Loading...
HomeMy WebLinkAbout06-18-21 PW Review Memo - 2803 West 3rd ANACORTES PUBLIC WORKS DEPARTMENT oti ° Steven Lange, Senior Engineering Tech P 0 BOX 547,ANACORTES,WA 98221 PHONE: 360 299 1983 E-MAIL:stevel@cityofanacortes.org CELL: (360)661-3468 Drainage Review Memo Date:June 18,2021 To: Dave Oicles, Permitting From: Steven Lange Subject: 2803 West 3d Place(P127424) cc: Eric Shjarback, Justin Symonds, Libby Grage, Don Measamer, Emily Morgan, Rob Frisinger The Public Works Engineering Department completed a review of the June 18, 2021 submittal for the above referenced project on June 18, 2021. Below are the comments: This Project is part of a Common Plan of Development, therefore the project has a direct connection to the storm system. This project is only required to provide Minimum Requirement#2, including the front cover and associated appendices. 1. Project Description and Summary: - BMP's (required in MR#5): Write in Direct connection for CPD. 2. Drainage Basin: Flow Control Exempt. The downstream was fixed with the Highland Development. 3. Applicability Flow Chart (Figure 1-2.4.1) — N/A 4. Applicability Flow Chart (Figure 1-2.4.2) — Use this one. 5. Minimum Requirement 1: Remove 6. Minimum Requirement 2: Accepted. 7. Minimum Requirement 3: Remove. 8. Minimum Requirement 4: Remove. 9. Minimum Requirement 5: Already meet this section, so remove. 10. Appendix 1: Need to provide in the report 11. Appendix 2: Not necessary. Remove r i • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation•Equipment • Capital Projects • Development Services .P W 12. Appendix 3: Noted. 13. Appendix 4: Accepted. 14. Appendix 5: Need to provide in the report 15.Appendix 6: Accepted. 16. Appendix 7: Remove. Thanks, Steven Lange Senior Engineering Tech te( '{ • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste A ® • Transportation •Equipment • Capital Projects • Development Services q.p .