Loading...
HomeMy WebLinkAboutBLD-2026-0443 - CLEAR & GRADE (GRADING & VEGETATION REMOVAL)Please request inspections online through the permit portal. If that is not possible please call (360) 293-1901 for Building or Planning inspections. For Public Works inspections, please call (360) 293-1938. PARCEL: P137283 LEGAL DESCRIPTION: (0.1837 ac) THE EAST 10 FEET OF LOT 3 AND ALL OF LOTS 4 AND 5 AND THE WEST 10 FEET OF LOT 6, BLOCK 67, TUTTLE & BUCKLEY'S PLAT OF ANACORTES, SKAGIT CO. WASH., AS PER PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 23, RECORDS OF SKAGIT COUNTY, WASHINGTON. AKA LOT 2 SURVEY AF#202503310037 APPLICANT: Headrick, Debbie 2018 R Avenue Anacortes, WA 98221 360-293-7431 OWNER: RR SUMMIT NW LLC UNKNOWN ANACORTES, WA 98221 FEES:Paid Due Monitoring Clear and Grade Fee $134.26 $0.00 Grading Permit Fee $23.50 $0.00 $0.00Totals : REQUIRED INSPECTIONS Initial BMP's. This stormwater inspection must be completed prior to any other inspections. Stormwater Final Public Works Final CONSTRUCTION CONTRACTOR:SUMMITX CONTRACTORS INC 2018 R AVENUE ANACORTES, WA 98221 3602937431 License: SUMMICI802BZ Expires: 02/16/2028 $157.76 BLD-2026-0443 CLEAR AND GRADE ISSUED: EXPIRES: 07/20/2026 07/20/2027 PROJECT NAME: LOT 2-3940 B ROCK RIDGE PARKWAY SITE ADDRESS: 3940 B ROCK RIDGE PARKWAY ANACORTES * No clearing will be permitted in Tract A or the 16' alley behind the subject property. * Any exposed dirt will require BMPS so that a discharge will not leave the site CONDITIONS Page 1 of 1Printed by : Jennifer Watson on: 08/03/2026 02:17 PM City of Anacortes, WA 904 6th Street Anacortes, WA 98221 (360) 293-1901 http://cityofanacortes.org/ CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT CLEARING LIMIT 10' PUBLIC UTILITY EASEMENT N1°17'12"E 100.00' N1°17'12"E 100.00' 16' ALLEY CITY OF ANACORTES ROW 40.00' TRACT A 1,417 SF MONUMENT IN CASE 80.00'80.00' 80.00' 80.00'80.00'80.00' LOT 1 8,000 SF LOT 2 8,000 SF LOT 3 8,000 SF ROCK RIDGE SOUTH PHASE 5 AF #201807270027 TRACT B ROCK RIDGE SHOUTH PHASE 2 AF #200701240094 N 89°14'46" W 240.01' N 88°42'48" W 240.00' N 88°42'48" W 240.00' R =1 0 0 .0 0 ' L =6 4 .3 5 ' D =3 6 °5 2 '1 1 " ROCK RIDGE PARKWAY BLOCK 67 TUTLE AND BUCKLEY'S PLAT OF ANACORTES N 1°17'12" E 100.00' 16.00' 4.79' 7.02' 16.00' N1°17'12"E 100.00' R=200.00' L=24.12' D=6°54'36" R=125.00' L=80.44' D=36°52'12" N 88°42'48" W 134.13' 25' EX. BRASS SURFACE MONUMENT 178.01' 39.93' 15.00' 25' 25' N 88°42'48" W 240.00' 1 9 . 9 9 ' N 88°42'48" W 175.02' 10' PUBLICUTILITYEASEMENT - CLEARING AND VEGETATION REMOVAL ONLY. - NO EXT. BUILDINGS TO DEMO. - ENTIRE LOT IS CLEARING LIMIT. - CLEARING AND VEGETATION REMOVAL ONLY. - NO EXT. BUILDINGS TO DEMO. - ENTIRE LOT IS CLEARING LIMIT. - CLEARING AND VEGETATION REMOVAL ONLY. - NO EXT. BUILDINGS TO DEMO. - ENTIRE LOT IS CLEARING LIMIT. F D2 F D2 F D2 F D2 F D2 F D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 A D2 A D2 A D2 A D2 A D2 A D2 F D2 F D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 A D2 A D2 A D2 A D2 A D2 A D2 F D2 F D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 B D2 A D2 A D2 A D2 A D2 A D2 A D2 B D2 B D2 N BMP T5.13: POST-CONSTRUCTION SOIL QUALITY AND DEPTH MINIMUM REQUIREMENT #2 BMP'S BMP C233: SILT FENCE BMP C105: STABILIZED CONSTRUCTION ENTRANCE / EXIT STORM DRAIN INLET PROTECTION I-40.20-00 BMP C130: SURFACE ROUGHENING BMP C123: PLASTIC COVERING / SOIL STOCKPILE BMP C235: WATTLES BMP C154: CONCRETE WASHOUT AREA LOT INFORMATION PARCEL#: P137283 CODE & PROJECT DESCRIPTION LOT SIZE : 8,000 SQ.FT. ALL CONSTRUCTION TO COMPLY WITH LOCAL CODES AND ORDINANCES AND THE FOLLOWING: - 2021 INTERNATIONAL RESIDENTIAL CODE - 2021 UNIFORM PLUMBING CODE - 2021 WASHINGTON STATE ENERGY CODE ADDRESS: 3940 B ROCK RIDGE PARKWAY A A4 A A4 B A4 B A4 C A4 C A4 D A4 D A4 H A4 H A4 F A4 F A4 E A4 E A4 G A4 G A4 DRAFTED BY: THE INFORMATION, PLANS, DESIGNS, NOTES AND ARRANGEMENTS SHOWN ON THIS DRAWING ARE CONFIDENTIAL AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF STRANDBERG CONSTRUCTION INC. DRAWINGS NOTED AS PRELIMINARY, SCHEMATIC, AND/ OR CONCEPT CONTAIN INFORMATION THAT IS CONCEPTUAL AND SUBJECT TO CHANGE. THE DESIGNER MAKES NO CLAIM FOR ACCURACY OF CONCEPTUAL INFORMATION OR OF INFORMATION SUPPLIED BY OTHERS. J. STERLING INITIAL: OWNER APPROVAL PROJECT / CLIENT INFO 07-13-26 1" = 20' U.N.O. PAGE #: BUILDER INFO: MAILING ADDRESS: 2018 R AVE. Monday, July 13, 2026 PRINTED: FILE: C:\C - DESIGN JOBS\4 DEVELOPMENTS\Rock Ridge\Summit Rockridge Development\RR - PH5 - 3 Extra Lots\2_Design\RR PH5 Extra Lots - 24 X 36 Layout.layout DESIGNED BY: SCALE DATE ANACORTES WA 98221 PHONE: 360-293-7431 WEB: www.strandbergconstruction.com THE LOCAL 17 DEVELOPMENT 2701 17TH ST, ANACORTES, WA 98221 J. STERLING PAGE: 4 of 7 D1 CLEARING PLAN FOR P137283 - 3940 B ROCK RIDGE PARKWAY Clearing and Removal to be done by: SummitX Contractors 2018 R. Ave Anacortes, WA 98221 CESCL Steve Whitlock Strandberg Construction 1" = 10' U.N.O. RR SUMMIT NW LLC 2018 R AVE ANACORTES, WA 98221 ABATEMENT SERVICES CONTRACTOR INFORMATION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) TO INCORPORATE ECOLOGY’S REQUIRED BMPS FOR CONSTRUCTION DEMOLITION, AS OUTLINED IN THE 2024 STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (VOLUME IV, CHAPTER 7, BMP S438). ABATEMENT CORPORATION AND DEMOLITION COMPANY TO ADDRESS THE FOLLOWING: 1 POLLUTANT SOURCE CONTROL IDENTIFY AND PROPERLY DISPOSE OF HAZARDOUS SUBSTANCES PRIOR TO DEMOLITION (E.G., PCBS, ASBESTOS, LEAD-BASED PAINT, MERCURY SWITCHES). PREVENT EXPOSURE OF HAZARDOUS MATERIALS TO STORMWATER. INCLUDE DUST CONTROL MEASURES THAT AVOID RUNOFF. 2 SITE PROTECTION COVER ALL DEBRIS PILES AND DUMPSTERS. PLACE STORM DRAIN COVERS OR SIMILAR CONTAINMENT DEVICES BEFORE WORK BEGINS EACH DAY; REMOVE THEM ONLY AFTER SWEEPING AND CLEANING AT THE END OF EACH DAY. PROTECT STORMWATER INLETS AND OVERLAND FLOW PATHS USING BERMS, DIKES, OR OTHER CONTROLS. 3 DEBRIS AND DUST MANAGEMENT SWEEP ADJACENT PAVED SURFACES DAILY; COLLECT AND DISPOSE OF DEBRIS APPROPRIATELY. USE WATER TRUCKS OR HYDRANTS FOR DUST SUPPRESSION, ENSURING THAT WATER USED DOES NOT RESULT IN RUNOFF. 4 PCBS IN BUILDING MATERIALS FOLLOW ECOLOGY’S 2024 GUIDANCE DOCUMENT: HOW TO FIND AND ADDRESS PCBS IN BUILDING MATERIALS. VISUALLY INSPECT POTENTIAL PCB-CONTAINING MATERIALS DURING THE PLANNING PHASE AND ENSURE INTEGRITY IS MAINTAINED UNTIL REMOVAL. IMPLEMENT BMPS SUCH AS CATCH BASIN INSERTS, DRY SWEEPING, AND AVOIDANCE OF LEAF BLOWERS NEAR DEGRADED MATERIALS. NOTIFY THE LOCAL STORMWATER PROGRAM IF PCBS ARE KNOWN OR LIKELY TO BE PRESENT. 5 RECOMMENDED BEST PRACTICES USE SCREENING TO CONTAIN WIND-BLOWN DEBRIS. SCHEDULE DEMOLITION FOR DRY PERIODS WHENEVER POSSIBLE. ADDITIONAL DEMOLITION BMP'S BMP C105: STABILIZED CONSTRUCTION ENTRANCE / EXIT PURPOSE STABILIZED CONSTRUCTION ENTRANCES ARE ESTABLISHED TO REDUCE THE AMOUNT OF SEDIMENT TRANSPORTED ONTO PAVED ROADS BY VEHICLES OR EQUIPMENT. THIS IS DONE BY CONSTRUCTING A STABILIZED PAD OF QUARRY SPALLS AT ENTRANCES AND EXITS FOR CONSTRUCTION SITES. CONDITIONS OF USE CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE IF PAVED ROADS OR OTHER PAVED AREAS ARE WITHIN 1,000 FEET OF THE SITE. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE, RATHER THAN ONLY AT THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION. ON LARGE COMMERCIAL, HIGHWAY, AND ROAD PROJECTS, THE DESIGNER SHOULD INCLUDE ENOUGH EXTRA MATERIALS IN THE CONTRACT TO ALLOW FOR ADDITIONAL STABILIZED ENTRANCES NOT SHOWN IN THE INITIAL CONSTRUCTION SWPPP. IT IS DIFFICULT TO DETERMINE EXACTLY WHERE ACCESS TO THESE PROJECTS WILL TAKE PLACE; ADDITIONAL MATERIALS WILL ENABLE THE CONTRACTOR TO INSTALL THEM WHERE NEEDED. BMP C233: SILT FENCE PURPOSE USE OF A SILT FENCE REDUCES THE TRANSPORT OF COARSE SEDIMENT FROM A CONSTRUCTION SITE BY PROVIDING A TEMPORARY PHYSICAL BARRIER TO SEDIMENT AND REDUCING THE RUNOFF VELOCITIES OF OVERLAND FLOW. SEE FIGURE II-4.2.12 SILT FENCE (P.369) FOR DETAILS ON SILT FENCE CONSTRUCTION. CONDITIONS OF USE SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. SILT FENCE SHALL PREVENT SOIL CARRIED BY RUNOFF WATER FROM GOING BENEATH, THROUGH, OR OVER THE TOP OF THE SILT FENCE, BUT SHALL ALLOW THE WATER TO PASS THROUGH THE FENCE. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. CONVEY ANY CONCENTRATED FLOWS THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT POND. DO NOT CONSTRUCT SILT FENCES IN STREAMS OR USE IN V-SHAPED DITCHES. SILT FENCES DO NOT PROVIDE AN ADEQUATE METHOD OF SILT CONTROL FOR ANYTHING DEEPER THAN SHEET OR OVERLAND FLOW. BMP T5.13: POST-CONSTRUCTION SOIL QUALITY AND DEPTH PURPOSE AND DEFINITION NATURALLY OCCURRING (UNDISTURBED) SOIL AND VEGETATION PROVIDE IMPORTANT STORMWATER FUNCTIONS INCLUDING: WATER INFILTRATION; NUTRIENT, SEDIMENT, AND POLLUTANT ADSORPTION; SEDIMENT AND POLLUTANT BIOFILTRATION; WATER INTERFLOW STORAGE AND TRANSMISSION; AND POLLUTANT DECOMPOSITION. THESE FUNCTIONS ARE LARGELY LOST WHEN DEVELOPMENT STRIPS AWAY NATIVE SOIL AND VEGETATION AND REPLACES IT WITH MINIMAL TOPSOIL AND SOD. NOT ONLY ARE THESE IMPORTANT STORMWATER FUNCTIONS LOST, BUT SUCH LANDSCAPES THEMSELVES BECOME POLLUTION GENERATING PERVIOUS SURFACES DUE TO INCREASED USE OF PESTICIDES, FERTILIZERS AND OTHER LANDSCAPING AND HOUSEHOLD/INDUSTRIAL CHEMICALS, THE CONCENTRATION OF PET WASTES, AND POLLUTANTS THAT ACCOMPANY ROADSIDE LITTER. ESTABLISHING SOIL QUALITY AND DEPTH REGAINS GREATER STORMWATER FUNCTIONS IN THE POST DEVELOPMENT LANDSCAPE, PROVIDES INCREASED TREATMENT OF POLLUTANTS AND SEDIMENTS THAT RESULT FROM DEVELOPMENT AND HABITATION, AND MINIMIZES THE NEED FOR SOME LANDSCAPING CHEMICALS, THUS REDUCING POLLUTION THROUGH PREVENTION. APPLICATIONS AND LIMITATIONS ESTABLISHING A MINIMUM SOIL QUALITY AND DEPTH IS NOT THE SAME AS PRESERVATION OF NATURALLY OCCURRING SOIL AND VEGETATION. HOWEVER, ESTABLISHING A MINIMUM SOIL QUALITY AND DEPTH WILL PROVIDE IMPROVED ON-SITE MANAGEMENT OF STORMWATER FLOW AND WATER QUALITY. SOIL ORGANIC MATTER CAN BE ATTAINED THROUGH NUMEROUS MATERIALS SUCH AS COMPOST, COMPOSTED WOODY MATERIAL, BIOSOLIDS, AND FOREST PRODUCT RESIDUALS. IT IS IMPORTANT THAT THE MATERIALS USED TO MEET THE SOIL QUALITY AND DEPTH BMP BE APPROPRIATE AND BENEFICIAL TO THE PLANT COVER TO BE ESTABLISHED. LIKEWISE, IT IS IMPORTANT THAT IMPORTED TOPSOILS IMPROVE SOIL CONDITIONS AND DO NOT HAVE AN EXCESSIVE PERCENT OF CLAY FINES. THIS BMP CAN BE CONSIDERED INFEASIBLE ON TILL SOIL SLOPES GREATER THAN 33 PERCENT. DESIGN GUIDELINES - SOIL RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. - SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE FOLLOWING: 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. 2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL. 3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS A. THE ORGANIC CONTENT FOR “PRE-APPROVED” AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO 65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION. B. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS IDENTIFIED IN TABLE 220-B, TESTING PARAMETERS, IN WAC 173-350-220. THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. L IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED BELOW: 1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. 2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT “PRE-APPROVED” RATES, OR AT CUSTOM CALCULATED RATES BASED ON TESTS OF THE SOIL AND AMENDMENT. 3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT “PRE- APPROVED” RATE OR AT A CUSTOM CALCULATED RATE. 4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS. MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE. SOIL THAT ALREADY MEETS THE DEPTH AND ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. MAINTENANCE - ESTABLISH SOIL QUALITY AND DEPTH TOWARD THE END OF CONSTRUCTION AND ONCE ESTABLISHED, PROTECT FROM COMPACTION, SUCH AS FROM LARGE MACHINERY USE, AND FROM EROSION. - PLANT VEGETATION AND MULCH THE AMENDED SOIL AREA AFTER INSTALLATION. - LEAVE PLANT DEBRIS OR ITS EQUIVALENT ON THE SOIL SURFACE TO REPLENISH ORGANIC MATTER. - REDUCE AND ADJUST, WHERE POSSIBLE, THE USE OF IRRIGATION, FERTILIZERS, HERBICIDES AND PESTICIDES, RATHER THAN CONTINUING TO IMPLEMENT FORMERLY ESTABLISHED PRACTICES. STORM DRAIN INLET PROTECTION I-40.20-00 SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORM WATER STRUCTURE IT WILL SERVICE THE BIGD SHALL HAVE A BUILT IN HIGH-FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 3 THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 4. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). BMP C235: WATTLES PURPOSE WATTLES ARE TEMPORARY EROSION AND SEDIMENT CONTROL BARRIERS CONSISTING OF STRAW, COMPOST, OR OTHER MATERIAL THAT IS WRAPPED IN BIODEGRADABLE TUBULAR PLASTIC OR SIMILAR ENCASING MATERIAL. THEY REDUCE THE VELOCITY AND CAN SPREAD THE FLOW OF RILL AND SHEET RUNOFF, AND CAN CAPTURE AND RETAIN SEDIMENT. WATTLES ARE TYPICALLY 8 TO 10 INCHES IN DIAMETER AND 25 TO 30 FEET IN LENGTH. WATTLES ARE PLACED IN SHALLOW TRENCHES AND STAKED ALONG THE CONTOUR OF DISTURBED OR NEWLY CONSTRUCTED SLOPES. SEE FIGURE II-4.2.14 WATTLES (P. 378) FOR TYPICAL CONSTRUCTION DETAILS. WSDOT STANDARD PLAN I-30.30-00 ALSO PROVIDES INFORMATION ON WATTLES (HTTP://WWW.WSDOT.WA.GOV/DESIGN/STANDARDS/PLANS.HTM#SECTIONI) CONDITIONS OF USE USE WATTLES: - IN DISTURBED AREAS THAT REQUIRE IMMEDIATE EROSION PROTECTION. - ON EXPOSED SOILS DURING THE PERIOD OF SHORT CONSTRUCTION DELAYS, OR OVER WINTER MONTHS. - ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED. - THE MATERIAL USED DICTATES THE EFFECTIVENESS PERIOD OF THE WATTLE. GENERALLY, WATTLES ARE TYPICALLY EFFECTIVE FOR ONE TO TWO SEASONS. - PREVENT RILLING BENEATH WATTLES BY PROPERLY ENTRENCHING AND ABUTTING WATTLES TOGETHER TO PREVENT WATER FROM PASSING BETWEEN THEM. DESIGN CRITERIA - INSTALL WATTLES PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOUR. - NARROW TRENCHES SHOULD BE DUG ACROSS THE SLOPE ON CONTOUR TO A DEPTH OF 3- TO 5- INCHES ON CLAY SOILS AND SOILS WITH GRADUAL SLOPES. ON LOOSE SOILS, STEEP SLOPES, AND AREAS WITH HIGH RAINFALL, THE TRENCHES SHOULD BE DUG TO A DEPTH OF 5- TO 7- INCHES, OR 1/2 TO 2/3 OF THE THICKNESS OF THE WATTLE. - START BUILDING TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UP. SPREAD EXCAVATED MATERIAL EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHODS. - CONSTRUCT TRENCHES AT INTERVALS OF 10- TO 25-FEET DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE, AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE TRENCHES. - INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY END TO END. DO NOT OVERLAP THE ENDS. - INSTALL STAKES AT EACH END OF THE WATTLE, AND AT 4-FOOT CENTERS ALONG ENTIRE LENGTH OF WATTLE. - IF REQUIRED, INSTALL PILOT HOLES FOR THE STAKES USING A STRAIGHT BAR TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE SOIL. - WOODEN STAKES SHOULD BE APPROXIMATELY 3/4 X 3/4 X 24 INCHES MIN. WILLOW CUTTINGS OR 3/8-INCH REBAR CAN ALSO BE USED FOR STAKES. - STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. MAINTENANCE STANDARDS - WATTLES MAY REQUIRE MAINTENANCE TO ENSURE THEY ARE IN CONTACT WITH SOIL AND THOROUGHLY ENTRENCHED, ESPECIALLY AFTER SIGNIFICANT RAINFALL ON STEEP SANDY SOILS. BMP C154: CONCRETE WASHOUT AREA PURPOSE PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORMWATER FROM CONCRETE WASTE BY CONDUCTING WASHOUT OFF-SITE, OR PERFORMING ON-SITE WASHOUT IN A DESIGNATED AREA TO PREVENT POLLUTANTS FROM ENTERING SURFACE WATERS OR GROUND WATER. CONDITIONS OF USE CONCRETE WASHOUT AREA BEST MANAGEMENT PRACTICES ARE IMPLEMENTED ON CONSTRUCTION PROJECTS WHERE: - CONCRETE IS USED AS A CONSTRUCTION MATERIAL. - IT IS NOT POSSIBLE TO DISPOSE OF ALL CONCRETE WASTEWATER AND WASHOUT OFF-SITE (READY MIX PLANT, ETC.). - CONCRETE TRUCKS, PUMPERS, OR OTHER CONCRETE COATED EQUIPMENT ARE WASHED ON-SITE. NOTE: IF LESS THAN 10 CONCRETE TRUCKS OR PUMPERS NEED TO BE WASHED OUT ON-SITE, THE WASHWATER MAY BE DISPOSED OF IN A FORMED AREA AWAITING CONCRETE OR AN UPLAND DISPOSAL SITE WHERE IT WILL NOT CONTAMINATE SURFACE OR GROUND WATER. THE UPLAND DISPOSAL SITE SHALL BE AT LEAST 50 FEET FROM SENSITIVE AREAS SUCH AS STORM DRAINS, OPEN DITCHES, OR WATER BODIES, INCLUDING WETLANDS. BMP C123: PLASTIC COVERING PURPOSE: PLASTIC COVERING PROVIDES IMMEDIATE, SHORT-TERM EROSION PROTECTION TO SLOPES AND DISTURBED AREAS. CONDITIONS OF USE: PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS, EXCEPT AS STATED BELOW. PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. NOTE: THE RELATIVELY RAPID BREAKDOWN OF MOST POLYETHYLENE SHEETING MAKES IT UNSUITABLE FOR LONG-TERM (GREATER THAN SIX MONTHS) APPLICATIONS. - DUE TO RAPID RUNOFF CAUSED BY PLASTIC COVERING, DO NOT USE THIS METHOD UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY CONCENTRATED RUNOFF. SUCH AREAS INCLUDE STEEP AND/OR UNSTABLE SLOPES. - PLASTIC SHEETING MAY RESULT IN INCREASED RUNOFF VOLUMES AND VELOCITIES, REQUIRING ADDITIONAL ON-SITE MEASURES TO COUNTERACT THE INCREASES. CREATING A TROUGH WITH WATTLES OR OTHER MATERIAL CAN CONVEY CLEAN WATER AWAY FROM THESE AREAS. - TO PREVENT UNDERCUTTING, TRENCH AND BACKFILL ROLLED PLASTIC COVERING PRODUCTS. - WHILE PLASTIC IS INEXPENSIVE TO PURCHASE, THE ADDED COST OF INSTALLATION, MAINTENANCE, REMOVAL, AND DISPOSAL MAKE THIS AN EXPENSIVE MATERIAL, UP TO $1.50-2.00 PER SQUARE YARD. - WHENEVER PLASTIC IS USED TO PROTECT SLOPES INSTALL WATER COLLECTION MEASURES AT THE BASE OF THE SLOPE. THESE MEASURES INCLUDE PLASTIC-COVERED BERMS, CHANNELS, AND PIPES USED TO COVEY CLEAN RAINWATER AWAY FROM BARE SOIL AND DISTURBED AREAS. DO NOT MIX CLEAN RUNOFF FROM A PLASTIC COVERED SLOPE WITH DIRTY RUNOFF FROM A PROJECT. BMP C130: SURFACE ROUGHENING Purpose: Surface roughening aids in the establishment of vegetative cover, reduces runoff velocity, increases infiltration, and provides for sediment trapping through the provision of a rough soil surface. Horizontal depressions are created by operating a tiller or other suitable equipment on the contour or by leaving slopes in a roughened condition by not fine grading them. Use this BMP in conjunction with other BMPs such as seeding, mulching, or sodding. CONDITIONS OF USE: - All slopes steeper than 3H:1V and greater than 5 vertical feet require surface roughening to a depth of 2 to 4 inches prior to seeding. - Areas that will not be stabilized immediately may be roughened to reduce runoff velocity until seeding takes place. - Slopes with a stable rock face do not require roughening. - Slopes where mowing is planned should not be excessively roughened. HH AA BB CC DD EE FF GG DRAFTED BY: THE INFORMATION, PLANS, DESIGNS, NOTES AND ARRANGEMENTS SHOWN ON THIS DRAWING ARE CONFIDENTIAL AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF STRANDBERG CONSTRUCTION INC. DRAWINGS NOTED AS PRELIMINARY, SCHEMATIC, AND/ OR CONCEPT CONTAIN INFORMATION THAT IS CONCEPTUAL AND SUBJECT TO CHANGE. THE DESIGNER MAKES NO CLAIM FOR ACCURACY OF CONCEPTUAL INFORMATION OR OF INFORMATION SUPPLIED BY OTHERS. J. STERLING INITIAL: OWNER APPROVAL PROJECT / CLIENT INFO 07-13-26 1" = 20' U.N.O. PAGE #: BUILDER INFO: MAILING ADDRESS: 2018 R AVE. Monday, July 13, 2026 PRINTED: FILE: C:\C - DESIGN JOBS\4 DEVELOPMENTS\Rock Ridge\Summit Rockridge Development\RR - PH5 - 3 Extra Lots\2_Design\RR PH5 Extra Lots - 24 X 36 Layout.layout DESIGNED BY: SCALE DATE ANACORTES WA 98221 PHONE: 360-293-7431 WEB: www.strandbergconstruction.com THE LOCAL 17 DEVELOPMENT 2701 17TH ST, ANACORTES, WA 98221 J. STERLING PAGE: 5 of 7 D2 CLEARING STORMWATER BMP'S 1" = 10' U.N.O. RR SUMMIT NW LLC 2018 R AVE ANACORTES, WA 98221