HomeMy WebLinkAboutPermit File BLD-2019-0511 1715 O Avenue (46)I L3L MATERIALS TESTING & CONSULTING, INC. Fidalgo Flats - 20B301 - Field Report: Lateral Framing: Report #F263216 CLIENT Madrona Real Estate Investors VIII, LLC DATE 08/18/2021 PROJECT LOCATION 1715 O Avenue Anacortes WA 98221 PERMIT # BLD-2019-0511 Inspection Information: Inspection Date: Time Onsite: 1:00 Weather 08/18/2021 pm Conditions: Inspection Performed: Lateral Framing Comments: Sunny, 73 deg 1) Location: Interior shearwalls, grids (1-6/A-D), Basement to the roof Details: Shearwall schedule on S4 0 2) MTC at this time inspected the interior shear walls at the locations noted above. MTC verified APA rated 15/32" CDX sheathing. Fastening was with .148x2.25" nails. MTC verified edge nailing at all panels and holdown studs per the shearwall schedule. MTC also verified 1st floor anchor bolts. MTC verified A35/LTP4 clips at all top plate to rim connections. MTC also verified all roof level outside SW6 shearwalls. The following items were noted as in -complete or needing correction: • The basement SW2 wall on grid 4.4 needs additional edge nailing. Fastening was observed to be at 3" to 6" on -center. • At the 4th floor, the SW3 corridor wall at grid B/2-2.6 was missing edge nailing to the wall top plate. • Bottom plate nailing was in -complete at numerous locations. • Continuous holdown runs were not complete. All competed work was visually inspected and was in -compliance with approved plans and specs. The framing foreman was informed of all items noted above. These will be re -inspected at a later date along with all continuous holdown runs and remaining exterior shear walls on the south and west sides of the building. To the best of MTC inspector's knowledge, the above -described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing Burlingtonl0lympialBellinghamlSilverdale ITukwila 3 60.75 5.1990 www.mtc-inc.net Fidalgo Flats - 20B301, 0811812021, #F263216, Page 1 of 3 MATERIALS TESTING & CONSULTING, INC. y' i I UPLOADED: 08/18/2021 14:31:13 UPLOADED: 08/18/2021 14:31:41 UPLOADED: 08/18/2021 14:32:0,. UPLOADED: 08/18/2021 14:32:23 Asa mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing BurlingtonOlympialBellinghamlSilverdalelTukwila 360.755.1990 www.mtc-inc.net Fidalgo Flats - 20B301, 0811812021, #F263216, Page 2 of 3 JL &rl rr I 111,"Lum- MATERIALS TESTING & CONSULTING, INC. UPLOADED: 08/18/2021 UPLOADED: 08/18/2021 14:33:30 REPORTED BY: Ross Jorgensen REVIEWED BY: Robert McNamara, Project Manager As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing BurlingtonjOlympia 1BellinghamlSilverdaleITukwila 3 60.75 5.19 90 www.mtc-inc.net Fidalgo Flats - 2013301, 0811812021, #F263216, Page 3 of 3