Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit File BLD-2022-0606 2105 10th Street
C7 City of AnaCortes Invoice/Permit#: BLD-2022-0606 904 6th Street Applied date: 08/01/2022 P.O.Box 547 Issue date: 08/01/2022 Anacortes, WA 98221-0547 Expire date: 01/28/2024 =A '360, 293-1901 Job Address: 2105 10TH ST Permit Type: PV Solar Permit ANACORTES WA98221-1423 Project: APN: P56194 Remarks: PV Solar Roof Mount Installation: 5.92 kW,2 circuits Owner: BRADLEY&AURA GAINES Contractor: SOLGEN POWER LLC Address: 2105 10TH ST Address: 1992 SAINT ST ANACORTES WA 98221-1423 RICHLAND WA 99354-5314 Phone: (206) 303-8606 Phone: (509) 530-2369 License#: SOLGEPL820BE General Information: Fees: Building Valuation 5091 Building Permit Fee 125.25 Plan Review Fee 81.41 State Building Code Fee Resi 6.50 Total Calculated: 213.16 Deposits/Receipts: 0.00 Total Due: 213.16 The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law, or of any order,proclamation,guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to be true and correct. > SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUE BY 1 2 3 4 5 o w " w0 N N x H N z u = Z N b x rc o a Z N CS4 6i d N Cl) Q w N Z) cn cn w cLLn cN-n U N OW w U Cl) CO N O 00 Q Q ¢ w o�. y O� Z O W �N O J ZZm F� 3 w m CO N O LLU w o CO G� cq J M N � .. LR 5 Z d N N O O U U 0 U)u~i E w w d O LU w O w N N LL } 2 0 U O[� Z U) O CO v) O �- � CO 2 of W O N 17rW J F- W w Z U C M ❑ � CO � U W U J Z : m C CO co Z � Z � Z 2< OU Q U) C H N � F- H m LO LLLL UU O O a N UU _o Q � o_ o�oW 1 / �0 C) N V to ¢O X {/ } vJ 0 N w wro a:o rn . 1 Q V O Z W rn — — a to w w = �QW W�zW (3 LU DO zu�OHZ)Lu CC z LLl I Zowzmix,F I > ! zzww �..K j PWm3=o?ow �U F-z0 dZozw< =oozw< .- �C, ODU-= ;gwwwOZZ WO WazwFOO�z f'1 r� r UJJZJW Wwwz ilt /^—' J _ �. o I F-Q>-4 W Z w z UY:m. Kr z = w m �C� z J =� LJ w Of Yk LU C7 1- ? z z = D cr' t`-' _ w o � a c * WQo 0 0 F- o 0 o W ® O � � ua C � —, Q 'L Q �t v, ° w NIL a uo ^o ¢z Cl)W�^ 0< LL W LL �M 3 ZO ¢O QO>O tr a X l Z E 4 S i ' 1 2 3 4 5 m =LU Z ❑ � O Q ~ ULU w Q ~ z Ow 0 LUz ~ w 0 ? ��J/J� wo � U } viwz w Y U) � ❑ zUzLD LU _ oZ < U) 0 ❑ z 10 Ow ~ � Z � Q O C� � W � J Cl) Q W � JdUz � o Ww U) F- c� � U ZZ 0 o a z Q W Q 0 W J WNW ❑ 0 W ❑ Z � c= UQ — op � p m = I = > Z ~ 2 mQ < — m - N U0C) z-Z jO 0 0E- Q � (D LL ww 25 0Z L 0 O V— Z w � � Qw = = �im � ° cnwc� � w z cD � v Q0o y _ U = U N N J 2Qa ? 206CDz00 w0UO ~ � Z Z F- 0 UQ OF- w Q U ti N 2 � w o zw � � rv — F- zz0 wviF UQ Zz � 2Z p Q O co Q oUo � OwoQF- za w ::)0w ❑ Z5OQ ? wZmo Quo U O O7 W � wzw r- W— o owwwoF- Qo2oQ000Z CVO z cn M � _ � W JJF ❑ ZUYUd � U` (_nJ � = � Z � < QY W ~ ZU Z Q O Z 0� � W = Q = EWWQYQ Wz Jw ❑ J � QU2W UQ — W +-+ W � Yp ~ 00 2 < of = � wz 00 --J JJF p U Uw � — O � — w w - 0 X Q W Ur o � w � a � � a � z � z � aJc~nQW (/) >- o � � w � w �� � w W 2 r �_ U o = — (n � ❑ ❑ JOWOQ WU } Q > � ZJ W OW MJ2mJOJ Q lt7 (� z ui w � H WOQcnQUO (-) U)— n > z (nQQmW Z (nQH `.QUw z N M Lf') C6 f� 06 6 a a U 0 ''^^ W w VJ J Z ❑ ❑ N H Z ❑ W0zZ C-6 N L ZU _Of Cn H ZJ H W N CO�/J ^, OU O W mt2 � 0 ❑ U) W ~> ❑ aDoQ' QOmx W ❑ G6 N VJ = � cn � oUU ❑ ~ J > w � � (�� az0d- 0z0 ❑ � b MJ Q Z ~ 000d7D0' Z ❑ J W ❑_ W co Z — ❑ ❑ Q � W O z � W w � = � CD00 < wQU j � ❑ moDQZC'1Za � NN �� G��N '�� �o U' U Q J OWZ ❑ Fz = w r.1 � Z 0zwJ ~ � = Q = QQwcnw of m 2� Q JZ W w0 OC) Z � Q aw - JQwU' -j - W J , � W U J J J — U W' — W a - Q Q Z W _ U QQ ❑ Q ZQ U = Q � Z 00U � � z ZwO jQ' ❑ Q = O Ja mQC'1 = off — > o � OJ � 0 � �' i{ o VJ � w ww � m U wcn � ❑ ❑ ~ UzJ � �,, � N ��� W p H = Ow ❑ mom w = o -iF- UzcnwSwpQQ d ��y �� � J z n� of 0 w .Z w m ^� U w Q W ❑ J = ! 1S U) U Q p � I..1_ W ZzwU) J } Z "' = wQ � � Z)12 Zz DU � e� Q Z U O � +� J W m N Q O Z o (n W W J Q O W m O Q 0 Z Q O U Q Z N J N Z J F- H Z H W W W � X W ❑ 2 W W W ❑ 2 U` U F) w Q MM� W � 0 � � = = gwpQF- � a0 � Qm = = = � = m = = ❑ ❑ off > W w Y W Lf� W > U' z (D = Q = wazco0jj� J � F- O } � 0 = X = OUC OU cn W U > E w m H W H m Q J W Q Q m Z 2 Q m ❑ t w o <Q - u Q C6 C� cl i L6 co w w ❑ O M 0 � � a. < Zw � (DCoO o J U 0 � < ❑ 4 f' ❑ U) W .{ I Z W � w 2Z Q W W ❑ Z � w = W = � W H C) U W Z � Xcn � W �•' Z �- Z W .ft r. r {} Fwm � = OQzW O f + I 2 0 = 0 F- wP � 1 � � W � zONQ � a - y f W U) a O V ZDOOOW Q = W U f wpp0U) F- = u) 0 ao U W J < ❑ wfnO � O � / _ W W m ❑ Z WO W J QYm � wzW � Q --t z f .+' ml Uj J Z J W W w W W = J Z :� — 0 J d m z = = o w o ;.; W Z Ll it-no 00- V) Z E 5 1 2 3 4 5 b wo N 0 w Q � u N _ u' co CV X H N z z X Oro LU a � LU Q w W C0 U N N _ N 0 �o aN U nnp ti= w w Cf) n N N z cn cn N 0 00� LL LL CI M J O V J Q Q Q w 0 �cp G�oN ti,� o o CM w Q a4-0 Q m oat P� Q '^ 0 Q v, N CDW w � C6 00 J M fn In Z d O O O O U U p U) ul- (n p Q O >, LLJX U N N LL a 2 O U m Z U) cn cn 0 Cl) LU � w 0 a) 0 U W J J w Z U C6 LL U) � p ; p J z p •� Q ci c� z z 0U Q O N L LL W ~ ~ LO O N LPL D DLL _ N w Q z QUU LO _o J LO a O Uoo (wj M N CV w W Cl) O rn a Z w LLI (� 0 0 0 U) LO Ora a I w � w zw � oz � w Qw w - - LL LL Zcn0P w0L: o OUDOf - ZOU LU fw � U w U) X H _O Z w W W W 0 Z H w M = O z 0 W Li2 O _ 0 H J ~ 0 3: 0� wF- z0Na � w ❑ o O Z) O O Q W Z W w - 0LLJw0 = w0 U D 2ZLUU) 0 5o O ~ a � wC) U)F- ' 0 z Q I Y coZ Z Z w O W W LL o ZwHUU (~) Z o � = -1O ofz a- cn zF- a >- awZU) z O 2 Z 2 2 O w O U ? cnacnF- UO� U LU J Z D 7 z z � IJ U Z w w m n' Z J 2 H LO (� D w W 0 Z ~ 0 F- Z Z Z = D U - = W 0 cn cn Z aw 0� 00 O � F- O Ov a +1 a W N LL Ln C° v 0 W aZ ? war- OQw z LL OQO a0 > 0 2 � a � 6 Z E 5 1 2 3 4 5 w M J `' J W Q Q U UCl) � 0 0 z_ Z �t O CO W = K Z W a 0 0CN CL � N U o N i N w o 0o w � a o a \, U M J K > y 2 J Q Q N O F Oi CO Z r /�/y o w x3 W Q U+ /o Z o Q? rn rN� v 5 oaa�i� c^ W U c m W x 0' p O N �/� LL + a VJ O0 o�w og�o ULL O a CV c~i Jp cl� rl\ Q Z N O 0 Z N C W W V J Q z_o y? U) L a W O 2 w ti 0 `m Q N U to d a W W Y N w o c co a 0 O O V O Z a O Z N O H O O H 0) t� � 7 J � w � w xa xLL OO OO O N w (u LL xQx LL XaX UU U ¢ UQ Cl) x J U __ p Urn Ulu ¢ N� H U Z Z Z Z w W w W W N o M LL' LL' In N N U 1 1 1 LO 7 w w W O Z Dvj Z pcti W ¢¢ LL � LL W O W o x W O� O� ~ Z W a x a x Of W 2 W U CD z Q ~ LU Q' O z z W O Wo N Q M o M w CD U N O 3 3 d O LL m 9 Q LL LL +� W rn 0 0 Z � o � o _j LO w mxw U U O N � � W o o a3 (M ¢3 4Y N N a N a w 0 I I I I Z w Of Q Z = Z _ mow z a a g � = LL a: (n LL mo M In ZcoOP wOLo �~ CDN 0 D � W0UW >W>' u II F F ZOLLJ X > F oao uai oao U U O z w W W Z 00 roim M� �_ �_ H LU co � _ Q 00 W U U 2i 0 W 0- O H W n u u 11 2 W H Z O N Q Q- In� Inln �) �) LL CO W ~ ZUHZ C) N N N N N zWZW c� LLJ (/)w ¢ = w0 2C) 0 LLJ 0p � ~ IZO 2i -i U xx xx j �N w �\ � Q (n W U � >� D a roomer Om �� Om �/ J W W ~ > O U 0 N q N m 2 m 0 7 1- Y 00 0 W Z W J 2 0 II x o I� Z U ~ O w 0 > W w U II II II II N� \ N \\ W a- O W U U ~ Z N N ��WN rM7 O�w^ rMl C� Z w w LLjU w U m LL 2~LL J O J � Z (n Y a W F ^J>ON o W Wol 2 0 ~ = Z = = O w 0 W Q IL M�Z... mmz LL �F �} Fy�V V Z cn Q cn H 00� 0 x D Q Owao (Doo U x m O Z KNIO NIn W F_ `' w H `' Z2U Z� Z� W 20 m U)i Y O z o U m gxg C) w > Z N X X W W Z m a2 C9 O Dow �� 2 2— L L Z L m2 u\ o F a t �_ ❑ zo U H m> N X U N �"� w Qo 7� W Q W fn W ID W 2 0 cnpN ZU J J ZN - mww0 II om Q ~ mo 2 0(D Q J JZ m- O Y w O -, o U W z U Z r N z o Of po II m0 N7 NN (9Ww W2 � Z> �W�O I\2 N� xg 20 Lu T W O 7 r-d>— Z W F W a W N F>-Z.... �N\ NNNN Z> Z Z 0 (� mO Q C7X o(o o(o QUO �NQ z �k 70 CO N N J < w W W Z> _ F z N UU U U U =O 0 W D Co N m9�2�9�Q� Q Q Q Z cc) Q W I f m UU U U U CAIO 0 0 Z N O>— HNNCl)...-- U> O J J Z N M VQ Q z 4 V 7 1 2 3 4 5 U 6S W z > ow = w p a N CN U N N ti N 0 00 o m M -- O 4-0 c� co � w _r_ a U) � O � U Oq (� W N � Q — O o v, J m LO o � N 0 w U r ti W prn co Q zw � LLI c)o O CDJ � U LO 0 LO p � ULLI w zw � w = z p z I-- w p = w = w � z001-- 0 � OU � zOf 0Ucw � o � CO � ui zm � Wzz0 � Q i < =D_ MU' w0a. 0 � W � � ~ 0 .- cn � W O — � X N o} wm = WOZ � F- Z U` W Z w = i c�/ izz� Z U Q J U O �� �(�� %ry �O W � p 0 U) F- U p � E � �� oo Zco couy Q = ZLLJ M: a- 0 � \O (n O C � 3 l'" �F: � z J F- U) (n � O O a � o c� Ww � pZ w0 �`�� p QYOOF W Z W F Z Q O D m = F- � F- P� � d Z W H U U U Z O O rL = JO z = cn zF- < >- Zcnz O = z = = Ow0 O O ---------- ------------------- z ED CO m u W J J w L M O 1 O04 C' J z Q L Q LL It O LO � � a w m w m i < J J N J J N Q O 0 coN 0 0 m 'T ( d Lo H Ww >w L = CV > W = U 0 C UT: = w w O 0 = w w z Z L w c� z w 0 � F- Q w U +� X W LL w J m J W w 00 a O w — U) J D 0-1 0 J D � 0 Z Q � J � J p z 0 0 < 0-1 N M 4 N Cl) �t 6 Z E b 5 1 2 3 4 5 z w o r ' O Q � ~ m � II � W w o o Z � z � _ w � >' w o QQM � � O H W N O O cn ~ a 2 CD �J N Z X � CS �'� oo Q N O C/) z a 00 2� a O r Q o w a m a ¢ � a U N N 2iw Ow Q o owl: ,i �, �o I` N Q LL H Z ? 7�d°�b N ���� O /�� O Q W O lg `` O VJ � W _ � e� M o 0 Q cn Q gw ) o � o ~ CUB Q � w wQ w w o LL r� Z Ua Z zz co O � z O Z 2 � Z > � a Y a. z> = U O w O a C� C6 N U) O � U W Q _0 -1-0 O m LO O N N O O W W N 00 O OJ = ~ D � o Q wok M CD LL m 00 m 0 0gQ co rn Z w D w o 0 m (DoU C) Q U) `od a m w zw � oZ � w Qw w - - p = LLT: LL Z 0P 0 � D OD , W0003: 50 O z w W W w 0 N HW QZw c0 a = 0 O ~ ~ O N 0 U) H Z O N Q W W zcnOJLU ¢ = Lu (D U 2Z � U) 0p = a0 HQU) W UUJ ~ E5 � 9 Q w w U) p Z W 0 Y m D w w Z W Z Q 0 O m d O > H WdZLLJF- UUUZ r = J O J ly Z d (n z � Q )- Q W zU) z O = z = = Ow0 z N u bo C� J O p Q a o V) c� a z Z D O z E 5 1 2 3 4 5 E5=9 HA cn > z 4t ❑ a�i� � N d U N N N 0 00 o M cn M x O O 4--+ m w Z a Q U U C6 r > C] W L-) W U) v 440 :3 4C c ° i > O 0 C-' a N U w a� N W J W IJU Z5 (J} LiJ i . Z W V C171 [� • Q<3.> ~ • �w CO z " uyw> m W `V O _ o u O v � z m Ln s = J O- i r C- y w p Q N w woo o of ° �` w 5L Q 's L t r • O o � J � � LO o a a it CYO41, Ur ' 0 at CL W w ~ LOU = z' zw � z � w Qw w — — ZU) 0 wOF- J O ~ z0cw D U � = U w z ~ Z F- z � � W ~ a O z W w z z n Wm � = O~ W o ow 0 = w0 LLJ Z U � w J � OW w z > � zNQw O z O w>w > ZDOooQwz � CC U) (1) U) wZ - 0LL. J W O = WU' G J 0L W pp0 �00' ~ � J U W w JUO F- QU) WUO � a0 L.L Z U) QWWWEzz wo wO u � YmzWw0WLL ZJ U N W � azwHU (_) Uz a Ln z � _ � J z J W W W W O U) 0 >j O ~ = O = = 0w 0 z 0 = r j v ? cnQcn � U � c) � �10 - Z/I O x Z c� U) 0 Z WoU DC a - Ll -iDQ r V w QmC00 s U) (D � C = z J O � 0 C O ry J U Lu O z d z . ^ ° vJ w C/) 0 Q z n 6 Z 5 Self-flashingRT� MINI base for • i metal roof-top PV mounting systems RT-MINI is suitable for mounting any rail system with a conventional L-Foot. k 1 t Dual bolt design : M8 or 5/16" x for L-Foot & 1 /4" for EMC Easy tapping 1/4" Hex Bolt ❑ 1CC screw guide upper channel ® C Flat lip for M8 or 5/16" ❑■ PV Cable ICC ESR 3575 Hex Bolt clips 00 bottom channel Installation Manual Roof Smarter PV . . . . . . RT� MINI Flexible Flashing certified by the International Code Council (ICC) Engineered to ASTM D 1761 (Standard Test Methods for Mechanical Fasteners in Wood) Components Dimensions in (mm) RT2-00-M I N I B K 0 0 0 3 1/2 (90) 0 0 2 (50) �`s v 0 MINI base : 20 ea. Screw : 40 ea. Rafter installation Extra RT-Butyl : 10 ea. Optional item 5 x 60mm Mounting screw(RT2-04-SD5-60) : 100 ea./Bag 5/16" Hex bolt, washer& nut set (RT-04-13N30SL-US): 100 ea./Bag RT-Butyl (RT2-04-BUTYLT) : 10 ea./Box RT-Butyl is Roof Tech s flexible flashing used in one million residential PV systems for the last 26 years. It is the first PV mounting system with Flexible Flashing certified by the ICC. Engineered to withstand wind speeds up to 180 mph and ground snow up to 90 psf. Metal Flashing Retrofit Flexible Flashing Deck installation - I 4 Shedding water? 100% Waterproof ICC ESR-3575 ASTM2140 testing UV testing (7500 hrs.) LI P.E. Stamped Letters available at www.roof-tech.us/support TAS 100 A on metal and asphalt roof. Roof Tech Inc. www.roof-tech.us • • • �•• 1 � , 858.935.6064 CH1140www.chikoiar.com/Www.chikosolar.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FTH-21 1 CHIKO AL Roof Hook 211 TECHNICAL DATA Main Material 6005-T5 & SUS304 Uplift P N*Fv (N=3) Wind Load Up to 60 M/S Snow Load 1 .4 KM/M2 Hook Spacing Up to 2000mm Installation Site Roman Tile Roof AL Roof Hook 019 co CHIKO L Feet matching to the Flashing,supplying the best waterproofing goy solution for Asphalt Shingles Roofs, 225 ADVANTAGES COMPONENT LIST WARRANTY ■ Enables simple, fast and cost-effective MATERIAL QTy installation. AL Flashing 01 ■ High class anodized aluminium. AL L Feet 01 - 1 0 ■ Fasteners and rail nut configurated to 050 Nut 01 YEARS.,,, save extra parts purchasing. SUS Bolt M8*25 01 SUS M8 Wahser 02 ■ 100% water proofing. Wooden Screw M8*90 01 Silicon Rubber 01 UL LISTED U ORDERING SPECIFICS C o US us Standard Packaging 16PCS/CTN "STE° Dimensions 34X25X7CM LISTED Intertek [PV MOUNTING SYSTEM] 5010190 Weight 6KG E483644 Conforms to UL STD NO.2703 CH1140www.chikoiar.com/Www.chikosolar.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-7R-2100 CHIKO 7 RAIL 2100MM CK-7R-3200 CHIKO 7 RAIL 3200MM CK-7R-4200 CHIKO 7 RAIL 4200MM 411 TECHNICAL DATA V I Main Material AL 6005-T5 Wind Velocity Up to 60 M/S 30.8 Xi=31918.082 mm4 Yi=81501 .592 mm4 7 RAIL Ln CHIKO 7R aluminium rail is designed for CD roof mounting system, it could applied on +� all roof mount system. 31.3 ADVANTAGES COMPONENT LIST WARRANTY ■ Easy installation MATERIAL QTY ■ Highclass anodized Aluminium Rail 01 � 1J ■ Tilt- in nut - YEAR ■ Universal on roof mount system UL LISTED ORDERING SPECIFICS Standard Packaging 8 PCS/PKG C V` US Dimensions 2100/3200/4200mm us Weight 15/22.8/30KG C 13TE� LISTED Intertek [PV MOUNTING SYSTEM] 5010190 E483644 Conforms to UL STD NO.2703 CH1140www.chikoiar.com/Www.chikosolar.com Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FT-SKA CHIKO 7 Rail Splice Kit "444 TECHNICAL DATA Main Material AL 6005-T5 Wind Load Up to 60 M/S Snow Load 1 .4 KM/M2 � � 7 RAIL SPLICE KIT Zo�� 45.7mm CHIKO 7R aluminium rail splice kit is designed for 7R rail connection from back I/ / to position. The most simple and handy r installation way. ADVANTAGES COMPONENT LIST WARRANTY ■ Easy installation MATERIAL QTY ■ Highclass anodized Aluminium Rail Splice Kit 01 SUS304 Bolt M8*25 02 YEAR Star Washer 02 UL LISTED ORDERING SPECIFICS Standard Packaging 200 PCS/PKG C U` US Dimensions 51 X38X22CM us Weight 30KG <STE� LISTED Intertek [PV MOUNTING SYSTEM] 5010190 E483644 Conforms to UL STD NO.2703 CH1140www.c , Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FTM-K30 CHIKO Intergated Grounding Mid Clamp 30mm CK-FTM-K33 CHIKO Intergated Grounding Mid Clamp 33mm CK-FTM-K35 CHIKO Intergated Grounding Mid Clamp 35mm CK-FTM-K38 CHIKO Intergated Grounding Mid Clamp 38mm 1 CK-FTM-K40 CHIKO Intergated Grounding Mid Clamp 40mm TECHNICAL DATA Main Material AL 6005-T5 Intergated Grounding CD Mid Clamp CHIKO end clamps is designed base on 7R rail to fix module on the end of rail, have D=30/33/35/38/40/45/50 founction of intergated grounding, 30mm to 50 mm thickness module are available. ADVANTAGES COMPONENT LIST WARRANTY ■ Intergated Grounding MATERIAL QTY ■ Easy installation Mid Clamp 01 ■ High class anodized SUS304 Bolt M8 01 ■ Tilt- in nut 050 SUS304 Nut 01 Rivet 02 UL LISTED ORDERING SPECIFICS C ��STE� U` us Standard Packaging 100 PCS/BOX 400PCS/CTN us Dimensions 50X38X20CM LISTED Intertek Weight 26.8/27.5/28/28.6KG [PV MOUNTING SYSTEM] 5010190 E483644 Conforms to UL STD NO.2703 CH1140www.c , Solar Mounting Solutions PRODUCT LINE Item Product Name CK-FTE-K30 CHIKO Intergated Grounding End Clamp 30mm CK-FTE-K33 CHIKO Intergated Grounding End Clamp 33mm CK-FTE-K35 CHIKO Intergated Grounding End Clamp 35mm CK-FTE-K38 CHIKO Intergated Grounding End Clamp 38mm CK-FTE-K40 CHIKO Intergated Grounding End Clamp 40mm TECHNICAL DATA Main Material AL 6005-T5 Intergated Grounding End Clamp 7- ® CHIKO end clamps is designed base on D=30/33/35/38/40/45/50 7R rail to fix module on the end of rail, have founction of intergated grounding, 30mm to 50mm thickness module are available. ADVANTAGES COMPONENT LIST WARRANTY - Intergated Grounding MATERIAL QTY ■ Easy installation End Clamp 01 ■ High class anodized SUS304 Bolt M8*25 01 ■ Tilt- in nut SUS304 Washer M8 01 050 SUS304 Nut 01 Rivet 01 UL LISTED ORDERING SPECIFICS C V` us (T�)Us Standard Packaging 100 PCS/BOX 400PCS/CTN Dimensions 50X38X20CV LISTED Intertek Weight 22/24.5/25.5/26KG [PV MOUNTING SYSTEM] 5010190 E483644 Conforms to UL STD NO.2703 .ri 5UNTECH Full Black Series 350-370 Watt 120 HALF-CELL ALL BLACK MONOFACIAL STPXXXS- B60/Wnhb MODULE Features High power output High PID resistant Compared to 158.75 mm half- Advanced cell technology cell module,the power output and qualified materials lead to can increase 25-30 Wp high resistance to PID Excellent weak light Suntech current sorting performance i I process More power output in weak I i System output maximized by light condition,such as haze, reducing mismatch losses up cloudy,and morning to 2%with modules sorted& packaged by amperage Extended wind and snow Withstanding harsh load tests environment Module certified to Reliable quality leads to a withstand extreme wind better sustainability even in (3800 Pascal)and snow harsh environment like desert, loads(5400 Pascal)* farm and coastline Certifications and standards: GUL61730 �n _ InWrtek Trust Suntech to Deliver Reliable Performance Over Time Special Cell Design • World-class manufacturer of crystalline silicon photovoltaic modules The unique cell design • Unrivaled manufacturing capacity and world-class technology leads to reduced electrodes • Rigorous quality control meeting the highest international standards: resistance and smaller ISO 9001,ISO 14001 and IS017025 current,thus enables higher • Regular independently checked production process from international fill factor.Meanwhile,it can accredited institute/company reduce losses of mismatch • Tested for harsh environments(salt mist,ammonia corrosion and sand and cell wear,and increase blowing testing:IEC 61701,IEC 62716,DIN EN 60068-2-68)** total reflection. • Long-term reliability tests • 2 x 100%EL inspection ensuring defect-free modules Industry-leading Warranty based on nominal power IP68 Rated Junction Box • 98%in the first year,thereafter,for The Suntech IP68 rated years two(2)through twenty-five junction box ensures an industry fea (25),0.55%maximum decrease from outstanding waterproof dingpne MODULE'snominal power output level,supports installations 3 arwarranty per year,ending with the84.8% in all orientations and in the 25th year after the defined reduces stress on the cables. 3 WARRANTY STARTING DATE' WO High reliable performance, 1 10 25 • 12-year product warranty low resistance connectors • 25-year linear performance ensure maximum output warranty for the highest energy production. *Please refer to Suntech Standard Module Installation Manual for details. **Please refer to Suntech Product Near-coast Installation Manual for details. ***Please refer to Suntech Product Warranty for details. J SUNTECH STC XXXS-B60/Wn Maximum Power at STC(Pmax) 370 W 365 W 360 W 355 W 350 W 1039140.9$210.081 ---------------------------------------------------------------------------------------------------------------------------------------------- 989138.94010,041 Optimum Operating Voltage(Vmp) 34.3 V 34.1 V 33.9 V 33.7 V 33.5 V Droina eholes B Optimum Operating Current(Imp) 10.79 A 10.71 A 10.62 A 10.54 A 10.46 A --------------------------------------------------------------------------------------------------------------------------------------------------------- Open Circuit Voltage(Voc) 40.9 V 40.7 V 40.5 V 40.3 V 40.1 V 4-0 5 110 021 Produdlabel� B - ---------------------------------------------------------------------------------------------------------------------------------------------------------- Grounding holes Short Circuit Current(Isc) 11.49 A 11.42 A 11.35 A 11.28 A 11.21 A ----------------------------------------------------------------------------------------------------------------------------------------------------- Module Efficienty 20.3% 20.0% 19.7% 19.5% 19.2% e-14x91ass Mounting slotsots Operating Module Temperature -40°C to+85°C Barcode -------------------------------------------------------------------------------------------------------------------------------------------------------------- Maximum System Voltage 1000 V DC(IEC) Section A A (Rear View) Maximum Series Fuse R a ting 20 A r ]A -- _ PowerTolerance 0/+5 W --- Junction box STC:Irradiance 1000 W/m',module temperature 25°C,AM=1.5; Tolerance of Pmax is within+/-3%. lA 3511.381 NMOT STPXXXS-B60/Wnhb Section B-B Maximum Power at NMOT(Pmax) 278.2 W 274.3 W 270.7 W 266.8 W 263.3 W m ---- ---- ----- ------- ----- -- Optimum Operating Voltage(Vmp) 32.0 V 31.8 V 31.6 V 31.5 V 31.3 V -- - Optimum Operating Current(Imp) 8.69 A 8.62 A 8.56 A 8.48 A 8.42 A 2010 791 P g Open Circuit Voltage(Voc) 38.7 V 38.5 V 38.4 V 38.2 V 38.0 V --------------------------------------------------------------------------------------------------------------------------------------------------------- Note:mm[inch] Short Circuit Current(Isc) I 9.17 A 9.10 A 1 9.04 A 1 8.96 A 1 8.89 A NMOT:Irradiance 800 W/m',ambient temperature 20°C,AM=1.5,wind speed 1 m/s. ,._Temperature Characteristics Nominal Module Operating Temperature(NMOT) 42±2°C Current-Voltage&Power-Voltage Curve(370S) -------------------------------------------------------------------------------------------------------------------------------------------------------------- Temperature Coefficient of Pmax -0.36%/°C 400 -------------- - ----------------------- ------------ - Temperature Coefficient of Voc 0.3040/o/°C 350 ------------------------------------------------------------------------------------------------------------------------------------------------------------- to Temperature Coefficient of Isc 0.0500/o/°C Ho s 250 6 300 Mechanical Characteristics9V 6 50 6 100 Solar Cell Monocrystalline silicon 166 mm ------------------------------------------------------------------------------------------------------------------------------------------------------------ 50 No.of Cells 120(6 x 20) ------------------------------------------------------------------------------------------------------------------------------------------------------------- Dimensions 1756 x 1039 x 35 mm(69.1 x 40.9 x 1.4 inches) °° 1a 20 30 qo 50° ------------------------------------------------------- --------------------------------------------------------------------------------------------- Weight 20.3 kgs (44.8 lbs.) VotageM ------------------------------------------------------------------------------------------------------------------------------------------------------------- Front Glass ----------------3.2 mm(0.13 inches)tempered glass =l000wim eaowim eoo winv-aoo wrm==zoowim= ---------------------------------------- ----------------------------------------------------------------------------------------------------- Frame Anodized aluminium alloy ------------------------------------------------------------------------------------------------------------------------------------------------------------- Junction Box IP68 rated(3 bypass diodes) ------------------------------------------------------------------------------------------------------------------------------------------------------------- Output Cables 4.0 mm2, Portrait:(-)350 mm and(+)160 mm in length Landscape:(-)1300 mm and(+)1300 mm in length or customized length Connectors MC4 comP atible Dealer information Container Pieces per pallet 31 31 -------------- ----------------------------------- -------------------------------------------------------------------------- ....................... Pallets per container 6 26 ------------------------------------------------------------------------------------------------------------------------------------------------------------ Pieces per container 186 806 ------------ - -------------------------------- --------------------------------------------- --------------------------------------------------- Packaging box dimensions 1786 x 1130 x 1203 mm ---------------------------------------------------- ------------------------------------------------------------------------------------------------------ Packaging box weight 1 679 kg Information on how to install and operate this product is available in the installation instruction.All values indicated in this data sheet are subject to change without prior announcement.The specifications may vary slightly.All specifications are in accordance with standard EN 50380.Color differences of the modules relative to the figures as well as discolorations of/in the modules which do not impair their proper functioning are possible and do not constitute a deviation from the specification. hOL11llll@S Open Energy For All Microinverter Description Datasheet Hoymiles 1-in-1 microinverter,which can be connected to one panel and used in various applications,is one of the most flexible solar solutions.With the maximum DC voltage of 60 V,Hoymiles microinverter is a PV Rapid Shutdown Equipment and conforms H M-300N with NEC-2017 and NEC-2020 Article 690.12 and CEC-2021 Sec 64-218. H M-350N H M-400 N JJW All of the three models listed are equipped with reactive power control and are compliant with IEEE 1547,UL 1741 and CA Rule21. Features Easy installation,just plug and play External antenna for stronger communication with DTU With Reactive Power Control,compliant with CA Rule 21 High reliability,NEMA 6(IP67)enclosure, Compliant with U.S.NEC-2017&NEC-2020 6000 V surge protection 690.12 rapid shutdown Region: 0 o 2021 Hoymiles Power Electronics Inc.All rights reserved. sales@hoymiles.com Technical Specifications Model H M-30ON H M-350N H M-40ON Input Data(DC) Commonly used module power(W) 240 to 405+ 280 to 470+ 320 to 540+ Maximum input voltage(V) 60 MPPTvoltage range(V) 16-60 Start-up voltage(V) 22 Maximum input current(A) 11.5 11.5 12.5 Output Data(AC) Peak output power(VA) 300 350 400 Maximum continuous output power(VA) 295 349 382 Maximum continuous output current(A) 1.23 1.42 1.45 1.68 1.59 1.84 Nominal output voltage/range(V)' 240/211-264 208/183-228 240/211-264 208/183-228 240/211-264 208/183-228 Nominal frequency/range(Hz)' 60/55-65 Power factor(adjustable) >0.99 default 0.8 leading...0.8 lagging Total harmonic distortion <3% Maximum units per branch' 13 11 11 9 10 8 Efficiency CEC peak efficiency 96.7% CEC weighted efficiency 96.5% Nominal MPPT efficiency 99.8% Nighttime power consumption(mW) <50 Mechanical Data Ambient temperature range(°C) -40 to+65 Dimensions(W x H x D mm) 182 x 164 x 29.5 Weight(kg) 1.98 Enclosure rating Outdoor-NEMA 6(IP67) Cooling Natural convection-No fans Features Communication 2.4GHz Proprietary RF(Nordic) Monitoring S-Miles Cloud Warranty Up to 25 years Compliance UL 1741,IEEE 1547,UL 1741 SA(240 Vac),CA Rule 21 (240 Vac), CSA C22.2 No. 107.1-16,FCC Part 15B, FCC Part 15C PV Rapid Shutdown Conforms with NEC-2017 and NEC-2020 Article 690.12 and CEC-2021 Sec 64-218 Rapid Shutdown of PV Systems *1 Nominal voltage/frequency range can vary depending on local requirements. *2 Refer to local requirements for exact number of microinverters per branch. *3 Hoymiles Monitoring System. ©2021 Hoymiles Power Electronics Inc.All rights reserved. Sense Energy Monitor Technical Specifications Sense is a home energy monitoring device. It is used to measure current and voltage in the service mains and solar supply of your home. If installed outside, it must be kept dry and within specified temperature ranges.The Sense monitor should only be installed by a licensed electrician. Monitor (Monitor Model Nos. SM3, SM3S) Compatibility:120VAC (90V-130V), 60 Hz I Processor:1 GHz ARM TTr r Wi-Fi: 2.4 GHz 802.11b/g/n Power Consumption: <5 watts, 0.1 amps Dimensions: 5 3/8" H x 2 5/8"W x 1 1/4" D Weight: 220 g { RH <90%; Elevation <3000 meters; Temperature: 0-500C Current Transformers CAT III, 300V, 200A max May be used on uninsulated conductors Dimensions: 3 6/16" H x 2"W x 12/16" D r Inside Diameter: 1" r R Cable length: 46" r Power Cable 16 AWG (UL),THHN or THWN, 600V. Cable length: 14" Per UL requirements, the Sense energy monitor power cable itself is marked with all the required safety information, and compliance was verified as part of obtaining our safety certifications. It is jacketed with PVC to form a flexible power cord of UL type SVT, and marked as such. Certifications Certified to CSA STD C22.2 No. 61010-1 Conforms to UL STD 61010-1 Conforms to CAN ICES-3(B)/NMB-3(B) c � � us ilMO * sense Intertek 5002148 ,TY o City of Anacortes Photovoltaic System Permit Submittal Requirements Permit Required: A building permit is required for the installation or replacement of solar/photovoltaic (PV) systems, including roof top arrays, ground-mounted arrays and PV water heaters. An electrical permit is required from the State Department of Labor & Industries. Single family residence rooftop installations meeting the criteria in the attached checklist are eligible to obtain a building permit over-the-counter at the permit center in City Hall. CODES: International Residential Code (Current Edition) International Building Code (Current Edition) International Fire Code (Current Edition) National Electrical Code (Current Edition) FEES: Building Permits for installations are based on the material cost of the support system and labor for the installation. SUBMITTAL REQUIREMENTS FOR PV (OTHER THAN ONLINE OR OVER-THE-COUNTER PERMITS): 1) Permit Application Form A. 2) Site plan showing location of house and array/equipment on lot, with setback dimensions to property lines. 3) Roof plan showing the array. 4) Manufacturer specifications or the PV panels and mounting hardware. Include the weight of the equipment. 5) For rooftop systems not conforming to all of the criteria in the attached checklist, provide a roof framing plan and either: a) Structural calculations by a WA State Licensed Engineer or other competent person showing the adequacy of the existing roof structure to support the additional load, or b) Documentation showing that the roof structure was substantially overbuilt compared to prescriptive code requirements. 6) For ground mounted systems provide structural calculations by a WA state licensed engineer or other competent person showing how the structure meets wind design requirements for the structure and footings. Note that ground mounted equipment greater than 36 inches in height must adhere to minimum required property line setbacks of the applicable zoning district. NOTE: The purpose of this handout is to assist the public in complying with detailed permit submittal requirements. It is NOT a complete list of permit or code requirements and should NOT be used as a substitute for applicable laws and regulations. It is the responsibility of the owner/design professional to review the submittal for completeness and applicability to other codes. Only complete applications will be accepted by the City for review. To Be Completed By the Applicant Project Address: 2105 1Oth st Anacortes Washington 98221 Project Applicant: Ingrid Lomera Applicant Email:permitting@solgenpower.com Phone No.:8557091181 Site Owner Name: Bradley Gaines PV System Description: PV Solar Roof Mount Installation, 5.92kw, 2 circuits Determine if your project is eligible for an over-the-counter Permit(Check Yes or No) Yes No 1. PV System is designed and proposed for a detached single-family house,duplex or � Eltownhome. 2. PV System is designed for rooftop of house in general compliance with applicable ❑ ❑ codes. x 3. Mounting system is engineered and designed for PV. )p ❑ 4. Rooftop is made from light weight material such as shingles. x1 ❑ 5. PV system will be permitted and pre-approved by Labor& Industries Electrical ❑ ❑ division. x 6. To address uplift, panel are mounted no higher than 18"above the surface of the EX ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. 7. Total deal load of panels,supports, mountings, race ways,and all other )U ❑ appurtenances weight no more than one of the following. IF Yes, indicate which: ❑ No more than three and one half(3.5 pounds per square foot(PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5) PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0) PSF 8. Supports for solar panels are installed to spread the dead load across as many Ex ❑ roof-framing members as needed to ensure that no point loads in excess of fifty (50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. x7 ❑ 10. Panels are mounted no higher than the roof ridge or apex of roof(applies only to ❑ ❑ pitched roofs). X Comments: vi By Checking this box, I certify that all of the information provided on this form is correct. If you answered yes to all of the above questions,your PV installation is eligible for an over-the-counter building permit. To apply please bring in this completed form to our permit center at City Hall for an over-the-counter permit. To be Completed By Staff Project is eligible for over-the-counter permit? ❑Yes ❑ No PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT r Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street,Anacortes WA 98821 � 4� Phone: (360)293-1901 FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION 1. PROPERTY INFORMATION Project Address(Street,Suite#): Assessor Parcel Number: P56194 2105 10th st Anacortes Washington 98221 Subdivision/Lot#: Zoning Designation: Lot area (size): 6,098 sq.ft. 2. TYPE OF PROJECT ❑ New SFR ❑ New Accessory Dwelling Unit: ❑ Deck/porch (new/repair) ❑ New Duplex ❑ Attached to Primary Unit ❑ Interior remodel ❑ Detached from Primary Unit ❑ New Addition to SFR ❑ Garage, carport or accessory building ❑ Fence or retaining wall or duplex (new/repair) ® Other: Alteration - Solar Roof Project Summary: PV Solar Roof Mount Installation, 5.92kw, 2 circuits Project Valuation: $ 5,091 3. PROPERTY OWNER INFORMATION Name: Bradley Gaines Phone: 2063038606 Address(Street,City,State,Zip): Email Address: 2105 10th st Anacortes Washington 98221 gainesba@gmail.com 4. CONTRACTOR INFORMATION Name:* Solgen Power, LLC Phone: 8557091181 Contractor's Business Licenses State License#: City License#: *All Contractors&Subcontractors must have a valid City of Anacortes business license prior to doing work in the Expiration Date: Expiration Date: city. SOLGEPL820BE 01/05/2024 Address(Street,City,State,Zip): Email Address: permitting@solgenpower.com 5. CONTACT PERSON Select one person the city will contact for anything related to this project: ❑ Applicant ❑ Property Owner ® Contractor ❑ Other list below Name: Ingrid Lomera Phone: 8557091181 Address(Street,City,State,Zip): Email Address: 5715 Bedford St. Pasco WA 99301 permitting@solgenpower.com Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 5 of 18 GAT Y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street,Anacortes WA 98821 \�'�yq,cow� Phone: (360)293-1901 6. LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lenders involved with your project, write"no lenders"on the Name Line below. Name: n/a Phone: Address(Street,City,State,Zip): Email Address: 7. ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: I understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. I understand that if I submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. I understand and acknowledge that I could be responsible for providing as-built drawings (on paper or electronically) as part of the project's certificate of occupancy process. I understand and acknowledge that Special Inspections could be required as part of my project,and if needed I will be required to pay for the cost of these inspections. I understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. I understand that if permits are reviewed concurrently such as design review,site plan,traffic concurrency, etc.,any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. :�__+ 01/08/2022 Signature Date Ingrid Lomera Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 6 of 18 SOLGN P O W E R July 31, 2022 Subject: Proposed Solar Panel Installation Bradley Gaines Residence, 2105 10th ST,Anacortes,WA To Whom it May Concern, Our engineering department has reviewed information, gathered by our field crews, related to the proposed solar panel installation at the above-referenced address. The purpose of our review was to determine the structural adequacy of the existing roof. Based on our review and analysis of the available information, and in accordance with governing building codes, it is our professional opinion that the existing structure is permitted to remain unaltered for the proposed solar installation. Desigrn Parameter Summary Governing Building Code: 2018 Washington Building Code(2018 IBC) Risk Category: II Design Wind Speed: 110 mph (per ASCE 7-16) Ground Snow Load: 15 psf Roof Information Roof Structure: 2x6 Manufactured Trusses @ 24" O.C. Roofing Material:Asphalt Shingles(1 layer) Roof Slope: 32 degrees Roof Connection Details RT Minis into 2x rafters or truss top chords at 48" O.C., install per design drawings and manufacturer specs Locations per design drawings Note:Required embedment length excludes the tapered tip of the screw,and embedment into sheathing. Analysis The proposed installation - including weight of panels, racking, and mounts - will be approximately 2.62 psf. In the areas where panels are installed, roof live loads will not be present. The reduction of roof live load is adequate to fully or partially compensate for the addition of the panel installation. Because the member forces in the area of the solar panels are not increased by more than 5%, the stresses in the members are not increased by more than 5%, and so per section 806.2 of the International Existing Building Code (IEBC), the structure need not be altered for gravity loading. The proposed installation will be 6" max. above the roof surface (flush mounted) and parallel to the roof surface. Therefore, any increase in wind loading on the building structure from the solar panel installation is expected to be negligible. Wind is the governing lateral load case. Because the increase in lateral loading is not increased by more than 10%, per section 806.3 of the adopted IEBC,the structure need not be altered for lateral loading. Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16.This loading has been used to verify the adequacy of the connection specified above. Connection locations should be in accordance with design drawings. Conclusion The roof structure need not be altered for either gravity or lateral loading. Therefore, the existing structure is permitted to remain unaltered. Connections to the roof must be made per the "Roof Connection Details" section above. Copies of all relevant calculations are enclosed. Limitations and Disclaimers The opinion expressed in this letter is made in reliance on the following assumptions: the existing structure is in good condition; the existing structure is free from defects in design or workmanship; and the existing structure was code-compliant at the time of its design and construction. These assumptions have not been independently verified, and we have relied on representations made by the property owner and his or her agents with respect to the foregoing.The undersigned has not inspected the structure for patent or latent defects. Electrical engineering is beyond the scope of this analysis. Solar panels must be installed per manufacturer specifications. Structural design and analysis of the adequacy of solar panels, racks, mounts, rails, and other components is performed by each component's respective manufacturer and the undersigned makes no statement of opinion regarding such components. This letter and the opinions expressed herein are rendered solely for the benefit of the permitting authority(city or county building department), and may not be utilized or relied on by any other party. If you have any questions or concerns, please contact our office at (855)-709-1181, or email me directly at Trevor.Jones@solgenpower.com. Sincerely, Trevor A.Jones, P.E. 0 OR NNASONFS hP O � Z - 201148 8 07 RfGIs \� /0NAL ENCa 7/31/2022 SOLG . N P 0 W E R Note: All calculations per ASCE 7 Load Comparison This calculation justifies the additional solar load by comparing existing to proposed gravity loads in the location of the solar panels. Without Solar With Solar Dead Load Asphalt Shingles 3 3 psf 1/2" Plywood 1 1 psf Framing 3 3 psf Insulation 1 1 psf 1/2" Gypsum Ceiling 2 2 psf M,E, & Misc 1.5 1.5 psf Solar Panel 0 2.62 psf Total Dead Load 11.5 14.12 psf Snow Load Ground Snow Load, Pg 15 psf Exposure Factor, Ce 1 Thermal Factor, Ct 1.1 Importance Factor, IS 1 Flat Roof Snow Load 11.55 Eqn. 7.3-1 or jurisdiction min. Slope 32 degrees Unobstructed Slippery Surface? No No Slope Factor, CS 1.00 1.00 Sloped Roof Snow Load 11.6 11.6 psf Live Load Roof Live Load 1 20 1 0 Ipsf Load Combination D + Lr 31.5 14.1 psf D + S 23.1 25.7 psf Max. Load 1 31.5 1 25.7 Ipsf of original 81% Result: Because the total forces are decreased, per the relevant code provisions stated in the body of the letter, the existing roof structure is permitted to remain unaltered. SOLGr- N P O W E R RT Mini Connection Calculation This calculation justifies the connection of the solar panels to existing roof members, by showing the connection capacity is equal to or greater than the uplift force demands. Connection Demand Spacing perpendicular to rail 32.5 in 1/2 panel length Spacing parallel to rail 48 in Max spacing Effective Wind Area on each connection 10.8 ft` Roof Angle 32 degrees SOLAR PANEL j' ROOFING Wind Speed 110 mph LFOOT Exposure Coefficient, K, 0.92 6 Topographic Factor, K, 1 ROO MINI CHIKO Directionality Factor, Kd 0.85 '"Rail Elevation Factor, Ke 1.00 Velocity Pressure, q, 24.2 psf Mount Urough roof sheathing ' into existing rafters Zone 1 Zone 2e Zone 3 GCp(max) 1.24 1.47 1.78 Exposed Panels?(y,= 1.5) No No No Pressure Equalization Factor,ya 0.79 0.79 0.79 Uplift Force 23.5 28.0 33.8 psf Max. Uplift Force/Connection (1.0 WL) 254.7 302.8 365.9 Ibs ASD Factored (0.6 WL) 152.8 181.7 219.5 Ibs Solar Dead Load (0.6 DL) 17.0 17.0 17.0 Ibs Max. Uplift Force (0.6 WL-0.6 DL) 135.8 164.7 202.5 Ibs Connection Capacity Connection Type RT Mini into 2x Rafter Total Allowable Capacity 447.0 Ibs (per manufacturer) Compare ASD Factored Demand to Capacity Demand 202.5 Ibs Capacity 447.0 Ibs Result Capacity exceeds demands.Therefore,connection passes.