HomeMy WebLinkAboutPermit File BLD-2017-0306 1506 10th StreetCity of Anacortes
904 6th Street
P.O.Box 547
Anacortes, WA 98221-0547
(360) 293-1901
Job Address: 1506 10TH ST
ANACORTES WA 98221-1926
APN: P55842
Remarks: Install new PV system on roof
Owner: LEWIS PHINNEY
Address: 1506 10TH ST
ANACORTES WA 98221-1926
Phone: (719) 332-3562
General Information:
Building Valuation
1700
Invoice/Permit #: BLD-2017-0306
Applied date: 06/09/2017
Issue date: 06/0912017
Expire date: 12/06/2018
Permit Type: Single Family Alteration/Repair Permit
Project:
Contractor: BANNER ELECTRIC INC.
Address: PO BOX 242
I�i1n1�1% • : - 1 '
Phone: (360) 770-2185
License #: BANNEE1965RP
Fees:
State Building Code Fee
Building Permit Fee
Plan Review Fee
Total Calculated:
Deposits/Receipts:
Total Due:
4.50
60.10
39.07
103.67
0.00
103.67
Qv ::1
I t n .-f• .t •-� 1 I li7
0 _., G-4 =1
aF z• e., m 77
rn
r- ITS
K t r M
Tj r
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITIAIN 180 D4S; O* If
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WOR4 IS COMMENL; rJ
HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT, ALL PROV7ISIONiS
OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN ORJ46T,r•1I-IO
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER:$TAT12CR
LOCAL LAW REGULATING CON UCTIO OR THE PERFORMANCE OF CONSTRUCTION.
R..
y _ r C4 1
SIGNATURE OF OWNER OR AUTHORIZED AGENT 15!570EDBY
Horne BANNER ELECTRIC,... A License Online Business Appl.. �► col
Confirmation
Your request has been submitted and your confirmation number is 0401 s08413,
Below is information from your application
Filing Date and Time 6/9/2017 3:22.•25 PM
UBI 602453-660
Payment Method Credit Card
Amount Due 49.6
Credit Card Processing tree $1.23
Payment Amount $56.23
Please allow up to 10 business days for processing
Check the status of your application from the Activity tab.
For information on business resources, education and workshops go to htt;r//bis.dorw►a;gov
Give us your feedback
If you are a Min-ority, Woman, `veteran, or Small Business owner, 90 to OpMWBE website at h
Printa le '-M- • 'Q
-
Project Address:
Project Applican
Applicant Email:
Site Owner Nam
To Be Completed By the Applicant
�— 9!5 ?W62 r
'hone No
OWL
JUN 0 9 2017
CITY OF ANACORTES
PV System Description: U �p� �l�ir�4!/% �� — �lil� (�L�l-j j ✓I/4-�✓c�
Determine if your project is eligible for an over-the-counter Permit (Check Yes or No) Yes No
1. PV System is designed and proposed for a detached single-family house, duplex or
townhome. ❑
2. PV System is designed for rooftop of house in general compliance with applicable
codes. ❑
3. Mounting system is engineered and designed for PV.
4. Rooftop is made from lightweight material such as shingles. ❑
5. PV system will be permitted and re -a ❑
p pproved by Labor &Industries Electrical ❑
division.
6. To address uplift, panel are mounted no higher than 18" above the surface of the pi' ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system
may exceed the highest point of the roof.
7. Total deal load of panels, supports, mountings, race ways, and all other
appurtenances weight no more than one of the following. IF Yes, indicate which: ❑
❑ No more than three and one half (3.5 pounds per square foot (PSF)
❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and
one-half (4.5) PSF
❑ Frameless panels on at least 5/12 pitch roof weighing no more than five (5.0)
PSF
8. Supports for solar panels are installed to spread the dead load across as many 2 ❑
roof -framing members as needed to ensure that no point loads in excess of fifty
(50) pounds are created.
9. Attachment to the roof is specified by the mounting system manufacturer. % El10. Panels are mounted no higher than the roof ridge or apex of roof (applies only to 1 Q/ ElDitched rnnfcl
Comments:
Checking this box, I certify that all of the information provided on this form is correct.
If you answered yes to all of the above questions, your PV installation is eligible for anover-the-counter
building permit. To apply please bring in this completed form to our permit center at City Hall for an
over-the-counter permit.
is eligible for over-the-counter
❑ No
iF C�