Loading...
HomeMy WebLinkAbout20110207160936 0724204-2 0001 08/30/'200 7 002 102 Engineering Plan Review Fees $859.92 011 Y 0� ANACORTES PUBLIC WORKS DEPARTMENT cov, ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES SITE INFORMATION AND PROJECT VALUE OWNER: SITE ADDRESS: IJT ° t PROJECT DESCRIPTION: lE"Q•zo IM( JFM�St — Bale MBE. PROJECT VALUE [PV]: $ 1'1 4=1(0,. (Page 3 of 3 Total Cost) ENGINEERING PLAN REVIEW FEE ENGINEERING PLAN REVIEW FEE (.005 of Project Value) $ 01.9 TOTAL ENGINEERING REVIEW FEE $ DUE AT TIME OF SUBMITTAL OF PLANS FOR REVIEW CONSTRUCTION INSPECTION FEE CONSTRUCTION INSPECTION FEE BASE FEE $ 500.00 CONSTRUCTION INSPECTION FEE ( .015 of Project Value) $ ZCoq t S CONSTRUCTION INSPECTION FEE SUBTOTAL $ 1o 'Rc REDUCTION * $ TOTAL CONSTRUCTION INSPECTION FEE $ DUE UPON CONSTRUCTION PLAN APPROVAL * SUBJECT TO THE DIRECTOR OF ENGINEERING&DEVELOPMENT SERVICES APPROVAL,A 50% REDUCTION TO THE CONSTRUCTION INSPECTION FEE MAY BE ASSESSED IF THE DEVELOPER PROVIDES ON-SITE CONSTRUCTION INSPECTION AND CONSTRUCTION ENGINEERING THROUGH PRIVATE CONSULTANTS TO THE SAME STANDARD AS THAT OF THE CITY. E*t�• R.sk t- Fee d' .f_ -+ Ggwr-AS . It-44? t-ee $t_1(og,9 859.93 -1- A-... Page 1 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number 01-0‘8-V� APPENDIX D: INSP-07 JANUARY 2006 ANACORTES PUBLIC WORKS DEPARTMENT 4.y • A7 ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES ENGINEERING AND INSPECTION FEE WORKSHEET(DEVELOPER DEDICATED ASSETS) Engineering Project No. Project Location b'1- d'a-per oc2-1 besr R-1 Project Name Project Engineer Developer rn-I e%zv r>.o bl.-st.9ee-- The Developer shall enter the quantities shown on the construction drawings to be submitted to the City for review. This document is used to maintain the City's inventory of Public Works infrastructure and determine the amount of Engineering&Inspection Fees due to the City. DESCRIPTION UNITS QUANTITY Unit Cost Total Cost FEE AMOUNT 6" L.F. $25.00 8" L.F. $30.00 10" L.F. $37.00 12" L.F. I4S- $45.00 9'(0.S n 15" L.F. cc 18" L.F. ur 24" L.F. Other cc Other Catch Basin,Type I EA $740.00 41,qO P to Catch Basin,Type II EA $3500.00 Storm Manholes EA $5000.00 Ponds EA Bioswales EA Vaults or other water EA quality measures 6" L.F. $35.00 8" L.F. $45.00 10" L.F. cc 12" L.F. 15" L.F. 18" L.F. > 24" L.F. cc Other I— z Other co Sanitary Manholes 48" EA $5000.00 Sanitary Manholes EA Other Lift Station EA =_, -- i._,.G Page 2 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number cfl—dt APPENDIX D: INSP-07 JANUARY 2006 • STYE ANACORTES PUBLIC WORKS DEPARTMENT 41' w ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES 0010. DESCRIPTION UNITS QUANTITY Unit Cost Total Cost FEE AMOUNT 4" L.F. $45/$55 6" L.F. $55/$75 8" L.F. $55/$75 cc w 12" L.F. $65/$80 I— a 16" L.F. $75/$90 Other L.F. Water Meter EA $200.00 Fire Hydrant EA $5000.00 ($4)2'x length Street Construction ($3)24'x Length246Width IS' S.F. t7.D hel.62st/D,4-,JS length rn ($2.80)20'x w length w Street Lights EA $3000.00 cc ▪ Street&Stop Signs EA $200.00 rn Curb&Gutter L.F. $14.00 Overlay,Asphalt TON $100.00 Overlay,Concrete S.Y. Sidewalk S.Y. $28.80 31Co.Sc) Wheelchair Ramps S.Y. $36.00 Landscaping S.Y. $27.00 Trails S.F. Stream Enhancement S.F. Other Other Temporary • Erosion/Sediment Sum $2000.00 AiZD�.c� = Control" Earthwork C.Y. V32 $15.00 4.141ex0 Traffic Control LS $2000.00 Erosion Control LS $500.00 Utility EA $275.00 Relocation/Adjustment TOTAL COSTS $ '42410 Temporary Erosion/Sediment Control includes: Clear and Grade,Fill and Grade, ESC Supervisor, and Silt Fencing. • Page 3 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number en_OI`R-3-oe4 APPENDIX D: INSP-07 JANUARY 2006