HomeMy WebLinkAboutBLD-2026-0427 - DECK OR PORCHPlease request inspections online through the permit portal.
If that is not possible please call (360) 293-1901 for Building or Planning inspections.
For Public Works inspections, please call (360) 293-1938.
PARCEL: P56060
LEGAL DESCRIPTION: LOTS 9 AND 10, BLOCK 167, MAP OF THE CITY OF ANACORTES, ACCORDING TO THE PLAT
THEREOF RECORDED IN VOLUME 2 OF PLATS, PAGES 4 THROUGH 7, RECORDS OF SKAGIT COUNTY, WASHINGTON.
APPLICANT: Lemieux, Corey
13558a slice st
Anacortes, WA 98221
3606323434
OWNER: REEVES RICHARD C
REEVES SARAH P LANDRY JTWRS
ANACORTES, WA 98221
VALUATIONS:
Estimated construction cost 25000.00 $25,000.00
$25,000.00Total:
FEES:Paid Due
State Building Code Council fee $6.50 $0.00
Building Permit Fee $391.25 $0.00
Plan Review Fee $254.31 $0.00
$0.00Totals :
REQUIRED INSPECTIONS
Footings
Framing
Building Final
CONSTRUCTION CONTRACTOR:LEMIEUX LABOR & CONST LLC
13558 SLICE ST
ANACORTES, WA 98221
3606323434
License: LEMIELC770NG
Expires: 08/07/2027
$652.06
BLD-2026-0427 DECK OR PORCH
ISSUED:
EXPIRES:
07/14/2026
07/14/2028
PROJECT NAME: RICK REEVES DECK PROJECT
SITE ADDRESS: 1819 10TH STREET ANACORTES
Page 1 of 1Printed by : Jennifer Watson on: 07/31/2026 03:36 PM
City of Anacortes, WA
904 6th Street
Anacortes, WA 98221
(360) 293-1901
http://cityofanacortes.org/
DECK DIMENSION PLAN
Concept drawings based on provided sketch - verify dimensions on site before construction.
A1
Scale: 1 ft approx = 15.5 pt
EXISTING HOUSE / LEDGER
MAIN DECK AREA (APPROX. 305 SF)
ST
A
I
R
A
R
E
A
(
A
P
P
R
O
X
.
3
0
S
F
)
29' LEDGER / HOUSE SIDE
11
'
6
"
14'
12'
+
/
-
D
I
A
G
O
N
A
L
6'
6
"
4' 6" STAIR
NOTES
• Deck shape and dimensions are approximate from field sketch.
• Existing ledger to remain; inspect attachment, flashing, and condition.
• Decking: Trex, picture-frame border, fascia on exposed edges.
• Stair layout shown conceptually; verify rise/run on site.
DECK FRAMING / PIER PLAN
Concept drawings based on provided sketch - verify dimensions on site before construction.
A2
Scale: 1 ft approx = 15.5 pt
EXISTING 2x LEDGER W/ JOIST HANGERS
2x8 JOISTS @ 16" O.C. MAX
4x6 BEAM LINE - VERIFY FINAL LOCATION
1 2 3
4
5 6
2x
1
2
S
T
A
I
R
S
T
R
I
N
G
E
R
S
NOTES
• 2x8 joists shown perpendicular to ledger; use approved joist hangers at ledger.
• Use hurricane ties/framing clips where joists bear on 4x6 beam.
• Piers shown as conceptual locations; spacing and loads to be verified.
• Typical pier: 18"x18"x6" footing with 12" concrete pier/Sonotube above.
• Use post bases at concrete and post-to-beam connectors at 4x6 beam.
TYPICAL DETAILS & NOTES
Concept drawings based on provided sketch - verify dimensions on site before construction.
A3
Scale: 1 ft approx = 15.5 pt
SECTION A - LEDGER / JOIST
Existing ledger / house side
2x8 joist
Joist hanger + approved nails/screws
SECTION B - BEAM / POST / PIER
4x6 PT beam
4x4 PT post
12" concrete pier
18"x18"x6" footing
GENERAL CONSTRUCTION NOTES
1. All framing lumber to be pressure-treated exterior grade unless noted otherwise.
2. Joists: 2x8 at 16" O.C. max, crown up, fastened per connector schedule.
3. Beam: 4x6 PT with posts and piers located under load path.
4. Footings and pier depth/size must meet local code and frost/soil requirements.
5. Use corrosion-resistant exterior-rated connectors and fasteners.
6. Provide ledger flashing and verify ledger attachment to house framing.
7. Trex decking installation to follow manufacturer spacing and fastener requirements.
8. These are concept drawings only, not engineered structural plans.
9. Verify exact dimensions, stair rise/run, pier locations, setbacks, and permit requirements with City of Anacortes.
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 1 of 6
Permit #:
Received by:
Small Site Construction SWPPP
City of Anacortes Stormwater · 904 6th Street · Anacortes, WA 98221
Stormwater: 360-630-1037
General Information
Project Name Parcel Size acres
Project Address
Property Owner Phone
Site Contact Phone
Project Description
Describe the nature and purpose of the construction project. Include the total size of the area, any increase in existing impervious area; the total area expected to be disturbed by clearing, grading, excavation or other
construction activities, including off-site borrow and fill areas; and the volumes of grading cut and fill that are proposed.
Erosion control lead or responsible party
Phone
Engineer/Firm Phone
Site Conditions
Adjacent Areas: See the site plan, drainage plan, and construction drawings approved for the associated permit.
Critical areas: See the critical areas site plan approved for the associated permit.
REQUIRED before SWPPP can be approved:
1.Attach a copy of your stormwater site plan submitted with your building/grading permit application and attach
pictures.
2.Add a map of where your stormwater goes from your project to the discharge site.
3.Stormwater site plan shall list all BMPs for inspectors of construction site.
REQUIRED before final can be approved:
1. BMP T5.13: Post-Construction Soil Quality and Depth
PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT
Mailing Address: P.O. Box 547, Anacortes, WA 98221
Office Location: 904 6th Street, Anacortes WA 98821
Phone: (360) 293-1901
Weekly Erosion Control Self-Inspection Reports
All sites that have a Stormwater Pollution
Prevention Plan #2, 1-5 or 1-9 are required to
submit a weekly erosion control/BMP monitoring
inspection report through the citizen portal.
These reports can be found on the city website
and through the link on the submittals tab in the
permitting customer portal.
Turning in the
weekly report
consistently will
help keep your
project on
schedule and
avoid unnecessary
delays due to
cancelled
inspections.
Erosion-Control-Inspection-Form--Sites-Less-Than-One-Acre-fillable-PDF (anacorteswa.gov)
Stormwater Site Inspection Form (anacorteswa.gov) (For larger sites)
We appreciate your assistance in keeping our documentation up to date.
Just complete the fillable PDF, save it, and
then upload it with the blue upload tab.
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 2 of 6
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 3 of 6
Best Management Practices Illustration
Turn the page to see information corresponding to each numbered circle below.
About this Pollution Prevention Plan
This is Anacortes’s Small Site Construction Stormwater
Pollution Prevention Plan (“Construction SWPPP”)
intended to ensure your construction project minimizes
erosion and does not contribute pollution, including
sediment, to stormwater. This SWPPP is primarily
intended for projects under 2,000 sq ft.
This plan uses certain Best Management Practices
(“BMPs”) from the Stormwater Management Manual.
Some detailed descriptions are included; the remainder
and additional information are available at
https://fortress.wa.gov/ecy/ezshare/wq/Permits/
Flare/2019SWMMWW/2019SWMMWW.htm#Topics/
FrontCover.htm?TocPath=2019%2520SWMMWW%
257C_____0
The listed BMPs are the minimum necessary; if erosion
occurs, you must add additional BMPs as necessary
to control it.
You should include your Construction SWPPP in your
contract with your builder. You must keep a copy of this
SWPPP on the construction site or within reasonable
access to the site for construction and inspection personnel at all times.
Property owners and contractors are responsible for
ensuring all aspects of BMPs are followed, including
those not shown on the detail sheets. This Construction
SWPPP should be considered a living document and
must be updated as needed to reflect site conditions.
Preserve Vegetation/Mark Clearing Limits
Before any land disturbance, including clearing and
grading, clearly mark all clearing limits, sensitive areas
and their buffers, and trees that are to be preservedwithin
the construction area. Retain natural vegetation in an
undisturbed state to the maximum extent practical. Use
these BMPs:
•C101 to preserve natural vegetation
•C102 to establish buffer zones around important
vegetation you want to save
•C103 High Visibility Fencing to mark the
boundaries of your buffers
•C233 Silt Fence to ensure sediment doesn’t leave
the site
Establish Construction Access
Construction vehicles can damage or compact
soils, create sediment pollution, or track sediment
onto public roads.
•All equipment and vehicles that access the
construction area must use an existing driveway or a
stabilized construction entrance.
•Use BMP C105 Stabilized Construction Entrance
wherever traffic will be entering or leaving a
construction site if paved roads are within 1,000 ft of
the site. Construct a 12-inch thick pad of 4-inch to 8-
inch quarry spalls, a 4-inch course of asphalt treated
base, or use existing pavement. Place a separation
geotextile under the spalls to prevent fine sedimentfrom pumping up into the rock pad. Install the
construction entrance prior to any vehicles entering
the site, at the location shown on the site plan.
Create only one construction entrance per site.1
2
1b
1b
1b
2
1a
4
7
9a
9b
5
9b
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 4 of 6
•Use BMP C103 High Visibility Fencing to restrict
traffic to the construction entrance.
•Remove any sediment that is tracked onto pavementby shoveling or street sweeping and remove the
collected sediment or stabilize it on site.
Control Flow Rates (not shown)
Stormwater on a cleared site can create significant
flows that can damage downstream properties.
Protect properties and waterways downstream of the
project site from erosion and the associated discharge of
turbid waters. If your project is required to control flow
rates, you must use the following BMPs as shown on the
approved site plan:
•C203 Water Bars
•C209 Outlet Protection
•C235 Straw Wattles
Install Sediment Controls
When land is cleared of vegetation, stormwater can
pick up sediment, a pollutant. BMPs can prevent
sediment from leaving the site.
You must install sediment controls before land
disturbance to effectively minimize and control the
discharge of pollutants and sediments.
Use and properly install BMP C233 Silt Fence. You
must bury the filter fabric as shown in the diagram in
order for the BMP to be effective. You must repair the silt
fence if it is damaged.
Consider the following additional BMPs:
•C231 Brush Barrier
•C232 Gravel Filter Berm
•C234 Vegetated Strip
•C235 Straw Wattles
Note that C230 Straw Bale Barrier is no longer an
approved BMP.
Stabilize Soils
Leaving soils devegetated or exposed needlessly
creates erosion and sediment problems.
•Stabilize all exposed soils whenever constructionwork will stop for more than two days at a time during
the wet season (October 1 to April 30) or 7 days the
rest of the year (the dry season).
•Stabilize all exposed soils at the end of the shift
before a holiday or weekend.
•Stabilize all exposed soils with either vegetation, matcoverings, mulching, or in those areas to be paved, a
compacted base material.
•Use BMP C123 Plastic Covering over all stockpiles
with plastic or burlap if left unworked. Place sand-
filled burlap or geotextile bags every 3 to 6 ft along
seams and tie them together with twine to hold them
in place.
•If you excavate soil for the foundation, backfill that
soil against the foundation and grade it to drain away
from the building. Once the disturbed landscape
areas are graded, you must seed or sod the grass
areas.
Consider the following additional BMPs:
•C120 Temporary and Permanent Seeding
•C121 Mulching
•C122 Nets and Blankets
•C124 Sodding
•C125 Topsoiling/Composting
•C131 Gradient Terraces
•C140 Dust Control
Protect Slopes (not shown)
Slopes can be especially vulnerable to erosion, but
BMPs can mitigate sediment problems.
Design and construct cut-and-fill slopes to minimize
erosion. Use the following practices:
•Reduce continuous length of slope with terracing and
diversions
•Reduce slope steepness
•Roughen slope surfaces
•Use BMP C123 Plastic Covering over all exposed
slopes
•Use BMP C120 Temporary and Permanent Seeding
as soon as possible on exposed slopes
Manage off-site stormwater (run-on) separately from
stormwater generated onsite. Divert off-site stormwater
or groundwater away from slopes and disturbed areas
with interceptor dikes, pipes, or swales.
You may not create cut slopes over 4 feet high or slopes
steeper than 2 feet horizontal to 1 foot vertical. Fill
slopes may not exceed 4 feet high or 3 feet horizontal to
1 foot vertical. Slopes that exceed these criteria require
engineering.
Consider the following additional BMPs:
•C121 Mulching
•C122 Nets and Blankets
•C124 Sodding
•C203 Water Bars
•C208 Triangular Silt Dike (Geotextile‐Encased Check
Dam
Protect Drain Inlets
Storm drains are designed to collect and transport
clean stormwater, not water contaminated with
sediment or other pollutants. Storm drain inlets
must be protected so that runoff does not enter the
3
4
5
6
7
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 5 of 6
stormwater system without first being filtered or
treated or both.
•Use BMP C220 Storm Drain Inlet Protection to
protect all proposed and existing storm drain inletsduring construction so that stormwater runoff does
not enter the stormwater conveyance system without
first being filtered or treated (or both) to remove
sediment or other pollutants.
•Clean or remove and replace inlet protection devices
when sediment has filled one-third of the available
storage (unless a different standard is specified by
the product manufacturer).
•Keep all approach roads clean.
•Do not allow sediment and street wash water to enter
storm drains without treatment.
Stabilize Channels and Outlets
Stormwater channels and outlets can themselves
erode unless stabilized with rock or other armoring.
Design, construct, and stabilize all on-site conveyance
channels to prevent erosion as needed. Use BMP C209
Outlet Protection to provide stabilization, including
armoring material adequate to prevent erosion of outlets,
adjacent streambanks, slopes, and downstream reaches
at the outlets of all conveyance systems.
Consider the following additional BMPs:
•C122 Nets and Blankets
•C202 Channel Lining
Control Pollutants
Waste materials, demolition debris, and other
pollutants that occur onsite during construction can
contaminate the stormwater system unless
managed. Cement and related products can modify
the pH of stormwater.
Provide cover, containment, and protection from
vandalism for all chemicals, liquid products, petroleum
products, and other materials that have the potential to
pose a threat to human health or the environment.
Anytime you pour concrete, perform washout of the
concrete trucks following BMP C154 Concrete Washout
Area at designated washout areas only. Locate washout
areas at least 50 ft from sensitive areas such as storm
drains, open ditches, or water bodies, including
wetlands.
Clean contaminated surfaces immediately following any
spill incident. Apply fertilizers and pesticides in a manner
and at rates that will not result in loss of chemical via
stormwater runoff.
Use the following additional BMPs:
•C151 Concrete Handling
•C152 Sawcutting and Surfacing Pollution Prevention
•C153 Material Storage, Delivery, and Containment
Control De-Watering (not shown)
De-watering water extracted from foundations,
vaults, or trenches, has similar characteristics to
stormwater runoff at the site and can cause the
same impacts unless properly managed.
You may discharge clean, non-turbid de-watering, such
as well-point ground water, to systems that are
tributaries to, or directly into, surface waters if the de-
watering flow does not cause erosion or flooding or
interfere with the operation of the stormwater system.
Use the following BMPs:
•C220 Storm Drain Inlet Protection
•C236 Vegetative Filtration
Maintain BMPs (not shown)
All temporary and permanent erosion and sediment
control BMPs must be maintained and repaired as
needed to assure continued performance of their
intended function.
During the dry season, inspect sediment control BMPs
weekly or after a runoff-producing storm event. During
the wet season, inspect BMPs daily. Use BMP C150
Materials on Hand to ensure you are ready for a heavy
rain.
All temporary erosion and sediment control BMPs must
be removed within 30 days after the City determines that
the site is stabilized or after the temporary BMPs are no
longer needed. Trapped sediment must be removed or
stabilized on site. Disturbed soil areas resulting from
removal of BMPs or vegetation must be permanently
stabilized.
Manage the Project (not shown)
Phasing a project, especially when revegetation
occurs as part of each phase, can help prevent the
transport of sediment from the site.
•Fully implement this Construction SWPPP at all
times.
•Modify this Construction SWPPP whenever there is a
change in design, construction, operation, or
maintenance at the construction site that has or could
have a significant effect on the discharge of
pollutants to waters of the state.
•Inspect, maintain, and repair all BMPs as needed to
ensure continued performance of their intended
function.
8
9
10
11
12
Small Site Construc�on SWPPP (002) Updated 5/22/5025 page 6 of 6
Protect Low-Impact Development BMPs
Low-Impact Development techniques can be
damaged if they are compacted or accumulate
sediment during construction.
If there are any Low-Impact Development BMPs planned
for the site:
•Use BMP C103 High Visibility Fence to exclude all
construction and foot traffic from the infiltration, bio-
retention, or rain garden areas.
•Protect all infiltration areas or bio-retention and rain
garden BMPs from sedimentation through installation
and maintenance of erosion and sediment control
BMPs on portions of the site that drain into those
areas.
•Use BMP C233 Silt Fence or C234 Vegetated Strip
to control and avoid introducing sediment onto
permeable pavements. Bury the bottom of the filter
fabric at least 4 inches below the ground surface.
Backfill and tamp soil in place over the buried
portion of the filter fabric, so that no flow can
pass beneath the fence and scouring cannot
occur. Drive or place the fence posts into the ground
at least 18 inches. A 12-inch minimum depth is
allowed if topsoil or other soft subgrade soil is not
present and 18 inches cannot be reached.
•If pavements are fouled with sediments or no longer
pass an initial infiltration test, clean them using
procedures from the Stormwater Manual or the
manufacturer’s procedures.
Consider the following additional BMPs:
•C102 Buffer Zones
•C208 Triangular Silt Dike
•C231 Brush Barries
****************************************************************
I acknowledge that I have read the information
presented to me and agree to abide by the BMP
rules.
______________________ _____________________
Printed name Signature
______________________
Date
****************************************************************
13