Loading...
HomeMy WebLinkAboutCOR-2000-Response to Drawing Revisions - FEB. -23' 00 (WE0) 09:51 ORB ORGANIZATION INC TEL: 425-226-9115 P. 001 f M 3M 49:103FM31av O3E;lr- GAN=2-^6-7M8=4=30M%W. XNC ARCH/TECTS M PLANNERS w ENG/NE•ERS 607 SW Grady Way, Suite 210 Renton, Washington 98055-2977 Telephono_ (425) 226-3522 Facsimile: (425) 226-9115 Date and Time Transmitted: 23 ffP OD s of Pages: (IIMWain6 corer sheu) From: + o� Project k: ,249 To: SON Facsimile k 0) ?qt /dr Organization:AyAcavzs� Pi NNCor.Mv�rnr Reference: kENN4T Hard Copy will wil not be mailed Transmitted Items or Remarks: GG : S -1AF k /N FA 3lpD 243 8 8 i I `FEB. -23' 00 (WED) 09: 51 ORB ORGANIZATION INC TEL 425-226-9115 F. 002 THE ORS OR.GFANIZA'T=ON, XrOC. " ARCHITECTS • PLANNERS • ENGINEERS Anacortes Planning &Community Development Dept. 23 February 2000 Permit Center P.O.Box 547, Anacortes, WA 98221 Attn: Don Measamer Ref: Repair and Renovation, 2244&23' Street Units Sir, We are in receipt of your February 15 letter to Anacortes Housing Authority regarding your plans check for subject project and would like to make clarifications and corrections to the documents as follows: 1. Mr. Steve Jaffray of ARA will be contacting you to discuss sidewalk extension and dumpster location. 2. Barrier symbol will be white on blue background. 3. This 2-hour fire resistive wall detail was copied verbatim from the original construction drawings. Its presence on our documents was to show the Contractor what is there now and its method of construction so he can restore it to its original configuration when interior GWB is removed and reinstalled. 4. The Contract amount is $818,676, broken down as follows: Bldg 5 (903 22od Street) $139,175.00 -� Bldg 6A (909 2V Street) $116,907.00�— Bldg 6B (903 22°d Street) $161,443. Bldg 7B (904 23'a Street) $147,361.00 Bldg 8 (910 23rd Street) $253,790.00 5. All laundry rooms have fans, see Sheets M1, 2, and 3, Partial Utility Room Plan, 2-3BR(EF3) and 1"Floor 4BR Plan (EFl) and Schedule on MO. 6. Deck is supported by(2) 4x4 posts per Detail 9 on Sheet C4 (callout was omitted from plan view). 7. Concur that all walls and floor/ceiling assemblies separating units shall be 1-hour, continuous behind tubs, cabinets, etc. Penetrations will be firestopped. Firestopping is required and described by Specification Section 07270. 8. Concur that boxes in 1-hour walls shall be listed as 1-hour, separated on opposite sides of wall by mite. 24 inches. See also Spec Section 16050. 9. Concur that fire stopping is required at top plates of party walls, at void spaces and soffits not to exceed 10 feet. 10. Concur that floor/ceiling assembly also shall be draft stopped. 11. Concur that penetrations of floor/ceiling assemblies shall be fire stopped/draft stopped. 12. Concur that shafts shall be fire stopped. 13. Note that the washer/dryer alcove is open on front side, with full louvered doors. We will use 1-hour fire resistive construction in this area. FEB. -23' OMEN 09 : 52 ORB ORGANIZATION ING TEL 425-226-9115 P. 003 14. This is a typo. Buildings are Group R-3 occupancy. 15. Contractor will be directed to bolt ledger to each stud with (2) 5/16" x 5" lag bolts with washer, and to provide 2"x2"x3/16" plate washer at foundation anchor bolts. Vinyl siding catalog data will be submitted by the Contractor as required by the Specifications. 16. We will direct the Contractor to provide a small, inexpensive expansion tank at each water heater(see attached catalog cut). PRV's with an integral bipass are not a common item and are expensive. Also the check valve(&) in the domestic water supply system would not allow backfeed of any pressure generated. 17. Both the water heater and the furnace listed on Sheet MO are approved for installation in a closet. Combustion air for both is drawn from the interior space. Closet door is louvered, sized IAW Table 7-A of UMC. 18. Floor drain trap primers are required by specifications, see Section 15440, para 3.01/i With your concurrence we propose to provide your plan check letter and this letter to the Contractor and the Anacortes Housing Authority as a revision/clarification to the Contract Documents, directing the Contractor to incorporate the above directions. We believe this will accomplish the desired results without resorting to drawing revisions and reissue. We respectfully request that you issue building permits to the Contractor on that basis. Sincerely, Th Ojg t n..Inc. 4/ John Patterson Project Manager FEB. -23' 001WE01 09:52 ORB OROhAZATION INC TEL: 425-�6-9115 P. 004 FEB-22-00 TUE 12: 16 BCE SEATTLE FAX NO. 2064053976 P. 02 ANACORTES HOUSING AUTIIORTTY HUD LOW RENT PROJECT RESPONSE TO COMMENTS MECHANICAL ADDITIONS E 0 Shcct MO Replace existing"Gas Hot Water Tank Piping Diagram"detail with atta ctiment Mi. I i i 6 rcN / FEB. -23' 00 (WED) 09 : 52 ORB ORGANIZATION INC TEL: 425-226-9115 P. 005 FEB-22-00 TUE 12: 17 BCE SEATTLE FAX NO. 2064OS3978 P. 03 COMBINATION TEMPERATURE/ FLUE UP — SIZE PER PLANS PRESSURE RELIEF VALVE, -iW — SIZE PER PLAN — �W — SIZE PER PLANS GAS — SIZE PER PLANS _ EXPANSION TANK AMTROL MODEL c #ST—S—C GAS SHUT—OFF COCK HWT OUTS FULL SIZE TO NEAREST FLOOR DRAIN. G 2" HIGH 20 GA. GALVANIZED SHEET METAL PAN. SOLDERED BRAIN VALVE— , CORNERS WATER TIGHT, 1/2" DRAIN TO NEAREST FLOOR DRAIN. LJ 21�`x2"x2" FINISHED FLOOR C ANNEL NOTES: 1 . WATER HEATER LOCATED IN UTILITY CLOSET. 2. ZERO CLEARANCE GAS HOT WATER TANK PIPING DIAGRAM DIAGRAMMATIC I FEB. -?3' 00 (WE0) 09:53 ORB 010AIZATION INC TEL:4206-9115 P. 006 FED-22-00 TUE 12: 17 BCE SEATTLE FAX NO. 2064053976 P, 04 ExpansionThermal T71e logical solution to thermal expansion problems in domestic water lie ating Sys te Ins. !a grin :.:�'S- YrTr I is• ��i y . .. I Application, Sizing and Installation for Domestic Service Hot Water Systems Residential • Commercial • Institutional n — - FEV-2311) (WE0) 09:53 ORB OPCNIZATION INC TEL: 42 6 9115 P. 007 �f FEB-22-00 TUE 12: 18 8CE SEATTLE FAX NO. 2064053976 P, 05 - O 1rhermal Expansion Absorber and Hot Water ACcumulator System connections for Therm-X-Trols range from 3/4" to 3" depending on model. Separate, rigid polypropylene liner, - � NSF International listed for ST•5 _A- _�- _ .. �. and ST-12. ti r_ Heavy duty butyi diaphragm J� ./`� •� ti -^- '" barrier, Isolates water from air. Complies with FDA. ^- ✓ - - Adlustable, factory charged, sealed air cushion. Hirsh strengtn deep drawn steel rlome8. I Sturdy steel stand support on models 5T-25v �:, it;irr and larger. or? a:, Air charging valve with protective cap FeaturesInclude:• 11mi.n,n-metallic, non•c-orrosiva wrier re.,ervoir, i • Sealed-in pre-prLssari7ed air cushion;butyl diaphragm barrier .rpara4•, :am from air char;;e. Allow,9Inrage of expanded water �%ithout dangerously Inl ll-a8�n� G�.'jlt'Rt p(OcSUrtti. I • I'rvt%ytt-lwedle;:;openition of<o w % relief calve.. t., insl.tlf on nny �,,iwr hcalmi;,v5trnt. fall ran4r ,u >ize<. ' >;allnn, [c\S'_S n - itanLilV$ail water hcilrtut ",lumw,. tASME oc.iilably) i'ndri i, tN mvr hrater tr.,m hormIUl pn•..un) t'rib-;t. rpcitt ;. litr ,vidprnprrn: luanlinqg ata F tlr lint, ,- LJ A tr .1 . 'FEB. -23' 00 )WED) 09 : 54 ORB ORGANIZATION INC TEL:425-226-9115 P. 008 FEB-22-00 TUE 12: 19 BCE SEATTLE FAX NO. 2064053978 P, 06 ASME Capacities and oilinensions ST-C Therm-X-Trol expansion absorberS are designed and i constructed per ASME Code - .Section VIM _ IN-LINE MODELS 9 Sys. Ship i Model Tank Max• A — — —� No Vol- Accept. Height_ ` Diameter Conn- Wt IbS. _ _ a Lilt. Factor in k9. —. ST-5-C 2.1 .43 24 — . 26 —IV/. -12-C 17 4.7 .57 32 2'ro li 31 12 -/,�15.A— 3d System connection NPT We e I _ MJ—M STAND MODELS —e— sy9. shro Mode! Tank Mom- A I �� Vol. Accept. Height Dta_mster `_Conn. Wt- No. — —in. I cm in_ L�— In. kg Ibs. •" Lit. Gal Factor cm _ _ _ — A _ _ _ —4o t9v. 3t t7 49 ST•20V-C 29 7.6 .32 _ _ _ _ - - t — ST-30V-Ca7 12.5 .80 a2 t — — — — — '-- — — T 66 17.5 .66 60 23'/e 11 41 16'/^ I �/.H �aa- —95 e ST-42V-G — y — 56 8 25 25.0 45 81 32 L41 i6'h j /.won. ) _ ST•60V•C 95 _ _ — — — ST-60V•C 53.0 .65 94 —37 ' O1 2a_) t'/^°^ 7 863 90 00 i26 «t'/; 61 21 1 t'/.ZI-NNrvrt t15A 255 ST-180V•C 292 77.0 44 _ 144 5Ei'i: 61 2 U,r 4 t .ra t3d.0 795 J $T•210V-C 333 68.0 .39 r — _ — MODELS STAND M i Max. A B u I D E I Sys. i Ship Model Tank I _ No. Vol. Accept. He Diameter Space Height Diam. —im _Wt. — Lit. Gal Factor Cm in. cm tn. C_m In, cm in. cm in. [—rn_ kg Ibe. SY-451-C 800 156 fi5 160 71 7G 30 10 3'J^ 15 6 , fit 241 2 285 626 9 F — — — _ — — =12 ._. $T•452•C 600 211 .65 226 69 176 30 1 10 3'/• 1 15 6 16t 2< ! 2 .7d5 760 q $T-453 C 1000 264 .65 209 8P're 92 3E 112 d'h ) 18 7 76 30 3 `b68 610 $T-a54•C 1200 317 65 240 9ay7 �92 3G I t2 aV; 18 7 I JE 303-1415 9ta . 5T-455-Ci1400 370 .65 272 105'/.' 92 36 112 dY—_t8_ 7 7H a(J i I46? 7015 _ —T - T _ a ST-d56•C 1600 422 .65 1200 78`In ; 122 8 1 70_ 8_ tb 7'/, 707 a2 ; 3 T752 t655 E gT•a57•C 2000 528 .65 236 uv/, ) 122 dB 20 8_ t07 d2_, 3 Po7d t925 System ecnnaction NPT Fomate MAXIMUM OPERATING CONDITIONS pperalIng Temperature I ST•5-C Ihrotj9h ',T•u2 t0V-C 200" F (93`' __cY_e5L•C_lhrou0l ST-457-C 240°Fi,tt5�C1