HomeMy WebLinkAboutPermit File BLD-2019-0511 1715 O Avenue (28)MATERIALS TESTING & CONSULTING, INC. Fidalgo Flats - 20B301 - Field Report: Reinforcing Steel: Report #F254380 CLIENT Madrona Real Estate Investors VIII, LLC DATE 04/26/2021 PROJECT LOCATION 1715 O Avenue Anacortes WA 98221 PERMIT # BLD-2019-0511 Inspection Information: Inspection Date: Time Onsite: 10:00 Weather Mostly cloudy 04/26/2021 am Conditions: Inspection Performed: Reinforcing Steel Report Profile: ® Approved by Engineer Subcontractor: Continuous or Periodic: Periodic Sheets: S2.1, S3.0, S3.1 Location/Area: IStem walls gl (A-D/1-6) Details: Per the noted sheets above and notes below Level/Elevation: Foundation Reinforcing Grade: ASTM 615 Grade 60 Embeds: N/A Reference Reports: F254463 Approved Plans Dated: 11/16/2021 Remarks: F_ MTC on site as requested to visually inspect reinforcing steel at the following location(s): 1.) MTC observed the completion of the reinforcing steel for the building foundation stem walls at grid lines (A-D/1-6). MTC observed that the walls were inspected per plan sheet S2.1 and the typical details called out. -Reinforcing Steel Inspection: 1.) MTC visually inspected the reinforcing steel at the locations noted that the reinforcing steel complied with the approved project plans and specifications with the exceptions noted below. MTC observed the reinforcing steel size, grade, type, and placement. Deficiencies -At multiple locations, MTC noted the vertical reinforcing was not centered in the wall. The contractor is asking for engineer approval for this condition -The corner bars at the wall intersections are specified to alternate directions. -The diagonal bar at the step footings was not in place. -The 180-degree hook bar was not in place at the wall ends. -Wood spacers were being removed from the bottom of the wall at this time. MTC will very completion or acceptance of these items prior to placement of concrete. Deficiencies cleared with reinspection on 4/27/21. Reference report #F254463 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing Burlington IOlympialBe11inghamISilverdaleITukwila 3 60.75 5.1990 www.mtc-inc.net Fidalgo Flats - 20B301, 0412612021, #F254380, Page 1 of 2 ahz&UA&L" MATERIALS TESTING & CONSULTING, INC. To the best of MTC inspector's knowledge, the above -described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: UPLOADED: 04/26/2021 11:33:54 UPLOADED: 04/26/2021 11:33:56 UPLOADED: 04/26/2021 11:36:52 UPLOADED: 04/26/2021 11:36:54 REPORTED BY: Kevin Walters REVIEWED BY: Robert McNamara, Project Manager As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing Burlington IOlympia lBellinghamlSiIverdaleITukwila 360.755.1990 www.mtc-inc.net Fidalgo Flats - 20B301, 0412612021, #F254380, Page 2 of 2