HomeMy WebLinkAboutPermit File BLD-2021-0095 4401 Oakes Avenue (2) ot CODE Cp
r -w G1 94, 4/. Storm Water Minimum Requirements #2
rr. ENGINEERING DEPARTMENT
k,� 7 ty 904 Cth Street Anacortes,WA 98221
+ �' ��¢r ,�CO� boa www.anacorteswa.gov
C 0 g to FIELDg'45ec4'
Official Use Only: (Information to Inspectors)
Required Storm Water Facility and other related requirements:
High sediment discharge potential 125.
Combined new impervious surface is within the 9310 sq ft for both lots proposed.
Project Address: 4401 Oakes Ave Anacortes,Wa.98221 Submittal Date: 1/28/2021
Parcel Number: TBD Revision Number:
Permit Number: Acceptance Date (COA): 1/29/2021
Reviewer: Rob F.
FRONT OF REPORT
Submittal Checklist:
o TAB 1 - Drainage Analysis — Minimum Requirement #2
o APPENDIX 1 - Survey performed by a Professional Land Surveyor
o APPENDIX 2 - Model Soil Management Plan for BMP T5.13
o APPENDIX 3 - Determining Construction Site Sediment Damage Potential (Appendix 7)
o APPENDIX 4 - Site Plan with all applicable information (Minimum Size 11x17 — 30 scale)
o APPENDIX 5 - Documented Site Photos (North, South, East and West)
Project Description: (What is it you are looking to do? Provide details regarding, but not limited to, Lot SF,
Home SF, New and Replaced Hard Surface)
I want to build a 2,830 sqft home on this 10,910 sqft lot.The total house foot print will be 2,379.The new and replaced hard surface is 3,892 sqft.
Existing Site Conditions Summary:
(Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography,
vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed,
Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction PhasinglSequence)
There has been no previous permits on this lot.The site slopes from the back southeast corner of the site to the northwest corner at an average of 7%.
The site is grass with no trees.There are no critical areas identified on or near thie site.The lot south has a single family home with storm water
collected and directed to an existing8"strom pipe that extends down the east side of the sitein an existing storm and sewer easement and conveyed to
the Oakes Ave drainage system.Also an existing perforated pipe is located along the west property line that terminates in the northwest corner low point
of the property in an existing 8'deep 6'square dry well.
Version Date: December 19, 2018
Developed Conditions Summary:
(Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard
surfaces , proposed contours)
The submittal is for a single family home with a common access driveway also shared with 4317, 4319, Oakes Ave.The site plan
shows the layout of the home and driveway, sidewalks, patio for a total of 3,892 sqftof new and replaced hard surfacing. The
southeast corner of the lot will be cut up to 5'the the northwest corner will be filled approximately 5'All new concrete surfacing will be
sloped to a catch basin.The storm drainage for the lot already existsand currenty connects to the existing enclosed storm system in
Oakes Ave.A significant portion of the of the lot will be graded to accomodate the home and driveway.An existing utility easement for
storm, sewer,water, and dry utilities extends up the east side of the lot.
Site Sediment Transport Score: Total Points (High\Low) (See Determining Construction Site
Sediment Damage Potential (Appendix 7)
Complete the Applicability Requirements— Flow Chart (Figure 1-2.4.1 Attached, Figure 1-2.4.2 Attached
and Figure 1-2.5.1 Attached)
- Highlight the path and attach
DOE Stormwater Management Manual Minimum Requirements: (MR#1 to MR#5 only).
Refer to the 2012 Department of Ecology Manual, as amended in 2014 for further required information.
Version Date: December 19, 2018
Start Here
1 _
Does the site have 35% Yes See Redevelopment Minimum
or more of existing Requirements and Flow C h3
impervious coverage-'v (Figure I-2.4.2)_
Na
Does the project convert 3;
T acres or more of vegetation to
Does the project result in lawn or landscaped areas. or
5000 square feet. or Na convert 2.5 acres or more of
greater. of new plus native vegetation to pasture_
eplaced hard surface - -
area? V
�a
Yes
Yes Does the project result in 2.000
T square feet, or greater, of new plus
replaced hard surface area?
All Minimum Requirements
apply to the new and replaced
hard surfaces and converted
vegetation areas. Yes Na
■
Does the project have land
Minimum Requirements #1 disturbing activities of 7.000
through #5 apply to the new Yes square feet or greater?
and replaced hard surfaces
and the land disturbed. No
■
Minimum Requirement #2 '
applies.
Figure I-2.4:1
Flow Chart for Determining Requirements for
New Development
DEPARTMENT OF Re. ed..Une►01!
ECOLOGY ' a}ease see nrtpiiwrvw ecy.Wa.goivcooyigrr.r,rm Tar copyngnt notice Including permisslois.
State 0' Vi 3srlington flt3t0r Ot IIdOIIIt4.aid dlrclarrer.
version pate: uecemoer w, Lu'It5
TAB 2 (MINIMUM REQUIREMENT#2)
• 1-2.5.2 Minimum Requirement#2 — Construction Stormwater Pollution Prevention Plan (SWPP)
- All projects are required to complete Minimum Requirement 2.
- Refer to the 13 Elements of the SWPP (See document below, complete and attach)
- See attached Table 4.1.1, Table 4.2.1 and Table
- Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions,
Waterways and Runoff/Stormwater Detention Calculations.
Version Date: December 19, 2018
Table 4.1.1 Source Control BMP's by SWPPP Element
Element#1 Element#2 E lement 113
Element#5 Element#6 Element#9 Element#11 Element#12
BMP or Element Name Preserve Establish Stabilize Protect Control Maintain Manage the Protect Low
VegetntionlMark Construction Sorts Slopes Pollutants BMPs Project Impact
Clearino Limps Access Development
BMP C101: Preserving Natural Vegetation V
BMP C102:Buffer Iones V V
BMP C103:High Visibility Plastic or Metal
Fence
BMP C105: Stabilized Construction
Entrance 1 E xit •
BMP C106: Wheel Wash +/
BMP C107: Construction RoadiParkirg V
Area Stabilization
SMP C120:Temporary and PerrrBrrent V
Seeding
BMP C121: Mulching V
BMP C122: Nets and Blankets V V
BMP C123: Plastic Covering 1
BMP C124: Sodding V
BMP C125: Topsoiling 1 Composting V
BMP C126: Polyacrylarride for Soil Erosion V
Protection
BMP C130: Surface Roughening J V
BMP C131: Gradient Terraces V V
BMP C140: Dust Control
BMPC150: Materials On Hand V V
BMP C151: Concrete Handliig V
BMP C152: Sawcutting and Surfacing
Pollution Prevention
BMP C153: Material Delivery,Storage and
Containment
BMP C154: Concrete Vtbshout Area V
BMPC160: Certified Erosion and V V
Sediment Control Lead
BMP C162:Scheduling V
Version Date: December 19, 2018
Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element
— ISSeas*64 Bement id Element 413
Demerit 13 Element 46 Element NT Element 09 Element ate
WWI 51401120 Prole-et I.aw
BIIP Or Element Nem Control Protoct Plotect Control Control De-
Ftoatt Rates Slopes CluSlopes Orin Inlets annO� Pollutants WtrterInp Impact
Controls and Outlets 3erelopment
g11 P C2i}p: Interceptor Dille and Swale J /
811P C2G1: Grave-lr:ed Channels +/
— — r -
AMP C202;Channel Lining t/
AMP C 2R3: Wator Bars J J
AMP C204: Pipe Slope Drains 1
LIMP C206: Subsurface Orates �I
AMP C2136: Level Spreader r/
AMP C2IJ1 Check Darns
AMP CMS' Triangular Sant Cite laeotaxtl. - J
E r►caeed Cheek Derr
•
AMP C2110: Outlet Protection J
BMP C220: Storm Orate Inlet Prole$QR r
BMP C231: Brusly Sorrier
BMP C232. QrmV,I Fitter Berm tiI
AMP C233: Slit fence J .I
BMP C234: VegetatW Strip J ,I
BMP C236: Wattles
BM C236: Vegitetive Filtration
BMP C240: Sedirnont Trap
AMP C211: Temporary Sediment Pond J f
AMP C260: Construction Storm seter /
Cherries'Treatment
-.--
AMP C251:COnstrucllon store eeter d
F IIlrallan
AMP C252 High pH NeutralleatIon lisinp
CO
=
AMP C253:pH Control for Hlgh pit Witter
Version Date: December 19, 2018
13 Elements of SWPPP
(Construction Stormwater Pollution Prevention Plan)
Please check off boxes to show that each element has been read and understood. Provide details where
applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the
correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington
(SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic
Development Department, as well as under Stormwater on the Engineering Division of Public Work's page.
Owner Name:Chris Felt
Site Address:4401 Oakes Ave Anacortes,Wa.98221
Prepared By: Chris Felt
The Stormwater checklist or building permit determined that:
❑ The 13 elements must be addressed V These elements must be addressed
for construction activity adding under for construction activity adding 2,000
2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area.
This means that an attached narrative
and site plan are required with this
document.
Under each element, explain the best management practices (BMPs) used or justify reasoning for
those that will not be used. If needed, please attach a narrative to further explain plans or justification.
ELEMENT 1: Preserve Vegetation/Mark Clearing Limits
Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing
limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area.
❑ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum
degree practical.
A high visiblity construction fence BMP C103 will be installed at the perimeter of the construction site except if an existing fence already exists or were
silt fence is used.BMP will be installed as first step of construction.BMP to be monitored daily and repaired as needed.
Version Date: December 19, 2018
ELEMENT 2: Establish Construction Access
Limit construction vehicle access and exit to one route, if possible.
❑ Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize
tracking onto roads.
❑ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in
preventing tracking sediment onto roads.
n If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more
frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or
pick up and transport the sediment to a controlled sediment disposal area.
Conduct street washing only after sediment is removed in accordance with the above bullet.
❑ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging
into systems tributary to waters of the State.
The construction entrance will be limited to one location at the top of the existing concrete driveway on the northeast corner of the lot with BMP C 105 or
C107(Construction Entrance).Any dirt or mud that is tracked onto the roadway will be cleaned immediately.
ELEMENT 3: Control Flow Rates
❑ Protect properties and waterways downstream of development sites from erosion and the associated
discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater
runoff from the project site.
❑ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities
as one of the first steps in grading. Assure that detention facilities function properly before constructing
site improvement (e.g. impervious surfaces).
If permanent infiltration ponds are used for flow control during construction, protect these facilities from
siltation during the construction phase.
BMP C233,Silt fence will be installed along the west and the north downslope perimeter of the construction site.The majority of the site will be disturbed.
Version Date: December 19, 2018
ELEMENT 4: Install Sediment Controls
Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge
of pollutants.
❑ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in
grading. These BMPs shall be functional before other land disturbing activities take place.
Minimize sediment discharges from the site. The design, installation and maintenance of erosion and
sediment controls must address factors such as the amount, frequency, intensity and duration of
precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of
soil particle sizes expected to be present on the site.
❑ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment
removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility.
Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet
the flow control performance standard in Element#3, bullet#1.
❑ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of
juvenile salmonids attempting to enter off-channel areas or drainages.
❑ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to
increase sediment removal, and maximize stormwater infiltration.
Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid
discharging sediment that is still suspended lower in the water column.
BMP C233,Silt Fence will be installed along the west and north downslope perimerter of the construction site.To be installed prior to the start of
construction. BMP to be monitored daily and repaired as needed.BMP C162 Scheduling.
ELEMENT 5: Stabilize Soils
Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable
BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic
covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early
application of gravel base early on areas to be paved, and dust control.
❑ Control stormwater volume and velocity within the site to minimize soil erosion.
❑ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize
erosion at outlets and to minimize downstream channel and stream bank erosion.
❑ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent
erosion.
o During the dry season (May 1 —Sept 30): 7 days
o During the wet season (Oct 1 —Apr 30): 2 days
Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather
forecast.
❑ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be
Version Date: December 19, 2018
located away from storm drain inlets, waterways, and drainage channels.
^%1 ivii �irTrgi>�edtli.amount of soil exposed during construction activity.
Minimize the disturbance of steep slopes.
n Minimize soil compaction and, unless infeasible, preserve topsoil.
Stabilize exposed and unworked soils by appliction of effective BMPs that pervent erosion.Applicable BMPs include,but are not limited to:temporary
and permanent seeding,sodding,mulching,and plastic covering per BMP C123 on soils stockpiles.BMP to be monitored daily and repaired as needed.
Refer to Table 4.1.1 in MR#2.
ELEMENT 6: Protect Slopes
n Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include,
but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope
steepness, and roughening slope surfaces (Ex: track walking).
❑ Divert off-site stormwater (run-on) or ground water away from slopes and disturbed areas with
interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from
stormwater generated on the site.
At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion.
o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10-
minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition.
Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff
model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing
land cover condition for predicting flow rates from tributary areas outside the project limits. For
tributary areas on the project site, the analysis must use the temporary or permanent project
land cover condition, whichever will produce the highest flow rates. If using the Western
Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as
"landscaped" area.
o Where 15-minute time steps are available in an approved continuous runoff model, they may be
used directly without a correction factor.
n Place excavated material on the uphill side of trenches, consistent with safety and space
considerations.
Place check dams at regular intervals within constructed channels that are cut down a slope.
Consider soil types and its potential for erosion.
Stabilize soils on slopes, as specified in Element 5.
❑ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both
mulching and straw erosion control blankets.
The site has an average slope of 9%and slope protection will be installed as needed during and after excavation of the house site with plastic sheeting
and/or other metheods depending on the site conditions.
Version Date: December 19, 2018
ELEMENT 7: Protect Drain Inlets
n Protect all storm drain inlets made operable during construction so that stormwater runoff does not
enter the conveyance system without first being filtered or treated to remove sediment.
❑ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available
storage (unless a different standard is specified by the product manufacturer).
❑ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the
conveyance system without first being filtered or treated to remove sediment.
Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains
without prior and adequate treatment unless treatment is provided before the storm drain discharges to
waters of the State.
❑ Inlets should be inspected weekly at a minimum and daily during storm events.
Per detail 1-40.20-00 Strom Drain Inlet protection devices will be installed at existing catch baisn in the immediate vicinity of the project.To be installed
prior to the start of any construction Nearest CB is at the base of the existing concrete driveway at Oakes Ave. BMP to be monitored daily and repaired
as needed.
ELEMENT 8: Stabilize Channels and Outlets
Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following
expected peak flows:
o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in
Element 6, above.
Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent
streambanks, slopes, and downstream reaches at the outlets of all conveyance systems.
❑ The best method for stabilizing channels is to completely line the channel with a blanket product first,
then add check dams as necessary to function as an anchor and to slow the flow of water.
No storm water runoff will be conveyed off site via channels,swales,or streams.
Version Date: December 19, 2018
ELEMENT 9: Control Pollutants
❑ Design, install, implement, and maintain effective pollution prevention measures to minimize the
discharge of pollutants.
Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site
in a manner that does not cause contamination of stormwater.
❑ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum
products, and other materials that have the potential to pose a threat to human health or the
environment. On-site fueling tanks must include secondary containment. Secondary containment
means placing tanks or containers within an impervious structure capable of containing 110% of the
volume contained in the largest tank within the containment structure. Double-walled tanks do not
require additional secondary containment.
❑ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and
control measures. Clean contaminated surfaces immediately following any spill incident.
❑ Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents
discharge to surface water, such as closed-loop recirculation or upland land application, or to the
sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not
include wastewater from concrete washout areas.
❑ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of
chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and
procedures.
❑ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this
contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete
washing and curing waters, waste streams generated from concrete grinding and sawing, exposed
aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust
the pH of stormwater if necessary to prevent violations of the water quality standards.
❑ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas
only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or
streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete
spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land
applications for discharging wastewater from concrete washout areas.
Obtain written approval from Ecology and provide to the City before using chemical treatment other
than CO2 or dry ice to adjust pH.
❑ Woody debris may be chopped and spread on site.
❑ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel
tank drain down and removal, and other activities which may result in discharge or spillage of pollutants
to the ground or into stormwater runoff using spill prevention measures, such as drip pans.
❑ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs
may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle.
Per BMP C 154 a Concrete Washout Area is to be installed onsite to capture contaminated water from concrete washouts.To be installed prior to
foundation/concrete installation.BMP to be monitored daily and repaired as needed.Contractor is to provide spill prevention kit when excavation and
concrete crews are on site.
Version Date: December 19, 2018
ELEMENT 10: Control De-Watering
❑ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to
stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap
or sediment pond.
❑ Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to,
or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow
does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do
not route clean dewatering water through stormwater sediment ponds. Note that"surface waters of the
State" may exist on a construction site as well as off site; for example, a creek running through a site.
❑ Handle highly turbid or contaminated dewatering water separately from stormwater.
❑ Other treatment or disposal options may include:
1. Infiltration
2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that
does not pollute state waters.
3. Ecology-approved on-site chemical treatment or other suitable treatment technologies.
4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other
option.
5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized
dewatering.
❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam
can create highly turbid or contaminated dewatering water.
❑ Discharging sediment-laden (muddy) water into waters of the State likely constitutes a violation of water
quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration
and preserving vegetation.
If dewatering is needed all discharge will be directed to temp.sed.trap BMP C240 prior to discharge to the city storm drainage system.The sediment
trap will be designed for a typical 4,600 sqft impervious area or 0.11 acres where the developed 2 year flow is 0.03 cfs X 2080 sf/cfc flow=62 sf surface
area plan or 8'x8'square surface pond area minimum.
ELEMENT 11: Maintain BMPs
❑ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to
assure continued performance of their intended function in accordance with BMP specifications.
Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site
stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment
Version Date: December 19, 2018
control BMPs are bio-degradable and designed to remain in place following construction such as
compost socks.
❑ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and
compaction. All BMPs that are to remain in place following completion of construction shall be
examined and placed in full operating conditions. If sediment enters the BMPs during construction, it
shall be removed and the facility shall be returned to the conditions specified in the construction
documents.
❑ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from
removal of BMPs or vegetation.
BMP to be monitored daily and repaired as needed and/or as required by the city of Anacortes.Weekly reports are required to be submitted to the
building department.
prior to the stof any constrution. Nearest CB is at the base of the existing concrete driveway at Oakes Ave.BMP to be monitored daily and repaired
ELEMENT 12: Manage the Project— Projects subject to Minimum Requirements 1-9 must have a Certified
Erosion and Sediment Control Lead (CESCL)for site inspections. Projects subject to Minimum Requirements
1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the
CESCL or inspector, who shall be present on-site or on-call at all times.
❑ Phase development projects to the maximum degree practicable and take into account seasonal work
limits to prevent soil erosion and prevent transporting sediment from the site during construction.
Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued
performance of their intended function.
❑ Maintain, update, and implement the SWPPP.
❑ Clearing and grading activities for developments shall be permitted only if conducted using an approved
site development plan (e.g., subdivision approval).
❑ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if
shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of
the following:
1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to
receiving waters.
2. Limit activities and the extent of disturbed areas.
3. Proposed erosion and sediment control measures.
Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has
the authority to take enforcement action per AMC 19.76 Stormwater.
❑ The following activities are exempt from the seasonal clearing and grading limitations:
1. Routine maintenance and necessary repair of erosion and sediment control BMPs;
2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or
result in the removal of the vegetative cover to soil
3. Activities where there is 100% infiltration of surface water runoff within the site in approved and
installed erosion and sediment control facilities.
Version Date: December 19, 2018
BMP to be monitored daily and repaired as needed and the responsibility of the owner.
ELEMENT 13: Protect Low Impact Development BMPS
n If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the
Manual for requirements.
No LID BMP are proposed.
1/27/2021
Ap atn$Ifinatkuseii discharge will be directed to temp.sed.trap BMP C20311kbr to discharge to the city storm drainage system.The sediment
Version Date: December 19, 2018
TAB 5 (MINIMUM REQUIREMENT#5)
• Minimum Requirement#5—On-site Stormwater Management
All sites are required to utilize BMP T5.13 — Post Construction Soil Quality and Depth.
For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that
is considered feasible. No other on-site Stormwater Management BMP is necessary for that surface.
Feasiblity shall be determined by evaluation against:
1. Design criteria, limitations and infeasiblity criteria identified for each BMP in this manual, and;
2. Competing needs criteria listed in Chapter V-5— On-site Stormwater Management.
Lawn and Landscaped Area:
• BMP T5.13: Post-Construction Soil Quality and Depth. (Attach Detail in Report)
Refer to this site for requirements and specifications. All projects are required to utilize this BMP.
http://www.soilsforsalmon.org/pdf/Soil BMP Manual.pdf
See below for the "Model Soil Management Plan for BMP T5.13" to be submitted with Drainage
Report and Application Material.
Version Date: December 19, 2018
IMP to be monitored
PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age# of pages
Complete all information on page 1;only site address and permit number on additional pages.
Site Address/Lot No.:
Permit Type: Permit Number:
Permit Holder: Phone:
Mailing Address:
Contact Person: Phone:
Plan Prepared By:
ATTACHMENTS REQUIRED (Check off required items that are attached to this plan)
Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required)
_New planting beds and turf areas(amendment required)
Type of soil improvement proposed for each area
_ Soil test results(required if proposing custom amendment rates)
Product test results for proposed amendments
—
AREA# (should match Area#on Site Plan)
PLANTING TYPE Turf _Undisturbed native vegetation
Planting Beds _Other:
SQUARE FOOTAGE OF THIS AREA: square feet
SCARIFICATION inches(depth)of scarification needed to achieve finished total 12"loosened depth.
Subsoil will be scarified
PRE-APPROVED inches of compost or imported topsoil applied
AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT:
Topsoil import =cu.yards per 1,000 sq. ft.
_Amend with compost X ,000s sq.ft. in this area
Stockpile and amend =cubic yards of amendment —>—>—>—>—> QUANTITY: CU.YDS.
( cu.yds. stockpiled) (needed to cover this area to designated depth)
CUSTOM AMENDMENT Attach test results and calculations.
Topsoil import inches organic matter or topsoil import PRODUCT:
Topsoil&compost lift X 3.1
Amend =cu.yards/ 1,000 sq. ft.
Stockpile and amend X ,000s sq.ft. in this area
( cu.yds. stockpiled) =cubic yards of amendment —*—*—*—*—4 QUANTITY: CU.YDS.
MULCH ,000 sq.ft. PRODUCT:
X 6.2 (conversion, to give 2 inch mulch depth)
=cubic yards of mulch —*—*—*—*—*—* QUANTITY: CU.YDS.
TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only, totaling all areas/pages in this Plan)
❑ Product#1: ❑ Quantity: cu.yds.
Version Date: December 19, 2018
tglWEgat,dail % organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no)
tll Product#2: ❑ Quantity: cu.yds.
❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no)
❑ Product#3: ❑ Quantity: cu.yds.
❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no)
the
Date: Inspector: Approved: Revisions Required:
Date: Inspector: Approved: Revisions Required:
APPENDIX 1 — Survey performed by a Professional Land Surveyor
Version Date: December 19, 2018
APPENDIX 2 — Model Soil Management Plan for BMP T5.13
Note: Document is provided under Minimum Requirement 5 in this document
Version Date: December 19, 2018
APPENDIX 3— Determining Construction Site Sediment Damage Potential (Appendix 7 — NPDES Phase
II Permit)
Note: See attached
Version Date: December 19, 2018
Western Washington Phase II Stormwater Permit
APPENDIX 7 - Determining Construction Site
Sediment Damage Potential
The following rating system allows objective evaluation of a particular development site's potential to
discharge sediment. Permittees may use the rating system below or develop alternative process
designed to identify site-specific features which indicate that the site must be inspected prior to clearing
and construction. Any alternative evaluation process must be documented and provide for equivalent
environmental review.
Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development
site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is
a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to
determine the construction site sediment transport potential.
ii. STEP 1 —Sediment/Erosion Sensitive Feature Identification
Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of
sediment deposition or erosion. Special protection must be provided to protect them.
Sediment/erosion sensitive features include but are not limited to:
i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that
would be Salmonid bearing if not for anthropogenic barriers;
ii. Lakes;
iii. Category I, II, and III wetlands;
iv. Marine near-shore habitat;
v. Sites containing contaminated soils where erosion could cause dispersal of
contaminants; and
vi. Steep slopes (25% or greater) associated with one of the above features.
Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment
is complete.
iii. STEP 2 — Hydraulic Nearness Assessment
Version Date: December 19, 2018
Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not
be naturally attenuated before entering the feature. The conditions that render a site hydraulically near
to a feature include, but are not limited to, the following:
i. The feature or a buffer to protect the feature is within 200 feet downstream of the site.
ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel
or ditch.
August 1, 2013, Modified January 16, 2015 Appendix 7- Determining Sediment Damage
Potential Page 1 of 3
Version Date: December 19, 2018
A site is not hydraulically near a feature if one of the following takes place to provide attenuation
before runoff from the site enters the feature:
iv. Sheet flow through a vegetated area with dense ground cover
v. Flow through a wetland not included as a sensitive feature
vi. Flow through a significant shallow or adverse slope, not in a conveyance
channel, between the site and the sensitive feature.
Identify any of the sediment/erosion sensitive features from step one that are hydraulically near
the site, and proceed to step three. If none of the sediment/erosion sensitive features are
hydraulically near the site, the assessment is complete.
vii. STEP 3 —Construction Site Sediment Transport Potential
Using the worksheet below, determine the total points for each development site. Assign points
based on the most critical condition that affects 10% or more of the site.
If soil testing has been performed on site, the results should be used to determine the
predominant soil type on the site. Otherwise, soil information should be obtained from the
county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties
for step 1.D) and Erosion Potential (Table of Water Features for step 1.E)
When using the county soil survey, the dominant soil type may be in question, particularly when
the site falls on a boundary between two soil types or when one of two soil types may be present
on a site. In this case, the soil type resulting in the most points on the rating system will be
assumed unless site soil tests indicate that another soil type dominates the site.
Use the point score from Step 3 to determine whether the development site has a high potential
for sediment transport off of the site.
Total Score Transport Rating
<100 Low
❑100 High
A high transport rating indicates a higher risk that the site will generate sediment contaminated
runoff.
Construction Site Sediment Transport Potential Worksheet
A. Existing slope of site (average, weighted by aerial extent): Points
2% or less .. 0
>2-5% 5
>5-10% 15
>10-15% 30
>15% 50
B. Site Area to be cleared and/or graded:
<5,000 sq. ft 0
5,000 sq. ft. — 1 acre 30
>1 acres 50
C. Quantity of cut and/or fill on site:
<500 cubic yards 0
500 — 5,000 cubic yards 5
>5,000 — 10,000 cubic yards 10
>10,000 — 20,000 cubic yards 25
>20,000 cubic yards 40
D. Runoff potential of predominant soils (Natural Resources Conservation Service): Hydrologic
soil group A 0
Hydrologic soil group B 10
Hydrologic soil group C 20
Hydrologic soil group D 40
E. Erosion Potential of predominant soils (Unified Classification System): GW, GP, SW,
SP soils 0
Dual classifications (GW-GM, GP-GM, GW-GC,
GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) 10
GM, GC, SM, SC soils 20
ML, CL, MH, CH soils 40
F. Surface or Groundwater entering site identified and intercepted1:
Yes 0
No 25
G. Depth of cut or height of fill >10 feet:
Yes 25
No 0
H. Clearing and grading will occur in the wet season (October 1 — May 1): Yes 50
No 0
TOTAL POINTS 125
1 If no surface or groundwater enters site, give 0 points.
APPENDIX 4— Site Plan with all applicable information (Minimum Size 11x17 at a legible scale)
APPENDIX 5— Documented Site Photos (Show all directions of the site, including frontage)
(Insert Photo Here)
Location:
Description of the photo:
Photo taken by: