Loading...
HomeMy WebLinkAboutDOC-2000-ASI Project Pricing - ALL SIDES, INC. -- 12338 South Fidi Bay Rd.—Suite A—AnacoAes,WA 98221 —USA i i( A'� k Phone(360)299-0506—Fe (360)293-9385 Project: HUD Low Rent Project Eslzrnator Dan Bo dston Water line - 900' of water line installed, flushed, and sampled. Cutting concrete and patching of asphalt. Backfill to specs, excess soil materials will be removed from site, f This bid is for tie-in to line outside of the foundation. $19,985 % yf Alternate#1 J Valve and box installation on new domestic water line $60>,:`r Cabinets & countertops/installation All materials to meet or exceed requirements i J $9s,n2d) ($42.500deposit rc' Landscape Removal of and installation of all specified plants and materials. $7,700 Exterior concrete demolition Sidewalks, curbs, and cutting where necessary $2,650) New concrete installation New concrete sidewalks and patios, as specified on prints. (Not to include footings for light pole bases, entry ways, or stozage sheds.) U J$8,775 �� a Interior demolition �L To include removal and safe handling and delivery of all fore mentioned j fi cttues/hardware_ r 1 $26,900 t — � - All bids to specification expect for exclusion due to incomplete data 9 39vd 'JNI S30IS -I-Id Gl F4l7 i1Z;TO