish:Clear Item Description Qty in No. Kit 4. Sealing Washer.331D X.75X.157 1 Nano Rafter Mount Assembly • Nano Rafter Mount • Nano Gasket ` qo.73 119.0 + 119.0] ] 2 Lat Bolt Assembly • Hex Lag Bolt M8X115, DIN 571, 304S • Sealing Washer.33 ID X.75 X.157 �`� ; 00.33 I8.51 Material: EPDM+ Stainless Steel D10213-VO01 Dimensions shown are inches(and millimeters) Details are subjed to change without notice SUNMIOONX We've Got Your Rack! 1. Nano Mount 1.97 (Decking) [s0.0] 0 1 0.31 [11 [7.8] _ I AIM oC .� 04.00 Material:Aluminum [0101.6] Finish: Black Powder Coati ------------------------------------ [ [ [ 2. 024 1 � ¢3.66 [093.0] Material: USWR Silicone Foam Gasket with Adhesive ------------------------------------ 3. Self-Drilling Screw,#6.3 X 76 3.00 [76.3[ Part Description: Nano Deck Mount, Black Part No.: K50044-BK2 !N.3 Material:Stainless Steel Finish:Clear Item Description Qty in No. Kit 4. Sealing Washer.261D X.50X.125 1 Nano Deck Mount Assembly • Nano Deck Mount00.2 • Nano Gasket i �' R] I I � � 00.59 1 00.63 [75.01 [16.01 [ + [ 2 Decking Screw Assembly 4 • Self-Drilling Screw, #6.3 X 76 • Sealing Washer.261D X.50X.125 D10214-VO01 Dimensions shown are inches(and millimeters) Details are subject to change without notice SILFAB PRIME SILFAB ' SOLAR° SIL-370 HC •� RELIABLE ENERGY. DIRECT FROM THE SOURCE . Introducing Silfab Prime. Designed to outperform. Dependable, durable, high-performance solar panels engineered for North American homeowners. SILFABSOLAR.COM C E ETA�s ETA E° i EC � % Fraunhofer C:I-I u B B° Intertek Intertek • ISE *Chubb provides error and omission insurance to Silfab Solar Inc. ELECTRICAL SPECIFICATIONS Test Conditions STC NOCT Module Power(Pmax) Wp 370 276 Maximum powervoltage(Vpmax) V 34.95 32.48 Maximum powercurrent(Ipmax) A 10.60 8.50 Open circuit voltage(Voc) V 41.75 39.16 Short circuit current(Isc) A 11.25 9.07 Module efficiency % 20.2% 18.9% Maximum system voltage(VDC) V 1000 Series fuse rating A 20 Power Tolerance Wp 0 to+10 Measurement conditions:STC 1000 W/m'•AM 1.5•Temperature 25°C•NOCT 800 W/m'•AM 1.5•Measurement uncertainty<_3% Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by 0 to+10W. MECHANICAL PROPERTIES/COMPONENTS METRIC Module weight 19.5kg±0.2kg 43lbs±0.4lbs Dimensions(H x L x D) 1762 mm x 1037 mm x 35 mm 69.4 in x 40.8 in x 1.37in Maximum surface load(wind/snow)* 5400 Pa rear load/5400 Pa front load 112.8 Ib/ft2 rear load/112.8 Ib/ft2 front load Hail impact resistance o 25 mm at 83 km/h o 1 in at 51.6 mph Cells 120 Half cells-Si mono PERC 120 Half cells-Si mono PERC 9 busbar-83 x 166 mm 9 busbar-3.26 x 6.53 in Glass 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, DSM antireflective coating DSM antireflective coating Cables and connectors(refer to installation manual) 1350 mm,o 5.7 mm,MC4 from Staubli 53.15 in,o 0.22 in(12AWG),MC4 from Staubli Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet Frame Anodized Aluminum(Black) Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box UL 3730 Certified,IEC 62790 Certified,IP68 rated TEMPERATURE RATINGS WARRANTIES EW Temperature Coefficientlsc +0.064%/°C Module product workmanship warranty 25 years** Temperature Coefficient Voc 0.28%/°C Linear power performance guarantee 30years Temperature Coefficient Pmax -0.36%/°C >_97.1%end 1st yr NOCT(±2°C) 45°C >_91.6%end 12th yr >_85.1%end 25th yr Operating temperature -40/+85°C >_82.6%end 30thyr CERTIFICATIONS SHIPPING SPECS ULC ORD C1703,UL1703,CEC listed,UL 61215-1/-2,UL 61730-1/-2,IEC 61215-1/-2.IEC Modules Per Pallet: 26 or 26(California) Product 61730-1/-2,CSA C22.2#61730-1/-2,IEC 62716 Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed,ILL Fire Rating:Type 2 Pallets Per Truck 34or32(California) Factory 150900 1:2015 Modules Per Truck 884 or 832(California) A Warning.Read the Safety and Installation Manual for mounting specifications and before handling,installing and operating modules. 12 year extendable to 25 years subject to registration and conditions outlined under"Warranty"at si lfabsolar.com PAN files generated from 3rd party performance data are available for download at:silfabso[ar.com/downloads 69.4"[1762mm] E "v E 14"[356mm] 41.3"[1050mm] 14"[356mm] ounting Hole(x4) SILFAB SOLAR INC. Uf 0.5" 800 Cornwall Ave [12mm] Bellingham WA98225 USA T+1360.569.4733 cD info@silfabsolar.com SILFABSOLAR.COM E E rE E 1770 Port Drive ih 1.4"[35mm] E _ E n C o 0) Mo Burlington WA 98233 USA ih T+1360.569.4733 N 0i cc) c) 0 240 Courtneypark Drive East c _ Mississauga ON L5T 2Y3 Canada 3 0.06" 53.15" N T+1 905.255.2501 ��[1.5mm] [1350mm] Q c F+1905.696.0267 Cable Length 1- o .U Silfab-SIL-370-HC-20220701 O No reproduction of any kind is allowed without rainage Hole(x8) O 0 permission.Data and information issubjectto modifications without notice.©Silfab Solar Inc., 2022.Silfab Solar®is a registered trademark of �2.4"[60mm][60mm] o 8"[200mm] SilfabSolarinc.