Loading...
HomeMy WebLinkAboutAPP-2003-SEPA - s EA)N\ c\(‘ ccK S D ��a� °t t.� � X S. \2a . \ f CERTIFICATE OF MAILING T + 2® 9COR��P I, Kathy Janke, certify that I mailed, postage prepaid, copies of the foregoing document on April 4, 2003 to each of the following-named parties at the last known post office addresses, with the proper postage affixed to the respective envelopes: Kathy JankiS .. PROJEC : Kew Crews Grade and Fill Documents: MDNS/drawing/SEPA checklist Department of Ecology SEPA Environmental Review P.O. Box 47703 Olympia, WA 98504-7703 MDNS ONLY Ken Crews Don Measamer Steve Lange Sy 4 Mitigated Determination of Nonsignificance - City of Anacortes Description of Proposal: Grade and Fill Permit: Approximately 10,000 cubic yards of material will be imported to level the site • Proponent Kenneth Crews Location of Proposal, including street address, if any: Generally, 9320 Padilla Heights Road, Tract A and C of Short Plat No. 56-78, Section 3, Township 34 North, Range 2 east, Anacortes, Skagit County, Washington Lead Agency: City of Anacortes This lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment provided that the conditions set-out below are satisfied. Accordingly, an environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed checklist and other information on file with the lead agency. This information is available to the public on request. 1. The applicant shall acquire all necessary federal,state, and local permits. 2. A temporary erosion and sedimentation control plan shall be approved and implemented prior to construction. This MDNS is issued under 197-11-350(1); the lead agency will not act on this proposal for 15 days Y from the date below. Comments must be submitted by: April 21, 2003 Responsible official: Ian S. Munce, Director of Planning, P.O. Box 547, Anacortes, WA 98221, (360)299-1942 Signature: �+ __/, Date: 4/4/ 03 Publish: April 9, 2003 r S Y. .4 t9.yt Mitigated Determination of Nonsignificance - City of Anacortes Description of Proposal: Grade and Fill Permit: Approximately 10,000 cubic yards of material will be imported to level the site Proponent Kenneth Crews Location of Proposal, including street address, if any: Generally, 9320 Padilla Heights Road, Tract A and C of Short Plat No. 56-78, Section 3, Township 34 North, Range 2 east, Anacortes, Skagit County, Washington Lead Agency: City of Anacortes This lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment provided that the conditions set-out below are satisfied. Accordingly, an environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed checklist and other information on file with the lead agency. This information is available to the public on request. 1. The applicant shall acquire all necessary federal,state,and local permits. 2. A temporary erosion and sedimentation control plan shall be approved and implemented prior to construction. This MDNS is issued under 197-11-350(1); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by: April 21, 2003 Responsible official: Ian S. Munce, Director of Planning, P.O. Box 547, Anacortes, WA 98221, (360)299-1942 Signature: ` �� 4-1 Date: 4/4/03 Publish: April 9, 2003 • PuLisH - 9� _ _ ' lay 9,ppgr„- Mitigated Determination of Nonsignificance - City of Anacortes Description of Proposal: Grade and Fill Permit: Approximately 10,000 cubic yards of material will be imported to level the site Proponent Kenneth Crews Location of Proposal, including street address, if any: Generally, 9320 Padilla Heights Road, Tract A and C of Short Plat No. 56-78, Section 3, Township 34 North, Range 2 east, Anacortes, Skagit County, Washington Lead Agency: City of Anacortes This lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment provided that the conditions set-out below are satisfied. Accordingly, an environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed checklist and other information on file with the lead agency. This information is available to the public on request. 1. The applicant shall acquire all necessary federal,state, and local permits. 2. A temporary erosion and sedimentation control plan shall be approved and implemented prior to construction. This MDNS is issued under 197-11-350(1); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by: April 21, 2003 Responsible official: Ian S. Munce, Director of Planning, P.O. Box 547, Anacortes, WA 98221, (360)299-1942 Signature: 92+^�- ... 4'- Date: 4/4/ 03 Publish: April 9, 2003 • oikosucs? ) G1T Y O� CERTIFICATE OF POSTING I, lR Anbc tU5 , certify that I posted at least one/four copy(ies) of'the MDNS for the Ken Crews Grade and Fill Permit on the subject property or in conspicuous public places within 300 feet thereof on the Q day of April , 2003. Signature 4.7 Title Building Department Representative Additional notices were posted at the Municipal Building, Library, and Post Office on the 6 \ day of al 1 , 2003. Signature Kat Janke Title Land se Permi Manager it > ; Anacortes4t American P.O. Box 39, Anacortes, WA 98221 Affidavit of Publication In the Superior Court of the State of The Matter Of: A3901: HEMS -K.CREWS Washington In and For Skagit County c/o CITY OF ANACORTES STATE OF WASHINGTON I „ �....:.�w .:'• ...'� = Countyof Skagit an environ- ss Description of mental impact state- o sal: ment (EIS) is not re- Grade and Fill Permit: quired under 'RCW The undersigned,being first duly sworn on oath Approximately 10,000 43.21C.030(2)(c). This deposes that he/she is principal clerk of the Anacortes cubes yards to material decision was,made af- American, a weeklynewspaper. That said newspaper has will be imported to level ter review of a com- the site plated checklist and been approved as a legal newspaper by the Superior other information on Court of Skagit County and it is now and has been for Proponent: file with the lead agen- more than six months prior of the publication hereinafter Kenneth Crews cy. This information is referred to,published in the English language continually available to the public as a weekly newspaper in Skagit County, Washington, II Location of proposal- on request. and it is now and during all of said time was printed in an including street ad- 1. The applicant shall g dress.If any: acquire all necessary office maintained at the aforesaid place of publication of Generally, 9320 Padilla federal, state, and lo- said newspaper. _ Heights Road, Tract A cal permits. and C of Short Plat No. 2. A temporary ero- That the annexed is a true copy of an 56-78, Section 3, sion and sedimentation advertisement with publication dates, as it was published Township 34 North, control plan shall be in regular issues(and not in supplemental form)of said Range 2 east, Ana- approved and imple- cortes, Skagit County, merited prior to con- newspaper commencing with the issue Washington erection. This MDNS is issued of April 09, 2003 Lead Agency: _under 197-11-350(1); - — SSY O.. City of Anacortes the lead agency will not ,; act on this proposal for ' ":?, t This lead agency for 15 days from the date and ending with the issue 1,,......, Sao' 7 this proposal has de- below. Comments F W, termined that it does must be submitted by: of April 09, 2003. 20115d not have a probable Apr1121.2003 significant adverse im- Mitigated Determine- i pact on the environ- Responsible 'official- That such newspaper was regularly distributed to tion of Nonsignlfi- ment provided that the Ian S. Munce. Director its subscribers during all of said period. That the full canoe conditions set-out be- of Planning P O' Box amount of the fee charged for the foregoing in the sum of City of Anacortes low are satisfied. Ac- 547, Anacortes. WA $ _ 0.40 _ dit' i 4U YL. ,''.--it;., -:: Subscribed and sworn to before me this 98221.(360)299-1942 i i g day of / 20 Q g Signature: t h / GO Ian S.Munce ,Q/ Date:4/4/03 Notary Pub' and for the State ofWashi on PUBLISH: Anacortes American Clerk's filing stamp 00111:1111tt April 9,2003 01 p /4. A3901 .o> .f1-�.. . Mac0 . .sexoNE44.. `. 9: -o:U .11)1.'( emu'' 2p08 rz°t e ^,sr 2,, U e (Fj A��' ki � . LAND USE TO Don Measamer, Steve Lange FROM Land Use Permits !. _ , ,`tl . r+r.' ;. . :., f.)r jf Lf e3" RE Land Clearing Permit—Ken Crews , DATE March 27, 2003 Please find attached: Revised Checklist Revised Drawing ❑ You asked for a drawing with more detail - grade and fill southern portion of Property ❑ Please review and RETURN DRAWING TO PLANNING., Does this information address your concerns? Please respond as soon as possible.; Thank_yrou for your attention,to this. Kathj ( l I \ CITY OF ANACORTES ENVIRONMENTAL CHECKLIST FORM A. BACKGROUND 1. Name of proposed project, if applicable: 512W iXt eJte t °ha 2. Name of applicant: 3. Address and phone number of applicant and contact person: en-6 ti - /7 -70,. 9h. Z / 4. Date checklist prepared: trip lu ///a/ , re u-c-e-ct' Io 5. Agency requesting checklist: 6. Proposed timing or schedule(including phasing, if applicable): Lxt;iv5, 02 tin 7. Do you have any plan for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 7k 8. List any environmental information you know that has been prepared, or will be prepared, directly related to this project. 9. Do you know whether applications are pending for government approvals of other proposals directly affecting the affected geographic area covered by your proposal? If yes, explain. ' pane 14 Cr e 1425 1 c tll thin- E!! a calWei-ea/ it tit il pit I-Cd4 L p1 m f&r i G� te.,aacz Ayala byLk c*L4- k_ hit -.63 1,1 ,jam , WPitla-yt do '�iiGJV,L-/ C201/17 rwi4 e / v O- VIP t&C t i -- - - - - U e c� ",f-71-•' —Z : s>fi447-1,- -�, F S kri CA c „ 111 10. List any government approvals or permits that will be needed for your proposal, if known. Witt 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions in this checklist that ask you to describe certain aspects of Lyour proposal.LY.ou do not need to repeat these answers on this page. -Ott i4 n - (A , "!J /I2/L ) irkt R tc /!!I C a,-6-ic/ 1- 1- 414-1 in-ekc i G9 g-%.a✓ VIP/ £ "'- 16I 7/ �yt 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and Section, Township and Range if known. If a proposal would occur over a range of area,provide the range or boundaries of the site. Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. q 20 ?7,41 a C ti ii Li,- jc it C. 7a. cI— 11 G 61 sI)nf plat fn , 56-7i £c f 3 %rwn% o 3 y N i A;'ware. 7 C a,s E- 01 Hit lib thou 11-cy ill Qiwdits,' B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the affected geographic area(circle one). Flat'rolling,hilly; steep slopes,mountainous, other b. What is the steepest slope on the site(approximate percent slope)? �- .h D I air did- ✓i �'U f44/--et G ,ei a/c-tr. r. c. What general types of soils are found on the site(for example, clay, sand, gravel, peat,muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. c:t c4 '/7 /I y cizy_ cam. p,i/i, d. Are there any surface indications or history of unstable soils in the immediate vicinity? If so, describe. 2 1 , , . O't7Ar- ti-1 04/71-4-Cein_ , ! , ' CAn4<i<V7A11_ rettrz-; r , O. ' fd-w-t:t,erizzin.,(714,/-4z) ‘eedn.czi-va ±11 1. i.ivi#49 , CO _a. -64(4-e- &.±.49, _zigict- -kaisirn-47:v4 n nt-I zo_v at livLineS1-01-,) io.ovat f4__ ___4:4,.:/32 (ifiagd,-27, . vzhys -Arkezka-____v ..,a_gex-a-nac?,_ althril-e-c-, JA,_ 1(se 7_pga&L.,/ -1,1 a/44,4) 7_4_0free,/ deagve--r;K•c2_ 4 .0.74,0 „42_, -iviktrAfer_ opziltrim_-_0±2_ ,-/- &-wya . i. , a_eyce., 1 ivei-Anig- rh--itu ley•Ta.. 7:-Ant _6i(' 42_, yrrn , g/t4-7442.46- _ort.e4,1222_ 4_ aftneat-n-e-r,-i _ehr 7 ispanz4,?. . 4, ma_1/24-ry &at coat. el wu.rc 714:21„2.46, _a4nrce-_ J.4. 2)4.4 lickl,_90.mj 4,12-cre- en , taili olL_t: ah, linir4-_- _12‘,"1-: 1 2v-44 erekr) e,61-2 -6 &At- 4- _we:Haint 5_17t-et-r pi( "At PA441)-__.- _W, 4411---rete p_egfini— • , I, -kfreif 1 g 7 4 1,3 .gnwt ac.,;7_-_- _niers, Taier - , em:te/v,-141 -6figk _A__-cr, eftir_ _124-0- e7-4- 4244:e - , , ' rr _ rigt iitear -6_ brc_ EL„oLef/tati, sac- yu-k-_4rdili _ftlie.kci ci_eggaidnees. 67, , -7,,,knic- atice-0377 ArxKi-: ietz-e{tinri n tah- i rine:0C - . .. ily_(;; _frithkin . I i ----------- i • e. Describe the purpose,type and approximate quantities of any filling or grading proposed. Indicate source of fill. ez26 pro'e a 1- SU2v'Lut fry : Cvv .2 fret_ eitit f. Could erosion occur as a result of clearing, construction or use? If so, generally describe. c`a)vtt. ik vi,t_tt, e-ncLt CrC2titJL' - iz t-tcoa6v7t C.411 Yee- /7 Givsv C G L cytr b-c 012., 4 424: eiC L CrGl tit pILc,c,t, g. About what percent of the site will be covered by impervious surfaces after proposal construction(for example, asphalt or buildings)? ,v/,q- _ UCH 11 attt iL. tj tc-cir-IH p "vyrc Jt G�� j . ni,. Z uL- C(.4t- 4Gj"Gr " i — Ch cta . h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: ® C2Ubu nfrvi 7YZGtiotv3 o 42.40 r-z- en-V. e c-z./ 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors,industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. 'v/f b. Are there any off-site sources of emissions or odors that may affect your proposal? If so, generally describe. /VZ c. Proposed measures to reduce or control emissions or other impacts to air, if any: N/4- 3. Water a. Surface (1) Is there any surface water body or on in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes,ponds, 3 wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. (2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, describe and attach available plans. N/I? (3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Nla (4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose and approximate quantities if known. N% (5) Does the proposal lie within a 100-year floodplain? If so, note location on the affected geographic area plan. nli (6) Does the proposal involve any discharge of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. /to b. Ground (1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description,purpose and approximate quantities if known. Ito (2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example: domestic sewage, industrial, containing the following chemicals...; agricultural;, etc.). Describe the general size of the system,the number of such systems, the number of houses to be served(if applicable), or the number of animals or humans the system(s) are expected to serve. iV' A 4 f c. Water Runoff(including storm water): (1) Describe the source of runoff(including storm water) and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 1ralw y/tes29C j- n0'1J ✓kAia, /h i?) +he eI et/an2-- uL c d iv/ j-ice- try-me,3/ / )112.4i7 lli/l /zl hfl T -1-rl L 13av , (2) Could wdste materials enter ground or srface waters? If so, generally describe. ;t///i d. Proposed measures to reducee or control surface, ground and runoff water impacts, if f't any: 9 e-a -fro ' .cz e b�11 �- Ci t'L._ �7 Cc t C-chc o� -ILL prt3e0 vj Sv �luK �a �e 4 /-n a i, z Goa it kip a 7ta� wL. i t t'i- A'""4{r /21-7 erzn I 1 LGLL`t_ / 1 6L-'7• 4. Plants a a. Check or circle types of vegetation found on the site: ✓ deciduous trees: alder,maple, aspen, other ✓ evergreen trees: fir, cedar,pine,other shrubs ✓ grass ✓ pasture crop or grain ✓ wet soil plants: cattail,buttercup,bulrush, skunk cabbage, ✓ other water plants: water lily, eelgrass,milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? / r% I Gvi Et , 5 c. List threatened or endangered species known to be on or near the affected geographic area. d. Proposed landscaping,use of native plants, or other measures to preserve or enhance vegetation on the affected geographic area, if any: 5. Animals a. List any birds or animals which have been observed on or near the affected geographic area or are known to be on or near the affected geographic area: Birds: l'itii'veikefy,, AWzo7z-al 62�'n� 07=e-, eu /�JJ6a/z.0 Mammals: /1,14 va hyvve wa v ed u(a4 Ira ekiy, C 4 y c% G"9-r /7 1 Fish: l7DhZr , D�J�c'Lo'-r-� b. List any threatened or endangered species known to be on or near the affected geographic area: AeA4-)n- I-n h tc A.by ��h� ,--J/ c. Is the affected geographic area part of a migration route? If so, explain. 7? d. Proposed measures to preserve or enhance wildlife, if any: Win 6. Energy and Natural Resources a. What kinds of energy(electric,natural gas, oil,wood, stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. efe &fryG b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. rI c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: N�� 6 0 7. Environmental Health a. Are there any environmental health hazards,including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? List other proposed measures to reduce or control energy impacts, if any: /V/f (1) Describe special emergency services that might be required. (2) Proposed measures to reduce or control environmental health hazards, if any: w /it b. Noise (1) What types of noise exist in the area which may affect your project(for example: traffic, equipment, operation, other)? M// (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction,operation, other)? Indicate what hours noise would come from the site. W i/? 11-Si71,- e anyth 07CYi7 er nen1- ihd ul/5, Ctkrhp 1YI2e% -/ 67-a-Ii'- 3hpn ferh /,r„a-cc cie4/7 litey oLz�r�G')i " °✓z' oar (3) Proposed measures to reduce or control noise impacts, if any: N/ 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Gn-e dh 5e Gin+(Anti A-'A- sirs" h 1512P/ct is e ( G✓t GI r�L/ Piz7hc � dieAd b. Has the site been used for agriculture? If so, describe. ND . 7 L c. Describe any structures on the site. ` o-kre .) ipta,4( yhe 'ma / Sf c /Jtr. id Le)r— d. Will any structures be demolished? If so,what? A/c e. What is the current zoning classification of the site? fl i ,G',�itt,Awnt. f. What is the current comprehensive plan designation of the site? YYl4,'1 or�l/h,-c/Zvl.,'lc.c� rr/ g. If applicable,what is the current shoreline masterprogram designation of the site? i /p h. Has any part of the site been classified an"environmentally sensitive"area? If so, specify. 6tle/ ia-r746 i (4 Le/ -riL4, .t) i. Approximately how many people would reside or work in the completed project? II j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any? 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: 9. Housing 8 a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. zL/ hive,_ 3 l 'ottrni, hnt w b. Approximately how many units, if any,would be eliminated? Indicate whether high, middle, or low-income housing. of/p c. Proposed measures to reduce or control housing impacts, if any: hi/a- 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas; what is the principal building material(s)proposed? 2 2 I—et,F te; 61u -'i,.Gle= 129,17f- 72-e,: j'h4 41+ l-t/LLrd ce Zyy b. What views in the immediate vicinity would be altered or obstructed? c. Proposed measures to reduce or control aesthetic impacts, if any: 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? fl()24.- b. Could light or glare from the finished project be a safety hazard or interfere with views? Y7c c. What existing off-site sources of light or glare may affect your proposal? /l cr tcv d. Proposed measures to reduce or control light and glare impacts,if any? 9 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? it 01&L' b. Would the proposed proposal displace any existing recreational uses? If so, describe? /2a c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the proposal or applicant, if any? NIti 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for,national, state, or local preservation registers known to be on or next to the site? If so, generally describe. 1W b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c. Proposed measures to reduce or control impacts, if any: N/w 14. Transportation a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. Ake h ,(cde7,v-417 ihv XI a,azvr,- Spa 61' t pxvGc/tki l-ie,i1 Li. f` n.- priviPc> b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? 5UD f- nt Ili r9•it' . 2t7 c. How many parking spaces would the completed project have? How many would the project eliminate? /vI� 10 d. Will the proposal require any new roads or streets; or improvements to existing roads or streets,not including driveways? If so, generally describe(indicate whether public or private). • 7)a e. Will the project use(or occur in the immediate vicinity of)water,rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed proposal? If know, indicate when peak volumes would occur. w/it g. Proposed measures to reduce or control transportation impacts, if'any: 15. Public Services a. Would the proposal result in an increased need for public services (for example: fire protection,police protection, health care, schools, other)? If so, generally describe. inap_tre�. ,2c,fiv c r o -Ova— in rib"— 6" b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities a. Circle utilities currently available at the site: lectricity)natural g water, refuse service,iephon5)sanitary sewer, p c syste o er. b. Describe the utilities that are proposed for the project,the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. N/A - C. SIGNATURE 11 C The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. lw�LiLe vr✓ C/Le- n49 1/6/°3 Signature Date Submitted D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS ie r aa7 1. How would the proposal be likely to increase,discharge to water, emissions to air, production, storage or release of toxic of hazardous substances or production of noise? -zvr t kJ3 w 7l fan.t. Oyu aim pwr,,e7 21,1c VIc0, a„.6-t�(iuoo) 6du zvfcv lac /rah,I/A.1J ,o cczi T G � 1 f� yzoyicre 9,Zcti')z3 -70-r,w gnu Azice oL n h I < wt, i ��' 1,. Proposed M aeasures to avoid or malice,such increases are: 2. How would the proposal[ /be likely to affect plants, animals, fish or marine life? diet- kfri 2i%Gf/ cni , tyre a- Proposed measures to protect or conserve plants, animals, fish or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: • 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated(or eligible under study) for governmental protection; such as parks,wilderness, wild and scenic rivers, threatened or endangered species habitat,historic or cultural sites, wetlands, floodplains or prime farmlands? tVlk 12 • Th ( J J Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? iV/fig Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? /1v// Proposed measures to reduce or respond to such demand(s) are: W/ 7. Identify, if possible,whether the proposal may conflict with local, state or federal laws or requirements for the protection of the environment. rda a 13 Cfna,ei &w2, ; ci a el-4 Cr e tJ3 1 1, /✓a-nn- pet-7-91 -L pn jee t c� ie. Tie ��in /Ci L— Yv��v �Ga hi h.Z' G 2 9 3 z o Pia; 1-1"4:,44 . ,fie-rat-, -rc��' e / ' ea vLh aP SE eva t ive / - y V 1 U ®i(rt net cj rat i i/tc-c�c�yfit J O c/k-t-H 3 L : c d-T'n<�.. ed- SW c n.n.ems c . JnIpez ' t tL raj"� /6444 oz i c -,d/kkti ,e4.,a-c-0ze t: 1 . jittv'i c- 1n ti-74-NJ 0. 107,4 m.-nf a-Ci C440-2,e-n 156,/airiv -6-keztc, a 7 ld ° r el Gk) 2ve1-11;4 .?- Ot- -I/u fyzz /vim. 772.ezz 4-2 iv� C erg 1/9 atria"ti-t-tear I re Gem tz, T 771,C0 7'20v6- a Mx.„.„- az�l.�i-v�d-ii CA,h, Z /--rti /xpF 'hay' ,2�— v^r v /'u1/2w We H t 5 f�v%- efrr- t p /7--- . H dim c f44-c, tiv w4-V Un .d- ern, " / iza,tt 717, be- i-14A��x�� emu. p cd.-b- Wfl Ct '� f"'ef , ire-cMr s- fy'z.(4 in occe2- 6/1141; Project Log Sheet CrSu.� o - 4r�`a�lttil /�tru4 x- Janke, Kathleen From: Measamer, Don Sent: Tuesday, March 04, 2003 4:24 PM To: Janke, Kathleen Subject: Ken Crews SEPA Kathy, A project site visit for the proposed grade and fill Ken Crews property by Steve Lange and myself on 3/4/03 confirmed that the wood debris pile has been removed from the wetland buffer. Mr crews is installing the remaining silt fenceing and cleaning out the temporary drainage pond. Thank You ,Don City of Anacortes Don Measamer Plans Examiner don@cityofanacortes.org 360-293-1901 MP/1/4rs '7/1-11411 /747eL G i , _ Y -J �9Lg'5� x a.ND 1CT4SF.. TO Ed Frank, Gary Barnett, Don Measamer, Steve Lange FROM Land Use Permits RE Ken Crews SEPA Review/Grade and Fill Permit DATE February 3, 2003 Please find attached: • co Comments from staff ea Revised drawing ❑ The application is complete. Proceed with environmental determination. Z recommend the following conditions:, Thhee application is not complete. Please have the applicant provide the following 7 // scc-[09 �C�� /G��/ J� %0 7 091crt1Z1-; u[�cc �e AC71c r o AI �/ 7 ` 'hank,=you for yolir attention fic thS CITY OF ANACORTES ENVIRONMENTAL CHECKLIST FORM A. BACKGROUND 1. Name 9 fprop s gyp) �ect,if faapp,applicable:ale: r c _I ba o k ar e0., c�caci e or') j-goo-{-iea F a Co.S U S%d e e� pro 2. Name Nonfapp cant:CrCw`� 3. Address and phone number of applicant and contact person: 7oe.0 rfOt �S A Nat or'-I--CS 02613 - 767P 4. Date checklist p pared: 9/to/oz 5. Agency requesting checklist: ek o- 4uccco deS 6. Proposed timing or schedule(including phasing,if applicable): �car- or +coo . 7. Do you have any plan for future additions,expansion,or further activity related to or connected with this proposal? If yes, explain. iv 8. List any environmental information you know that has been prepared,or will be prepared, directly related to this project. u,eik su c•ucti. Ohl 4' I Budd Pi dce . 9. Do you know whether applications are pending for government approvals of other proposals directly affecting the affected geographic area covered by your proposal? If yes, explain. - rTh 0 10. List any government approvals or permits that will be needed for your proposal,if known. kVA 11. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site. There are several questions in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat these answers on this page. ,v tt VSe&bJc- area. Par So1-41 � trfL . f?al 1rov Levej j.o v,a aer1/4 arlxlCwt�� Res frv&4' 12. Location of the proposal. Give sufficient information for a person to understandrthe precise location of your proposed project,including a street address,if any,and Section, Township and Range,if known. If a proposal would occur over a range of area,provide the range or boundaries of the site. Provide a legal description,site plan,vicinity map,and topographic map,if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this cheg Sap p€ d la`, wt. Road, ¶ ac-4' A coc C. o 51.0 tQe . 4 - f seaat:1 i0o 3 -Taiso*)5k+P 3'1 003.4% #2a ie sad. C $ tlkc. utl!I a m c n er,a gyms-) B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the affected geographic area(circle one) 4iD roll' ,hilly, steep slopes,mountainous,other b. What is the steepest slope on the site(approximate percent slope)? 2 f t) I )0f C bW An.)141 deve.)c,e a. 5 r at- c. What general types of soils are found on the site(for example,clay,sand,gravel, peat,muck)? If you know the classification of agricultural soils,specify them and note any prime farmland. ( 'iv PG_si>!a k,xctai c k `� - �`f-Lj chi ct ( I orn�, ,� v d. Are there any surface indications or history of unstable soils in the immediate vicinity? If so,describe. NO 2 ,. I e. Describe the purpose,type and approximate quantities of any filling or gSjigi proposed. Indicate source of fill. C d is410 IC4C. ct(( pro `c S i-c s-+G_L 3 If�'"-1 c.90 S o t Li l c utt LiaV:L� 1GM1 I soorcc O� . (1 ani1cti{.e"'C� t cat"-, jct 'i- , f. Could erosion occur as a result of clearing,construction or use? If so, generally describe. Sa c- itn)svocc could., °CCU?" 5iJadd e(o o eot 4''t .»tGt5l'`C S be v j address ed/ c. IS eh/ivy-ter" g. About what percent of the site will be covered by impervious surfaces after proposal constru on(for example,asphalt or buildings)? 11/4//A 3o ka . Awl spec t 4C, f)ir w5 ck.pe aN w&C} t caw 0.X.-F0r id h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: ce { t wf a LQ.vc rtea5vrts _oS Per 2. Air a. What types of emissions to the air would result from the proposal(i.e.,dust, automobile,odors,industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. i L b. Are there any off-site sources of emissions or odors that may affect your proposal? If so,generally describe. {*fb c. Proposed measures to.ieduce or control emissions or other impacts to air,if any: • 3. Water a. Surface • 3 Ii (1) Is there any surface water body or on in the immediate vicinity of the site c (including year-round and seasonal streams, saltwater, lakes,ponds, / wetlands)? If yes,describe type andprovide names. If appropriate, state what stream or river it flows iiptto. '1'k e r c_ IS `.4 po X 1.G, ctvee. ¢C. ,.ac4b - ow rope +kerc.: is c,.=-jCCr Ctret:w� }L �}rt'tar cad tap fen tick% a r. inrv!c cov+twc tsv+ o etro✓`'"v above- }tom 30 t A-9 „Neat f- oEii net etc (2) Will the project require any work over,in,or adjacent to(within 200 feet) the described waters? If yes,describe and attach available plans. WA (3) Estimate the amount of fill and dredge material that would be placed in of removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. (4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose and approximate quantities if known. (5) Does the proposal lie within a 100-year floodplain? If so,note location on the affected geographic area plan. Ada (6) Does the proposal involve any discharge of waste materials to surface waters? If so,describe the type of waste and anticipated volume of discharge. Nt b. Ground (1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description,purpose-and approximate quantities if known. • !VD (2) Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for example: domestic sewage,industrial, containing the following chemicals...;agricultural;,etc.). Describe the general size of the system,the number of such systems,the number of A/A\ • 17 or Aar, coc/f - tro&i/j 7 To 1 \ ari -711 C, ‘✓^. r"r eel . Re,44 ..s 7e4 Ct?° A/Xri c , ?f rptfe- -rho Ace vc wc-oVat.Gl .$4,417 -fir ,SlirAc fir.-- erotic ern.'se .7141 �•Cc s y *�� s/ l � rt t 141.1 .led 'a de � . 'er Q eft/ �..� � �" / Ats tick 7 re -At• .s P' 44bl , • J I i houses to be served(if applicable),or the number of animals or humans the system(s)are expected to serve. c. Water Runoff(including storm water): (1) Describe the source of runoff(including storm water)and method of collection and disposal,if any(include quantities,if known). Where will this water flow? this water flow into other waters? If sp,despribe. / f. .Pkr rent-on ivd ea.) run,s r w to jµ-� ,: `4i.. cif hes `,G s�� r k l toa.c� c e to�t in al tv 4 r Cz4411 (2) Could waste materials enter ground or surface waters? If so, generally describe. 0. d. Proposed measures to reduce or control surface, ground and runoff water' pacts,if any: DEL- -kl kave- c +Q.lcc cct*c, r ptobbc ./ 'Say S eve"° kv' ,a) ,.vl,.ck . I4I` ,. 04 rucc V3'QA wQ4es" rvPe* reblereV2vvalAcv a c..4. 4. Plants a. Check 0/circle types of vegetation found on the site: Ver deciduous trees: alder,maple,aspen,other evergreen trees: fir,cedar,pine,other shrubs grass pasture crop on grain beewet soil plants: cattail,buttercup,bulrush,skunk cabbage, tto,j other water plants: water lily, eelgrass,nvlfoil,other other types of vegetation b. What kind and amount of vegetation will be removed or altered? �rc�e 4reeS enw c1rcts$ atpQv, I ctrcC— 0 0 I f c. List threatened or endangered species known to be on or near the affected geographic area. raw d. Proposed landscaping, use of native plants,or other measures to preserve or enhance vegetation on the affected geographic area,if any: rrC s pia.w41 cops er .S'tcvv cow-t tot 5. Animals t, fr/ a. List any birds or animals which have been observed on or near the affected geographic area or are known to be on or near the affec,ted geographic area: Ir-Q/ • y�, i 5 �l bird am t. P: Ms,.•Al ` ri c 0-- , [4G cox(: r='Cr/ C:c t'.,�-, rim n,�, b. List any threatened or endangered species known to be on or near the affected geographic area: kJ tp2- �d�c Is the affected geographic area part of a migration route? If so,explain. P� cot (°�oP,,./�C,,J itza"Vr'^ r� y,(or t L,1 r�`" d. Proposed measures to preserve or enhance wildlife,if any: 44, 6. Energy and Natural Resources • a. What kinds of ene _ electric 1 atural gas,oil,wood,stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating,manufacturing,etc. b. Would your project affect the potential use of solar energyb adjacent properties? If so,generally describe. . 6 II c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: 7. Environmental Health a. Are there any environmental health hazards,including exposure to toxic chemicals, risk of fire and explosion,spill,or hazardous waste that could occur as a result of this proposal? List other proposed measures to reduce or control energy impacts,if any: /t (1) Describe special emergency services that might be required. (2) Proposed measures to reduce or control environmental health hazards,if any: MA b. Noise (1) What types of noise exist in the area which may affect your project(for example:le/ traffic,equipment,operation,other)? �/T' (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example: traffic, construction,operation,other)? Indicate what hours noise would come W from the site. S koN-k .4,er'ws t-4 4., mot!t"l , , e �# ,v�� �� y� i � kovrS csw1% (3) Proposed measures to reduce or control noise impacts, if any: • 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? r�s a eaI 1 f b. Has the site been used for agriculture? If so,describe. Nd • c. Describe any structures on,the site. , e � Id I vu 5�. 5r.,.a1 a d. Will any structures be demolished? If so,what? NQ e. What is the current zoningclassification of the site? f. What is the current comp hensive plan designation of the site? t _ ' ' niV g. If applicable,what is the current shoreline master program designation of the site? u/A h. Has any part of the site been classified an"environmentally sensitive"area? If so, specify. tale-I,Ica 1 a c rtbc-d i. Approximately how many people would reside or work in the completed project? NON j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or redflce displacement impacts,if any? ti/A 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: 1 9. Housing a. Approximately how many units would be provided,if any? Indicate whether high, middle, or low-income housing. 3 e Ieu3 CX�3�Y b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle,or low-income housing. t✓fa c. Proposed measures to reduce or control housing impacts,if any: N/A 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas;what is the principal building materi (s)proposed? at n b. What views in the immediate vicinity would be altered or obstructed? nva h�G c. Proposed measures to reduce or control aesthetic impacts,if any: 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it — mainly occur? it.ctvt., b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off-site sources of light or glare may affect your proposal? 9 d. Proposed measures to reduce or control light and glare impacts,if any? n,f A 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? tooC b. Would the proposed proposal displace any existing recreational uses? If so, describe? • c. Proposed measures to reduce or control impacts on recreation,including recreation opportunities to be provided by the proposal or applicant, if any? r 13. Historic and Cultural Preservation a. Are there any places or objects listed on,or proposed for,national, state,or local preservation registers known to be on or next to the site? If so,generally describe. b. Generally describe any landmarks or evidence of historic,archaeological, scientific, or cultural importance known to be on or next to the site.d c. Proposed measures to reduce or control impacts,if any: 14. Transportation a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans,if any. `� '++/ +p fteS O ,,,? Ica �r 1 E4.►P ► ct ,0 S'� en kticivciti ai a ® Mite . R&, � ¶rCv&4c dt' to b. Is site currently served by public transit? If not,w t is the appro 'mate distance to the nearest transit stop� ci 6 ' slap ,fir.'• ikfr,,;020 c. How many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets;or improvements to existing roads or streets,not including driveways? If so,generally describe(indicate whether public or private). NO e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transportation? If so,generally describe. ,JO f: How many vehicular trips per thy would be generated by the completed proposal? If know,indicate when peak volumes would occur. Ndi& g. Proposed measures to reduce or control transportation impacts,if any: • 15. Public Services a Would the proposal result in an increased need for public services(for example: fire protection,police protection,health care,schools other)? If so,generally describe. PVic, seruCei-5 era/ 'otit C4-bct tw AJCL•i(1 C vkver.o/ t b. Proposed measures to reduce or control direct impacts on public services,if any. , a 16. Utiliti a Circle utilities currently available at the site, lectrici ,natural gasS refuse service;telep on sanitary sewe septic system)other. 11 b. Describe the utilities that are proposed for the project,the utility providing the service,and the general construction activities on the site or in the immediate vicinity which might be needed. tja C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature Date Submitted D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS of deo-6a 1. How would the proposal be likely to-inareer,e discharge to water,emissions to air, production,storage or release of toxic of hazardo substances or production of noise? .mout, o%opt_ 4kc4 ,.vnk\ pp so'C .enviC cr4 oLtI . i,�ot''kees -�Sa re,.s,S wa.je'— rabic, attb+w. "AO t`°! c t,t +0 ca�vLkis,1 ..}I.�, ttlaaile�, y IS ° bevwe released r.y awd.. w, eke9e w-t* prep ". Om e'�s Proposed measures to avoid at reduce such increases are: 2. How would the proposal be likely to affect plants,a�n�i,a 4�s,fish or mvnne life? Le 6�� d r i up c,,.,�e t^,s�•,-- ueAct�.�- P�v„"G wOv P' Proposed measures to protect or conserve plants,animals,fish or marine life are: 3. How would the proposAl be likely to deplete energy or natural resources? uo} 04 all 42 Proposed measures to protect or conserve energy and natural resources are: NAIS 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated(or eligible under study)for governmental protection; such as parks,wilderness, wild and scenic rivers,threatened or endangered species habitat,historic or cultural sites, wetlands,floodplains or prime farmlands? IL/A Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likelyto affect land and shoreline use,including whether it P Po would allow or encourage land or shoreline uses incompatible with existing plans? Imo/ - r Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s)are: 7. Identify,if possible]whether the proposal may conflict with local,state or federal laws or requirements for the protection of the environment. 13 LAND USE Date Received: 9 /aLlI c f.. Logged In: �C] Logged Out: Time: 10 16 avv, Reference: k Q w'Lutk 7 0 Go 3-5 . (We Please initial if approved and / or include comments: Street Department: tie /7.Fi. ,1.s.,%a Comments: Water Department: 74)7 e oL Comments: Sanitation Department: "MCA. Comments: it'o/thee . 1 KitPalbliCO G 1891 41 9L'Og�' **, cs Ak ®11 • vn USE September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK —THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) Thank you. III 1 ( , -crvin-44t (...______ ves, 4As -i- - A 'fit '9�.og se 0 USE e TO Ed Frank, Gary Barrett, Don Measamer, Steve Lange �� FROM Land Us Permits RE Ken Crews SEPA Review/Grade and Fill Permit DATE February 3, 2003 Please find attached: O Comments from staff Revised drawing v - - The application is complete, Proceed with environmental determination. I recommend the following conditions: , ,, ❑ The ;application is not complete. Please have the applicant provide the following information. er. DV/791 Thannlc_ e forour• ctte6tan_to='> hi . QC r /'1 Gti' �� I "= "SO inn ITEM TO Ed Frank, Gary Barnett, Don Measamer, Steve Lange FROM Land Use Permits RE Ken Crews SEPA Review/Grade and Fill Permit DATE February 3, 2003 Please find attached: Comments from staff Revised drawing IIL The application is complete. Proceed with environmental determination. I recommend the following conditions: A.eta¢ouaD See Skeeto oa ESCST m,6evaW ,c cu R Z E2oSlota Cot-S. -to IIC a-PP2. ai 1.4 �.xeics fJ2PAssnna-sr. p.tL. egniaL PP.rdloMS carts n.t5t6401:1121 The application is not complete. Please have the applicant provide the following information. that *Ifi" for Or attientiGnafa fhi . y 1„r y o G +� 1 �f 9 o t mm Z.g.ND 'USE i TO Ed Frank, Gary Bamett, Don Measamer, Steve Lange FROM Land Use Permits RE Ken Crews SEPA Review/Grade and Fill Permit DATE February 3, 2003 Please find attached: a Comments from staff Revised drawing n The application is complete. Proceed with environmental determination. T recommend the following conditions:; The application is not complete. Please have the applicant provide the following --- 'inforr mation. Thank you for your attentioi►t g,this. (-1 ( ' LOG-IN STAFF RESPONSE 1T Y Oe{s • '� ems !7 , Ali 008��� I.PiNI A USE November 5, 2002 Ken Crews SEPA Revie Ed Frank - Building Department — 293-1901 1. Map shows access road from Padilla Heights Road south to grade and fill area. SEPA discusses access from Reservation Road. Please make two documents clear as to scope of project. 2. Please review wildlife comments and revise as necessary to state activity around site. 3. Grade and fill design shall be by a professional engineer. The engineer of record shall review all special inspection reports for fill compliance with the approved design. The design shall state whether or not the fill is designed to support structures. Don Measamer commented: grade and fill permit will take care of our concerns. Dan Harju — Fire Department — 293-1925 No comment VG° f? I so 3/4/03 Gary Barnett — Engineering — 293-1920 1. Remove and restore area covered by woody debris pile in etl d and buffer. 2. Stabilize cut bank at east end of section A-A (30' easement area). SEE STEVE LA S COMMENTS ATTACHED Mike King - Police Department No comment. Gary Robinson - Park Department — 293-1918 No comment. Doug Terry — Maintenance No comment TESCP TEMPORARY EROSION CONTROL/SEDIMENTATION PLAN LPSWCP LARGE PARCEL STORMWATER CONTROL PLAN KCSWDM KING COUNTY SURFACE WATER DESIGN MANUAL II 5r02 trt Public Works orks 4;0014; Engineering and Development Services Memo Date: 10-24-2002 T : Kathy Janke From: Steve Lange Subject: Ken Crews Sepa Review cc: Gary Barnett, Don Measamer After visiting the site and walking the project, these are my comments. Gary's are included as well. 1. Update the plan to show actual conditions as they exist now. After visiting the site, the completed slope grading is not showing correctly. See redline on sheet 1 of 1. 2. Identify the fill area. 3. How much fill has actually gone into this project? 4. Show existing grade prior to backfill on cross-section A-A. If available. 5. Remove and restore area covered by the woody debris pile in the wetland. 6. Stabilize the cut along the bank along the East side of Section A-A. This would be next to the 30' easement. T k you, ¢ Steve ange Y Day of A nacores Telephone 360 293 1920 Engineering and Development Services Fax 360 293 1538 PO Box 547 Email engineerng©cdyoianacores oro Anacor es.WA 96221 movw cityofanacores ore LAND USE Date Received: iDfroioal Logged In: [I Logged Out: Time: 4' U�Dpn� Reference: 3tPR Appi(accticn1l G roAt1 P ( t kX` yke, kenneftti °mow s ' ,o 'Paa tlo Iatt ett Please initial if approved and / or include comments: Street Department: ,P i/ Asj,y/1 Comments: 60.4 Water Department: 6 � 02- j Comments: to,< Sanitation Department:'-r'lCL-- Comments: 0 k !; 00 GZT oa • 'ea) tfri A Ad Nam E COV: LAND USE • • TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: Grading Plan —The SEPA application is complete. Proceed with environm tal determination. No issues at this time. 4 49.-C ..._, _ ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. Gel „afie Gt=t )241111111a11 co Trim CIoR LAND LTIEUE TO Ed Frank, Ga r 'tt (2) Mik King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits I 0 flo 01-- RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 i I he original application/drawing was circulated in late September. delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: .. Grading Plan The SEPA application is complete. Proceed with environmental determination. No issues at this time. ❑ The applicant shall provide the following information: Please attach the following conditions too�this environmental review: / . Pairn LZ /c_ a-y.4 code Novd7 ✓; ` l� i� wW-11 i i1,3€ Lak Ca qk T nn you. -4)aaz e-n A- A C moo` e__-40e-rn2A-+ 0--vta-49 GS�YO,' 99 �w th I l11M Ina- l !► �o>� n USE TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: Grading Plan ❑ The SEPA application is complete. Proceed with environmental determination. No issues at this time. ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. C� 0 1ft Y O� :411 **fts MSI ;i. E A .10*Itilet •• • USE TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: • Grading Plan ❑ The SEPA application is complete. Proceed with environmental determination. No issues at this time. ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. 1 Calk S IN A °per inn vSE CCS M TO .Ed-Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: Grading Plan The SEPA application is complete. Proceed with environmental determination. No issues at this time. Gto,icy, c cui eln au ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. l kdi a z�uvn vSE TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson m FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: '. Grading Plan �] The SEPA application is complete. Proceed with environmental determination. No �` issues at this time. 0 The applicant shall provide the following information: iip, Ki;,,,/ pa Imo. Please attach the following conditions to this environmental review: Thank you. ) Z'tY O ," • co M ASA �j. 1091 • • I ® �_ 9ooglt D vs i TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: Grading Plan ❑ The SEPA application is complete. Proceed with environmental determination. No issues at this time. ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. 7U L a 04 kt 11Av T r YoCy ff, 'aim �1 1891 4,7 cagS Et ( mm f �lf�, September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) /� 1 Sow =±i 1° feet( po..ciCg4s 464st . � edit �;2,5c[.• L/. fix,/(�'�-du �.2:% woke tG V1/c/C t./(.tw✓V�J (_",L'C'd,:_,./�/-. C+IZ.'J /o ✓c_y,".P `cl� ./ -le � J( -eti L+.:c CG ( [{� (c'7'b r7:a"✓r'I N4'S') '(.mac G/J A.1-[?/52 /'I/Jc.:7 G Ga r Ti e,t %t AiZe.-<''J Thank you. C 1Ci. d 1tc-c- cccdltl 54-A''- `(3c.. 7 A ,t c,- utrati lid ./ � ( cam./n T■1891 I ' Fri anni 43, 9Cogt LAND USE TO Ed Frank, Gary Barnett (2), Mike King, Dan Harju, Doug Terry, Gary Robinson FROM Land Use Permits RE SEPA Application/Grade and Fill Permit — Kenneth Crews — 9320 Padilla Heights Road DATE October 16, 2002 he original application/drawing was circulated in late September. Engineering asked to delay an environmental determination by the Planning Director until "...full submittal received". The Building Department worked with the applicant and the attached Grading Plan has been submitted for your further review. Please find attached: s Grading Plan ❑ The SEPA application is complete. Proceed with environmental determination. No issues at this time. ❑ The applicant shall provide the following information: Please attach the following conditions to this environmental review: Thank you. y �ri •gj 1891 ki Sr Ak LAND TTSE September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) /7,a4o- Coitret-ezt71/7 Thank you. ea"!te (fr LISA6"/ a-- -etv21"1&9rzcl • NC 6 6triA Coo YmIL . a / 0 Ci !Ala 0 cagS At 44 klasii 7m a LAND TIS, September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) Thank you. -1 s j Y F°Mk '�11116110 IB91 tral 9cost`s lAtir 7* LgND USE September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) Thank you. }Y ) Cy 011111100 71j 1891 tri 90oR`s rj. Ti 4 R/11 ka7z4 LAND USE September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON F THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: I SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) I Thank you. / 6 — I -01 .— GST y O� 9c0g't Alla [MI - Tra A wjn XIS September 23, 2002 SEPA Checklist Grade & Fill Permit Kenneth Crews 9320 Padilla Heights Road TO Ed Frank, Gary Barnett (2), Gary Robinson, Dan Harju, Mike King, Doug Terry FROM Land Use Permits THANK YOU FOR YOUR ATTENTION TO THIS. THE REPRODUCTION MACHINE IS DOWN AND UNAVAILABLE UNTIL NEXT WEEK—THERE IS ONE DRAWING ON THIS PROJECT LOCATED IN THE BUILDING DEPARTMENT. Please review at that location. Please return comments to Planning by Friday, October 4, 2002. Please find attached: SEPA CHECKLIST DRAWING (IN BUILDING DEPARMENT) Thank you. CITY OF ANACORTES ENVIRONMENTAL CHECKLIST FORM A. BACKGROUND 1. Name of proposed.pro ect,if applicable: bah.)ler e CZ" FtI1I T2_rr .' 465 r C <J' cztroct-d c. c a.d e onJ gocr+L+eaS-1 `> C66+ S 1c+ e o Prep 2. Name of a cant: jieva3e Crew) 3. Address and phone number of applicant and contact person: 7660 Ai h'lac-v\S A?vac or-i-eg 026T3 - 767? 4. Date checklist prepared: 5. Agency requesting checklist: et- o4 4ua.colleS 6. Proposed timing or schedule(including phasing,if applicable): (.4 co_r or +wo • 7. Do you have any plan for future additions,expansion,or further activity related to or connected with this proposal? If yes,explain. N4 8. List any environmental information you know that has been prepared,or will be prepared, directly related to this project. L weikkit 5U v OK) �t I L �Crl ) dert-- 9. Do you know whether applications are pending for government approvals of other proposals directly affecting the affected geographic area covered by your proposal? If yes, explain. �© 10. List any government approvals or permits that will be needed for your proposal,if known. kVA 11. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site. There are several questions in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat these answers on this page. Make- vsec,b)e, area. Car S0P- t.t.'Y1 N Lc_ f`04w c . -RA e.. grov Le vG' to r.eice-s o+„AciI rtL t tt^. Res erua-hot"' RI.- 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project,including a street address,if any,and Section, Township and Range,if known. If a proposal would occur over a range of area,provide the range or boundaries of the site. Provide a legal description,site plan,vicinity map,and topographic map,if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any pemut applications related to this checkist /a& prl.I t k. tk,(. R ¶rc c-k A cmv C- car no-p. t,ls 56:^ 7g Sects 4tor 3 -ra&wsk p 3't tiJor pc, e, a. ca`4 e4 tke. t.Jlit an never,d�a�3 B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the affected geographic area(circle one) C roll' ,hilly, steep slopes,mountainous,other b. What is the steepest slope on the site(approximate percent slope)? I 51° pc 6 h1 rile d,-)kl dctic lb e CL, Jro c.+ What general types of soils are found on the site(for example,clay,sand,gravel, peat,muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. atv Ca-S+:" 1_. r 'a i of ct t ON—II 4 O'"ec. d. Are there any surface indications or history of unstable soils in the immediate vicinity? If so,describe. t 2 ( % e. Describe the purpose,type and approximate quantities of any filling or grading proposed. Indicate source of fill. c p w.W Ic-}�, -Pt I ro \e�-E- LL L3 tic. 0 p V r Sources o� 11 cawclwke--r-- y cow 1c-4 ';-4- f. Could erosion occur as a result of cle�aring,construction or use? If so, generally describe. 5ar C. ry ioc( could ocCUP'' erO,tvto eo, ir1 cn,eaSV -C-S besr,ei addtc-CS audit ew9{w'ce 1 g. About what percent of the site will be covered by impervious surfaces after proposal construcAon(for example,asphalt or buildings)? a//A 4Gvj4 ka.vC. con Src t flG ?ita iNA5 &pervcs O ' ta•Act - t CLAW o"-de- h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: c t ( ..1 t( I.q vc r,eaSVr of ckS pc r- ep,e t w e E+` 2. Air a. What types of emissions to the air would result from the proposal(i.e.,dust, automobile,odors,industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. /A b. Are there any off-site sources of emissions or odors that may affect your proposal? If so,generally describe. rib c. Proposed measures taleduce or control emissions or other impacts to air,if any: . 3. Water a. Surface 3 (1 (1) Is there any surface water body or on in the immediate vicinity of the site (including year-round and seasonal streams,saltwater,lakes,ponds, wetlands)? If yes,describe type and provide names. If appropriate,state CJ- what strea�mm or river it flows i to. �"h e r '� i 5 tpo X 1•to A.rCC � wc-0904,�5- ay rope+ +1,,ere_ s =tettT' aren:'',`�tC , arcekY'' r9. oY et0.% A rn !writ ctmtrvs 'svt or '}" ke- a ewe- 4kc y_" „uedre r' 1,-v-e oU ashjecctivt pre (2) Will the project require any work over,in,or adjacent to(within 200 feet) the described waters? If yes,describe and attach available plans. N/A (3) Estimate the amount of fill and dredge material that would be placed in of removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. - N/A (4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose and approximate quantities if known. (5) Does the proposal lie within a 100-year floodplain? If so,note location on the affected geographic area plan. Ad (6) Does the proposal involve any discharge of waste materials to surface waters? If so,describe the type of waste and anticipated volume of discharge. No b. Ground (1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description,purpose-and approximate quantities if known. Ale • (2) Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for example:domestic sewage,industrial, containing the following chemicals...;agricultural;,etc.). Describe the general size of the system,the number of such systems,the number of h//'4 4 7l. Ifjj Aal itAir tro611 ?to -,AA'-,AA'errs ua . y e1/4 st a ite.5 `/f s¢/ .7 c ..zl ,�'C'/^ l to Act a.. we//at_-I 4,4T.4.17 a� r ost y �1 rec (J I>// litTrade f$.-1Y+.r/'s -zik' &heti.° ///►/ r As- 714 ..tea--z . c' y t. /c-,.1s 4 AS envy ..5-eirAc biderike- crsvicer-.vs' -fib1 c cr4- oect - Ay e pal< tilarisre " ice cc r /o..r percar 'l /fl tic( /7 recit ,4(/ x' proL4 , I I . I _ I l houses to be served(if applicable),or the number of animals or humans the system(s)are expected to serve. c. Water Runoff(including storm water): (1) Describe the source of runoff(including storm water)and method of collection and disposal,if any(include quantities,if known). Where will this water flow? Will this water flow into other waters?�Iff so,despribe. Slthcs ,h«,ci t =.ltrxxcil _ �* tit ote 0. 0 .r,,�rwcr- bCL (2) Could waste materials enter ground or surface waters? If so, generally describe. NiIt. • d. Proposed measures to reduce or control surface,ground and runoff water impacts,if anYPeCAL -kt k0.vc- Ck km, +rice, actt-C,. cl÷ 4kc% r itopic",ait, -s euC tCvv 4.,e1/44 t et' rva4uret., Pvtwe pit resbiepwI aer as t ®.tao 4. Plants a. Check o$ircle types of vegetation found on the site: °° deciduous trees: alder,maple,aspen,other tee evergreen trees: fir,cedar,pine,other shrubs grass pasture crop or grain wet soil plants: cattail,buttercup,bulrush,skunk cabbage, other water plants: water lily, eelgrass,milfoil,other other types of vegetation b. What kind and amount of vegetation will be removed or altered? #reeS 00•Nd r-s sc.. arac- • F C c. List threatened or endangered species known to be on or near the affected geographic area. d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the affected geographic area,if any: �raSS p ICA-VV4lsAl . r-f eYI v YIDS svu4t't 5. Animals a. List any birds or animals which have been observed on or near the affected geographic area or are known to be on or near the affected geographic area: Birds: S' ►'i t""cc S Mammals: ,ala t IT" Fish: hdoAc, b. List any threatened or endangered species known to be on or near the affected geographic area: Nv / c. Is the affected geographic area part of a migration route? If so,explain. d. Proposed measures to preserve or enhance wildlife,if any:AS 6. Energy and Natural Resources a. What kinds of ener: ' electric .tural gas,oil,wood,stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating,manufacturing,etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. 6 c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: 7. Environmental Health a. Are there any environmental health hazards,including exposure to toxic chemicals, risk of fire and explosion, spill,or hazardous waste that could occur as a result of this proposal? List other proposed measures to reduce or control energy impacts,if any: P,4 (I) Describe special emergency services that might be required. WA (2) Proposed measures to reduce or control environmental health hazards,if any: NA b. Noise (1) What types of noise exist in the area which may affect your project(for example: traffic,equipment, operation,other)? v/' (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example: traffic, construction,operation,other)? Indicate what hours noise would come from the site. s(�pr� ` TM}� Nti4Ut" ' Yt "'e, dt. 4 ►vc4tC { p out!ISIN 1,6%; S csw(y\L (3) Proposed measures to reduce or control noise impacts,if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? sing , oa.J S t ( i.�teTS J �j P113 sI Psc�t cart l° - b. Has the site been used for agriculture? If so,describe. Nd c. Describe any structures on the site. I boo St 5�(, SkOp , 6 c r�� La�1 )1 d. Will any structures be demolished? If so,what? e. What is the current zoning.classification of the site? La- rwQW4l oke-4"vrl t .. f. What is the current comprehensive plan designation of the site? j g. If applicable,what is the current shoreline master program designation of the site? 1v/A h. Has any part of the site been classified an"environmentally sensitive"area? If so, specify. - e t c h sae i. Approximately how many people would reside or work in the completed project? ni f j. Approximately how many people would the completed project displace? P/A k. Proposed measures to avoid or reduce displacement impacts,if any? A VA 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: /V4 8 9. Housinp a. Approximately how many units would be provided,if any? Indicate whether high, middle,or low-income housing. ex s 1.t 3 1)4 rda+.V 0vs G b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle,or low-income housing. rv/A c. Proposed measures to reduce or control housing impacts,if any: Nlp 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas;what is the principal building materi (s)proposed? b. What views in the immediate vicinity would be altered or obstructed? Ava h+G c. Proposed measures to reduce or control aesthetic impacts,if any: t�Il� 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? my.Nes b. Could light or glare from the finished project be a safety hazard or interfere with views? • c. What existing off-site sources of light or glare may affect your proposal? 9 d. Proposed measures to reduce or control light and glare impacts,if any? KVA 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? V�3oWC b. Would the proposed proposal displace any existing recreational uses? If so, describe? 11/4.kO c. Proposed measures to reduce or control impacts on recreation,including recreation opportunities to be provided by the proposal or applicant, if any? 13. Historic and Cultural Preservation a. Are there any places or objects listed on,or proposed for,national,state,or local preservation registers known to be on or next to the site? If so,generally describe. b. Generally describe any landmarks or evidence of historic,archaeological, scientific, or cultural importance known to be on or next to the site. kAt c. Proposed measures to reduce or control impacts,if any: VA 14. Transportation a Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans,if any. (� dC$." is/ qcs ,4 too wt4�.►d+J q Q o f� 04. otc priva- 4t"- 10 b. Is site currently served by public transit? If not,whpt is the appro mate distance to the nearest transit stop? P1L 6,is slop art 805,0 c. How many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets;or improvements to existing roads or streets,not including driveways? If so, generally describe(indicate whether public or private). N'a e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transportation? If so,generally describe. ao f. How many vehicular trips per day would be generated by the completed proposal? If know,indicate when peak volumes would occur. kilA g. Proposed measures to reduce or control transportation impacts,if any: 'VA 15. Public Services a. Would the proposal result in an increased need for public services(for example: fire protection,police protection,health care,schools other)? If so,generally describe. pt/b11C. �r@rUCP.J pen, , p C14tj Ivy tl t„i� ,}wNotKeA b. Proposed measures to reduce or control direct impacts on public services,if any. 16. Utilities • a. Circle utilities currently available at the site electrici ,natural gasS refuse service;telep on sanitary sewe septic system other. 11 n b. Describe the utilities that are proposed for the project,the utility providing the service,and the general construction activities on the site or in the immediate vicinity which might be needed. oh C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. . -.Pk4 Flo% Signature Date Submitted D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS dr d¢C.feat-kG 1. How would the proposal be likely to-inereeee discharge to water,emissions to air, production,storage or release of toxic of hazardops substances or production of noise? „iouC:. ► of}C.. 4.10.3 ,,N{t\ pv}�r � -C— YP.sSV�r 0,4 46r10,5 r.ua-k' atI trw at c �JbGtG� ,moo �a\r{�� g. j' yROy$t I waxier-rbevAds rt,eQs� tat py' a.0\4,. l•'.v( Otilia.Cpsw4 properivi outwers' Proposed measures to avoid dr reduce such increases are: ¢1X *LC 4ec.,tt. 2. How would the proposal be likely to affect plants,animals,fish or marine life? v dr i up u.cM 4' , ue1ict Oat",ta Proposed measures to protect or conserve plants,animals,fish or marjpe life are: 3. How would the proposaal be likely to deplete energy or natural resources? KRA R`t' R`� 12 % 1 Proposed measures to protect or conserve energy and natural resources are: IVA 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated(or eligible under study)for governmental protection;such as parks,wilderness, wild and scenic rivers,threatened or endangered species habitat,historic or cultural sites, wetlands,floodplains or prime farmlands? N� Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use,including whether it would allow or encourage land or shoreline uses incompatible with existing plans? M'A& Proposed measures to avoid or reduce shoreline and land use impacts are: N/ . 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s)are: 7. Identify,if possible.,whether the proposal may conflict with local,state or federal laws or requirements for the protection of the environment. 13 CITY OF ANACORTES ENVIRONMENTAL CHECKLIST FORM A. BACKGROUND 1. Name 9f fpproposed project,if applicable: C bG no k r CO.... d I LJerr-'-' l f i Stde c4 cl �` Y c C& l�' oni S'OtJ4�'COI.S+ & C0.S 2. Name of applicant: eA &J 1. Crc"-O 3. Address and phone number of applicant and contact person: 7 St ) rno \5 7G 7� Atuae6r - S 2R3 - 4. Date checklist/ ',pared:9/ 16l02— 5. Agency requesting checklist: e► oC u&coS 6. Proposed timing or schedule(including phasing,if applicable): �. �C_Cc.r or +coo 7. Do you have any plan for future additions,expansion,or further activity related to or connected with this proposal? If yes,explain. 8. List any environmental information you know that has been prepared,or will be prepared, directly related to this project. D )) �e N_-#-1Gc�r 5 v rvei o►J ct t L e ,i I cL e 9. Do you know whether applications are pending for government approvals of other proposals directly affecting the affected geographic area covered by your proposal? If yes, explain. f�O 10. List any government approvals or permits that will be needed for your proposal, if known. N/A 11. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site. There are several questions in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat these answers on this page. /�Makt vsc�.bit� are, -Par sot-.1.4l.,«t t N 4 LC_1 c`u4urc_ . i$a _ grOV t..e VC/ to rh.a.f Gcw.Palt s?le 'Y tk,‘, RESerLt&4'ty✓ pj 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address,if any,and Section, Township and Range,if known. If a proposal would occur over a range of area,provide the range or boundaries of the site. Provide a legal description, site plan,vicinity map,and topographic map,if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist AO p j t I k.. t4, Remit_ -crack A exty . C, 51,014 ra& a.? . " — f 5euc,4°" 3 --rao . aLtp 3'-i tit)F4 . .Ras„ejc . cath e4 tke, tullla rYae*��ta�J B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the affected geographic area(circle one) roll' ,hilly, steep slopes,mountainous,other b. What is the steepest slope on the site(approximate percent slope)? c. What general types of soils are found on the site(for example,clay,sand, gravel, peat,muck)? If you know the classification of agricultural soils,specify them and note any prime farmland. ; c i 1 A ilk C-: ON n orrc d. Are there any surface indications or history of unstable soils in the immediate vicinity? If so,describe. toO 2 e. Describe the purpose,type and approximate quantities of any filling or grading proposed. Indicate source of fill. G p ry p ¶c-- -RI It ra l E SOi rcC oC gdk a.wGILA, t L% j Ca cj t4 't-i f. Could erosion occur as a result of clearing,construction or use? If so, generally describe. `vtiacc coif 0c, oc C:r Use ere,j ow co rot .reC S V be y,,.vr acIJtP-CS 1 CtvtS ewel(s.,rc-C/ g. About what percent of the site will be covered by impervious surfaces after proposal construction(for example,asphalt or buildings)? N/A dog kacc. co 6 spec l Ct. :p1Ock1,5 depe a,is or, caw gurcirir`E h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: r+,eaSVref exS Pc,— 2. Air a. What types of emissions to the air would result from the proposal(i.e.,dust, automobile,odors,industrial wood smoke)during construction and when the project is completed? If any, generally describe and give approximate quantities if known. `4 b. Are there any off-site sources of emissions or odors that may affect your proposal? If so,generally describe. a`J6 c. Proposed measures toseduce or control emissions or other impacts to air,if any: 3. Water a. Surface 3 (1) Is there any surface water body or on in the immediate vicinity of the site (including year-round and seasonal streams,saltwater, lakes,ponds, wetlands)? If yes,describe type and provide names. If appropriate, state ex— what streqm�m or river it flows i to. i 1.e r 1 S eLoposl i, tx rGe ~4J a ,Ccekr. ovc Lp,per( t � y� tro )1vV+ (_lh"ilPv5 ,..t='"F' O �ro✓w� c SC k {f r' tww� cwV §> <==qr+ prof (2) Will the project require any work over, in,or adjacent to (within 200 feet) the described waters? If yes,describe and attach available plans. (3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. - N/A (4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose and approximate quantities if known. (5) Does the proposal lie within a 100-year floodplain? If so,note location on the affected geographic area plan. A (6) Does the proposal involve any discharge of waste materials to surface waters? If so,describe the type of waste and anticipated volume of discharge. NQ b. Ground (1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description,purpose—and approximate quantities if known. • (2) Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for example: domestic sewage,industrial, containing the following chemicals...;agricultural;,etc.). Describe the general size of the system,the number of such systems,the number of A/IA 4 t k IC Aar !ham r•V trail/� 744ec \411r ;v il eq a4 c, r . ere 7 .4 -r C??O / J a/ f A t .-�'.r f'�C'y t/l•'-L",Q..- T'p /tR LC at_ W ClI LC.: -S,�Yrf 7 �B.r" r tit, # 7rase fPerfrnr 4/ - ' &/ict'c .1/1/ i e roc €. ,44 a•VC/4/4 S ,citnal Gr- tcG male --- crsvccrry j .lt.te wac c,"4 y IF4..l" 714_1 reper+ rfrcd -,ley Ae ce d 6 y r. puuC ,,,�,� s', ✓d�.�- ter.cc ,c� pas,(7 ,nyc( ,9ired 1 i t fin' ,., • I /1 � houses to be served(if applicable),or the number of animals or PP ), humans the system(s)are expected to serve. c. Water Runoff(including storm water): (1) Describe the source of runoff(including storm water)and method of collection and disposal,if any(include quantities,if known). Where will this water flow? Will this water flow into other waters? If sp,desribe. &taller rent-oft ivdvJ run.S 1w+4 e4tam c d1, (es ..+in°`-9 it, toad.- c eYti.e�-t- ttlt ma+ek cnJ4O —to raver' 13QMt (2) Could waste materials enter ground or surface waters? If so,generally describe. fik d. Proposed measures to reduce or control surface,ground and runoff water kipacts,if arty: pan4 kave.. &! fq.(cc.- c4tC e9 -41.,Cef^ itoblcw.i .so eve .%) tcwe*.2/ .4At4 1c t'.. err ruck e,reti wetr tvimeAt pale ., > ` 4. Plants a. Check or?circle types of vegetation found on the site: deciduous trees: alder,maple, aspen,other evergreen trees: fir,cedar,pine,other shrubs grass pasture crop or grain wet soil plants: cattail,buttercup,bulrush, skunk cabbage, other water plants: water lily, eelgrass,milfoil,other other types of vegetation b. What kind and amount of vegetation will be removed or altered? —911,0,E. 4reeS gwd- t r&.`S ' 5 c. List threatened or endangered species known to be on or near the affected geographic area. d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the affected geographic area,if any: �ret_SS p lavv#1 co crar 04' 1 t 5. Animals a. List any birds or animals which have been observed on or near the affected geographic area or are known to be on or near the affected geographic area: Birds: 543-r-4r ( S Mammals: ka)4 6 t"S Fish: b. List any threatened or endangered species known to be on or near the affected geographic area: c. Is the affected geographic area part of a migration route? If so, explain. l d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and Natural Resources a. What kinds of ener electric atural gas,oil,wood,stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating,manufacturing,etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. 6 f i k l, C J c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: Nl '` r 7. Environmental Health a. Are there any environmental health hazards,including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? List other proposed measures to reduce or control energy impacts,if any: (1) Describe special emergency services that might be required. N/ (2) Proposed measures to reduce or control environmental health hazards,if any: b. Noise (1) What types of noise exist in the area which may affect your project(for example: traffic, equipment,operation,other)? ��1 (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example: traffic, construction,operation,other)? Indicate what hours noise would come4 from the site. g kor—k {C°"`' ea4 S V% Cre"✓ ) Zkk4 'LovtS 041 (3) Proposed/measures to reduce or control noise impacts,if any: �! 0 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? 06NC st4- ., G G,G�w ? ra per;t r�e,.S 1 .}.�pSO t .� nESS) 7 b. Has the site been used for agriculture? If so, describe. Nd c. Describe any structurs on tthe5sL p f i t b� V S e°s o `" ra 1 I d. Will any structures be demolished? If so,what? e. What is the current zoningclassification of the site? vQ c,-4vra f. What is the current comprehensive plan designation of the site? ,J� g. If applicable,what is the current shoreline master program designation of the site? h. Has any part of the site been classified an"environmentally sensitive"area? If so, specify. "'' s 1 as ciecl t be- i. Approximately how many people would reside or work in the completed project? N✓I\ j. Approximately how many people would the completed project displace? "A k. Proposed measures to avoid or reduce displacement impacts,if any? AVA 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 8 1, 9. Housinp a. Approximately how many units would be provided, if any? Indicate whether high, middle,or low-income housing. eSt 3 Wrap", is cn S C e b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle,or low-income housing. A c. Proposed measures to reduce or control housing impacts, if any: 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas;what is the principal building materi (s)proposed? asa- f b. What views in the immediate vicinity would be altered or obstructed? IO h+C.� c. Proposed measures to reduce or control aesthetic impacts, if any: N/A 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? pvvc. b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off-site sources of light or glare may affect your proposal? PO N / 9 (Th d. Proposed measures to reduce or control light and glare impacts, if any? tV/A 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? ItuovvC., b. Would the proposed proposal displace any existing recreational uses? If so, describe? IV0 c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the proposal or applicant, if any? N�9 13. Historic and Cultural Preservation a. Are there any places or objects listed on,or proposed for,national, state,or local preservation registers known to be on or next to the site? If so,generally describe. M® b. Generally describe any landmarks or evidence of historic,archaeological, scientific, or cultural importance known to be on or next to the site. c. Proposed measures to reduce or control impacts,if any: t4 14. Transportation a. Identify public streets and highways serving the site and describe proposed access f ♦" 'y to theexisting street( � \system. Show on siteplans, if any. /�1y�� a w a�"(iak �� . Res J.t-1 "sow✓ ffi. f'O✓ \��� 0 `X) t �� L Zkvacti eta �, tole, 4+. Rd.. -rrc to i ) C b. Is site currently served by public transit? If not,whf t is the appro��x}}mate distance to the nearest transit stop?1,, " W 6 34ap o ' l'�9, 0 c. How many parking spaces would the completed project have? How many would the project eliminate? JA d. Will the proposal require any new roads or streets; or improvements to existing roads or streets,not including driveways? If so, generally describe(indicate whether public or private). e. Will the project use(or occur in the immediate vicinity of)water,rail,or air - transportation? If so,generally describe. re;O f. How many vehicular trips per day would be generated by the completed proposal? If know, indicate when peak volumes would occur. nJ/A g. Proposed measures to reduce or control transportation impacts,if any: 15. Public Services a. Would the proposal result in an increased need for public services(for example: fire protection,police protection,health care,schools other)? If so, generally describe. pi 11C, Serinee3 ptov b't i4c ivy Pao-fill r rues eA ccr�-- t . b. Proposed measures to reduce or control direct impacts on public services,if any. 16. Utilities a. Circle utilities currently available at the site c'electrici ,natural gas 6te refuse service=telephon sanitary sewe septic system other. 11 b. Describe the utilities that are proposed for the project,the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. tj/A C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature Date Submitted D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS �f deCre" o 1. How would the proposal be likely to.inaree tre discharge to water, emissions to air, production, storage or release of toxic of hazardops substances or production of noise? ,.you 1-opc 4kES ev%\\ ,p cenviC, 0,4 cub(IG. Qor°ks �cv.s$ t,u� er- r te. 0,103 44 +o cow Ah,o -4�,�0'e-r.2oy$c, ,e&ia tj�°^`�i released f-N a ( c ae vv+ outset rC Propose measures to avoid Ur reduce such increases are: ettx 4Lc Lett 2. How would the proposal be likely to affect plants,animals, fish or m ne life? Le d up 14) / a4 � p - d,�.,; Proposed measures to protect or conserve plants,animals, fish or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? IJClc GO •12 - Proposed measures to protect or conserve energy and natural resources are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated(or eligible under study)for governmental protection; such as parks,wilderness, wild and scenic rivers,threatened or endangered species habitat,historic or cultural sites, wetlands,floodplains or prime farmlands? ifte Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? tvt A Proposed measures to avoidor reduce shoreline and land use impacts are:/ 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s)are: 7. Identify,if possible,,whether the proposal may conflict with local, state or federal laws or requirements for the protection of the environment. 13 r, I , I r (,).) :> (Tk i ._ l.....,.� / A104.48„rwass es w — - •�• 1.--.. H � FxISTIN�' RAVEL ROAD- . ,� t �. �,�x to - - - -- - _ --=@•5114 ND �8.•rt4+00 a: 0 0 + f o ;, II 1 \ Ct ri _ APPROX EX, CUT 1 Ol . \ ' GROUND ------....+,.,.. -- -- \ I . 1 t i o ,• ,- • o- FILL \ LIMITS OF EXISTING GRADING AREA so o 25 GRAPHIC SCALE 20 + a01 14 \� \ Z I �� , „ --,,, in \ %`,.,.N. - • ••• \ ^ \ / ( ( IN FEET ) \ + �'; 1 1 inch — 50 it. \\ \ I Q I tf� + / J \ J 1 t . - \ I 1 O pRA1N TO • p� a •. \' gc GRADE T�� NT POt� «��� +• —.�t-- / i , \ I. I MPOR YSED1el o , \ I N \-. / It/ . . \ ' _ \ e ` WOodyN., TEMWORARY N \ I V 1 \_ . 1 \ gR1S�; �E 01MEN7PC� _ - - -- - - - - - - - - -- - ,_, , l 1 / - riNN_ . \ qr-- / i 1 >s.\\,0��� � LEGEND I \NI gnoti v°"° 1 R / / �` / y y WETLANDS / i I NN \ °\tiF �gq I I r- / / � TEMPORARY WOODY \ <0 Gf7*gy •V STOCKPILES i I \ `'�'� ._.? , T G / \\ TEMPORARY ��" SEDIMENT POND \ �•,'~�,, • ,� • / / CUT \�� �y tii,� \m �� /ram �` �` 1 1 1 , , ----,... -„,„ ---. 7,/ I / \\ ,\\ \� \-`~ -,.._ ~ ! ,• ,�/ \GRADE TO 1 / k ;;:::CHECK / /---____. i NN \ ` .� 'N � .. GRADETO\ � \ DRAIN / � / � \ \ .\� �``\ �`. ` • \ • I� � � � \ \ •\ \ �� / COMPLETE SLOPE \ \ . \\ \\ \\ \ `., ,� ` \, \ , �` 1 / `� GRADING /\\\ \\ \\ \ \\ ,_ \ T POf2Rl .. 1 ct150:I.S, .1 \ \\ \\ \ �� \ \\ \ �\ I ( prM6ivl:i?�3 / EX. SILT FENCE \ \\ \\ \ \�`� ` \ I �\ _ \:•� REPAIR/REPLACE AS NEEDED \� \ \ \ \ \ :� \\ �` �1 u �� - ~� )\\CULVERT / GROUND ELEVATION \ \ �\ \ � \ \ ` ` ,\ \\ `\ �' _ _.,�``�r \\ '�-� PROPERTY LINE \\ \ \ \\` \ \F \�\ \ ` \ \ , `\ ` I GRADE TU • ��RAWBALE BARRIER/DAM AND ILT F CE (CREWS PROPERTY) I \ \\ \ \ \\ \ \4 �\ � ' `\ I •`...,, DRAIN - ` � • SEE E130SION CONTROL, SHEE R AD LAN \ \\ \ 1\ ,`\ \ I ` DATED S'EP�MBER 30, 2002 FC�R ADD IONAL \ \\ \, N \` \\\ \ 1\ DETAILS) \ \ \\ \ \\ \ -'�`\ `\ \ TEI •EN .i, \\ PX. EXISTING DITCH LOCATION ID 1-- N I SEP I,,,. Q0+ , N1'. =lt D ,\ \,r, _ ..._ • : ' : : ..,.,., =+ / yfi i 5 w x. RESERVATION ROAD FUTURE SA ITARY \ \ SEINER CON CTION .% J Z w J ! WETLAND -I It I 15 OE GRAI)IN<_ AREA- ARE O 1 EASEMENT WO n 1 11 rel w w AVERAGE FILL DEPTH ±3.5' -+ L 50 i Le CoPV ! — - `\\ I a EXISTING I - a `EXISTING GRAVEL ROAD . RAILROAD TRACKS -- -- ` J rn fa, i u L ., I AIAXIN1UM SLOPE m 'PAINING nI II t70 00 SECTION A—A NOTE: SITE MAP BASED ON SURVEY INFORMATION PROVIDED BY: (SCALE: 1"=50') NORTHWEST DATUM & DESIGN, INC., DATED SEPTEMBER 23, 2002. SOME ADDITIONAL GRADING HAS OCCURRED SINCE THAT TIME. NO. DATE BY APPR. REVISION - ( SMELT 1 3-21-03 CP MB ADDED DETAILS TO S.W. ^___ S BU E �aFA,AEANO To © 2020 ENGINEERING, Inc. etwasgi• • ; RESERVATION ROAD PROPERTY 700 DUPONT STREET/ PO BOX 1621 ,°,n/ ' `l' ' •'` , � BELLINGHAM, WA 98227-1621 USA GRADING PLAN 1 (360)671.20 FAX:(360)671-0322 �,,.flisill a `�� t KEN CREWS (TO COMPLETE GRADING WORK IN PROGRESS) Or - ' i•,:,e , +.F www.2020en ineenng.corn 1:41111:06:VisT569Alir G A� 706 ST• MARY'S PLACE ANACORTES, WA 98221 IC N C I N t 0,1 F� I:N 0 "To provide s/mple ne nnrc solid ons M complex envirommontil( „- F �,2 360-293-7678 \ to mr•t,`uhv .1 i•newt EXPIRES FEBRUARY 16, 200.31 DATE JANUARY 13. POUT I LOP. ,313rn! I SCALE. AS SHOWN DR4WN PY•• cr DESIGNED BY•• M. EIUEHRF'R� CHEMED RY M. HUE7•IRER EROSION & SEDIMENT CONTROL NOTES KEY BALE INTO 1 . THE IMPLEMENTATION OF THESE EROSION AND SEDIMENT CONTROL(ESC) PLANS AND THE CONSTRUCTION, SOIL AT BOTH MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE ENDS OF DAM STRAW BALE CHECK DAM NOTES: CONTRACTOR UNTIL ALL SITE GRADING WORK IS COMPLETED AND THE SITE HAS STABILIZED. eti1 . PLACE BALES PERPENDICULAR TO FLOW. 2. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL 4 4 t 2, EMBED THE BALE 4" INTO THE SOIL AND CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE "KEY" THE FND BALES INTO THE CHANNEL SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. \\/\\/ \ .�M," �s �+ , ;� 3! -_,air,,,,,,../ \\��\� �,,,. BANKS. ��>'/�\�\\/y-,441 ,2., ,a�+ia. ' ✓\ /\��\!/,' 3. BALES PLACED WITH ENDS TIGHTLY ABUTTING. 3. WHERE STRAW MULCH OR "HOG FUEL" FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A \��•\Y/i`�/� %,,% Sri',/", �/�\rr�� ��!\\N�\ FILL ANY GAPS BETWEEN FILTERAW, ROCKS OR FABRIC ANDITAMP MINIMUM THICKNESS OF 2 TO 3 INCHES. \\,, r BACKFILL MATERIALS TO PREVENT EROSION 4. CHANNELS, DITCHES, SWALES AND OTHER CONVEYANCE SYSTEMS SHALL BE STABILIZED TO PREVENT EROSION OR FLOW APnLND THE BALES DURING AND AFTER CONSTRUCTION. INSTALL OUTLET PROTECTION FOR ALL CULVERTS. SECTION I I I w 5. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE WOODEN STAKE OR REBAR > APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). j/ DRIVEN THROUGH BALE in ,/ TYP 2 PER BALE ? 6. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED O STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SEEDING AND/OR J 1,'.;, ,t LL �.OA3} MULCH COVER, RELOCATION OF DITCHES AND SILT FENCES, ETC.). FLOW % W • - 7. THE ESC FACILITIES SHALL BE INSPECTED BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE \ \ \ \ \\ \ \ \i /\/\/ /\i*/ - 1 - :: "1 ' CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES y� �� /// /\\r�/\?/A.< .\yti_� t ���y\ \///\\, ���%/��\ 7\10 /�/�� 1 `\� DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. \�\\�\\�\\K�. . / /i / i i ,,// Y0/cter\�//\fir.\//,/i./ STRA\A BALES EMBED STRAW ' ' TIGHTLY ABUTTING 30). 1 BALE 4" MIN. III INTO SOIL. ELEVATION PLAN 2"x2" BY 14 Ga. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED, OTHERWISE USE EXTRA STRENGTH FILTER FABRIC. . 2"x4" WOOD POSTSSTEEL � STRAW BALE CHECK DAM DETAILS POSTS, REBAR, OR'EQUIVALENTE (TYPICAL) N .T.S . „rrr„rrr,,,,•r,,, ,rrr ,rr .rr rr ,.' ATTACH •FILTER FABRIC poor' rr"irr"ir''o''li'Rl' i,pr'in''iii"iir''iinio'i9"ii"' SECURELY TO UPSTREAM ill Ar rrr ur v' r' r' '' "' pA uiu Ar A Ar Or rA pr ,n ' SIDE OF POST pA1r rnr ,pr ppr,,ir pr' rr' n UI . p rrr p pr rr P A' A 1 111 ,lurr r , rr rr 1 II! 1p p1 III IO Ir Ur rr A 0 1r II _ A UI Ili 1ii 1il 1i 1p ii 1i1 j111 III 111111100IIIi 001100111j11niiirlli=rp'ir,i:W III III II 10 0011011001100111po1111 :o01 jI1 011 111.•• '•. �' ' �� iI- • n 111111111111111011i1 j10111i11I1111111101 11111 . 4 ... ' LOW linliO j01011j11IiU111011IIp11101111j1 •111. ..' -. -'• , „�- 00110111111011IIII I •_ _ iiiiIiMI 011119 001j1 ' �i •`:.' -- ':#5 REBAR 111jj1 IIII . ... _ r ter'-, 5 '��S,,iAl , ' ,I , IIIIj1111p r - ,)yII' } r 1(ry �, \r 111�r ' \ \ 8" MAXIMUMSPACING WITH i -� I?0//1 S� f :S \ „I // / /\/\/ \/\/\/i W/RE SUPPORT FENCE �j/ �/;r / ' ' �t`I}`� C';''I /\\��\\��\\��\\ /\//. /�. 6' MAX/MUM SPACING WITHOUT - 1 r I/ j r /�J -f .. ;7-ih fj�l",rl ;ii� �I . �' WIRE SUPPORT FENCE r1r / 7— I / {r(111g1,fi " r - ;,(V/I 'I{)fy ii, { il�t(,1, STEEL OR WOOD POST •-4 ' 'I• / r' i n jl? �Ih,1I l.hti{hk`�` . " �36" (1m) HIGH MAX. <c • r - / i ' ' 4 , ,, - ,. lil(�,- i H , PONDING HEIGHT PONDING HEIGHT - il='°' O).t i% -• II I FLOW 1 i 'I 3/4" (20mm) MIN. DRAIN ROCK 9" MAX. 1 . EXCAVATE THE TRENCH. 2. PLACE AND STAKE STRAW BALES FLOW L— (225mm) WITH 2 #5 REBAR (MIN. 36" LONG) .. .ti;s' . `//\/ //\/\/\// STORAGE HT e4 - 8" (200mm) PER BALE. \/\\ .4.-'?:: '- '..i\\j\\j`` . . \ / \// % 12 MIN. \ \\� (300mm) / // (300mm)i\ j\\ \\ ' _ , h , ; <\, / 4"x6" (100 X 150mm) /\ /�\/ I.', `-1;� 1) �j , >Y' - TRENCH WITH COMPACTED \\ ),� ',-- /1 ,I ;'_ .„, �; NATIVE SOIL OR 3/4"-1.5" s 'r,s v % r�2,-r�i ,� , T WASHED GRAVEL BACKFILL J �<9} ,•J 15 0' /N,ipi I I . SILT FENCE TRENCH DETAIL INSTALLATION WITHOUT TRENCHING ��l,�ffl�?��)f ; *- /� h�,( ," 1I �} NOTES� Ij}� l , :`j,;\ (�% i i r" { `I I;II�/) Dy 1. SILT FENCE SHALL BE PLACED ON SLOPE ��_ �5 ,f�ij�p)r l j yI 4( J ;,' rI,'f�-•�1 Ilfi i'f• l ,(' CONTOURS TO MAXIMIZE PONDING EFFICIENCY. /� i�r''J'(�,f,�J'SJ/I�)�ILII�\\�5� - ,; 7. ' tiI'I` I'liFI{�I',A, 1I,Ii 2. INSPECT STORM EVENT AND REMOVE SEDIMENT WHEN I j' I - '1' •%i;1,ll llli `�`�1�,�(.Ii ��1il �I, NECESSARY. 9" (225mm) MAXIMUM r (--- PI RECOMMENDED; RECOMMENDED STORAGE HEIGHT. I 'I, �� _,,-2 i:- s ,I I' 3. REMOVED SEDIMENT SHALL BE DEPOSITED I TO AN AREA THAT WILL NOT CONTRIBUTE I i SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 4. JOINTS IN FILTER FABRIC SHALL BE SPLICED 4. WEDGE LOOSE STRAW BETWEEN 3. BACKFILL AND COMPACT THE AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. BALES. EXCAVATED SOIL. rm STRAW BALE BARRIER -3 EROSON CONTROL SILT FENCE J (TYPICAL))(TYPICAL) N .T.S. C N .T.S. J'-► n 2020 ENGINEERING, Inc. o ><BUM w RESERVATION ROAD PROPERTY ;; � 700 DUPONT STREET/ PO BOX 1621 e �°x *W ,* f, 7.f . EROSION AND SEDIMENT CONTROL a �"I r s a�t BELLINGHAM, WA 98227-1621 USA Y (360)671-2020 FAX:(360)671-0322 160 25353 w KEN CREWS DETAILS , ti www.2020engineering.com .5`s �' `£9 G`t' 706 ST. MARY'S PLACE ANACORTFS, WA 98221 OF r l c 1 r\i C C I N SlONAL 360-293-7678 "To provide simple economic solutions to compfnr environmrnl.�l iaCur< • NO. DATE BY APPR. REVISION ` .. to,,,,,,it kdnrr nrorle / EXPIRES FEBRUARY 16, 2003 �, I DATE SEPTEMBER 30 2002 JOB: 313cm SCALE AS SHOWN DRAWN BY: C. PERRY H DESIGNED BY: BUENRER CHECKED BY: M. BUENRER