Loading...
HomeMy WebLinkAboutCOR-2000-Deck Framing - APR, -2T OO(TNL') 07 21 ORB ORGA-NIZATION INC TEL 425-226-9115 P. 001 r THE 4303EL3M O3EL47rAN==�@WX430 r, INC. " ARCHITECTS• PLANNERS• ENGINEERS Housing Authority of the City of Anacortes 27 April 2000 719 Q•Avenue Anacortes,WA 98221 -- Attn: Steve Jaffray Reference 26 April RFI on deck framing The drawings indicate cutting existing rim and cantilevering deck joists,.sistering to existing. In retrospect I think it would be easier and cleaner to simply attach a new ledger and conventional frame the deck,see attached sketch. The cost of a ledger, hangars and lag bolts should be more than offset by the reduced length of the new joists and deletion of the full nailing or bolting that cantilevering would require.Cutting the siding and flashing would be required in either scenario. Sincerely, The ORB Organvation,Inc, John Paterson Project Manager ?o y - -- 607 SW Grady Way,Suite 210,Renton.Washin6ton 98055-2977/(425)226-2522/M(425)226.91I5 APR; -27' 00(THU) 07:21 ORB ORGANIZATION ING TEL:425-226-9115 P. 002 re I ,-- (aA4v t�AaG,ag EncHENb I (z)Z.xG7 YtOM zLAS�+ LAS LeKEe- 4x4Pos-r(Te-rv) (2) SX&V5"Ga%V t-.&4 Oo-rc 1 " Sceews a lb"o.c. Fop- t5EAeoic) (2� M x4 La,GS w/Wa5tFE¢ Movl���o 5 ,a12 REMove v�wy� S�D�Nc As eE4v, ArrLm t5lrFE4T uowe jto�ur,� $,NEw 4EDGB2 A) APPROV - -- l 27 111,o0