Loading...
HomeMy WebLinkAboutPermit File BLD-2017-0306 1506 10th StreetCity of Anacortes 904 6th Street P.O.Box 547 Anacortes, WA 98221-0547 (360) 293-1901 Job Address: 1506 10TH ST ANACORTES WA 98221-1926 APN: P55842 Remarks: Install new PV system on roof Owner: LEWIS PHINNEY Address: 1506 10TH ST ANACORTES WA 98221-1926 Phone: (719) 332-3562 General Information: Building Valuation 1700 Invoice/Permit #: BLD-2017-0306 Applied date: 06/09/2017 Issue date: 06/0912017 Expire date: 12/06/2018 Permit Type: Single Family Alteration/Repair Permit Project: Contractor: BANNER ELECTRIC INC. Address: PO BOX 242 I�i1n1�1% • : - 1 ' Phone: (360) 770-2185 License #: BANNEE1965RP Fees: State Building Code Fee Building Permit Fee Plan Review Fee Total Calculated: Deposits/Receipts: Total Due: 4.50 60.10 39.07 103.67 0.00 103.67 Qv ::1 I t n .-f• .t •-� 1 I li7 0 _., G-4 =1 aF z• e., m 77 rn r- ITS K t r M Tj r THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITIAIN 180 D4S; O* If CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WOR4 IS COMMENL; rJ HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT, ALL PROV7ISIONiS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN ORJ46T,r•1I-IO GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER:$TAT12CR LOCAL LAW REGULATING CON UCTIO OR THE PERFORMANCE OF CONSTRUCTION. R.. y _ r C4 1 SIGNATURE OF OWNER OR AUTHORIZED AGENT 15!570EDBY Horne BANNER ELECTRIC,... A License Online Business Appl.. �► col Confirmation Your request has been submitted and your confirmation number is 0401 s08413, Below is information from your application Filing Date and Time 6/9/2017 3:22.•25 PM UBI 602453-660 Payment Method Credit Card Amount Due 49.6 Credit Card Processing tree $1.23 Payment Amount $56.23 Please allow up to 10 business days for processing Check the status of your application from the Activity tab. For information on business resources, education and workshops go to htt;r//bis.dorw►a;gov Give us your feedback If you are a Min-ority, Woman, `veteran, or Small Business owner, 90 to OpMWBE website at h Printa le '-M- • 'Q - Project Address: Project Applican Applicant Email: Site Owner Nam To Be Completed By the Applicant �— 9!5 ?W62 r 'hone No OWL JUN 0 9 2017 CITY OF ANACORTES PV System Description: U �p� �l�ir�4!/% �� — �lil� (�L�l-j j ✓I/4-�✓c� Determine if your project is eligible for an over-the-counter Permit (Check Yes or No) Yes No 1. PV System is designed and proposed for a detached single-family house, duplex or townhome. ❑ 2. PV System is designed for rooftop of house in general compliance with applicable codes. ❑ 3. Mounting system is engineered and designed for PV. 4. Rooftop is made from lightweight material such as shingles. ❑ 5. PV system will be permitted and re -a ❑ p pproved by Labor &Industries Electrical ❑ division. 6. To address uplift, panel are mounted no higher than 18" above the surface of the pi' ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. 7. Total deal load of panels, supports, mountings, race ways, and all other appurtenances weight no more than one of the following. IF Yes, indicate which: ❑ ❑ No more than three and one half (3.5 pounds per square foot (PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half (4.5) PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five (5.0) PSF 8. Supports for solar panels are installed to spread the dead load across as many 2 ❑ roof -framing members as needed to ensure that no point loads in excess of fifty (50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. % El10. Panels are mounted no higher than the roof ridge or apex of roof (applies only to 1 Q/ ElDitched rnnfcl Comments: Checking this box, I certify that all of the information provided on this form is correct. If you answered yes to all of the above questions, your PV installation is eligible for anover-the-counter building permit. To apply please bring in this completed form to our permit center at City Hall for an over-the-counter permit. is eligible for over-the-counter ❑ No iF C�