HomeMy WebLinkAboutPermit File BLD-2021-1040 5203 Doon Way (2) DEPARTMENT OF THE ARMY
M\l'17z CORPS OF ENGINEERS,SEATTLE DISTRICT
4735 EAST MARGINAL WAY SOUTH,BLDG 1202
r>� SEATTLE,WA 98134-2388
4G �P
O �
2`F STAPES 04 PSr'�1G
Regulatory Branch April 11, 2022
Mr. Jason Smith
5203 Doon Way
Anacortes, Washington 98221
Reference: NWS-2021-908
Smith, Jason
(Float Replacement)
Dear Mr. Smith:
We have reviewed your application to replace an existing float and ramp with a new
180-square foot float and 160-square foot ramp in Flounder Bay, Puget Sound at
Anacortes, Washington. Based on the information you provided to us, this "Letter of
Permission" (LOP) permit authorizes your proposal as depicted on the enclosed
drawings dated June 5, 2021, which are made part of this permit. In order for this LOP
authorization to be valid, you must ensure that the work is performed in accordance with
the enclosed Letter of Permission General Conditions and the following special
conditions:
a. In order to meet the requirements of the Endangered Species Act (ESA) and
Magnuson-Stevens Fishery Conservation and Management Act (MSA) programmatic
consultation for Structures in Inland Marine Waters of Washington State (National
Marine Fisheries Service (NMFS) Reference Number WCRO-2016-00012, U.S. Fish
and Wildlife Service (USFWS) Reference Number 01 EWFW00-2016-F-0565), you must
implement and abide by the ESA requirements and/or agreements set forth in the
Biological Opinions (BOs) dated September 13, 2016 and January 20, 2017,
respectively, and the enclosed NMFS West Coast Region Programmatic Tracking and
Response Form dated March 27, 2022, in their entirety. The BOs are available on the
U.S. Army Corps of Engineers (Corps) website (Permit Guidebook, Permitting, Regional
General Permits, Resources and Templates for Regional General Permit 6 for
Structures in Inland Marine Waters). The National Marine Fisheries Service (NMFS)
certified the proposed project meets the terms and conditions of the programmatic
consultation on March 27, 2022 (NMFS Reference Number WCRO- 2016-00012-4185).
Failure to comply with the commitments made in this consultation constitutes non-
compliance with the ESA and your Corps permit. The USFWS/NMFS is the appropriate
authority to determine compliance with the ESA. If you cannot comply with the terms
and conditions of this programmatic consultation, you must, prior to commencing
construction, contact the Corps, Seattle District, Regulatory Branch for an individual
consultation in accordance with the requirements of the ESA and/or the MSA.
-2-
b. You shall implement and abide by the mitigation plan, Compensatory Mitigation
Plan for Flounder Bay Dock Project — Smith dated February 17, 2022. Mitigation shall
be constructed before or concurrent with the work authorized by the permit.
c. In order to meet the requirements of the Endangered Species Act you may
conduct the authorized activities from July 16 through February 15 in any year this
permit is valid. You shall not conduct work authorized by this permit from February 16
through July 15 in any year this permit is valid.
d. To ensure that light transmission is not impacted, grating must not be covered
with or blocked by any objects, such as, but not limited to, buildings, planters, storage
sheds or boxes, nets, carpets, boards, tables, lawn furniture, or utility conduits or boxes.
We have reviewed your project pursuant to the requirements of the Endangered
Species Act and the Magnuson-Stevens Fishery Conservation and Management Act in
regards to Essential Fish Habitat. The U.S. Army Corps of Engineers has determined
that this project will comply with the requirements of the above laws provided you
comply with special condition "a" listed above.
Please be reminded that Special Condition "a" of your permit requires that you
implement and abide by the Endangered Species Act (ESA) requirements set forth in
the programmatic Biological Opinion (BO) for this project. In particular, within 60 days
you must provide an As-Built Report, as described in the BO.
The Washington State Department of Ecology determined your project does not
trigger the need for a Water Quality Certification or a Coastal Zone Management
consistency determination.
Puget Sound is a water of the U.S. The Section 10 jurisdictional boundaries are shown
on the enclosed permit drawings. If you believe these boundaries are inaccurate, you
may request a preliminary or approved jurisdictional determination (JD). If one is
requested, please be aware that we may require the submittal of additional information
to complete the JD and work authorized in this letter may not occur until the JD has
been completed.
Any change in the plans for this work will require that you submit revised drawings
to this office and receive our written approval of those changes prior to conducting the
work. If you object to any terms or conditions of this LOP or the JD, you may request an
administrative appeal under our regulations (33 CFR Part 331) as described in the
-3-
enclosed Notification of Administrative Appeal Options and Process and Request for
Appeal form.
Your authorization to conduct the proposed work under this permit expires 3 years
from the date of this letter. Within 30 days of completing the authorized work, you must
fill out and return the enclosed Certificate of Compliance with Department of the Army
Permit. Your signature on this form is our assurance you have conducted the work and
any required mitigation in accordance with the terms and conditions of this LOP,
including all special conditions. All compliance reports should be submitted to the U.S.
Army Corps of Engineers, Seattle District, Regulatory Branch at
nws.compliance@usace.army.mil. Please remember that failure to comply with the
terms and conditions of this LOP, including any special conditions, will invalidate your
authorization and could result in a violation of Federal law.
Thank you for your cooperation during the permitting process. We are interested in
your experience with our Regulatory Program and encourage you to complete a
customer service survey form. This form and information about our program is available
on our website at: www.nws.usace.army.mil (select "Regulatory Branch, Permit
Information").
While this project will not require further authorization from us, please note that it
must comply with all local, State, and other Federal requirements that may apply. A
copy of this letter and permit drawings will be furnished to Mr. Tyler Zimmerman, of TZ
Engineering, LLC, at tyler@tzengineering.com. If you have any questions about this
letter or our regulatory program, please contact Ms. Colleen Anderson at
colleen.c.anderson@usace.army.mil or at (206) 764-3262.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
Alexander "Xander" L. Bullock
Colonel, Corps of Engineers
District Engineer
Enclosures
cc: USFWS (wfwoctap@fws.gov)
Ecology (ecyrefedpermits@ecy.wa.gov)
DNR (lale.amiotte@dnr.wa.gov)
NMFS (owco.wa.consultationrequest@noaa.gov)