HomeMy WebLinkAboutIL272 Interlocal Agreement INTERLOCAL AGREEMENT
CITY OF ANACORTES -PORT OF ANACORTES
WHEREAS, the City of Anacortes, hereinafter referred to as"City" recognizes a need to
improve and upgrade that certain road known as Anacopper Mine Road between Oakes
Avenue and the entrance to the Port of Anacortes Airport; and
WHEREAS, the Port of Anacortes, hereinafter referred to as"Port", owns and operates
an airport facility served by said Anacopper Mine Road: and owns certain properties
adjacent to said Anacopper Mine Road collectively referred to as "Port's property" and
WHEREAS, improvement of Anacopper Mine Road would benefit properties owned by
the Port; and
WHEREAS, Creekside Village Development Company (a Washington Corporation)
hereinafter referred to as"Developer" is required to make certain improvements to
Anacopper Mine Road to mitigate impacts of the Plat of Copper Pond, as approved by the
Anacortes City Council; and
WHEREAS,R.C.W. 39.34 permits governmental entities to enter into interlocal
agreements, and good and valuable consideration exists therefore,
NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:
1. The City shall develop appropriate design and bidding specifications to make
the improvements to Anacopper Mine Road as set forth on the attached
Exhibit A and henceforth called "The Project". These shall be reviewed and
approved by the Port.
2. The City shall complete the bidding process for said improvements, shall select
a contractor to make said improvements, and shall administer said contract
until its completion.
3. The Port shall contribute to said project an amount not to exceed $250,000.00,
based on estimated total project costs of$450,000.00. Should the actual cost
of said project be less than said $450,000.00, the contribution from the Port
shall be reduced by the amount of such difference. "Actual cost" shall not
include the following: in house engineering, project management, permitting
and contract administration done by the City.
4. Any transportation impact fees required to be paid under the applicable City of
Anacortes ordinance after the effective date of this agreement by.either the
Port of Anacortes or tenants oft eT�ort of Anacortes located either at the Port
31 Anacortes Airport site or the land the Port owns adjacent to Anacopper
Min .
against the $250,000.00 paid pursuant_to this
agreement until all of the $250,000.00 is utilized as a credit.
5. Creekside Village Development Company shall contribute the sum of
$100,000.00 to said project and seek no reduction in said amount even if the
final costs of said project is less than $450,000.00. Included in the
commitment from Creekside Village Development Company are the costs of
the Hartford Avenue upgrade and the engineering for the Hartford/Oakes
Avenue and Anacopper/Oakes Avenue intersections. Monies previously
expended to directly facilitate these projects shall be included within the
$100,000 figure.
6. The City has estimated its share of the proposed Anacopper Mine Road
Improvement Project to be $100,000.00, plus engineering supervision of
construction and other in house engineering costs not covered. Should the
bids for the Project exceed the estimated $450,000.00 amount, the City
reserves the right to reject said bids and not proceed with the Project. Any
costs of the Project over$450,000.00 shall be paid by the City.
7. The City shall in the bid documents require the contractor to dispose of the
acceptable waste material at no cost to the Port to a Port of Anacortes'
designated site at the airport. Material shall be clean gravel or soil, free of
asphalt or root debris. Port shall supply a site description for the disposal site
to the City.
8. Should the bids for the improvement to Anacopper Mine Road not be accepted
by the City, Creekside Village Development Company shall be required to
proceed in a timely manner with a completion of previously agreed upon
improvements to Anacopper Mine Road and other required improvements.
9. Said improvements at Oakes Avenue and Hartford Avenue and Oakes Avenue
and Anacopper Mine Road shall be completed by Developer by the end of
MD], 1996, and the balance of said project shall be finished as soon thereafter
as reasonably possible.
10. In order to minimize the Developer's costs for said project, the City agrees to
waive its normal fees for engineering supervision of construction and any in
house engineering normally done by the City.
11. The City of Anacortes Public Works Director shall act as administrator of the
Project and shall coordinate with the designated Port representative to
establish and maintain a budget for the Project and to schedule disbursement of
Port funds in an orderly and convenient manner. The Port shall promptly
reimburse the City for the Port's pro rata share of payments required to be
made during the progress of construction.
)
12. Each party to this agreement agrees to hold each other harmless from any and
all claims for damages to persons or property arising out of acts or omissions
of its officers, employees, or agents in the performance of its obligations under
this agreement.
13. This agreement shall remain in effect until the completion of the Project or, if
the City elects not to proceed with the Project or, if the City elects not to
proceed with the Project under paragraph 6 above, until the Developer's
completion of the alternative improvements required under paragraphs 7, 8 and
9 above. •
Dated this 1..) day of April, 199 .
PORT OF ANACOR
rian Shortt, xecutive Director
CITY OF ANACORTES: 4,_4_ 7/4„,6-(/
H. Dean Maxwell, Mayor
The undersigned Creekside Village Development Company for and in consideration of
benefits to property owned by said Creekside Development Company hereby agrees to he
bound in all respects to this agreement and to fully and completely perform any obligations
assigned to it as part of this agreement.
CREEKSIDE VILLAGE DEVELOPMENT:
Ron Woolworth, Company President
Date this day of April, 1996.
fl
SCHEDULE "A"
INTERLOCAL AGREEMENT
2,900 11. of improvements to widen and reconstruct Anacopper Mine Road from SR 20
(Oakes Avenue) to the Anacortes Airport entrance and to include left turn lane
improvements to SR 20 (Oakes Avenue) at Anacopper Mine Road and at Hartford
Avenue. Major items of work are to include clearing and grubbing, roadway excavation,
excavation, embankment, storm drainage(primarily open ditch), asphalt concrete paving,
pavement marking and striping, signing and other work.