Loading...
HomeMy WebLinkAboutCOR-2019-Stormwater Third Party Review -Cricchio, Kevin From: Sent: To. Cc: Subject: Attachments: Cricchio, Kevin Tuesday, April 30, 2019 3:25 PM jagnfly@gmail.com' Lange, Steve; Frisinger, Rob; Measamer, Don Stormwater Third Party Review -BLD-2018-0594 Anacortes - Invoice 18443.05-1.pdf RE: Stormwater Third Party Review -BLD-2018-0594 Jag, Hello. Attached is an invoice for payment for third party review (stormwater drainage analysis) for the motel/hotel from last year. The amount owing to the city now is $1,172.50. You can pay for this at the Finance Department located here at city hall or by calling the Finance Department. You'll need to reference the building permit —BLD-2018-0594 when you do. Please let me know when paid. Please note, when I receive additional invoices) for third party review for your soon to be resubmitted revised /resubmitted building permit, I will forward these also to you for payment. Let me know if you have any questions. Thanks. Kevin Cricchio, AICP, ISA, WPIT � Senior Planner � Certified Arborist Planning, Community &Economic Development Dept. City of Anacortes P.O. Box 547 904 6th Street Anacortes, WA 98221 360.293.1937 (work) I kevinc@c:ityofanacortes.orq I www.cityofanocortes.orq My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56. 7 f' Gray 8z OsboY-rie, Inc. CONSULTING ENGINEERS October 4, 2018 Mr. Steve Lange Project Manager City of Anacortes P.O. Box 547 Anacortes, Washington 98221 SUBJECT: PLAN REVIEW, 30TH AND Q HOTEL CITY OF ANACORTES, SKAGIT COUNTY, WASHINGTON G&O #18443.05 Dear Mr. Lange: We received the plans for the 30`h and Q Hotel on October 1, 2018. The site includes two parcels which are currently undeveloped as well as City right -of --way along 30th Street. The proposed project consists of constructing a hotel at the southwest corner of 30�' Street and Q Avenue, paved parking, concrete sidewalk, and road and storm drainage improvements. Stormwater runoff from the entire developed site is proposed to be discharged directly to the City storm sewer system. The submittal included: • Civil Plans • Drainage Report • Basin Map • As -Built Drawings • Pipe Installation Guide • Pipe Flotation Technical Note We offer the following comments to the developer regarding our review of the submitted information. D> f: •.. ' . ' � IZ I �e>mc�°ill 1. Figure labeling throughout the report is inconsistent, switching from numerical to alphabetical. Please revise to label figures consistently. "' ^� o , Qe# �-B#tee#�V�-Bui#tli�g BSty+#e 210 Arling#o�Washing#or+982�3�3fi0��54-5498- Fa�(360� 454-5491 ;`',G Primed on recycled paper Mr. Steve Lange October 4, 2018 Page 2 2. The overall format of the Drainage Report, with large sections copied from the 2012 Stormwater Management Manual for Western Washington (Manual), is difficult. In general, the Manual should only be referenced when necessary, with proper citation of copied material, and more discussion of the project's compliance with the requirements of the Manual would be useful. I�v'�uj�ct Descripui®n 3. The proposed hotel is identified as being approximately 22,000 square feet. It appears that 22,000 square feet is the approximate size of the entire property, not the size of the hotel. The WWHM output provides conflicting areas as well. Please revise all size references as appropriate. 4. Please clearly identify the existing, new, and replaced pervious, impervious, and pollutant -generating areas for the project. 5. This section describes the new downstream pipe culvert replacements as being ADS N-12 pipe, yet Sheet C11 shows PVC pipe. The distance between the top of the proposed pipe and the ground level is difficult to decipher from the plans, but we recommend against the use of PVC for the driveway crossings. A minimum of 1 foot of cover should be present for ADS pipe. If this is not achievable, we recommend using ductile iron pipes. 6. The uplift force calculations show a 24-inch pipe; however, the plans and the description provided address new 12-inch pipes, not 24-inch pipes. Additionally, it is unclear as to where this minimum cover is needed. Per Sheet C11, it appears that the pipes will not have a 32-inch minimum cover. Please revise and/or clarify as necessary. P�/I1 nnimum Requirements 7. Under Minimum Requirement #2 (Element 4), the report discussed two 60-inch-diameter catch basins yet the plan sheets show 48-inch diameter. Based on the angles of the incoming pipes to the manhole at Station 4+25, a 60-inch-diameter catch basin seems appropriate. Please revise the report and/or plans as necessary. 8. For Minimum Requirement #3, BMP 5411 (BMPs for Landscaping and Lawn/Vegetation Management) is recommended for this project site. Mr. Steve Lange October 4, 2018 Page 3 9. Per Table 2.5.1 of Volume I of the Manual, Minimum Requirement #5 must meet the Low Impact Development (LID) Performance Standard and BMP T5.13 or List #2. Please provide a detailed feasibility analysis of BMPs in the order shown in List #2. The verbiage currently listed under this section is not applicable to on -site stormwater management as described by Ecology. 10. The report states that Minimum Requirement #6 (runoff treatment) is not required. From the WWHM output, it appears that 0.56 acre of parking is proposed. This is greater than the 5,000-square-foot threshold for water quality requirements. It appears this site needs to provide runoff treatment. If not, please clearly identify why Minimum Requirement #6 is not required for this project. If it is required, a description of the runoff treatment facility will be necessary as well as how the facility was sized.. 11. The discussion of Minimum Requirement #6 also states that a detention pond will provide treatment for all pollution -generating impervious surface (PGIS). This detention pond is not discussed further in the report or included on the plans or in the WWHM output in Appendix 1. Please revise accordingly. 12. The discussion of Minimum Requirement #7 (Flow Control) is not adequate to determine compliance with the requirements of the Manual. Please revise accordingly. 13. The project does not appear to discharge to any wetlands, either directly or indirectly. The discussion of Minimum Requirement #8 shall clearly identify the applicability of this requirement. CIVIL PLANS �• �r it 14. Our review of the electronic PDF plans was interrupted by the fact that numerous items on the plans are illegible, including pipe inverts. The plans include a plethora of labels, many of which clutter the sheets and are not legible or it is unclear what is being labeled. Please revise accordingly so the plans can be reviewed more thoroughly. 15. The plans are missing a legend. Please add a legend that includes all existing and proposed features. Pnn[e:i ��r re���cled {+�?sr Mr. Steve Lange October 4, 2018 Page 4 16. Many of the sheets include colored areas, possibly identifying cut and fill amounts. It is recommended that these layers be turned off. If colors are to be used, please include them in the legend. 17. Multiple details are not legible. Please revise accordingly. 18. The electronic plan sheets are not presented in the correct order. Please reorder the sheets for clarity. 19. A detail showing the construction entrance shall be added. �;�.�.; � 20. The demolition plan should not show the proposed development. 21. It appears that stormwater runoff is not being collected in the northeast portion of the site. Please review to ensure this water is being captured and treated as necessary. 22. Winged headwalls are likely not necessary for the downstream areas along 30th Street. Please contact me if you have any questions on this plan review. Sincerely, GRAY & OSBORNE, INC. �'' r�- c �' G Stacey A. Clear, P.E. SAC/hh Encl. �: P��iletf aii re�.}�cle�1 pzner ENGINEERING CIVIL -STRUCTURAL -PLANNING -SURVEYING RESIDENTIAL HOME DESIGN SEP 2 September 18, 2018 Y OF ANACUFiI ES Kevin Crichio, AICP, ISA, WPIT Associate Planner City of Anacortes RE: Narrative for 3002 30t" Street Hotel Kevin, 17.24.110 Building standards. A. In order to make large new buildings compatible with the scale of existing city development, and create a pedestrian -friendly environment, the apparent size of buildings and parking areas shall be broken down to relate to human scale by the following means: B. If a building facade exceeds fifty feet in length and is within twenty feet of a sidewalk, plaza, courtyard, or similar pedestrian area, it shall be broken down into smaller elements by jogging the wall in or out a minimum of four feet for at least ten feet of length, or by adding an element such as a porch, recessed entry, bay window, projecting trellis or similar substantial architectural feature at least four feet deep by ten feet wide by one story high, at intervals so that no continuous wall plane is more than fifty feet in length. See architectural drawings. C. If a building exceeds thirty feet in height, its apparent height shall be modulated wherever it is within ten feet of a sidewalk, plaza, courtyard, or similar pedestrian area, by adding shorter (twenty feet or less) building elements such as a wing of the building, arcade, trellis, lower roof overhang, horizontal projection at least two feet deep, awning, balcony or other architectural feature to reduce the apparent height to a more human scale. See architectural drawings. D. If a building wall is within twenty feet of a sidewalk, plaza, courtyard, or similar pedestrian area, it shall incorporate human -scale elements such as windows, arcades, lower roof overhangs, small-scale textural and color changes, moldings, balconies, projecting and recessed elements, doorways, landscaped areas, trellises, artwork and/or other small-scale architectural features so that people will not be walking past large blank wall surfaces. See architectural drawings. E. Primary building entrances shall be clearly visible from streets, pedestrian ways and parking areas, with recessed or covered entrance areas to protect people from the rain. Projects shall be designed to facilitate pedestrian access, with pedestrian walkways connecting building entrances to adjacent public ways in locations which provide access to pedestrian street crossings. See architectural drawings. F. Service and loading areas shall be located away from the primary parking and pedestrian areas to minimize conflicts. Dumpsters, loading platforms, storage areas, and similar functions shall be screened from direct view from pedestrian areas by attractive view -obstructing fencing or dense landscaping. So noted. See architectural drawings. Dumpster location will be at COA Public Works Direction. BCHEMMER CON5LJ LTING GROUP PLLC 3C1 3C'" STREET, SUITE C, ANAGORTES, WA. 95221 • (360) 293 - 9CC6 SCHEMM,,A coNs> o4o GRGUP Pac ENGINEERING CIVIL -STRUCTURAL -PLANNING -SURVEYING RESIDENTIAL HOME DESIGN G. Parking lots in this zone shall provide landscaped areas distributed throughout the parking areas, totaling not less than five percent of the parking lot area, in addition to the perimeter landscaping required by subsection 17.46.080(A). In order to limit impervious surface and avoid excessively large parking areas, parking lots in the C zone shall not exceed the minimum number of spaces required for each use under Chapter 17.46 by more than ten percent. (Ord. 2794 § 1 (Att. A), 2008; Ord. 2592 Att. A § 13, 2002) See architectural and civil drawings. Areas for landscaping have been set aside. Native plants approved by the City of Anacortes will be used throughout. 17.24.120 Basic design standards. The following requirements shall apply to a building or complex of buildings exceeding fifty thousand square feet in gross floor area, because of the potential for a large structure to overwhelm and dominate this section of the city, to the detriment of existing uses and smaller businesses: See architectural drawings. The proposed building is 20,949 square feet gross floor area. AMC 17.24.120 does not apply. A. To visually modulate the vast expanses of parking required for a large building, an added two percent of the parking lot areas shall be developed in landscaping, in addition to the basic parking lot landscaping requirement for this zone. The landscaping plan for the project must be approved by the planning commission. B. Parking shall be broken into several smaller parking lots, and buildings shall have entrances on more than one side, to reduce walking distances and to reduce the apparent expanse of the parking lots. C. To visually modulate the greater size of the building, all sides of the building shall either meet the building standards for being within twenty feet of a pedestrian area, or shall be partially screened by landscaped areas not less than five feet in width, with at least one tree for each thirty feet of facade length. (Ord. 2794 § 1 (Att. A), 2008; Ord. 2592 Att. A § 12, 2002) incerely, James T. Schemmer, P.E. SEP202016 u+. C� i'`� OF ANACORiES SC HEMM ER GO NSLJ LTING GROUP PLLC • 301 3OT� STREET, 5uiTe G, ANACORTEs, WA. 95221 • (360) 293 - 9006 � PIT i SEP202018 CITY OF ANACORTES .SEPA ENVIRONMENTAL CHECKLIST Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" onlv when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision - making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals: For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non -projects) questions in Part B - Environmental Elements —that do not contribute meaningfully to the analysis of the proposal. A. Background HELP 1. Name of proposed project, if applicable: Salish Inn 2. Name of applicant: Ek Tera Asara, LLC SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 1 of 15 3. Address and phone number of applicant and contact person: 905 20t11 Street, Anacortes WA 98221 Kuljit & Jag Shoker 360-770-3701 4. Date checklist prepared: 09/12/cols 5. Agency requesting checklist: City of Anacortes 6. Proposed timing or schedule (including phasing, if applicable): Project complete May 1st 2019 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No future additions, expansions, or further activity related to or connected with this Proposal are anticipated. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None Known 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. A BLA has been submitted to COA. 10. List any government approvals or permits that will be needed for your proposal, if known. Commercial Building Permit. ROW permit, Fill & Grade Permit for commercial. Roadway improvements 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 2 of 15 4 Story, 40 room concrete/wood frame hotel with indoor swimming pool, exercise room, one elevator, two stairways. Total Building area 20,949, Sq Ft, Parking 11,012 Sq Ft, Total Lot size 14,964 Sq Ft, Gross area 30,952 Sq Ft 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Parcel # 60611, 60612 - Whitney's 1st to Anacortes, Lots 1,2 and 3, Block 4, "Whitney's First Addition to the City of Anacortes". As per Plat Recorded in Volume 2 of Plats, page 32, records of Skagit County Washington. Section 30, Township 35, Range 02. In Skagit County B. Environmental Elements HELP 1. Earth h)• elpl a. General description of the site: (circle one): Flat, rolling, hilly, steep slopes, mountainous, other 3% Slope Cleared Residential lot. AVG. b. What is the steepest slope on the site (approximate percent slope)? 7% maximum c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. 2-2.5 feet loose organic topsoil, med. stiff to very stiff lean clay (Native Glaciomarine Drift Deposits) to 37ft BGS in boring b-1 where it transitioned to very dense/hard interbedded silty clay. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No SEPA Environmental checklist (WAC 197-11-960) July 201(i Page 3 Of 15 e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Fill must be import from approved source. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. All fill and grade will need to be shored and protected from weather. See Geotest report on soils. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 13,224 Sq Ft or 900. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: TESC Plan has been proposed. Off site drainage and street I mprovements are to be installed first and protected from sedimentation. Retaining walls and foundations will be installed to Geotech and Structural Engineer Specifications. 2. Air hf elpl a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Typical emissions from excavation and other construction heavy equipment. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. There are no potential emissions and/or odors from surrounding land uses that would affect the proposal that are know at this time. c. Proposed measures to reduce or control emissions or other impacts to air, if any: None at this time. 3. Water hf elpl a. Surface Water: juel 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 4 of 15 N/A 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. N/A 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. M� b. Ground Water: hel 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. M�7 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. N/A c. Water runoff (including stormwater): No 1) Describe the source of runoff (including storm water) and method of collection anA disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters? If so, generally describe. MZE SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 5 of 15 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No. The man made conveyance to salt water will be improved. J. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The man made conveyance to salt water has been designed to meet Engineering Standards. 4. Plants hel a. Check the types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other X shrubs Himalayan Blackberry X grass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Site will be cleared and grubbed. The site will have 10% Gross Area of site landscaping installed. c. List threatened and endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Native plants and Street Trees acceptable to the City of Anacortes and property ownership will be installed. e. List all noxious weeds and invasive species known to be on or near the site. Himalayan blackberry SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 6 of 15 5. Animals Ihel a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds, other: Seagulls, Crows &Pigeons mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other None b. List any threatened and endangered species known to be on or near the site. None known. c. Is the site part of a migration route? If so, explain. None known. d. Proposed measures to preserve or enhance wildlife, if any: None at this time. e. List any invasive animal species known to be on or near the site. Rats 6. Energy and Natural Resources hel a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electric and Natural Gas b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: High efficiency appliances and plumbing fixtures will be used throughout the hotel. 7. Environmental Health hf elpl SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 7 of 15 a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. None Known except normal risks typical of heavy equipment during construction. 1) Describe any known or possible contamination at the site from present or past uses. None Known 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. N/A 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project Is development or construction, or at any time during the operating life of the project. Diesel for Heavy equipment 4) Describe special emergency services that might be required. None 5) Proposed measures to reduce or control environmental health hazards, if any: Contractor to manage site to provide optional environmental protection. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Traffic along Q Aven & 30th Street 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. Site will follow hours COA requires to control construction noise. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 8 of 15 3) Proposed measures to reduce or control noise impacts, if any: Site construction to be managed to minimize time and impact. 8. Land and Shoreline Use hel a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. Vacant Land. Street and Alley improvements will provide better access to adjacent commercial use properties. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? No 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: c. Describe any structures on the site. None d. Will any structures be demolished? If so, what? None e. What is the current zoning classification of the site? Commercial f. What is the current comprehensive plan designation of the site? UGA g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. No i. Approximately how many people would reside or work in the completed project? 40 units @ 2 persons per unit with up to 4 works = 84 people SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 9 of 15 j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, n any: NIA �. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The proposal is for a hotel in the Commercial zone for Anacortes; an allowed use. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: N/A 9. Housing hel a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. The Proposed use is a 40 b. Approximately how many units, if any, middle, or low-income housing. None unit Hotel would be eliminated? Indicate whether high, c. Proposed measures to reduce or control housing impacts, if any: N/A 10. Aesthetics hel a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 41' 7-1/4" Exterior is AFC cladding w/horizontal cedar or Hardiplank siding. b. What views in the immediate vicinity would be altered or obstructed? Views from the commercial building to the West would be obstructed. I Proposed measures to reduce or control aesthetic impacts, if any: SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 10 of 15 Design has been provided by an architect to match Northwest Design. 11. Light and Glare IuLlpj a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Light will reflect from windows to the East and West at daybreak and sunset b. Could light or glare from the finished project be a safety hazard or interfere with views? I� c. What existing off -site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None Proposed 12. Recreation hel a. What designated and informal recreational opportunities are in the immediate vicinity? Playground at 32nd & Q. Bowling Ally b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: The project improves access to recreational. uses w/sidewalks and street improvements 13. Historic and cultural preservation hf elpl a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. None Known SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 11 of 15 b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. None c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. The site has been cleared and is surrounded by commercial and residential strctures that to our knowledge did not encounter any registered archialogical discoveries. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. N/A 14. Transportation hel a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. 30th Street serves the site from R Avenue. Q Ave serves the site from the North and South. 30th Street will be improved to commercial ave to the West. b. Is the site or affected geographic area currently served by public transit? If so, generally describeA If not, what is the approximate distance to the nearest transit stop? No. 20 Blocks, 10th and Q ave is the nearest Skat bus stop. c. How many additional parking spaces would the completed project or non -project proposal have? How many would the project or proposal eliminate? Would have 42 parking spaces and none eliminated d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Yes, Q street wil be improved to 38' wide with curb and gutter - both sides and sidewalk on one side. 30th street % mprovement with sidewalk on one side. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 12 of 15 e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. None 80.5 81 vtpd Guest am .8X40 = 32.4 Employee am 1.01X7 = 7.07 Pm .83X40 = 33.2 pm 1.11X7 = 7.77 f. How many vehicular trips per day would be generated by the completed projector proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? 80.5 81 vtpd Guest am .8X40 = 32.4 Employee am 1.01X7 = 7.07 Pm .83X40 = 33.2 pm 1.11X7 = 7.77 g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: Off site improvements to 30t'' Street and Q Ave. will enhance transportation movements in the vicinity. 15. Public Services hf elpl a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The use is a 4 Story Hotel. Increases in public services are consistant with the expected use for the property. b. Proposed measures to reduce or control direct impacts on public services, if any. The building proposed will be sprinklered and will have Fire apparatus hookup installed. Addintionally a Fire Hydrant will SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 13 of 15 be installed at a location designated by the Anacortes Fire Department and the City of Anacortes Water Department. 1o. Utilities hf elpl a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Same as Above C. Signature HELP The above answers are true anq complete to the best of my knowledge. I understand that the lead agency is relying on them make itjs-de"ision. Signature: - Name of signee y Position and Agency/Organiz tion Date Submitted: D. Supplemental sheet for nonproject actions HELP SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 14 of 15 (IT IS NOT NECESSARY to use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; pro- duction, storage, or release of toxic or hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demands) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 15 of 15