Loading...
HomeMy WebLinkAboutPermit File BLD-2020-0227 1505 Harbor View Court (5)Affordable Washington Backflow Testing (360) 863-3784 BACKFLOW PREVENTION ASSEMBLY TEST REPORT WATER PURVEYOR Anacortes ACCOUNT # ASSEMBLY ID/FILE #/UTILITY DEVICE # Meter # NAME OF PREMISE Progressive Design Builders Commercial ❑ Residential W SERVICE ADDRESS 2718 Geer Lane Anacortes ZIP 98038 CONTACT PERSON Steve Smith PHONE (541) 740-2948 LOCATION OF ASSEMBLY In Box Left side of Foundation Behind Fence DOWNSTREAM PROCESS Irrigation System DCVA W RPBA ❑ PVBA ❑ OTHER NEW INSTALL W EXISTING ❑ REPLACEMENT ❑ REMOVED ❑ OLD SERX APPROVED ASSEMBLY? YES ❑d NO ❑ PROPER INSTALLATION? YES ❑V NO ❑ MAKE OF ASSEMBLY Febco MODEL 850 SERIAL NO. HF54519 SIZE 1" DCVA / RPBA DCVA / RPBA RPBA PVBA / SVBA INITIAL CHECK VALVE NO.1 CHECK VALVE NO.2 AIR INLET TEST OPENED AT PSID CLOSED TIGHT d❑ CLOSED TIGHT ❑� OPENED AT PSID PASSED #1 CHECK PSID LEAKED ❑ LEAKED ❑ DID NOT OPEN FAILED ❑ 2.2 PSID 2.1 PSID AIR GAP OK? CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART CHECK VALVE NEW ❑ ❑ ❑ ❑ ❑ U HELD AT PSID PARTS ❑ ❑ ❑ ❑ ❑ ❑ LEAKED ❑ ❑ ❑ ❑ ❑ ❑ F-1 AND ❑ ❑ ❑ ❑ ❑ ❑ CLEANED ❑ REPAIRS REPAIRED ❑ TEST AFTER CLOSED TIGHT ❑ CLOSED TIGHT ❑ RV EXERCISED ❑ AIR INLET PSID REPAIRS LEAKED ❑ LEAKED ❑ OPENED AT PSID PASSED ❑ FAILED ❑ PSID PSID #1 CHECK PSID CHK VALVE PSID AIR GAP INSPECTION: SUPPLY PIPE DIAMETER SEPARATION PASS ❑ FAIL ❑ DETECTOR METER READING LEFT SERVICE AS FOUND Isolation valve: Open ❑d Closed ❑ SOV#1: Open ❑d Closed ❑ SOV#2• Open i] Closed ❑ REMARKS: TESTERS SIGNATURE: "UCD -LINE PRESSURE 51 PSI CONFINED SPACE? No CERT. NO. B5134 DATE 8/28/2021 TESTERS NAME PRINTED David Foy TESTERS PHONE # (360)333-2057 REPAIRED BY: LIC NO. DATE FINAL TEST BY: CERT. NO. DATE CALIBRATION DATE 02-26-2021 GAUGE # 03161194 MODEL Midwest 845 SERVICE RESTORED YES 0 NO ❑ I certify that this report is accurate, and I have used WAC 246-290-490 approved test methods and test equipment. Affordable Washington Backflow Testing (360) 863-3784 BACKFLOW PREVENTION ASSEMBLY TEST REPORT WATER PURVEYOR Anacortes ACCOUNT # ASSEMBLY ID/FILE #/UTILITY DEVICE # Meter # NAME OF PREMISE Progressive Design Builders Commercial ❑ Residential W SERVICE ADDRESS 1505 Harbor View Ct Anacortes ZIP 98038 CONTACT PERSON Steve Smith PHONE (541) 740-2948 LOCATION OF ASSEMBLY In Box Right of Entry at Foundation DOWNSTREAM PROCESS Irrigation System DCVA ke RPBA ❑ PVBA ❑ OTHER NEW INSTALL W EXISTING ❑ REPLACEMENT ❑ REMOVED ❑ OLD SERX APPROVED ASSEMBLY? YES ❑d NO ❑ PROPER INSTALLATION? YES ❑V NO ❑ MAKE OF ASSEMBLY Febco MODEL 850 SERIAL NO. HF79009 SIZE 1" DCVA / RPBA DCVA / RPBA RPBA PVBA / SVBA INITIAL CHECK VALVE NO.1 CHECK VALVE NO.2 AIR INLET TEST OPENED AT PSID CLOSED TIGHT d❑ CLOSED TIGHT ❑� OPENED AT PSID PASSED #1 CHECK PSID LEAKED ❑ LEAKED ❑ DID NOT OPEN FAILED ❑ 2.3 PSID 2.6 PSID AIR GAP OK? CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART CHECK VALVE NEW ❑ ❑ ❑ ❑ ❑ U HELD AT PSID PARTS ❑ ❑ ❑ ❑ ❑ ❑ LEAKED ❑ ❑ ❑ ❑ ❑ ❑ F-1 AND ❑ ❑ ❑ ❑ ❑ ❑ CLEANED ❑ REPAIRS REPAIRED ❑ TEST AFTER CLOSED TIGHT ❑ CLOSED TIGHT ❑ RV EXERCISED ❑ AIR INLET PSID REPAIRS LEAKED ❑ LEAKED ❑ OPENED AT PSID PASSED ❑ FAILED ❑ PSID PSID #1 CHECK PSID CHK VALVE PSID AIR GAP INSPECTION: SUPPLY PIPE DIAMETER SEPARATION PASS ❑ FAIL ❑ DETECTOR METER READING LEFT SERVICE AS FOUND Isolation valve: Open ❑d Closed ❑ SOV#1: Open ❑d Closed ❑ SOV#2• Open i] Closed ❑ REMARKS: TESTERS SIGNATURE: "UCD -LINE PRESSURE 100 PSI CONFINED SPACE? No CERT. NO. B5134 DATE 8/28/2021 TESTERS NAME PRINTED David Foy TESTERS PHONE # (360)333-2057 REPAIRED BY: LIC NO. DATE FINAL TEST BY: CERT. NO. DATE CALIBRATION DATE 02-26-2021 GAUGE # 03161194 MODEL Midwest 845 SERVICE RESTORED YES 0 NO ❑ I certify that this report is accurate, and I have used WAC 246-290-490 approved test methods and test equipment.