HomeMy WebLinkAboutDOC-2000-ASI Project Pricing - ALL SIDES, INC. --
12338 South Fidi Bay Rd.—Suite A—AnacoAes,WA 98221 —USA i i( A'� k
Phone(360)299-0506—Fe (360)293-9385
Project: HUD Low Rent Project
Eslzrnator Dan Bo dston
Water line -
900' of water line installed, flushed, and sampled. Cutting concrete and patching
of asphalt. Backfill to specs, excess soil materials will be removed from site, f
This bid is for tie-in to line outside of the foundation.
$19,985 % yf
Alternate#1
J
Valve and box installation on new domestic water line
$60>,:`r
Cabinets & countertops/installation
All materials to meet or exceed requirements i
J $9s,n2d)
($42.500deposit rc'
Landscape
Removal of and installation of all specified plants and materials.
$7,700
Exterior concrete demolition
Sidewalks, curbs, and cutting where necessary
$2,650)
New concrete installation
New concrete sidewalks and patios, as specified on prints. (Not to include
footings for light pole bases, entry ways, or stozage sheds.) U J$8,775 �� a
Interior demolition �L
To include removal and safe handling and delivery of all fore mentioned j
fi cttues/hardware_
r 1 $26,900
t — �
- All bids to specification expect for exclusion due to incomplete data
9 39vd 'JNI S30IS -I-Id Gl F4l7 i1Z;TO