Loading...
HomeMy WebLinkAboutPermit File BLD-2017-0306 1506 10th Street (2)CITY OF ANACORTES PLANNING & BUILDING DEPT: APPROVED PLANS ADDRESS: I TOV /D s� APPROVED $Y: SUBJECT TO FIELD INSPECTION. APPROVED PLANS SHALL NOT BE ALTERED 1,NITHOUT AUTHORIZATION � k e! 3`+ � r a-� � cn ro u� � o � Wp ��� W rat �°'` -® Nip �3 W � � S N��� � rr f l� l `M �. '�jj W ��=.3 ~ � � ems++ U �:.::..�:� Q, <t `� o Q � O � �_ L� U r (D 3 (n . o ul o Cl =- 'o;:�Cn�. N O (D z� Dcf) CD cn NNCD (n N CD n CD n (D 0 C cr '' v `C � G) Q J � W 7N O 7 C O CD 6 CD C) �OoaoXE:� m m m a =3 nm C NCO n != C (o n (Q O O N C7�<CD 00 C O co CD sv o m w m (O O = (O O (D (Q V •"• (Q � O � Dcom Iwo D4x' 3�< el00 . < � o 0 W 0 0 < x.33mam m c a 0) mm CD G pp 3 .a L7 00 (D c SD C:c m _CD . -a -a y �o»o(n D (n a C)<9 -<M �co�0CA 0 O enCDoom 3 N N D N V CO O m D < N D C sli CD m (D D � N Cp O � O D �11 �I JUN 0 9 2011 � o Q. N m -v O O O X O a- D 7� CD -t CITY OF ANACORTES IronRidge 1495 Zephyr Ave Hayward, CA 94544 Starling Madison Lofquist, Inc. C'nnsultinl; 5trur tuna! and lnrensir l nnrineer� 5224 South 39th Street, Phoenix, Arizona 85040 tel: (602) 438-2500 fax: (602) 438-2505 ROC#291316 www.smleng.com rirL01 L9 JUN 0 9 2011 Lmod Attne Mr. David F. Taggart, Vice President Product OF ANACORTES December 18, 2014 Page 1 of 20 Subject: IronRidge XR100 Rail, Roof Flush Mounting System —Structural Analysis Dear Sir: We have analyzed the IronRidge XR100 Rail for the subject solar module support system and determined that, for the configurations and criteria described below, it is in compliance with the applicable sections of the following Reference Documents: Codes: ASCE/SEI 7-10 Min. Design Loads for Buildings &Other Structures International Building Code 2012 Edition Other: AC428, Acceptance Criteria for Modular Framing Systems Used to Support PV Modules, dated Effective November 1, 2012 by ICC-ES Aluminum Design Manual, 2010 Edition The IronRidge XR100 Rail is an extruded aluminum section with an overall depth of 2.438 in. and a net area of 0.583 sq.in. The rails are used to support solar modules, typically, on the roof of a building. See Exhibit A — attached. The rails are clamped to aluminum angle brackets that are either attached directly to the roof framing or attached to a stand that is screwed to the roof framing. The rails are mounted across the slope with a small clearance (flush mounting) to the underlying roof structure. The installed solar modules are at the same slope as the underlying roof structure. All loads are transferred to the roof framing through the angle brackets by simple bi-axial flexure of the rails. The maximum span of the rails is governed by either the mid -span flexural stresses or the deflection requirement that the rail not come into contact with the roof. The effect of seismic loads (for all design categories A-F) have been determined to be less than the effect due to wind loads in all load conditions and combinations. Therefore, the maximum allowable spans for common load cases are shown in the tables below. Tables lA-9A are for modules with a maximum long dimension of 67.5 inches and Tables 1B-9B are for modules with a maximum long dimension of 78.5 inches. Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers IronRidge Or. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 2 of 20 Table 1A - MAXIMUM SPANS (in) - Roof Slope 0° to 6° - Wind Zone 1 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 122 104 88 82 73 66 61 56 53 50 105 122 104 88 82 73 66 61 56 53 50 110 122 104 88 82 73 66 61 56 53 50 Category 120 122 104 88 82 73 66 61 56 53 50 B 130 112 104 88 82 73 66 61 56 53 50 140 104 104 88 82 73 66 61 56 53 50 150 97 97 88 82 73 66 61 56 53 50 160 91 91 88 82 73 66 61 56 53 50 170 85 85 85 82 73 66 61 1 56 53 50 100 122 104 88 82 73 66 61 56 53 50 105 117 104 88 82 73 66 61 56 53 50 110 112 104 88 82 73 66 61 56 53 50 120 102 102 88 82 73 66 61 56 53 50 Category C 130 94 94 88 82 73 66 61 56 53 50 140 88 88 88 82 73 66 61 56 53 50 150 82 82 82 82 73 66 61 56 53 50 160 77 77 77 77 73 66 61 56 53 50 170 72 72 72 72 72 66 61 56 53 50 100 113 104 88 82 73 66 61 56 53 50 105 108 104 88 82 73 66 61 56 53 50 110 103 103 88 82 73 66 61 56 53 50 120 94 94 88 82 73 66 61 56 53 50 Category p 130 87 87 87 82 73 66 61 56 53 50 140 80 80 80 80 73 66 61 56 53 50 150 75 75 75 75 73 66 61 56 53 50 160 70 70 70 70 70 66 61 56 53 50 170 66 66 1 66 66 66 66 61 1 56 1 53 50 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -2- IronRidge Or. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 3 of 20 Table 2A - MAXIMUM SPANS (in) - Roof Slope 00 to 60 - Wind Zone 2 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 109 104 88 82 73 66 61 56 53 50 105 103 103 88 82 73 66 61 56 53 50 110 98 98 88 82 73 66 61 56 53 50 120 90 90 88 82 73 66 61 56 53 50 Category B 130 83 83 83 82 73 66 61 56 53 50 140 77 77 77 77 73 66 61 56 53 50 150 72 72 72 72 72 66 61 56 53 50 160 68 68 68 68 68 66 61 56 53 50 170 64 64 64 64 64 64 61 56 53 50 100 91 91 88 82 73 66 61 56 53 50 105 87 87 87 82 73 66 61 56 53 50 110 83 83 83 82 73 66 61 56 53 50 120 76 76 76 76 73 66 61 56 53 50 Category C 130 70 70 70 70 70 66 61 56 53 50 140 65 65 65 65 65 65 61 56 53 50 150 61 61 61 61 61 61 61 56 53 50 160 57 57 57 57 57 57 57 56 53 50 170 54 54 1 54 54 1 54 54 54 1 54 53 50 100 84 84 84 82 73 66 61 56 53 50 105 80 80 80 80 73 66 61 56 53 50 110 76 76 76 76 73 66 61 56 53 50 120 70 70 70 70 70 66 61 56 53 50 Category D 130 65 65 65 65 65 65 61 56 53 50 140 60 60 60 60 60 60 60 56 53 50 150 56 56 56 56 56 56 56 56 53 50 160 52 52 52 52 52 52 52 52 52 50 170 49 49 49 49 49 49 49 49 49 49 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -3- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 4 of 20 Table 3A - MAXIMUM SPANS (in) - Roof Slope 0° to 60 - Wind Zone 3 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 87 87 87 82 73 66 61 56 53 50 105 83 83 83 82 73 66 61 56 53 50 110 79 79 79 79 73 66 61 56 53 50 Category 120 72 72 72 72 72 66 61 56 53 50 B 130 67 67 67 67 67 66 61 56 53 50 140 62 62 62 62 62 62 61 56 53 50 150 58 58 58 58 58 58 58 56 53 50 160 54 54 54 54 54 54 54 54 53 50 170 51 51 1 51 51 51 51 51 51 51 50 100 73 73 73 73 73 66 61 56 53 50 105 70 70 70 70 70 66 61 56 53 50 110 67 67 67 67 67 66 61 56 53 50 120 61 61 61 61 61 61 61 56 53 50 Category C 130 56 56 56 56 56 56 56 56 53 50 140 52 52 52 52 52 52 52 52 52 50 150 49 49 49 49 49 49 49 49 49 49 160 46 46 46 46 46 46 46 46 46 46 170 43 43 43 1 43 43 1 43 43 43 43 43 100 67 67 67 67 67 66 61 56 53 50 105 64 64 64 64 64 64 61 56 53 50 110 61 61 61 61 61 61 61 56 53 50 120 56 56 56 56 56 56 56 56 53 50 Category D 130 52 52 52 52 52 52 52 52 52 50 140 48 48 48 48 48 48 48 48 48 48 150 45 45 45 45 45 45 45 45 45 45 160 42 42 42 42 42 42 42 42 42 42 170 40 40 40 40 40 40 1 40 1 40 1 40 1 40 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -4- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 5 of 20 Table 4A - MAXIMUM SPANS (in) - Roof Slope 7° to 270 - Wind Zone 1 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 112 97 83 72 64 58 53 49 46 43 105 112 97 83 72 64 58 53 49 46 43 110 112 97 83 72 64 58 53 49 46 43 120 112 97 83 72 64 58 53 49 46 43 Category B 130 112 97 83 72 64 58 53 49 46 43 140 105 97 83 72 64 58 53 49 46 43 150 98 96 82 72 64 58 53 49 46 43 160 92 92 81 72 64 58 53 49 46 43 170 87 87 79 71 64 1 58 53 1 49 46 43 100 112 97 83 72 64 58 53 49 46 43 105 112 97 83 72 64 58 53 49 46 43 110 112 97 83 72 64 58 53 49 46 43 120 103 97 83 72 64 58 53 49 46 43 Category C 130 96 95 82 72 64 58 53 49 46 43 140 89 89 80 71 64 58 53 49 46 43 150 84 84 78 70 64 58 53 49 46 43 160 79 79 76 69 63 58 53 49 46 43 170 74 74 74 67 62 57 53 49 46 43 100 112 97 83 72 64 58 53 49 46 43 105 108 97 83 72 64 58 53 49 46 43 110 103 97 83 72 64 58 53 49 46 43 120 95 95 82 72 64 58 53 49 46 43 Category D 130 88 88 80 71 64 58 53 49 46 43 140 82 82 78 70 63 58 53 49 46 43 150 77 77 76 68 62 58 53 49 46 43 160 73 73 73 67 61 57 53 49 46 43 170 68 68 68 65 60 56 53 49 46 43 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -5- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 6 of 20 Table 5A - MAXIMUM SPANS (in) - Roof Slope 7° to 27° - Wind Zone 2 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 106 97 83 72 64 58 53 49 46 43 105 102 97 83 72 64 58 53 49 46 43 110 97 97 83 72 64 58 53 49 46 43 Category 120 90 90 83 72 64 58 53 49 46 43 B 130 83 83 83 72 64 58 53 49 46 43 140 77 77 77 72 64 58 53 49 46 43 150 73 73 73 72 64 58 53 49 46 43 160 68 68 68 68 64 58 53 49 46 43 170 64 64 64 1 64 64 58 53 49 46 43 100 91 91 83 72 64 58 53 49 46 43 105 87 87 83 72 64 58 53 49 46 43 110 83 83 83 72 64 58 53 49 46 43 120 76 76 76 72 64 58 53 49 46 43 Category C 130 71 71 71 71 64 58 53 49 46 43 140 66 66 66 66 64 58 53 49 46 43 150 62 62 62 62 62 58 53 49 46 43 160 58 58 58 58 58 58 53 49 46 43 170 55 55 55 55 55 55 53 49 1 46 43 100 84 84 83 72 64 58 53 49 46 43 105 80 80 80 72 64 58 53 49 46 43 110 77 77 77 72 64 58 53 49 46 43 120 70 70 70 70 64 58 53 49 46 43 Category D 130 65 65 65 65 64 58 53 49 46 43 140 61 61 61 61 61 58 53 49 46 43 150 57 57 57 57 57 57 53 49 46 43 160 53 53 53 53 53 53 53 49 46 43 170 50 1 50 50 50 50 50 50 49 46 43 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -6- IronRidge Or. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 189 2014 Page 7 of 20 Table 6A - MAXIMUM SPANS (in) - Roof Slope 7° to 27° - Wind Zone 3 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 sf 50 psf 60 psf 70 psf 80 psf 90 psf 100 87 87 83 72 64 58 53 49 46 43 105 83 83 83 72 64 58 53 49 46 43 110 80 80 80 72 64 58 53 49 46 43 120 73 73 73 72 64 58 53 49 46 43 Category B 130 68 68 68 68 64 58 53 49 46 43 140 63 63 63 63 63 58 53 49 46 43 150 59 59 59 59 59 58 53 49 46 43 160 1 56 56 56 56 56 56 53 49 46 43 170 52 52 52 52 52 52 52 49 46 43 100 74 74 74 72 64 58 53 49 46 43 105 71 71 71 71 64 58 53 49 46 43 110 68 68 68 68 64 58 53 49 46 43 120 62 62 62 62 62 58 53 49 46 43 Category 130 58 58 58 58 58 58 53 1 49 46 43 C 140 54 54 54 54 54 54 53 49 46 43 150 50 50 50 50 50 50 50 49 46 43 160 47 47 47 47 47 47 47 47 46 43 170 44 44 44 44 1 44 44 44 44 44 1 43 100 68 68 68 68 64 58 53 49 46 43 105 65 65 65 65 64 58 53 49 46 43 110 62 62 62 62 62 58 53 49 46 43 120 57 57 57 57 57 57 53 49 46 43 Category D 130 53 53 53 53 53 53 53 49 46 43 140 49 49 49 49 49 49 49 49 46 43 150 46 46 46 46 46 46 46 46 46 43 160 43 43 43 43 43 43 43 43 43 43 170 1 41 41 41 41 41 41 41 41 41 41 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers - 7 - IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 8 of 20 Table 7A - MAXIMUM SPANS (in) - Roof Slope 280 to 450 - Wind Zone 1 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 107 98 84 75 67 61 56 52 49 46 105 107 98 84 75 67 61 56 52 49 46 110 106 97 84 75 67 61 56 52 49 46 Category 120 101 94 82 74 67 61 56 52 49 46 B 130 96 91 80 72 66 61 56 52 49 46 140 91 88 78 70 65 60 56 52 49 46 150 87 85 76 69 64 59 56 52 49 46 160 83 82 74 67 62 58 55 52 49 46 170 79 79 72 1 66 61 1 57 54 51 1 49 46 100 101 94 82 74 67 61 56 52 49 46 105 98 93 81 73 67 61 56 52 49 46 110 95 91 80 72 66 61 56 52 49 46 120 90 87 77 70 65 60 56 52 49 46 Category C 130 85 84 75 68 63 59 56 52 49 46 140 81 80 72 66 62 58 55 52 49 46 150 76 76 70 65 60 57 53 51 49 46 160 73 73 68 1 63 59 55 52 50 48 46 170 69 69 66 61 57 54 51 49 1 47 45 100 96 91 80 72 66 61 56 52 49 46 105 93 89 79 71 65 61 56 52 49 46 110 90 87 77 70 65 60 56 52 49 46 120 85 83 75 68 63 59 55 52 49 46 Category D 130 80 80 72 66 61 58 54 52 49 46 140 75 75 70 64 60 56 53 51 48 46 150 71 71 67 62 58 55 52 50 48 46 160 68 68 65 60 57 54 51 49 47 45 170 64 64 62 1 58 55 52 50 48 46 44 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -8- IronRidge Or. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 9 of 20 Table 8A - MAXIMUM SPANS (in) - Roof Slope 28° to 45° - Wind Zone 2 (67.5 Max Module Length) XR100 Wind Ground Snow Load Rail Speed Exposure mph 0 psf 10 20 30 40 50 60 70 80 90 sf psf psf psf psf psf sf sf psf 100 107 98 84 75 67 61 56 52 49 46 105 107 98 84 75 67 61 56 52 49 46 110 106 97 84 75 67 61 56 52 49 46 120 101 94 82 74 67 61 56 52 49 46 Category 130 94 91 80 72 66 61 56 52 49 46 B 140 88 88 78 70 65 60 56 52 49 46 150 83 83 76 69 64 59 56 52 49 46 160 78 78 74 67 62 58 55 52 49 46 170 74 74 1 72 66 61 57 54 51 49 46 100 101 94 82 74 67 61 56 52 49 46 105 98 93 81 73 67 61 56 52 49 46 110 94 91 80 72 66 61 56 52 49 46 120 87 87 77 70 65 60 56 52 49 46 Category 130 81 81 75 68 63 59 56 52 49 46 C 140 76 76 72 66 62 58 55 52 49 46 150 71 71 70 65 60 57 53 51 49 46 160 67 67 67 63 59 55 52 50 48 46 170 1 64 64 64 61 57 54 51 49 47 45 100 95 91 80 72 66 61 56 52 49 46 105 91 89 79 71 65 61 56 52 49 46 110 87 87 77 70 65 60 56 52 49 46 120 81 81 75 68 63 59 55 52 49 46 Category 130 75 75 72 66 61 58 54 52 49 46 D 140 70 70 70 64 60 56 53 51 48 46 150 66 66 66 62 58 55 52 50 48 46 160 62 62 62 60 57 54 51 49 47 45 170 59 59 59 1 58 55 52 50 48 46 1 44 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -9- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 10 of 20 Table 9A - MAXIMUM SPANS (in) - Roof Slope 280 to 450 - Wind Zone 3 (67.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 sf 40 sf 50 psf 60 psf 70 psf 80 psf 90 psf 100 107 98 84 75 67 61 56 52 49 46 105 107 98 84 75 67 61 56 52 49 46 110 106 97 84 75 67 61 56 52 49 46 Category 120 101 94 82 74 67 61 56 52 49 46 B 130 94 91 80 72 66 61 56 52 49 46 140 88 88 78 70 65 60 56 52 49 46 150 83 83 76 69 64 59 56 52 49 46 160 78 78 74 1 67 62 58 55 52 49 46 170 74 74 72 66 61 57 54 51 49 46 100 101 94 82 74 67 61 56 52 49 46 105 98 93 81 73 67 61 56 52 49 46 110 94 91 80 72 66 61 56 52 49 46 120 87 87 77 70 65 60 56 52 49 46 Category C 130 81 81 75 68 63 59 56 52 49 1 46 140 76 76 72 66 62 58 55 52 49 46 150 71 71 70 65 60 57 53 51 49 46 160 67 67 67 63 59 55 52 50 48 46 170 64 64 64 61 57 54 51 49 1 47 45 100 95 91 80 72 66 61 56 52 49 46 105 91 89 79 71 65 61 56 52 49 46 110 87 87 77 70 65 60 56 52 49 46 120 81 81 75 68 63 59 55 52 49 46 Category p 130 75 75 72 66 61 58 54 52 49 46 140 70 70 70 64 60 56 53 51 48 46 150 66 66 66 62 58 55 52 50 48 46 160 62 62 62 60 57 54 51 49 47 45 170 59 59 59 58 55 52 50 48 46 44 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -10- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 11 of 20 Table 1B - MAXIMUM SPANS (in) - Roof Slope 0° to 60 - Wind Zone 1 (78.5" Max Module Length) XR100 Wind Ground Snow Load Rail Speed Exposure mph 0 psf 10 20 30 40 50 60 70 80 90 sf psf psf psf psf psf sf psf psf 100 114 97 82 76 68 61 56 52 49 46 105 114 97 82 76 68 61 56 52 49 46 110 114 97 82 76 68 61 56 52 49 46 120 114 97 82 76 68 61 56 52 49 46 Category 130 105 97 82 76 68 61 56 52 49 46 B 140 97 97 82 76 68 61 56 52 49 46 150 90 90 82 76 68 61 56 52 49 46 160 85 85 82 76 68 61 56 52 49 46 170 80 80 80 76 68 61 56 52 49 46 100 114 97 82 76 68 61 56 52 49 46 105 110 97 82 76 68 61 56 52 49 46 110 105 97 82 76 68 61 56 52 49 46 120 96 96 82 76 68 61 56 52 49 46 Category 130 88 88 82 76 68 61 56 52 49 46 C 140 82 82 82 76 68 61 56 52 49 46 150 76 76 76 76 68 61 56 52 49 46 160 71 71 71 71 68 61 56 52 49 46 170 67 67 1 67 67 1 67 61 56 52 49 46 100 106 97 82 76 68 61 56 52 49 46 105 101 97 82 76 68 61 56 52 49 46 110 96 96 82 76 68 61 56 52 49 46 120 88 88 82 76 68 61 56 52 49 46 Category 130 81 81 81 76 68 61 56 52 49 46 D 140 75 75 75 75 68 61 56 52 49 46 150 70 70 70 70 68 61 56 52 49 46 160 66 66 66 66 66 61 56 52 49 46 170 62 62 62 62 62 61 1 56 1 52 1 49 1 46 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -11- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 12 of 20 Table 2B - MAXIMUM SPANS (in) - Roof Slope 0° to 6° - Wind Zone 2 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 101 97 82 76 68 61 56 52 49 46 105 96 96 82 76 68 61 56 52 49 46 110 92 92 82 76 68 61 56 52 49 46 Category 120 84 84 82 76 68 61 56 52 49 46 B 130 78 78 78 76 68 61 56 52 49 46 140 72 72 72 72 68 61 56 52 49 46 150 67 67 67 67 67 61 56 52 49 46 160 63 63 63 63 63 61 56 52 49 46 170 59 59 59 59 59 59 56 1 52 49 46 100 85 85 82 76 68 61 56 52 49 46 105 81 81 81 76 68 61 56 52 49 46 110 77 77 77 76 68 61 56 52 49 46 120 71 71 71 71 68 61 56 52 49 46 Category C 130 1 66 66 1 66 66 66 61 56 1 52 49 1 46 140 61 61 61 61 61 61 56 52 49 46 150 57 57 57 57 57 57 56 52 49 46 160 53 53 53 53 53 53 53 52 49 46 170 50 50 50 1 50 50 1 50 50 50 49 46 100 78 78 78 76 68 61 56 52 49 46 105 75 75 75 75 68 61 56 52 49 46 110 71 71 71 71 68 61 56 52 49 46 120 65 65 65 65 65 61 56 52 49 46 Category p 130 60 60 60 60 60 60 56 52 49 46 140 56 56 56 56 56 56 56 52 49 46 150 52 52 52 52 52 52 52 52 49 46 160 49 49 49 49 49 49 49 49 49 46 170 1 46 46 46 1 46 1 46 1 46 1 46 1 46 1 46 46 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -12- IronRidge Or. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 13 of 20 Table 3B - MAXIMUM SPANS (in) - Roof Slope 0° to 6° - Wind Zone 3 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 sf 80 sf 90 psf 100 81 81 81 76 68 61 56 52 49 46 105 77 77 77 76 68 61 56 52 49 46 110 74 74 74 74 68 61 56 52 49 46 120 67 67 67 67 67 61 56 52 49 46 Category 130 62 62 62 62 62 61 56 52 49 46 B 140 58 58 58 58 58 58 56 52 49 46 150 54 54 54 54 54 54 54 52 49 46 160 50 50 50 50 50 50 50 50 49 46 170 48 48 1 48 48 1 48 48 48 48 48 46 100 68 68 68 68 68 61 56 52 49 46 105 65 65 65 65 65 61 56 52 49 46 110 62 62 62 62 62 61 56 52 49 46 120 57 57 57 57 57 57 56 52 49 46 Category 130 52 52 52 52 52 52 52 52 49 46 C 140 49 49 49 49 49 49 49 49 49 46 150 45 45 45 45 45 45 45 45 45 45 160 43 43 43 43 43 43 43 43 43 43 170 1 40 40 40 40 40 40 40 40 40 40 100 63 63 63 63 63 61 56 52 49 46 105 60 60 60 60 60 60 56 52 49 46 110 57 57 57 57 57 57 56 52 49 46 120 52 52 52 52 52 52 52 52 49 46 Category 130 48 48 48 48 48 48 48 48 48 46 140 45 45 45 45 45 45 45 45 45 45 150 42 42 42 42 42 42 42 42 42 42 160 39 39 39 39 39 39 39 39 39 39 170 37 37 37 37 37 37 37 37 37 37 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -13- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 14 of 20 Table 4B - MAXIMUM SPANS (in) - Roof Slope 7° to 27° - Wind Zone 1 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 105 91 77 67 59 54 49 46 43 40 105 105 91 77 67 59 54 49 46 43 40 110 105 91 77 67 59 54 49 46 43 40 Category 120 105 91 77 67 59 54 49 46 43 40 B 130 105 91 77 67 59 54 49 46 43 40 140 98 91 77 67 59 54 49 46 43 40 150 91 89 76 67 59 54 49 46 43 40 160 86 86 75 67 59 54 49 46 43 40 170 81 81 74 66 59 54 49 46 43 40 100 105 91 77 67 59 54 49 46 43 40 105 105 91 77 67 59 54 49 46 43 40 110 104 91 77 67 59 54 49 46 43 40 120 96 91 77 67 59 54 49 46 43 40 Category C 130 89 89 76 67 59 54 49 46 43 40 140 83 83 74 66 59 54 49 46 43 40 150 78 78 73 65 59 54 49 46 43 40 160 73 73 71 64 58 54 49 46 43 40 170 69 69 1 69 62 1 57 53 49 46 43 40 100 105 91 77 67 59 54 49 46 43 40 105 101 91 77 67 59 54 49 46 43 40 110 97 91 77 67 59 54 49 46 43 40 120 89 88 76 67 59 54 49 46 43 40 Category p 130 82 82 74 66 59 54 49 46 43 40 140 77 77 72 65 59 54 49 46 43 40 150 72 72 70 63 58 54 49 46 43 40 160 68 68 68 62 57 53 49 46 43 40 170 64 64 64 61 56 52 49 46 43 40 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -14- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 15 of 20 Table 5B - MAXIMUM SPANS (in) - Roof Slope 7° to 27° - Wind Zone 2 (78.5" Max Module Legnth) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 99 91 77 67 59 54 49 46 43 40 105 95 91 77 67 59 54 49 46 43 40 110 91 91 77 67 59 54 49 46 43 40 120 84 84 77 67 59 54 49 46 43 40 Category B 130 78 78 77 67 59 54 49 46 43 40 140 72 72 72 67 59 54 49 46 43 40 150 68 68 68 67 59 54 49 46 43 40 160 1 64 64 64 64 59 54 49 46 43 40 170 60 60 60 60 59 54 49 46 43 40 100 85 85 77 67 59 54 49 46 43 40 105 81 81 77 67 59 54 49 46 43 40 110 77 77 77 67 59 54 49 46 43 40 120 71 71 71 67 59 54 49 46 43 40 Category 130 66 66 66 66 59 54 49 46 43 40 C 140 61 61 61 61 59 54 49 46 43 40 150 57 57 57 57 57 54 49 46 43 40 160 54 54 54 54 54 54 49 46 43 40 170 51 51 51 51 51 51 49 46 43 40 100 78 78 77 67 59 54 49 46 43 40 105 75 75 75 67 59 54 49 46 43 40 110 71 71 71 67 59 54 49 46 43 40 120 66 66 66 66 59 54 49 46 43 40 Category D 130 61 61 61 61 59 54 49 46 43 40 140 57 57 57 57 57 54 49 46 43 40 150 53 53 53 53 53 53 49 46 43 40 160 50 50 50 50 50 50 49 46 43 40 170 47 47 47 47 47 47 47 46 43 40 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -15- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 16 of 20 Table 6B - MAXIMUM SPANS (in) - Roof Slope 70 to 270 - Wind Zone 3 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 Psf 70 Psf 80 psf 90 psf 100 81 81 77 67 59 54 49 46 43 40 105 78 78 77 67 59 54 49 46 43 40 110 74 74 74 67 59 54 49 46 43 40 Category 120 68 68 68 67 59 54 49 46 43 40 B 130 63 63 63 63 59 54 49 46 43 40 140 59 59 59 59 59 54 49 46 43 40 150 55 55 55 55 55 54 49 46 43 40 160 52 52 52 52 52 52 49 46 43 40 170 49 49 49 49 1 49 49 49 1 46 43 1 40 100 69 69 69 67 59 54 49 46 43 40 105 66 66 66 66 59 54 49 46 43 40 110 63 63 63 63 59 54 49 46 43 40 120 58 58 58 58 58 54 49 46 43 40 Category C 130 54 54 54 54 54 54 49 46 43 40 140 50 50 50 50 50 50 49 46 43 40 150 47 47 47 47 47 47 47 46 43 40 160 44 44 44 44 44 44 44 44 43 40 170 41 41 41 41 41 41 41 41 41 40 100 64 64 64 64 59 54 49 46 43 40 105 61 61 61 61 59 54 49 46 43 40 110 58 58 58 58 58 54 49 46 43 40 120 54 54 54 54 54 54 49 46 43 40 Category D 130 49 49 49 49 49 49 49 46 43 40 140 46 46 46 46 46 46 46 46 43 40 150 43 43 43 43 43 43 43 43 43 40 160 40 40 40 40 40 40 40 40 40 40 170 38 1 38 38 38 1 38 1 38 38 38 1 38 1 38 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -16- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 17 of 20 Table 7B - MAXIMUM SPANS (in) - Roof Slope 280 to 450 - Wind Zone 1 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 99 91 78 70 62 56 52 48 45 43 105 99 91 78 70 62 56 52 48 45 43 110 98 90 78 70 62 56 52 48 45 43 120 93 87 76 68 62 56 52 48 45 43 Category B 130 89 84 74 67 61 56 52 48 45 43 140 85 82 72 65 60 56 52 48 45 43 150 81 79 70 64 59 55 52 48 45 43 160 77 76 68 62 58 54 51 48 45 43 170 73 73 1 66 61 57 53 50 1 48 45 43 100 94 88 76 69 62 56 52 48 45 43 105 91 86 75 68 62 56 52 48 45 43 110 89 84 74 67 61 56 52 48 45 43 120 84 81 72 65 60 56 52 48 45 43 Category C 130 79 78 70 63 59 55 52 48 45 43 140 75 75 67 62 57 54 51 48 45 43 150 71 71 65 60 56 52 50 47 45 43 160 67 67 63 58 54 51 49 46 44 43 170 64 64 61 57 53 50 48 45 44 42 100 89 85 74 67 61 56 52 48 45 43 105 87 83 73 66 61 56 52 48 45 43 110 84 81 72 65 60 56 52 48 45 43 120 79 78 69 63 59 55 52 48 45 43 Category D 130 74 74 67 61 57 53 50 48 45 43 140 70 70 65 60 56 52 49 47 45 43 150 66 66 62 58 54 51 48 46 44 42 160 63 63 60 56 53 50 47 45 43 42 170 60 60 58 54 51 48 46 44 42 41 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers -17- IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 18 of 20 Table 8B - MAXIMUM SPANS (in) - Roof Slope 28° to 45° - Wind Zone 2 (78.5" Max Module Length) XR100 Rail Wind Speed Ground Snow Load Exposure mph 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 100 99 91 78 70 62 56 52 48 45 43 105 99 91 78 70 62 56 52 48 45 43 110 98 90 78 70 62 56 52 48 45 43 120 93 87 76 68 62 56 52 48 45 43 Category B 130 88 84 74 67 61 56 52 48 45 43 140 82 82 72 65 60 56 52 48 45 43 150 78 78 70 64 59 55 52 48 45 43 160 73 73 68 62 58 54 51 48 45 43 170 69 69 66 61 57 53 50 48 45 43 100 94 88 76 69 62 56 52 48 45 43 105 91 86 75 68 62 56 52 48 45 43 110 88 84 74 67 61 56 52 48 45 43 120 81 81 72 65 60 56 52 48 45 43 Category C 130 76 76 70 63 59 55 52 48 45 43 140 71 71 67 62 57 54 51 48 45 43 150 67 67 65 60 56 52 50 47 45 43 160 63 63 63 58 54 51 49 46 44 43 170 59 59 59 57 53 50 48 45 44 42 100 89 85 74 67 61 56 52 48 45 43 105 85 83 73 66 61 56 52 48 45 43 110 82 81 72 65 60 56 52 48 45 43 120 75 75 69 63 59 55 52 48 45 43 Category D 130 70 70 67 61 57 53 50 48 45 43 140 66 66 65 60 56 52 49 47 45 43 150 62 62 62 58 54 51 48 46 44 42 160 58 58 58 56 53 50 47 45 43 42 170 55 55 55 54 51 48 46 44 42 41 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers - 18 - IronRidge Mr. David F. Taggart IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis December 18, 2014 Page 19 of 20 Table 9B - MAXIMUM SPANS (in) - Roof Slope 28° to 45° - Wind Zone 3 (78.5" Max Module Length) XR100 Wind Rail Speed Ground Snow Load Exposure mph 0 psf 10 20 30 40 50 60 70 80 90 sf psf psf psf psf psf sf sf psf 100 99 91 78 70 62 56 52 48 45 43 105 99 91 78 70 62 56 52 48 45 43 110 98 90 78 70 62 56 52 48 45 43 120 93 87 76 68 62 56 52 48 45 43 Category 130 88 84 74 67 61 56 52 48 45 43 B 140 82 82 72 65 60 56 52 48 45 43 150 78 78 70 64 59 55 52 48 45 43 160 1 73 73 68 62 58 1 54 51 48 45 43 170 69 69 1 66 61 57 53 50 1 48 45 43 100 94 88 76 69 62 56 52 48 45 43 105 91 86 75 68 62 56 52 48 45 43 110 88 84 74 67 61 56 52 48 45 43 120 81 81 72 65 60 56 52 48 45 43 Category 130 76 76 70 63 59 55 52 48 45 43 C 140 71 71 67 62 57 54 51 48 45 43 150 67 67 65 60 56 52 50 47 45 43 160 63 63 63 58 54 51 49 46 44 43 170 1 59 59 59 57 53 50 48 45 44 42 100 89 85 74 67 61 56 52 48 45 43 105 85 83 73 66 61 56 52 48 45 43 110 82 81 72 65 60 56 52 48 45 43 120 75 75 69 63 59 55 52 48 45 43 Category 130 70 70 67 61 57 53 50 48 45 43 D 140 66 66 65 60 56 52 49 47 45 43 150 62 62 62 58 54 51 48 46 44 42 160 58 58 58 56 53 50 47 45 43 42 170 55 55 55 54 51 48 46 44 42 41 Notes —see page 20 Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers - 19 - IronRidge December 18, 2014 Mr. David F. Taggart Page 20 of 20 IronRidge XR100 Rail, Roof Flush Mounting System — Structural Analysis Notes —Tabulated values are based on the following criteria: l . Building mean roof height = 30 ft 2. Risk Category I 3. Solar maximum module long dimension is 67.5 inches for Tables 1A-9A and 78.5 inches for Tables 113-913. 4. Provide 2 in. clear between roof and rail 5. End cantilever span (max) = 0.40 x maximum span from above tables 6. No rail splices in end spans 7. No rail splices in middle 1/3 of interior spans 8. Single simple span(s). Spans listed in the tables above may be multiplied by 1.08 for continuous rails of 3 or more spans. Our analysis assumes that the rails, including the connections and associated hardware, are installed in a workmanlike manner in accordance with the "IronRidge Roof Mount Installation Manual" by IronRidge and generally accepted standards of construction practice. Additional information is available at the IronRidge web site, IronRidge.com. Verification of PV Module capacity to support the loads associated with the given array shall be the responsibility of the Contractor or Owner and not IronRidge or Starling Madison Lofquist. The adequacy of the supporting roof framing is to be determined by others. Please feel free to contact ire at your convenience if you have any questions. Respectfully yours, Tres Warner, P.E. Design Division Manager Starling Madison Lofquist, Inc. 1G'. Y� h`k� ^0 •d 36104 �O 'ram �a '��crs•►••e� .�w. GSM as nl . EXPIRES O1I31/L.0 IZ•�8•�� Consulting Structural and Forensic Engineers -20- p O O a p O � z O w H F o Z w a k 3 o � c D 4 a�� oo�m �U u=�» �� ow O �o - �w ao�� �_ p �� z z <. _ �Vco� C�\_ �"' ��j o�xx `a M �' w � � w cn V..� Q 00 Q w \3 / w Z J ¢U �� W -Q fr Q J � Z Z � O L.L O � O Cj Q � 3 � o _ X U \ �� N N N z 0 o i � i h rQ z O� O N � � � zo U �Q z p � U U 4 < < h p'+' Z U' d � w i O a m = I W wV)Q 0 J H z LO Z 0; _ OW H Jr 0 Q J `O O W wQ �.. � U -� v, w o Q J W Q x c z N \ X Q U Z LU W V)< oQ V) o JQ OU ow oU zo_ V On z� "' O z :Eo J =) W Cry O W U U V) u_ 0 0 z N J r w p Q� pU V) z w Wdoor .� LL= O 0 0 CN �3 Om �I 0 m � h o�m F--� ZW H u=�0 ate- 0 0Q m Q s v) m x 0=Lu = �0 LN J O LL �, Project Report I RON RI DGE --_- _----�_a_-._s_ - Make Solar �trenger Project Details Name Phinney Date 2017-06-09 Module Itek Energ}` : IT 300 SE (�Omm) Total Modules 24 '� -� � �` Dimensions 39.4" x 65.9" x 2.0" Total Watts 7,200 c,�..1i t� � l9 ����% Tilt 21 ° Attachment Pts 2�1 � '� JUN 0 9 2011 Load Assumptions Building Details _ _ __CIT-Y-OF ANACORTES Wind Exposure B Building Height: 20' Wind Speed 100 mph Roof Slope 21 Ground Snow Load 0 psf Risk Category I Attachment Spacing 7.0 ft Engineering Validation RAILS XR10 XR100 XR1000 r 0 ' TOTAL PROJECT COST $728 MAX SPAN [portrait) Zone 1 6' �" 9' 7" 12' 7" Zone 2 6' 1 " 9' 11' 10" Zone 3 =1' 1 I " 7' =1" 9' 8" MAX CANTILEVER portrait) Zone 1 2' 6" 3' 10" S' Zone 2 2' S" 3' 7" =}' 9" Zone 3 2' 2' I 1 " 3' 10" LOADS ZONES (portrait) DOWN �, (lbs) UPLIFT T (lbs) LATERAL H (lbs) Zone 1 24� .0 -156.0 20.0 Zone 2 2�.0 -273.0 20.0 Zone 3 2�k1.0 -435.0 20.0 SubArray Information Columns Rows Orientation Required Rail Provided Rail Attach Pts Clamps Splices 6 1 Portrait 20' 1" 1 set of 22.0' 6 =1 End Clamps 2 [2 x 11'] 10 Mid Clamps 6 1 Portrait 20` 1" 1 set of 22.0' 6 4 End Clamps 2 [2 x 11'] 10 Mid Clamps 6 1 Portrait 20' 1" 1 set of 22.0' 6 �1 End Clamps 2 �2 x I I'J 10 Mid Clamps 6 1 Portrait 20' 1" 1 set of 22.0' 6 �1 End Clamps 2 [2 x 11'] 10 Mid Clamps. Weight Details Tota] Weight Weight /Attachment Distributed Weight 11701bs 48.81bs 2.7 psf Bill of Materials Part No. Description XR-100-132A XR100, Rail 132" (11 Feet) Clear RS-GD-MCL-275 Kit, 4pcs, Grounding Mid Clamp 2.75", Clear 29-7000-204 4-pack, End Clamp (G) 1.97", Mill RS-LFF--001 Kit, 4pcs, Slotted L-Foot XR-100-SPLC Kit, Splice XR100, Mill (1) XR-I00-CAP Kit, End Cap XR100 (10 sets per bag) RS-GDST-001 Kit, 2pcs, Grounding Strap 29-50TB-005 Kit, 2pcs, 1 /4 x 3/4 Microinverter Mounting, T-Bolt RS-GDLG-002 Kit, 2pcs, Grounding Lug T-Bolt Discount 45.0% US prices only Spares Qty, MSRP Ea Discount Price 0 16 $52.20 45% $459.36 0 10 $14.00 45% $77.00 0 4 $12.00 45% $26.40. 0 6 $18.00 45% $59.40 0 8 $8.00 45% $35 20 1 2 $14.00 45% $15.40 0 2 $18.00 45% $19.80 0 12 $3DO 45%n $19.80 0 2 $14,00 45%n $15.40 Total Price Ext $727976 Price/ Watt $0610 Total Weight 1381bs IronRidge makes no representation or warranty, either express or implied., of any kind with respect to this software or its contents (such as product information, recommendations, applicability, descriptions or prices) including, but not limited to, merchantability and fitness for a particular purpose, how current it is, its accuracy, its completeness, product availability, its security or that defects will be corrected. �� IronRidge 2012. All rights reserved. JUN 0 9 2011 E CITY OF ANACORTES