Loading...
HomeMy WebLinkAboutPermit File BLD-2020-0803 2007 10th Street (3) City of Anacortes Invoice/Permit#: BLD-2020-0803 904 6th Street P.O.Box 547 Applied date: 12/22/2020 Issue date: 12/23/2020 Anacortes, WA 98221-0547 (360) 293-1901 Expire date: 12/21/2023 Job Address: 2007 10TH ST Permit Type: Single Family Alteration/Repair Permit ANACORTES WA 98221-1421 Project: APN: P56127 Remarks: Remove all drywall frombasement,flooring, and fixtures. Remove a non-bearing wall. Reinstall all new fixtures. Permit renewed on May 28, 2022. Owner: ERIC BECKER Contractor: OWNER Address: 9049 LOYALAVE NW Address: SEATTLE WA 98117 Phone: (206)240-8754 Phone: License#: General Information: Fees: Flood plain development N Building Permit Fee 209.25 Building Valuation 12000 Plan Review Fee 136.01 Occupancy Group r-3 State Building Code Fee Resi 6.50 #of utility Sinks 1 Plumbing Permit Fee 48.00 #of Hand Sinks 1 Renew Building Permit Fee 128.63 #of Water Closets (Toilets) 1 Total Calculated: 528.39 #of Showers 1 Deposits/Receipts: 399.76 Total Due: 128.63 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation,guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and iped this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSu BY