HomeMy WebLinkAbout06-18-21 PW Review Memo - 2803 West 3rd ANACORTES PUBLIC WORKS DEPARTMENT
oti ° Steven Lange, Senior Engineering Tech
P 0 BOX 547,ANACORTES,WA 98221 PHONE: 360 299 1983
E-MAIL:stevel@cityofanacortes.org CELL: (360)661-3468
Drainage Review Memo
Date:June 18,2021
To: Dave Oicles, Permitting
From: Steven Lange
Subject: 2803 West 3d Place(P127424)
cc: Eric Shjarback, Justin Symonds, Libby Grage, Don Measamer, Emily Morgan, Rob
Frisinger
The Public Works Engineering Department completed a review of the June 18, 2021
submittal for the above referenced project on June 18, 2021. Below are the comments:
This Project is part of a Common Plan of Development, therefore the project has a direct
connection to the storm system. This project is only required to provide Minimum
Requirement#2, including the front cover and associated appendices.
1. Project Description and Summary:
- BMP's (required in MR#5): Write in Direct connection for CPD.
2. Drainage Basin: Flow Control Exempt. The downstream was fixed with the
Highland Development.
3. Applicability Flow Chart (Figure 1-2.4.1) — N/A
4. Applicability Flow Chart (Figure 1-2.4.2) — Use this one.
5. Minimum Requirement 1: Remove
6. Minimum Requirement 2: Accepted.
7. Minimum Requirement 3: Remove.
8. Minimum Requirement 4: Remove.
9. Minimum Requirement 5: Already meet this section, so remove.
10. Appendix 1: Need to provide in the report
11. Appendix 2: Not necessary. Remove
r
i • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste
• Transportation•Equipment • Capital Projects • Development Services
.P W
12. Appendix 3: Noted.
13. Appendix 4: Accepted.
14. Appendix 5: Need to provide in the report
15.Appendix 6: Accepted.
16. Appendix 7: Remove.
Thanks,
Steven Lange
Senior Engineering Tech