Loading...
HomeMy WebLinkAboutCOR-2018-Plan Review -may 8 s6c)orxi , Inc. CONSULTING ENGINEERS October 4, 2018 Mr. Steve Lange Project Manager City of Anacortes P.O. Box 547 Anacortes, Washington 98221 SUBJECT: PLAN REVIEW, 30TH AND Q HOTEL CITY OF ANACORTES, SKAGIT COUNTY, WASHINGTON G&O #18443.05 Dear Ivlr. Lange: We received the plans for the 30`h and Q Hotel on October 1, 2018. The site includes two parcels which are currently undeveloped as well as City right-of-way along 30th Street. The proposed project consists of constructing a hotel at the southwest corner of 30th Street and Q Avenue, paved parking, concrete sidewalk, and road and storm drainage improvements. Stormwater runoff from the entire developed site is proposed to be discharged directly to the City storm sewer system. The submittal included: + Civil Plans • Drainage Report Basin Map As -Built Drawings • Pipe Installation Guide + Pipe Flotation Technical Note We offer the following comments to the developer regarding our review of the submitted information. DRAINAGE REPORT General 1, Figure labeling throughout the report is inconsistent, switching from numerical to alphabetical. Please revise to label figures consistently, 3710 168th Street NE, Building B, Suite 210 Arlington, Washington 98223 (360) 454-5490 Fax (360) 454-5491 I'n�r�en oi: re:.acird F.zpai Mr. Steve Lange October 4, 2018 Page 2 2. The overall format of the Drainage Report, with large sections copied from the 2012 Stormwater Management Manual for Western Washington (Manual), is difficult. In general, the Manual should only be referenced when necessary, with proper citation of copied material, and more discussion of the project's compliance with the requirements of the Manual would be useful. Project Description 3. The proposed hotel is identified as being approximately 22,000 square feet. It appears that 22,000 square feet is the approximate size of the entire property, not the size of the hotel. The WWHM output provides conflicting areas as well. Please revise all size references as appropriate. 4. Please clearly identify the existing, new, and replaced perdtous, impervious, and pollutant -generating areas for the project. 5. This section describes the new downstream pipe culvert replacements as being ADS N-12 pipe, yet Sheet CI I shows PVC pipe. The distance between the top of the proposed pipe and the ground level is difficult to decipher from the plans, but we recommend against the use of PVC for the driveway crossings. A minimum of 1 foot of cover should be present for ADS pipe. If this is not achievable, we recommend using ductile iron pipes. 6. The uplift force calculations show a 24-inch pipe; however, the plans and the description provided address new 12-inch pipes, not 24-inch pipes. Additionally, it is unclear as to where this minimum cover is needed. Per Sheet C11, it appears that the pipes will not have a 32-inch minimum cover. Please revise and/or clarify as necessary. Minimum Requirements 7. Under Minimum Requirement #2 (Element 4), the report discussed two 60-inch-diameter catch basins yet the plan sheets show 48-inch diameter. Based on the angles of the incoming pipes to the manhole at Station 4+25, a 60-inch-diameter catch basin seems appropriate. Please revise the report and/or plans as necessary. 8, For Minimum Requirement #3, BMP 5411 (BMPs for Landscaping and Lawn/Vegetation Management) is recommended for this project site. Mr. Steve Lange October 4, 2018 Page 3 9. Per Table 2.5.1 of Volume I of the Manual, Minimum Requirement #5 must meet the Low Impact Development (LID) Performance Standard and BMP T5.13 or List 42. Please provide a detailed feasibility analysis of BMPs in the order shown in List #2. The verbiage currently listed under this section is not applicable to on -site stormwater management as described by Ecology. 10. The report states that Minimum Requirement #6 (runoff treatment) is not required. From the WWHM output, it appears that 0.56 acre of parking is proposed. This is greater than the 5,000-square400t threshold for water quality requirements. It appears this site needs to provide runoff treatment. If not, please clearly identify why Minimum Requirement #6 is not required for this project. If it is required, a description of the runoff treatment facility will be necessary as well as how the facility was sized. 11. The discussion of Minimum Requirement #6 also states that a detention pond will provide treatment for all pollution -generating impervious surface (PGIS). This detention pond is not discussed further in the report or included on the plans or in the WWHM output in Appendix 1. Please revise accordingly. 12. The discussion of Minimum Requirement #7 (Flow Control) is not adequate to determine compliance with the requirements of the Manual. Please revise accordingly. 13. The project does not appear to discharge to any wetlands, either directly or indirectly. The discussion of Minimum Requirement #8 shall clearly identify the applicability of this requirement. CIVIL PLANS General 14. Our review of the electronic PDF plans was interrupted by the fact that numerous items on the plans are illegible, including pipe inverts. The plans include a plethora of labels, many of which clutter the sheets and are not legible or it is unclear what is being labeled. Please revise accordingly so the plans can be reviewed more thoroughly. 15. The plans are missing a legend. Please add a legend that includes all existing and proposed features. Mr. Steve Lange October 4, 2018 Page 4 16. Many of the sheets include colored areas, possibly identifying cut and fill amounts. It is recommended that these layers be turned off. If colors are to be used, please include them in the legend. 17. Multiple details are not legible. Please revise accordingly. 18. The electronic plan sheets are not presented in the correct order. Please reorder the sheets for clarity. Sheet CS 19. A detail showing the construction entrance shall be added. Sheet C6 20. The demolition plan should not show the proposed development. Sheet C1Q 21. It appears that stormwater runoff is not<being collected in the northeast portion of the site. Please review to ensure this water is being captured and treated as necessary. 22. Winged headwalls are likely not necessary for the downstream areas along 30th Street. Please contact me if you have any questions on this plan review. Sincerely, GRAY & OSBORNE, INC. Stacey A. Clear, P.E. SAC/hh Encl. Cricchio, Kevin From: Cricchio, Kevin Sent: Friday, September 28, 2018 10:29 AM To: jas.sho37@gmail.com'; 'James T Schemmer'; 'James T Schemmer, P.E.' Cc: Fyrrce, Groc; Symonds, Justin; Lange, Steve; Nelson, Kait; Kennedy, Jack; Nemeth, Terry; Frisinger, Rob; Shjarback, Eric Subject: 9/20/18 Resubmittal Review - Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel RE: 9/20/18 Resubmittal Review -Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel On September 20, 2018, we received a resubmittal concerning the items listed below. Please note that additional items/ revisions are still needed as follows: 1. As stated below, the building elevations need to clearly show the average original grade and how you are complying with the maximum permitted height in the underlying Commercial Zone. The maximum permitted height in the Commercial Zone (take from average original grade) is 40 feet. Currently the plans show a motel that is greater than a 41 feet. 2. Much more detail on your landscape plan is needed. Six trees are shown. Please clearly show &label proposed understory plantings (shrubs, perennials, etc.) Please label either common name or Genus and species. Native vegetation is preferred. Use of a key may be beneficial as well. A minimum of 10% of the site shall be landscaped. 3. A parking analysis is needed as to how you are complying with AMC Chapter 17.46. How many parking spaces Gil e required by code? How many are provided? 4. Please designate one of the plan sheets as a "Parking Plan." On the parking plan, please show proposed parking lot dimensions. Minimum dimensions must be approved by the city engineer. Please note, that only 1/3 of required parking can be for compact cars per AMC 17.46.010(J). Extraneous layers need to be either turned off or the respective transparency increased. Show this graphically and summarize this information in your parking analysis. 5. On your site plan, please clearly label lot dimensions &property corners. Lot dimensions need to be based a survey of the subject property. Please include a copy of your survey. On the site plan, also show the proposed building. 6. Off-street parking is also required to be landscaped per AMC 17.46.070. How are you complying with this? Show this too on your landscape plan. 7. As stated below, please show lot coverage calculations on the site plan. What is proposed and what is allowed in the Commercial Zone? 8. Steve in Public Works is reviewing your drainage analysis for completeness. I will let you know if there are any revisions needed. When resubmitting, please clearly label. and cloud all revisions on your plans. Additionally please provide a narrative explaining how you have complied to the items listed above. Please note that the subject building permit application is still deemed incomplete. If you have any questions, please let me know. Thanks Kevin Cricchio, AICP, ISA, WPIT I Associate Planner (Certified Arborist Planning, Community & Economic Development Dept. City of Anacortes I P.O. Box 547 1 904 6+h Street I Anacortes, WA 98221 360,293,1937 (work) 1 kevinc@cityofanacortes.ora I www.oityofanacortss.ora My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56. From: Cricchio, Kevin Sent: Tuesday, September 11, 2018 11:43 AM To: 'jas.sho37@gmail.com' <jas.sho37@gmail.com>; 'James T Schemmer' <jt.schemmer@gmail.com>; 'James T Schemmer, P.E.' <jt.schemmer@scgeng.com> Cc: 'Frisinger, Rob'; Fyrrce, Groc <gfyrrce@cityofanacortes.org>; Symonds, Justin <justins@cityofanacortes.org>; Lange, Steve <stevel@cityofanacortes.org>; Nelson, Kait <kaitlynn@cityofanacortes.org>; Kennedy, Jack <jackk@cityofanacortes.org>; Nemeth, Terry <nemetht@cityofanacortes.org> Subject: Incomplete Application - Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel RE: Incomplete Application -Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel Jag, Just following up with you regarding the email below and requested items. Please note that the subject building permit application recently submitted is deemed incomplete effective today. The items below are needed to make the application complete. Therefore since the subject building permit is incomplete, it is not considered vested to current code or current fees and is thus subject to changes in code and fees. Please note, that the items below need to be submitted in full no later than 90 days from the date deemed incomplete [9-11-18] per AMC 19.20.130(B)(2)(b). Thank you. Kevin Cricchio, AICP, ISA, WPIT � Associate Planner � Certified Arborist Planning, Community &Economic Development Dept. City of Anacortes I P.O. Box 547 1 904 6fh Street I Anacortes, VVA 98221 360.293.1937 (work) I kevinc@cityofanacortes.orq I www.cityofanacortes.orq My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56. From: Cricchio, Kevin Sent: Thursday, September 6, 2018 2:44 PM To: 'jas.sho37@gmail.com' ; James T Schemmer; James T Schemmer, P.E. Cc: Frisinger, Rob; Fyrrce, Groc; Symonds, Justin; Lange, Steve; Nelson, Kait; Kennedy, Jack; Nemeth, Terry Subject: Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel 9-6-18 z RE: Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel jag, On May 9, 2017, a pre -application conference was conducted regarding a proposed motel at 3002 "Q" Avenue. Please see the attached summary letter. Then on August 291 20181 we received some application material to construct this proposed motel along with a boundary line adjustment application to consolidate the two underlying platted lots. Additional information is needed however associated with your most recent building permit application submittal as follows: 1. A drainage analysis is required that complies with the 2012 DOE SWMMWW as amended in 2014. Third party review will be required. The applicant/ landowner will be required to reimburse the city for the full cost of this third party review. 2. A commercial building permit application is needed that. is signed by the landowner 3. Structural calculations are needed prepared by structural engineer 4. A "building code analysis" is needed prepared by the project architect 5. SEPA environmental review is required. This entails filling out a SEPA environmental checklist. The cost associated with this is $400.00. 6. The elevations of the building need to show average original grade and how you are complying with the maximum permitted height with the Commercial Zoning District. The maximum permitted height in the Commercial Zone is 40' above average original grade per AMC 17.24.090. 7. A parking plan is needed that shows how you are complying with the minimum number of off-street parking stalls (see attached pre-app summary letter). One off-street parking stall is required for every guest room per AMC 17.46.020. 8. A landscape plan is needed that shows how you are complying with the minimum percent of onsite landscape (see attached pre-app summary letter). 10% of the site must be landscaped + parking areas. 9. Provide lot coverage calculations on the plans and how you are complying with the maximum permitted (see attached pre-app summary letter) 10. Provide a narrative explaining how you are complying with the Commercial Zoning District's building & design standards per AMC 17.24.110 & 17.24.120. 11. The site plan needs to be based on the survey of the subject property with property corners and dimensions shown. The items needed on the site clan are listed here. 12. Please coordinate with the city's plans examiner -Rob Frisinger regarding the required plan review deposit associated with the building permit application submittal. Once the application material requested above has been provided to us, we can begin our review of your building permit application. Please note that once we begin reviewing your building permit application, additional revisions may be requested of you from one or more departments reviewing your application. If you have any questions, please let me know. Thanks. Kevin Cricchio, AICP, ISA, WPIT � Associate Planner � Certified Arborist Planning, Community &Economic Development Dept. City of Anacortes I P.O. Box 547 1 y04 61h Stree, I Anacortes, WA 98221 360.293.1937 (work) I kevinc@cityofanacortes.orq I www.cityofanacortes.ora My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56. 0 Cricchio, Kevin From: Sent: To: Cc: Subject: Attachments: Cricchio, Kevin Thursday, September 6, 2018 2:44 PM jas.sho37@gmail.com'; James T Schemmer; James T Schemmer, P.E. Frisinger, Rob; Fyrrce, Groc; Symonds, Justin; Lange, Steve; Nelson, Kait; Kennedy, Jack; Nemeth, Terry Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel PCED Letter, PRE-2017-0013.pdf RE: Building Permit Application Submittal, Construction of Motel @ 3002 Q Avenue Motel Jag, On May 9, 2017, apre-application conference was conducted regarding a proposed motel at 3002 "Q" Avenue. Please see the attached summary letter. Then on August 29, 2018, we received some application material to construct this proposed motel along with a boundary line adjustment application to consolidate the two underlying platted lots. Additional information is needed however associated with your most recent building permit application submittal as follows: 1. A drainage analysis is required that complies with the 2012 DOE SWMMWW as amended in 2014. Third party review will be required. The applicant/ landowner will be required to reimburse the city for the full cost of this third party review. 2. A commercial building permit application is needed that is signed by the landowner 3. Structural calculations are needed prepared by structural engineer 4. A "building code analysis" is needed prepared by the project architect 5. SEPA environmental review is required. This entails filling out a SEPA environmental checklist. The cost associated with this is )400.00. 6. The elevations of the building need to show average original grade and how you are complying with the maximum permitted height with the Commercial Zoning District. The maximum permitted height in the Commercial Zone is 40' above average original grade per AMC 17.2460906 7. A parking plan is needed that shows how you are complying with the minimum number of off-street parking stalls (see attached pre-app summary letter). One off-street parking stall is required for every guest room per AMC 17.46.020. 8. A landscape plan is needed that shows how you are complying with the minimum percent of onsite landscape (see attached pre-app summary letter). 10% of the site must be landscaped +parking areas. 9. Provide lot coverage calculations on the plans and how you are complying with the maximum permitted (see attached pre-app summary letter) 10. Provide a narrative explaining how you are complying with the Commercial Zoning District's building & design standards per AMC 17.24.110 & 17.24.1209 11. The site plan needs to be b,.,ed on the survey of the subject propeny with property corners and dimensions shown. The items needed on the site plan are listed here. 12. Please coordinate with the city's plans examiner - Rob Frisinger regarding the required plan review deposit associated with the building permit application submittal. Once the application material requested above has been provided to us, we can begin our review of your building permit application. Please note that once we begin reviewing your building permit application, additional revisions may be requested of you from one or more departments reviewing your application. If you have any questions, please let me know. Thanks. Kevin Cricchio, AICP, ISA, WPlT � Associate Planner � Certified Arborist Planning, Community & Economic Development Dept. City of Anacortes I P.O. Box 547 1 904 6th Street I Anacortes, WA 98221 360.293.1937 (work) I kevinc@citvofanacortes.org I www.cityofanacortes.org My incoming and outgoing email messages are subject to public disclosure requirements per RCW 4Z.56. Anaeortes Planning, Community 8z Economic Development Dept. Permit Center P:O. Box 547, Anacortes, WA 982214547 PH (360) 299-1984 Don Measamer, Director of Planning, Commun ly and Economic Development FA.X.(360) 2934938 May 9, 2017 Jag Sandhu 905 201h Street Anacortes, WA 98221 RE: Proposed 35 Unit Hotel; 3UO2 "Q" A�►enue; Parcel #{': Pb0611 & 60612; PRE-2Q17-OQ13 Dear Mr. Sandhu: A pre -application conference was held today regarding constructing a 35-unit hotel on the subject property. The pre -application conference resulted in the following comments: DEPARTMENT OF PLANNING, COMMUNITY &ECONOMIC DEVELOPMENT: 1. The subject property is located in the Commercial {C} Zoning District. Please refer to Chapter 17.24 of the Anacortes Municipal Code {AMC} regarding the Commercial Zoning District's permitted uses, conditional -uses, setback requirements, density, maximum land coverage, maximum building height, & off-street parking requirements. 2. You wish to construct a 35-unit hotel on the subject property. Per AMC § 17.24.020, "overnight accommodations" {i.e., hoteis & motels} are an allowed land use within the Commercial Zoning District. 3. Pursuant to AMC § 17.24.060, there is no setback from adjoining property lines except when abutting residentially zoned properties with no intervening street or alley there shall be a 5400t setback. 4. No critical areas appear to be located either an the subject property or within 300 feet of it. 5. At time of building permit application submittal, a copy of a boundary survey of the subject .property is required. The survey needs to be performed by a Washington State licensed surveyor. 6. At time of building permit application, please provide a narrative as to how you comply with AMC § 17.24.110 and § 17.24.120 regulating building standards and design standards respectively. 7. At time of building permit application submittal, a landscape plan shall be submitted to PCED far review that conforms to AMC Chapter 17.41. In the Commercial Zone, planting Page 1 of 3 areas along street frontages shall be a minimum of ten (10) feet wide with trees planted therein at an average of thirty (30) feet apart per AMC § 17.41.020(D). Ten (10) percent of the gross site area shall be landscaped per AMC § 17.41.020(G). Plants indigenous to Western Washington are preferred. 8. Per AMC § 17.46.020, for hotels and motels one (1) off-street parking space is required fior every guest room. Additionally, off-street parking must be onsite not within the city's right- of-way. The parking lot shall be landscaped per AMC Chapters 17.46 & 17.41. 9. The proposed development will require SEPA environmental review per AMC 18.04.120. 10. The maximum permitted .height in the Commercial Zoning District is forty (40) feet above average original grade pursuant to AMC § 17.24.090. Please show average grade on your elevations and how you meet this requirement. 11. Per AMC § 17:24.080, the maximum permitted land coverage in the Commercial.Zoning District is fifty (50) percent. Please provide lot coverage calculations on your site plan and how you are meet this requirement. 12. At time of building permit application submittal,_ please provide us with a drainage analysis /stormwater plan that complies with the 2012 Department of Ecology Stormwater Management Manual for Western Washington (SWMMWW) as amended in 2014. The drainage analysis and stormwater plan needs to be completed by a Washington State registered civil engineer. The City will require third party review of this drainage /stormwater plan. Prior to building permit issuance, the applicant shall reimburse the city for the .cost. 13. The building will required to be designed by a Washington State registered architect and structural engineer. 14. The alleyway, "W Avenue, and 30 Street need to be developed /improved per Public Works Department requirements. 15. Any dumpsters and recycling will need to be located onsite and designed to meet city dum,pster pad specifications. WATER DEPARTMENT: 16. This may require a backflow double check assembly. 1# you have any questions, please contact Terry Nemeth in the Water Department at (360) 293-1921. PUBLIC WQ:RI(S DEPARTMENT: 17. Requirements from the Public Works Department will be forthcoming. If you have any questions, please contact Steve Lange at (36.0) 661-3468 Page 2 of 3 FIRE DEPARTMENT: 18. Automatic sprinkler system per NFPA 13 is required. 19. Fire Alarm system per NF'PA 72 is required. 20, Fire extinguishers per NFPA 10 are required. 21. Carbon Monoxide detectors per RCW may be required. 22. Fire hydrants and water flow to be provided per IFC appendices B/ 23, Comments are preliminary in nature and may change as additional information is provided. 24. For Fire Department questions, please contact Jack Kennedy at {360) 293-1932. These commentsare preliminary in nature and subject to change based on more detailed information, if you have any questions, please feel free to contact me at (360) 293-1937 or by email at kevinc@cityofanacortes.org. Thank you. Sincerely, c, l� Kevin Cricchio, AICP Associate Planner Page 3 of 3 G, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT ME ¢ IAL & MULTI -FAMILY BUILDING PERMIT APPLICATION 0 2�1$ Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 _- Phone: (360) 293-1901, Fax: (360) 2934938 CI" 'i OF ANACORTES PLEASE REFER TO THE COMMERCIAL &MULTI-FAMILYB UILDING PERMIT CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite #I PARCEL(S) #: 3002 30 TO S:j jkVjkWt%fc A 9 9 22 �fo0lo6l , e�o��2 Subdivision/Lot#: PROJECT VALUATION: $ 4,000,000 w rk u ri`PS A ns iko 2 31415 BL APPLICANT: Phone: EK CS*LN ASARA Lw Sw %3 7D Address (Street, City, State, Zi ): Email Address: 9 DS 20 $ 7Ni�COR7GtCS WA 982Z1S . 5�1 oker ct7 A PROPERTY OWNER: Phone: ZEE A5WA oe U, C, 360. 7703 7D Address (Street, City, State, Zip): Email Address: CONTACT PERSON: Scu rt w�r,�L2 Cojsvc TwGc RLC (05m Sc NiE Phone: R) 3(4>04o 70 8. +386 Address (Street, City, State, Zip): Email Addre s: 0 30TN asT ATE C ZeS wA I BM ' f , sct e4�t�Y'cJ LENDING AGENCY: Phone: Address (Street, City, State, Zip): Email Address: CONTRACTOR: * Phone: Address (Street, City, State, Zip): Email Address Professional License # Exp. Date: *All Contractors do subcontractors must have a valid City ofAnacortes business license prior to doing work in the City. Contact the City's Business License #: Exp. Date: Finance Department at (360) 2994968. PROPOSED WORK: t. - 'cc7m'' . Iiw�pRCJV is ?iU L ow &,Oa+N T i I4owt WO AD m;"Atyrz PROPOSED NEW SQUARE FOOTAGE: Basement SQ': 936 SF I" Floor SQ': 1%(95 $F 2' Floor SQ': 5M3 SF 3' Floor SQ': 613�3 5� 4' Floor SQ': 5013-� g F Garage SQ': 40 (at 5C Other SQ': Retaining Wall: Yes N No ❑ Fire Sprinkler: Yes ® No ❑ Occupancy Group(s): �-. S .2 Occupant Load(s) Type of Construction: V A I declare under penalty of perjury that the information I have provided on this form/application is true, correct, and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Anacortes. Print Name: R - Amb li L1 Owner C$ Agent ❑ (specify): Signature: Date: V Page 1 of 5 Existing Impervious SQ': IMPERVIOUS S p New Impervious SQ: 13 ZZ4 SF Total Disturbed Land/Soil SQ': Total Proposed: Cut: 4p() Cy Fill: i31, New hard surfaces (pervious & impervious) IS Z2A S F Land converted from native vegetation to lawn or landscaping SQ': 3 Z G"7 tr Land converted from native Equipment Type: vegetation to pasture SQ': Appliance/Equipment Information (new and relocated): Total #: Furnace: Gas #o Elec #: Other #: Wall Heater: Gas #: Elec #: Other: #: Location(s): 42 Gas Water Heater: #: ` , Location(s): PTjeA&Asrt N Heat Pump: Elec #: Other #: Air Conditioner /Handler: Elec #: Other: #: Location(s): Radiant /Hydronic Heating: Gas #: Elec #: Other: #: Location(s): Exhaust Fans: Bath #:10,4`LLaundry #: 3 Kitchen #: 2 Other #: �—] Range Hood: #: ype 1 is 2 (Circle which one) Location(s): K ivaw Fireplace: Gas #: >�� Elec #: Other: #: Location(s): t 4 t N Clothes Dryer & Duct: as #: Elec #: Other: #: Location(s): Z Olt Stove/Range/Oven: as #: 1 lec) : Other: #: Location(s): 1,2 Refrigeration Unit: Elec #: Other: #: Location(s): t� Z/S/ •� Ram 6'4 1 Gas Piping/ Outlet(s): #: Location(s): Boiler: Gas #: Elec #: BTUs: Location(s): Other: #: Location(s): TOTAL MECHANICAL OUTLETS: C S Fixture Type (new and relocated): PLUMBING Total #: FIXTURES. Fixture Type (new and relocated): Total #: Water Closet (Toilet): 42. Refrigerator water supply (for water/ice dispenser): 3 Kitchen Sink: Pressure Reduction Valve/Pressure Regulator: Utility Sink: � Water Service Line: 11? 1 Tub: 3 Water Piping:X, Hand Sink: �2, Clothes Washer: 3 Shower: Electric Water Heater: Tank -less? Yes ❑ No Q9 Dishwasher: Backflow Prevention Device: Urinal: Hose Bib: Floor Drain / Floor Sink: 2 Drinking Fountain: ' Hydronic Heat in: Floor ❑ Wall ❑ Grease Interceptor: Other: Other: TOTAL PLUMBING FIXTURES: Page 2 of 5 f � ANWe< PLANNING, COMMUNITY, &ECONOMIC DEVELOPMENT DEPARTMENT COMMERCIAL & MULTI -FAMILY BUILDING PERMIT CHECKLIST Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6`h Street, Anacortes WA 98821 Phone: (360) 2934901, Fax: (360) 2934938 PRE -APPLICATION MEETING? ❑ YES ❑ NO IF YES, FILE #: Plans shall be of sufficient clarity to indicate the location, nature, and extent of the work proposed, and conform to the provisions of the adopted International Codes and City Ordinances, PERMIT TYPE: •� �e X =W ow Q@ �. a CD SUBMITTAL REQUIREMENTS:eD col p Ci The number indicates the number of '� C O copies for submittal (if applicable). ° a. eD CD R° O CD Commercial & Multi -Family Building Permit Application 1 I 1 1 1 1 1 Z. Site Plan Drawn to Scale) 2 2 2 0 2 2 Copy of Boundary Survey 2 2 2 0 2 Z. Building Plans Drawn to Scale 2 2 2 2 2 Z Reduced Site Plan (I I" X 17" 2 2 2 0 2 Z Reduced Floor Plan (I I" X 17" 2 2 2 2 2 2, Structural Calculations (if applicable) 2 2 2 2 2 Energy Code NREC Compliance -including Calculations, 1 1 1 1 1 Lighting, & Commissioning Temporary Erosion & Sediment Control Narrative (13 2 2 2 0 0 Elements of SWPPP) Sek Temporary Erosion and Sediment Control Site Plan SKe.VTC 2 2 2 0 0 Drainage Plan (How the site meets DOE's Stormwater 2 2 2 0 0 Manual) S 2 Landscape Plan SWjMT C R 2 2 2 0 0 2, Parking Plan 5 qVii TC11 2 2 2 0 0 2 Grading Plan/Cut/Fill sWcxie [ C I_ e 1601 e 07 2 2 2 0 0 ul Critical Areas Report if applicable) 1 1 1 0 0 Geotechnical Report if applicable) 1 1 1 0 0 Traffic Impact Analysis if applicable) 1 1 1 0 1 Plan Review Deposit ✓ ✓ ✓ ✓ ✓ Digital Copy of Plans on Flash/CD due at permit issuance ✓ ✓ ✓ ✓ Page 3 of 5 NOTES: l . Handouts and standard details maybe found on the City's Planning, Community, &Economic Development website or can be obtained at city hall during normal business hours. 2. Plans, calculation, &reports prepared by state licensed architects or professional engineers must be stamped and signed by the design professional. 3. The drainage analysis /plan & TESC Plan shall comply with the 2012 Department of Ecology's Stormwater Management Manual for Western Washington (as amended in December 2014). 4. Within 180-days of application submittal refunds are allowed up to maximum of 80% of plan review fee so long as no review has been performed by staff (Per IBC 109.6). The applicant must initiate this refund request by submitting a signed letter to the Building Department. Page 4 of 5 STAFF DETnniv NATION OF COMPLETENESS: Please note, that the subject building permit application will be reviewed by staff for completeness. All %J the items above as listed in the "Commercial & Multi -Family Building Permit Checklist" need to be submitted at time of application submittal unless deemed unnecessary by staff. If staff deems the application incomplete, the applicant will be notified by mail and/or email as to what items and/or revisions are still needed. Additionally, if the application is deemed incomplete, the applicant will have 90-days to submit the requested information per AMC 19.20.130(B)(2)(b). If the requested items and/or revisions are not provided by the deadline [90-days], the application maybe rejected by staff and returned to the applicant along with any unspent application fees per AMC 19.20.130(C)(3)(b). IS OR 1 THE APPLICATION COMPLETE? (CIRCLE ONE) COMPLETE INCOMPLETE If deemed incomplete, what is the date it was deemed incomplete? If fff If deemed incomplete, was it deemed as such at the counter, by letter, or email by letter or email, when was it mailed by USPS or emailed? deemed incomplete at the counter, when was this checklist with items circled (Circle One)? given to the applicant? If deemed incomplete, what is the Wday deadline for resubmittal of requested items and/or revisions? If deemed incomplete, who deemed it as such? (Please include the letter /email in the file detailing what additional items or revisions are still needed). If the application is deemed complete, what is the date it was deemed complete such? & who deemed it as Page 5 of 5