HomeMy WebLinkAbout04-26-07 Deviation approval ft
CAS. •tt
ANACORTES PUBLIC WORKS DEPARTMENT
P.O. BOX 547, ANACORTES, WA 98221 PH (360) 293-1919
�4 '
� �i FRED BUCKENMEYER, P.L.S., DIRECTOR FAX (360) 293-1938
E-MRIL: fredb@cityofanacortes.org
eo
April 26, 2007
Dale Herrigstad
Herrigstad Engineering
4320 Whistle Lake Road
Anacortes, WA 98221
Subject: Deviation Request for proposed Rear Lot Access to 3007 West 3rd Street
Dear Dale,
Thank you for your March 22, 2007 letter requesting a street width reduction from the original
May 22, 2006 letter of 20-feet.
The 20-foot width construction requirement is based on the alley paving width requirement, per
the Anacortes Municipal Code — Street Standards— Chapter 16.32 and the 2006 EDS
Standards— Streets —STR-01.
After meeting our meeting on April 23, 2007, I routed your request at the Development Review
Committee Meeting on April 24, 2007 to determine compliance with City Design Standards.
It was determined that your request meets or exceeds the 2006 EDS Standards — Streets —
STR-12 (Non-Motorized Paths and Access Roads) and STR.28.1 (Driveways). To
accommodate the topographic constraints in the area, the request is granted with the following
conditions:
1. The paving width shall be a minimum of 15-feet on Erie Avenue and West 4th Street.
This will allow the appropriate widths for Maintenance Vehicles and Ambulances and is
the minimum width for Public Access Easement or Tract as identified in STR-12.
2. Provide a cross-section on Erie Avenue of 3-inch Asphalt, 2-inch Crushed and 6-inch
minimum gravel base, borrow or ballast.
3. Provide a cross-section on West 4th Street of 2-inch Asphalt, 2-inch Crushed and 6-inch
minimum gravel base, borrow or ballast.
4. Provide 30-foot radius of asphalt at the corners.
5. Provide a maintenance agreement for the portion of driveway improvements that lie
within West 4th Street.
If you have any questions or would like to meet and discuss, please call me at 360-661.3468.
Sincerely,
C ANAC, TES
Steven R. Lange
Project Manager
CC: Fred Buckenmeyer, Jeff Miller, Dave Walde, Don Measamer, Rick Harvey, Colleen
Sargent, Jay Smitater • Wastewater •Streets• Storm Drainage •Engineering •Solid Waste
•Transportation and Equipment •Capital Projects • Development Services