Loading...
HomeMy WebLinkAboutPermit File BLd-2019-0061 2804 Oakes Avenue (2)6 ruin: Tim K Garrison tirngC�iimkgarrison.corn Subject: RE: 2804 Oakes Avenue beam removal Nte: August 9, 2019 at 7:56 AM to: Sam Hill sdhill@gwtc.net Hi Sam, AM 12�2019 Removal of the LR loft and associated glulam beams as you describe below is okay. 'I checked this on site prior to the demo and confirm no structural issues. Please feel free to print this for the City if they so request. Also, they may call me any time to discuss. Have a terrific day! Tim K. Garrison, P.E. 2316 Antone Way, Anacortes, WA 98221 email: Tim&@TimKGarrison.com CITY OF ANACORTES Phone and text: 360-7084865 FacebookPage: Tim KGarrisonPLANNING & BUILDING DEPT, Website: TimKGarrison.com APPROVED PLANS Check my backlog and stvWljloyfe. in queue here: https://wwr"M&j6ym/my-sch ADDRESS: dLSSC� ----Original Tim, per our earlier conversation and your site visit: le We have removed the three 6 1/2" x 13" GLB's that were located in the living room of the above referenced location. The beams were attached to the x 18" GLB between the living room wall and the new wall we constructed as part of the added remodel with fabricated hangers. On the opposite wall, the beams were inserted into the existing brick fireplace. There was no physical attatchment at the fireplace wall, the beams sat only in a pocket of removed brick. Per your observation and recommendation, we sheared the wall between the living room/new construction with 1/2" OSB nailed 4"OC with 8D nails as per your 1PW structural shear wall callout schedule from floor to ceiling. This created a double sided shear wall as we had previously sheared the wall in the remodel section as per your callout. This wall is tied into the two 6 3/4" x 19" GLB's in the new remodeled section and per your observation and review, will act as a horizontal shear for necessary structural stability. Samuel Hill Designs in Wood LTD