Loading...
HomeMy WebLinkAboutPermit File BLD-2021-0077 4319 Oakes Avenue (2) 1 ' City of Anacortes Invoice/Permit#: BLD-2021-0077 904 6th Street • Applied date: 01/25/2021 P.O.Box 547 Issue date: 01/29/2021 '0: Anacortes, WA 98221-0547 Expire date: 07/28/2022 ;,''"' 4,r., (360) 293-1901 Job Address: 4319 OAKES AVE Permit Type: Single Family Residence Permit ANACORTES WA 98221 Project: APN: Remarks: NEW SFR Automatic Sprinkler System Required.Verify prior to framing inspection. Owner: CHRIS FELT Contractor: CASCADE BUILDING DESIGNS INC Address: 16839 KAMB RD Address: 16839 KAMB RD MOUNT VERNON WA 98273-8147 MOUNT VERNON WA 98273-8147 Phone: (360)661-4176 Phone: (360)661-4176 License#: General Information: Fees: Occupancy Group it-1 Traffic Impact Fee 2,817.69 Use Zone R-2 Non Sprinklered SFR Fire Fee 102.58 Flood plain development N EMS Impact Fee 363.70 New or Replaced Hard Surface 8276 SFR/duplex: site plan/design 60.00 Lot Area 13923 Stormwater Review 662.08 1st Floor Square Footage 2372 Plan Application Fee 200.00 Garage Square Footage 599 Building Permit Fee 2,393.75 Deck Square Footage 180 Plan Review Fee 1,555.94 Porch Square Footage 74 Mechanical Permit Fees 160.05 Stove, Appliance 1 Plumbing Permit Fee 153.00 Building Valuation 350000 State Building Code Fee Resi 6.50 # Forced Air Furnace <=100k 1 Sewer Inspection Fee 52.14 #of Backflow Devices 1 Storm Drain GFC-Residential 1,746.97 #of Tubs, bath 2 Sewer GFC-Residential 9,331.86 Park Impact Fee 615.00 #of Clothes Dryers 1 #of Clothes Washers 1 Total Calculated: 20,221.26 #of Dishwashers 1 Deposits/Receipts: 0.00 # of Gas Outlets 6 #of Gas Fireplace 1 Total Due: 20,221.26 #of Gas Piping 1 #of Gas Water Heaters<= 100k 1 #of Tankless Water Heaters 1 #of Water Piping 3 #of Hose Bibs 2 #of Kitchen Sinks 1 #of Hand Sinks 3 #of Range Hoods 1 #of Showers 1 #of utility Sinks 1 #of Ventilation Fans 5 #of Water Closets(Toilets) 3 1 Y City of Anacortes Invoice/Permit#: BLD-2021-0077 904 6th Street Applied date: 01/25/2021 P.O.Box 547 Issue date: 01/29/2021 _ ;' 0, Anacortes, WA 98221-0547 (360) 293-1901 Expire date: 07/28/2022 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY u„..., � Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT ��'�' Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y `�� Phone: (360)293-1901 FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION 1. PROPERTY INFORMATION Project Address(Street,Suite#): Assessor Parcel Number: 4319 Oakes Ave P 133694 This may change when Felt 2 lot short plat final is approved&recorded Subdivision/Lot#: Zoning Designation: Lot area (size): 13923 Lot 1 R2 sq.ft. 2. TYPE OF PROJECT New SFR ❑ New Accessory Dwelling Unit: ❑ Deck/porch (new/repair) III New Duplex ❑ Attached to Primary Unit ❑ Interior remodel ❑ Detached from Primary Unit ❑ New Addition to SFR ❑ Garage, carport or accessory building E Fence or retaining wall or duplex (new/repair) ❑ Other: Project Summary: Build a single family home Project Valuation: $350,000 3. PROPERTY OWNER INFORMATION Name:Chris & Cheryl Felt Phone:360-661-4176 Address(Street,City,State,Zip): Email Address: 16839 Kamb Rd Mount Vernon, WA. 98273 cascadebd@live.com 4. CONTRACTOR INFORMATION Name:*Cascade Building Designs Phone:360-661-4176 Contractor's Business Licenses State License#: City License#: *All Contractors&Subcontractors must have a valid City CASCABD831 B4 6040744372 of Anacortes business license prior to doing work in the Expiration Date: Expiration Date: City. 1/31/2022 1/31/22 Address(Street,City,State,Zip): Email Address: 16839 Kamb Rd Mount Vernon,WA.98273 cascadebd@live.com 5. CONTACT PERSON Select one person the city will contact for anything ® Applicant ❑ Property Owner ❑ Contractor related to this project: ❑ Other(list below) Name:Chris Felt Phone:360-661-4176 Address(Street,City,State,Zip): Email Address: 16839 Kamb Rd Mount Vernon, WA. 98273 cascadebd@live.com Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 5 of 18 Y 0 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 9111111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; %" Phone: (360)293-1901 6. LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lenders involved with your project, write"no lenders"on the Name Line below. Name: TBD Phone: Address(Street,City,State,Zip): Email Address: 7. ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: C.F. I understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. I understand that if I submit incomplete, inaccurate, and/or erroneous information it will take the C.F. City longer to process my permits. I understand and acknowledge that I could be responsible for providing as-built drawings (on paper C.F. or electronically) as part of the project's certificate of occupancy process. I understand and acknowledge that Special Inspections could be required as part of my project, and C.F. if needed I will be required to pay for the cost of these inspections. C.F. I understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. C.F. I understand that if permits are reviewed concurrently such as design review, site plan,traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. ciAz:d- Piet- 1/22/2021 Signature Date Chris Felt Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 6 of 18 I;G � PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 1co�. `� Phone: (360)293-1901 FORM BP-2: STRUCTURE AND SITE INFORMATION AIIMM 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4319 Oakes Ave PARCEL NUMBER(S) P133694 This may change when Felt 2 lot short plat final is approved & recorded 2. DETAILED PROPOSED STRUCTURE INFORMATION Complete the following information as it relates to your project. Mark items that are not applicable with "N/A". Structure height:21' 4 1/2" AREA SQUARE FOOTAGE OCCUPANCY GROUP CONSTRUCTION TYPE OCCUPANT LOAD 1st Floor: 2372 2nd Floor: N/A 3rd Floor: N/A Basement: N/A Garage: 599 Total deck: 180 Total porch: 74 Other: Other: Other: 3. QUESTIONS ABOUT THE PROPOSED STRUCTURE Is a fire sprinkler system being installed? 0 YES ❑ NO Is a monitored fire alarm being installed? ❑ YES 12 NO Are retaining wall(s) being built? ❑ YES 12 NO Are structural plans required? YES ❑ NO 4. PROJECT SITE INFORMATION A. Is work within the City's right-of-way proposed? If yes, you will be required ❑ YES 12 NO to submit a right-of-way permit application. If you have already submitted a ROW permit, list the permit number here: B. Is the property located in a flood zone? ❑ YES NO If yes, list the flood zone designation: C. Are there slopes in excess of 15%on or abutting the site? If yes, a ❑ YES ® NO geotechnical report will likely need to be submitted. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 7 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 911111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; `,:7 Phone: (360)293-1901 D. Are there critical areas or buffers on or abutting (within 300-feet of)the ❑ YES ® NO project site? If yes, a critical areas report will likely need to be submitted. E. Is the lot less than 5,000 sq. ft. in area? ❑ YES ® NO If yes,your site and building will need to comply with the standards in AMC 19.43.010.C. F. Is your project involving an accessory dwelling unit? El YES NO If yes,your site and building will need to comply with the standards in AMC 19.47. G. Will more than 2-acres be cleared and/or more than 5,000 board feet ❑ YES 12 NO (about 1 log truck load)of timber be harvested? If so you may need to obtain a forest practices permit from DNR. H. Is this project subject to the SEPA process? If yes, you will be required to ❑ YES 12 NO submit a SEPA checklist. If you have already completed the SEPA process, list the permit number here: 5. REQUIRED SIGNATURE I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. c� i - 1/22/2021 Signature Date Chris Felt Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 8 of 18 I;GI (�� PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 1co�. `� Phone: (360)293-1901 FORM BP-3: PLUMBING AND MECHANICAL FIXTURES imiiM MECHANICAL Equipment Type: Appliance/Equipment Information (new and relocated): Total #: Furnace: Gas#:1 Elec#: BTU: Other#: 1 Wall Heater: Gas#: Elec#: Other:#: Location(s): 0 Gas Water #:1 Location(s): Garage 1 Heat Pump: Elec#: Other It Capacity: 0 Air Conditioning: Elec#: Other#: Capacity: 0 Radiant/Hydronic Gas#: Elec#: Other:#: Location(s): 0 Exhaust Fans: Bath#:4 Laundry#:1 Other: 5 Range Hood: #:1 Location(s): Kitchen 1 Fireplace: Gas#:1 Elec#: Other:#: Location(s): Clothes Dryer& Duct: Gas#:1 Elec#: Other:#: Location(s): 1 Stove/Range/Oven: Gas#:1 Elec#: Other:#: Location(s): 1 Gas Piping/Outlet(s): #:6 Location(s):Deck,fireplace,range,dryer,water tank,furnace6 Boiler Gas#: Elec#: BTUs: Location(s): 0 Other: #: Location(s): 0 TOTAL MECHANICAL OUTLETS: PLUMBING Fixture Type(new and relocated): Total#: Fixture Type(new and relocated): Total#: Water Closet(Toilet): 3 Refrigerator water supply(for water/ice 1 Kitchen Sink: 1 Pressure Reduction Valve/Pressure Regulator: 1 Utility Sink: 1 Water Service Line: 1 Tub: 2 Water Piping: 1 Hand Sink: 0 Clothes Washer: 1 Shower: 1 Electric Water Heater: Tank-less? Yes VI 1 Dishwasher: 1 Backflow Prevention Assembly: 1 Hose Bib: 2 Other: 0 TOTAL PLUMBING FIXTURES: Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 9 of 18 I;GI � PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 r Phone: (360)293-1901 o FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4319 Oakes Ave PARCEL NUMBER(S) P133694 This may change when Felt 2 lot short plat final is approved&recorded 2. GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant architectural plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11" x 17" and drawn in an architectural scale. • Architectural plans for structures 4,000 square feet or larger are required to be prepared and stamped by an architect licensed in the State of Washington. • Structural plans must be stamped by a structural engineer licensed in the state of Washington. 3. REQUIREMENTS FOR ALL ARCHITECTURAL PLANS COMPLETE REQUIREMENTS PAGE#ON ? YOUR PLANS Cover (or 1st page) must include: 1 • Site address • Parcel number • Lot number(if applicable) • Lot size • Lot coverage • % impervious surface coverage Floor plans with existing (if applicable) and proposed building layout with square footages and with the use of each room/area labeled. 6 Window and door sizes labeled and window ventilation area. Commercial, Multi-Family, and Mixed-Use Structures must also include door and window 6 schedules. Plumbing, duct, and electrical layout. Penetration protection must be shown. N/A Opening headers, size, and material. Si ENG Cross section details, showing typical foundation,floor, wall, ceiling and roof construction and insulation. 8 Structural members labeled as to size and spacing as well as bracing, blocking, bridging, special connectors, and anchor bolts. 3,5&8 Details documenting energy code compliance. Attach File Exterior building elevations demonstrating compliance with applicable structure 2&3 type design standards (small lot, duplex, or ADU) and maximum building height Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 10 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 rt `V Phone: (360)293-1901 Building height (see AMC 19.42.120 for measurement methods,exceptions and modifications). 1,2,3 • Label the building height at the highest point of the structure from the average of the natural topography at the foundation at the front of the building. • Label the average elevation of the natural topography at the front of the building. • Label the elevation at the center of all exterior walls of the proposed building. • For ADUs only, include elevations demonstrating compliance with the height/setback plane(see AMC 19.47.030(C)(6)). Special details as needed (i.e., stairs,fireplaces, special construction). 2,3,4,5 Insulation and insulation values of walls, slab,floors, and roof/ceiling. 8 Existing and proposed grades with slope of lot shown. C1,C2 Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 11 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 9111111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; %" Phone: (360)293-1901 FORM BP-5: STORMWATER MANAGEMENT MINIMUM REQUIREMENTS DETERMINATION 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4319 Oakes Ave PARCEL NUMBER(S) 133694 This may change when Felt 2 lot short plat final is approved&recorded 2. GENERAL INFORMATION Most development within the City of Anacortes that involves disruption of soils, or construction of buildings, streets, parking lots,etc. requires a Stormwater review. Stormwater review requirements are based on either the amount of soil to be disturbed (grading,vegetation removal),or the amount of hard surface that is created or replaced on a site(building footprint,concrete,asphalt or gravel parking,sidewalk,etc.) This form is largely targeted for small projects and single family residences. For larger projects and more information please refer to the Anacortes Municipal Code(Chapter 19.76 Stormwater Management)and the latest Washington State Department of Ecology Stormwater Management Manual for Western Washington (Ecology Manual). 3. HARD SURFACE AREA CALCULATION Please calculate your project's hard surface amount;guidance is provided on the next page of this document. Use your project's total hard surface calculation to follow the flow chart(s) in this packet and determine the level of stormwater management required for you project. When determining your permit level or if stormwater thresholds are met or exceeded the entire project must be considered. A project is that portion of a property, properties,or right of way subject to land disturbing activities, new hard surfaces and replaced hard surfaces. The hard surface on your property will determine the storm water utility fees and the stormwater general facility charge. All new or replaced hard surfaces should be accounted for. Below are excerpts from the Anacortes Municipal Code and Ecology Manual that may assist you in preparing this information. "Hard surface area"means an impervious surface, a permeable pavement, or a vegetated roof. "Impervious surface"means a non-vegetated surface area which either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non-vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. "Replaced impervious surface"means,for structures, the removal and replacement of impervious surfaces down to the foundation. For other impervious surfaces, the removal down to bare soil or base course and replacement. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 12 of 18 CAW PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 $ Phone: (360)293-1901 Land disturbance Total 1 Description (SF) 12,561 Total Area of Land disturbing activity 2,785 Total area converted from vegetation to lawn or landscaped areas Hard surface area calculation Existing Removed Proposed Proposed Description (SF) (SF) Replaced New (SF) (SF) Non Pollution Generating Hard 0 0 0 3,550 Surface Area (Sidewalks, paths, patios,etc.) Pollution Generating Hard Surface Area 2,752 0 0 1,976 (Driveways, parking areas, etc.) Total Hard Surface 8,276 Site Size 13,923 Existing impervious surface coverage% 0.2 (sq.ft. hard surface/site size) Use the information in the above table to navigate the flow chart(s) on the next page and determine the applicable stormwater management minimum requirements for your project. Then complete the applicable Stormwater Minimum Requirements Form on the Public Works - Engineering Department Forms website and provide required submittal items/plans. Check applicable box Minimum Requirements Determination X Minimum Requirements#1-9. See Storm water drainage report El Minimum Requirements #1-5. Res.Building Per�Application Submittal checklist Updated October36,2019 Minimum Requirement#2. Page 13 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT l.. 9�'� Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Villieircv Phone: (360)293-1901 FLOW CHART FOR DETERMINING REQUIREMENTS FOR NEW DEVELOPMENT Start Here Does the site have 35% Yes See Redevelopment Minimum or more of existing ► Requirements and Flow Chart impervious coverage? (Figure I-2.4.2). No Does the project convert 3/4 acres or more of vegetation to Does the project result in lawn or landscaped areas,or 5,000 square feet,or No convert 2.5 acres or more of greater,of new plus ► native vegetation to pasture? replaced hard surface area? \ No Yes Yes Does the project result in 2,000 r square feet,or greater,of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted vegetation areas. Yes No Does the project have land Minimum Requirements#1 disturbing activities of 7,000 through#5 apply to the new YeS square feet or greater? and replaced hard surfaces and the land disturbed. No V Minimum Requirement#2 applies. Figure 1-2.4.1 Flow Chart for Determining Requirements for 641 New Development DEPARTMENT OF Revised June2015 ECOLOGY Please see http./Avww,ecy,wa gov/cnpyrighthtml for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 14 of 18 y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 kz Office Location:904 6th Street, Anacortes WA 98821 Phone: (360)293-1901 FLOW CHART FOR DETERMINING REQUIREMENTS FOR REDEVELOPMENT Does the project result in 2,000 square feet,or more,of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet or greater? v Yes No Minimum Requirements#1 through#5 apply to the new and replaced hard Minimum Requirement#2 applies. surfaces and the land disturbed. Next Question Does the project add 5,000 square feet or more of new hard surfaces? OR Convert 34 acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? Yes No All Minimum Requirements apply Next Question Is this a road to the new hard surfaces and the related project? \No converted vegetation areas. Yes Does the project add 5,000 square feet or more of new hard surfaces? Yes No Is the total of new plus replaced hard surfaces Do the new hard . 5,000 square feet or more, surfaces add 50%or No No additional No AND more to the existing 110requirements. does the value of the proposed improvements hard surfaces within -including interior improvements-exceed the project limits? 50%of the assessed value(or replacement value)of the existing site improvements? Yes�� All Minimum Requirements apply to the new and replaced hard surfaces and converted vegetation areas. --)Yes Figure 1-2.4.2 Flow Chart for Determining Requirements for Redevelopment DEPARTMENT OF Revised June 2015 ECOLOGY Please see htfp./Nuww.ecy.we.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability,and disclaimer Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 15 of 18 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT — Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 `4 86�� Phone: (360)293-1901 FORM BP-6: SITE PLAN REQUIREMENTS 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4319 Oakes Ave PARCEL NUMBER(S) P133694 This may change when Felt 2 lot short plat final is approved & recorded 2. GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant site plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11"x 17" and drawn in an engineering or architectural scale. 3. INFORMATION REQUIRED ON ALL SITE PLANS COMPLETE? REQUIREMENTS PAGE#ON YOUR PLANS 1 Cover sheet must contain all of the following: • Vicinity Map • Name of the project • Name, address, and telephone number of owner and agent(s) • Name, address, and telephone number of Applicant (if different from the owner) • Zoning designation of the site • Area, in square feet and acreage, of the project site • Reference to the Building Code used • Proposed use • Occupancy group • Construction type • Square footage and height of each individual building • Percent lot coverage • Percent impervious surfaces Scale and North Arrow 1 Property features: Location, identification, and dimensions of all property lines and 1 easements. All easements shown on the title report, Record of Survey, or plat must be dimensioned and shown. Location and dimensions of existing critical areas (wetlands, streams, steep slopes) and their associated buffers. N/A Location of Ordinary High Water Mark and shoreline jurisdiction limits (if adjacent to a shoreline). N/A Existing and proposed contours and site elevations (i.e. finished C1,C2 grades) at 5-foot minimum increments. The horizontal and vertical control datum must be clearly shown. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 16 of 18 ; Iy PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT I Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 k Phone: (360)293-1901 Structures: Location, identification, dimensions and size of all existing and 1 proposed buildings and other structures. Location of existing and proposed retaining walls, rockeries, and N/A Location, identification, and dimensions of all setbacks. 1 Show proposed projections into required setbacks, including dimensions (see AMC 19.44.140) N/A Utilities & Easements: Location and dimensions of existing and proposed stormwater, 1 sanitary sewer, potable water, and fiber lines/facilities. All wells and septic systems located on or near the project site must also be identified. Location of all existing and proposed fire hydrants within 300 feet of the boundary of the project site. N/A Location and dimensions of existing and proposed freestanding lighting fixtures, utility junction boxes, public utility transformers. N/A Stormwater Proposed Temporary Erosion and Sediment Control Measures, if not located on other plans. C2 Proposed permanent stormwater management BMPs. C2 Access, Circulation & Parking Location, identification, and dimensions of all existing and proposed N/A on-site and adjacent streets and alleys, including the location and dimensions of all existing and proposed curbs,gutters,sidewalks, median islands, and street trees. Show existing and proposed vehicular access to the site, including the size and location of driveways and curb cuts. 1 Show existing and proposed parking spaces, including surface material and dimensions of spaces. N/A Open Space (ADUs, Small Lots, and Duplexes) Show calculations, location, dimensions and provided square footage N/A of required open space area per AMC 19.43.010.C, E, or AMC 19.47, as applicable. Landscaping Show the location and design of landscape areas to be preserved and 1 planted, and a plant list to include the location, number,size and type of plant material by botanical and common name. Location of irrigation system if a permanent or temporary system is proposed. N/A Show the location of existing trees to be retained in conformance 1 with AMC 16.50, and tree protection measures to be implemented, when applicable. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 17 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 \' iv Phone: (360)293-1901 coW Provide a maintenance plan for any infiltration-based stormwater C2 best management practices (BMPs) built as part of the landscaping design, including the specifications and maintenance procedures of any soil amendments. Show new trees to be planted and tree unit credit calculations, in 1 conformance with AMC 16.50 Tree preservation,when applicable The following table, with project specific information filled in, must be placed on the site plan: 1 Required Landscaping For Example Calculations Site Area 7,500 sq.ft. %of site area to be landscaped (per 20%-R2A zone AMC Tables 19.42.020-.030) 1,500 sq.ft. required 1,850 sq.ft. provided Compliance with AMC Ch. 16.50 Tree unit credits required: Tree Preservation. • 8 tree units required Tree unit credits retained: • 2 trees 6"dbh=4 tree unit credits retained Tree unit credits provided: • 2 new deciduous trees(min. 2" caliper @ 6" above ground) • 2 new evergreen trees(8' in height) Number of required street trees 1 per 30'of frontage 60 lineal feet of frontage=3 street trees Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 18 of 18 Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information 4319 Oakes Ave Chris Felt Anacortes, Wa. 98221 16839 Kamb Rd Mount Vernon, Wa.98273 360-661-4176 cascadebd@live.com This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed. In addition, based on the size of the structure,the appropriate number of additional credits are checke s chosen by the permit Applicant. Authorized Representative L Date I ,. rr0 All Climate Zones R-Valuea U-Factora Fenestration U-Factorb n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGCb,e n/a n/a Ceilingk 491 0.026 Wood Frame Wali9'"'" 21 int 0.056 Mass Wall R-Value 21/21h 0.056 Floor 30g 0.029 Below Grade Wall"' 10/15/21 int+TB 0.042 Slabd R-Value & Depth 10, 2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1. Small Dwelling Unit: 1.5 credits ❑ Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. 02. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in#1 or#3. Exception: Dwelling units serving R-2 occupancies shall require 2.5 credits. ❑3. Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. 04. Additions less than 500 square feet: .5 credits Table R406.2 Summary Option Description Credit(s) la Efficient Building Envelope la 0.5 Q 0.5 1 b Efficient Building Envelope 1 b 1.0 ❑ 1c Efficient Building Envelope lc 2.0 ❑ ld Efficient Building Envelope ld 0.5 ❑ 2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑ 2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 1.0 1.0 3b High Efficiency HVAC 3b 1.0 ❑ 3c High Efficiency HVAC 3c 1.5 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 ❑ 5a Efficient Water Heating 5a 0.5 0 0.5 5b Efficient Water Heating 5b 1.0 ❑ 5c Efficient Water Heating 5c 1.5 1.5 5d Efficient Water Heating 5d 0.5 ❑ 6 Renewable Electric Energy 0.5 *1200 kwh 0.0 Total Credits 3.50 *Please refer to Table R406.2 for complete option descriptions Table R402.1.1 Footnotes For SI: 1 foot .= 304.8 mm, ci .=continuous insulation, int.= intermediate framing. a R-values are minimums. U-factors and SHGC are maximums. When insulation is installed in a cavity which is less than the label or design thickness of the insulation, the compressed R-value of the insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table. b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement wall. d R-10 continuous insulation is required under heated slab on grade floors. See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. Reserved. g Reserved. h Reserved. 'The second R-value applies when more than half the insulation is on the interior of the mass wall. Reserved. k For single rafter-or joist-vaulted ceilings, the insulation may be reduced to R-38. Reserved. m Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. Table R402.1.3 Footnote a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. titi HERR��s t o �+ � � ' Storm Water Drainage Report r � � / i mum Requirements 1 through h 9 � q g 27807 ENGINEERING DEPARTMENT CSFoI R 904 6th Street Anacortes, WA 98221 � /CNAL�' www.anacorteswa.gov Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: High sediment pctenlidl 125. Reviewed as #2 Only. Project Address: _4319-4401 Oakes Avenue Submittal Date: 1/25/2021 Parcel Number: _P133694 Revision Number: Permit Number: _BLD-2020-- Reviewer: Rob F. Acceptance Date (COA): 1/2//2U21 FRONT OF REPORT: Submittal Checklist: (All items listed below are required for a complete submittal) o Cover Sheet (Preparer to Provide): Project title, Location, Revision dates, Engineer's Stamp o TAB 1: Minimum Requirement#1 — Preparation of Stormwater Site Plans o TAB 2: Minimum Requirement #2 — Construction Stormwater Pollution Prevention (SWPP) o TAB 3: Minimum Requirement#3 — Source Control of Pollution o TAB 4: Minimum Requirement#4 — Preservation of Natural Drainage Systems and Outfalls o TAB 5: Minimum Requirement#5 — On-site Stormwater Managements o TAB 6: Minimum Requirement#6 — Runoff Treatment o TAB 7: Minimum Requirement #7 — Flow Control 4oik.CODEco T Y r, �rA{� o TAB 8: Minimum Requirement #8 —Wetland Protection ,mow (Mile 72. m o TAB 9: Minimum Requirement #9 — Operation and Maintenance o APPENDIX 1 - Survey performed by a Professional Land Surveyor ���lJr 1891 cy`' 4C031S 6° o APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) �ToxrsLp114Se� o APPENDIX 3 - Model Soil Management Plan for BMP T5.13 o APPENDIX 4 - Determining Construction Site Sediment Damage Potential (Appendix 7) o APPENDIX 5 - Site Plan with all applicable information (Minimum Size 11 x17 — 30 scale) o APPENDIX 6 - Documented Site Photos (North, South, East and West) o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. FLOW CONTROL EXEMPT Stormwater Management Requirements: Version Date: October 7, 2019 Previous Version Date: February 20, 2019 o Refer to the 2012\14 Department of Ecology Manual, as amended in 2014 for further required information. o See also, City of Anacortes Municipal Code 19.76 for additional information o See also, current Engineering Development Standards, Chapter 2- Storm Drainage for additional information. Project Description and Summary: Summary Table Existing Proposed Development Type Number of Lots 2 Lot Acreage in SF 24,833 SF _Soil Type(s) Coveland Gravely Loam HG C/D Site Sediment Transport Score (High\Low) High 125 Depth to Ground Water Table (Feet and Inches) N/A Flow Control Exempt (See completed Soils Analysis (Volume 1, Chapter 3.1.1) Infiltration Rate during Rainy Season (Inch\Per Hour) N/A Flow Control Exempt Impervious Surface (on-site) 3,900 sf 9,310 sf Impervious Surface (off-site) 0 0 New and Replaced Hard Surface Total (SF) 0 9,310 sf Lot Coverage (Percentage) 0 7 53% BMP (Required Minimum Requirement 5) BMP T5.13 Post Construction Soils Water Quality Method (Minimum Requirement 6) N/A Water Quantity Method (Minimum Requirement 7) N/A Existing Site Conditions Summary: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction PhasinglSequence) The 24,833 square foot lot has an existing concrete driveway extending from Oakes Avenue over the existing pan handle of the lot. The driveway is shared with an existing residence at 4317 Oakes Avenue. The site slopes from the back southeast corner of the site to the northwest corner of the site at an average of 9%. The site is grass with no trees. There are no critical areas identified on or near the site. The 48 North Plat to the east has an existing intercepting storm pipe running the length of the adjoining property line intercepting offsite flow from entering the site. The same is true for the single family home to the south with storm water collected and directed to an existing 8" storm pipe that extends through the center of this property in an existing storm and sanitary sewer easement and conveyed to the Oakes Avenue drainage system. Also an existing perforated pipe is located along the western property line that terminates in the northwest corner low point of the property in an existing 8 foot deep 6' square dry well. Developed Conditions Summary: (Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard surfaces , proposed contours) The submittal is for a two lot short plat with a common access driveway also share with 4317 Oakes Avenue. A preliminary layout identifies two homes and paved driveway and parking area in addition to sidewalks and patios for a total of new and replaced hard surfacing of 9,310 square feet. The southeast corner of the site will be cut up to 5 feet and the northwest corner of the site will be filled approximately 5 feet. All new concrete surfacing will be sloped to the Version Date: October 7, 2019 Previous Version Date: February 20, 2019 north and collected in a catch basin. The storm drainage from the site already exists and currently connects to the existing enclosed storm system in Oakes Avenue. A significant portion will be graded to accommodate the proposed homes and driveways. An existing utility easement for storm, sewer, water and dry utilities extends up the proposed new property line. Drainage Basin (2007 Storm Comp Plan — City website\publicworks\engineering\comprehensive plans): What Drainage Basin are you in? G5 Identify any downstream drainage issues (Storm Comp Plan: Yes. If so, describe: This site discharges to an existing drainage system on the South side of Oakes Avenue beginning at a catch basin at the bottom of the existing concrete driveway that flows west in an existing 12" storm pipe for 300 feet before discharging to an open drainage ditch. After 66 feet of open ditch the drainage system is a closed system for 2,254 feet to the Guemes Channel that combines with the Clearidege drainage system and crosses Oakes Avenue to the north and passed through the San Juan Passage Development to Edwards Way and conveyed to the discharge at the base of Edwards Way at Guemes Channel. The system is identified as being surcharged and that the portion in Edwards Way was to be replaced. The Edwards Way portion has two separate drainage pipes with one for the Clearidge drainage and a separate one for San Juan Passage. Complete the Applicability Requirements — Flow Chart (Figure 1-2.4.1 Attached, Figure 1-2.4.2 Attached and Figure 1-2.5.1 Attached) Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Figure 1-2.4.1 Flow Chart for Determining Requirements for New Development Start Here 1 Does the site have 35% Yes See Redevelopment Minimum or more of existing ► Requirements and Flow Chart impervious coverage? (Figure 1-2.4.2). No Does the project convert 3/4 acres or more of vegetation to Does the project result in lawn or landscaped areas, or 5,000 square feet,or No convert 2 5 acres or more of greater,of new plus ► native vegetation to pasture? replaced hard surface area? \ No Yes Yes Does the project result in 2,000 square feet, or greater,of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted vegetation areas. Yes No Does the project have land Minimum Requirements#1 disturbing activities of 7,000 through#5 apply to the new Yes square feet or greater? and replaced hard surfaces and the land disturbed. No V Minimum Requirement#2 applies. ft•NiM Figure 1-2.4.1 Flow Chart for Determining Requirements for New Development DEPARTMENT OF Revised June2015 ECO L O G Y Please see http.//www.ecy.wa.gov/copyright.hfm/for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. 2014 Stonnwater Management Manual for Western Washington Volume!- Chapter 2-Page 37 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Figure I-2.5.1 Flow Chart for Determining LID MR #5 Requirements Does the project discharge to Flow Control Exempt Waters(per Minimum Requirement(MR)#7)? Yes REQUIRED:Implement the following BMPs No where feasible: • BMP T5.13:Post-Construction Soil Quality ■ No(the and Depth Does the project project ▪ BMP T5.10A,8,or C:Downspout Full trigger only MRs#1- triggered Intihtration,Downspout Dispersion #5?{Per Figure 3.2 or only MR#2) No additional Systems,or Perforated Stub-out Figure 3.3 in Appendix0. Connections 1 of the 2013-2018 requirements . BMP T5.11 or T5.12:Concentrated Flow W1NA Phase II Permit Dispersion or Sheet Flow Dispersion &Phase I Permit). NOT REQUIRED:Achievement of the LID No(the project triggered Performance Standard.Applying the other Yes only MRs#1-#R9) BMPs in List#1 or List#2. Is the project inside the UGA? Did the project developer choose to meet No the LID Performance Standard? Yes Is the project on a parcel No of 5 acres or larger? REQUIRED:For each Did the project developer No Yes surface,consider the choose to meet the LID + BMPs in the order Performance Standard? REQUIRED:Meet the LID listed in List#1 for that Performance Standard through type of surface.Use Yes the use of BMP[s]in the the first BMP that is 2014 3W 1MAW except for considered feasible. Yes No Rain Gardens(the use of Bloretention is acceptable). NOT REQUIRED: Achievement of the LID ■ If the project can't meet the Performance Standard. REQUIRED:For each LID Performance Standard,it surface,consider the BMPs must seek and be granted an REQUIRED:Meet the LID Performance in the order listed in List#2 exception/variance. Standard through the use of any BMP{s]in for that type of surface.Use the 2014 SWVIMWWexcept for Rain Gardens the first BMP that is REQUIRED:Apply BMP T5.13 (the use of bioretenlion is acceptable). considered feasible. Post-Construction Soil Quality and Depth. REQUIRED for Projects Triggering MR#1-9`: NOT REQUIRED: Apply BMP T5.13 Post Construction Soil Achievement of the LID NOT REQUIRED:Applying the Quality and Depth. Performance Standard. BMPs in List#1 or List#2. NOT REQUIRED:Applying the BMPs in List #1 or List#2. *Recommended by Ecology for projects triggering MRs#1-#5. Figure 1-2.5.1 Flow Chart for Determining LID MR #5 Requirements DEPARTMENT OF Ratised June 2015 ECOLOGYPlease see hffpi/www.ecy.wa.gaulcopyright.hfmlfor copyright notice including permissions, State of Washington limitation of liability.and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume I- Chapter 2-Page 60 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 1 (MINIMUM REQUIREMENT #1) • 1-2.5.1 Minimum Requirement#1 — Prepare a Stormwater Site Plan - 1.3 — Preparation of a Stormwater Site Plan - 1.3.1 — Stormwater Site Plans: Step-by-Step Note: The level of detail needed for each step depends upon the project size. Provide a narrative description of each step. 1-3.1.1 Step 1 - Site Analysis: Collect and Analyze Information on Existing Conditions Site analysis shall be submitted as part of the Existing Conditions Summary above. Part of the information in this step should be used to help prepare the Construction Stormwater Pollution Prevention Plan. Purpose of the Site Analysis is to provide for a Low Impact Development site design that is intended to compliment the predeveloped conditions of the site. A Stormwater site plan has been prepared showing erosion control methods for this site. The site slopes at and average of 9% to the northwest corner of the site. The uphill property is developed with all storm water being intercepted at the property lines and conveyed away from this site. An existing interceptor trench along the west boundary with an existing perforated pipe in drainrock bedding, discharges to an existing 8 foot deep 6 foot by 6 foot drywell located at the low-point of the property in the northwest corner of the site protects the downhill properties from storm water discharge. The existing drywell, although not ideal for infiltration, was the result of a compromise with the neighboring downhill property to reduce the impact of offsite storm water discharge. The drywell seems to be helping. A soils report was completed for the site by Linda Spicher. The soils report included in Appendix 2 identifies the soils as sandy silty clay Hydrologic group C/D with a anticipated water table from 16" to 19" in depth. The soils are not conducive to infiltration with hard pan at the same depth as the anticipate water table. 1-3.1.2 Step 2 - Prepare Preliminary Development Layout Based upon the analysis of existing site conditions, locate the buildings, roads, parking lots, landscaping features, on-site stormwater management BMP's, and preliminary location of stormwater treatment and retention/detention facilities for the proposed development. BMP's will include covering soil stock piles and protecting down slope properties with silt fencing. The existing concrete driveway will act as the access to the site with a construction entrance located at the southern end. Grading will be extensive throughout the site. The storm water discharges to an exempt body of water with no opportunity for infiltration on site except for perforated stub out connections for each home. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 1-3.1.3 Step 3 - Perform Off-site Analysis (at Local Agency's Option): Use additional Sheets, if necessary, Ecology recommends that local governments require an off-site analysis for projects that add 5,000 SF or more of new hard surfaces, or convert 3/4 acres of vegetation to lawn or landscape areas, or convert 2.5 acres of forested area to pasture. Off-site analysis extends to mile downstream of the project site. The downstream drainage system is conveyed to a 12" drainage system on the South side of Oakes Avenue and flows west 300 feet before discharging to an open drainage ditch. After 66 feet of open ditch the drainage system is a closed system for 2,254 feet to the Guemes Channel. 1-3.1.4 - Determine Applicable Minimum Requirements Establish project size thresholds for the application of Minimum Requirements to new development and redevelopment projects. Figures 2.4.1 (Attached) and 2.4.2 (Attached) provide the same thresholds in a flow chart format. Based on the preliminary layout, determine whether Minimum Requirements #1 through #5 apply to the project; or, whether Minimum Requirements #1 through #9 apply. Please note, that Minimum Requirement#1 through #5 may trigger additional Minimum Requirements, such as Flow Control. The total new impervious area added to this site will be 9,310 square feet and over the 5,000 square foot threshold and triggers minimum requirements 1 through 9. 1-3.1.5 Step 5 - Prepare a Permanent Stormwater Control Plan (Refer to this section of the Ecology Manual for requirements.) A storm water plan is provided in the developed site plan in Appendix 5. The drainage system will be described in minimum requirement #5 below. The options for a perforated stub out and sheet flow dispersion are discussed in Minimum Requirement#5 below. 1-3.1.6 Step 6 - Prepare a Construction Stormwater Pollution Prevention Plan (MR#2 — 13 Elements) Refer to Chapter 11-3— Planning for a detailed description of each element. See also attached Tables 4.1.1 (Source Control BMP's by SWPPP Element) and Table 4.2.1 (Runoff Conveyance and Treatment BMP's by SWPPP Element). See attached 13 Elements of a SWPPP, please complete and attached 1-3.1.7 Step 7 - Complete the stormwater site plan The Stormwater Site Plan encompasses the entire submittal to the Local Agency with drainage review authority. Refer to this section of the Manual for further clarification of each item and what is required. See below: Version Date: October 7, 2019 Previous Version Date: February 20, 2019 • Project Overview • Existing Conditions Summary • Off-site Analysis Report • Permanent Stormwater Control Plan • Construction Stormwater Pollution Prevention Plan • Special Reports and Studies • Other Permits • Operation and Maintenance Manual • Declaration of Covenant for Privately Maintained Flow Control and Treatment Facilities. (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Declaration of Covenant for Privately Maintained On-site Stormwater BMP's (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Bond Quantities Worksheet, if applicable The project overview has been provided at the beginning of this report along with an existing conditions description. Maps are included in the attachments. 1-3.1.8 Step 8 - Check Compliance with all Applicable Minimum Requirements A Stormwater Site Plan as designed and implemented should specifically fulfill all Minimum Requirements applicable to the project. The Stormwater Site Plan should be reviewed to check that these requirements are satisfied. To take place during review and during and after construction. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 2 (MINIMUM REQUIREMENT #2) • 1-2.5.2 Minimum Requirement#2 — Construction Stormwater Pollution Prevention Plan (SWPP) - All projects are required to complete Minimum Requirement 2. - Refer to the 13 Elements of the SWPP (See document below, complete and attach) - See attached Table 4.1.1, Table 4.2.1 and Table - Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. Table 4.1.1 Source Control BMP's by SWPPP Element Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Elamarnf}7 ElamarnR Element05 Elements E lament/B ElementR11 Element012 Elamernf}13 BLIP or Element Nome Preserve Establish ProtectProtect Control Maintain Manage the Protect Low 1RagetetbnAMak Conatnjctbn Solo Slopes Pollutants BMPs Project Impact Clemina Limits Access Development BLIP C101: Preserving Natural Vegetation se BLIP C102:Buffer Ions ,/ I BLIP C103:High Vl ibilty Plastic or Metal r r Fence BLIP C105: SmhlixedConatroctlan r Entrance I Exit BLIP C105:Wheel Wash r BLIP C10T:Construction RoodfParkrlg r Area Stakllutlon BLIP C120:Temporary and Pernsnent r if Seeding ®LIP C121: Mulching r if BMP C122: Nets and Blankets I I SHP C123: Piers*Covering V ®HP C124: Sodding V SHP C125: ioptolling/Comportklg V SHP C120: Palymndmide for Soil Eroxlon V Protection SHP C130: Sudan Roughening V V SHP C131:GredleniTerraxn r r ®HP C140: Dust Control r SHP C150: Manrkrle On Hand r r SHP C151:Concrete Handling r SUP C132: Saerautdng and Surfacing r Palution Prevention SLIP C133: LIalerkrl Delver',Storage and r Containment BMP C134:Concrete Mahout area r SUP C100:Ceelled Erosion and r r Sediment Control Lead ®HP C102:Scheduing I Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Berne-Fit 13 El• tt Element Re Elemant Iq7.• €Itencet lift E 9rreeht R3 Elemank 3�10 Elc+lrent+�13 dP P ec MunerrtNare- • 'vl►trol 1 1I PRAM Ph4W[ ' SIeblllzo C:nnkml Combo!De, PfcicGk taDW Flow Flatus 3lnp..t •drain Inlais Sedkysint {.`harsrra� Pcdlulanti WHtetlh-p Ida __-- Cgffiireee end Orrlels Nrralupnrent $UP G2a4' wrgehteptorDM.4e-El Dvedn I DM P CM': Graga,l-end C haneels I/ - E3AIP CDT Chamnel L1rthI BAP i 2Oc: Water Daiir I lerI •EIRIP C2N; Ptp$ Slope Drams I — 8L1P C20d: Subisurboo Diairn V EIMP C3Q : Lftwe1 9101.eaAar I DO 'CMD': Chock Dams `--- 1 — r €6MPG3011; Trianiphr Nit Glhe{ e4exilki' � rr Pcane d etietk De EiMP Outlet Pn lccI bn __._. I- __ 6MP 3a: 911.orm Drain InletProteetlon- 1 • lamp C? 1.. Nue Elmilet I I I 9HP C araw.I Faker Bonn ' MP'G2 S{ pgnr c —I -- _ — . 1 9MPC29±1Viospilaliml31rip , i BMP Cf36c likritlos V E3MP 1 'kgItetIve Filtration if 0MP'.dalet SodfmonE Trap 1 1 ' BMPC241: Terry r r+yS•etli r►an4Porrn — I I i 'DMPCPS' r rullohSIod .iNdlat: Clle rleal/real :Ft I IE3MPG?S1:CancUonBtortrrMakr • Flllrallcr+ ElMP t:25Z I1 Ii pH NeulraltEdilon Ilelnp i4MPC", -pil contra for!lghpHWrter I / Version Date: October 7, 2019 Previous Version Date: February 20, 2019 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name:_ Chris Felt Site Address:_4319/4401 Oakes Avenue Prepared By: Dale Herrigstad PE The Stormwater checklist or building permit determined that: ❑ The 13 elements must be addressed ❑ These elements must be addressed for construction activity adding under for construction activity adding 2,000 2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, provide the BMP's that will be applicable to your project. Use the attached Tables provided. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits ▪ Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. A high visibility construction fence BMP C103 will be installed at the perimeter of the construction site except if and existing fence already exists or were silt fence is used. BMP will be installed as first step of construction. BMP to be monitored daily and repaired as needed. ELEMENT 2: Establish Construction Access Limit construction vehicle access and exit to one route, if possible. • Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. • Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or pick up and transport the sediment to a controlled sediment disposal area. Conduct street washing only after sediment is removed in accordance with the above bullet. ❑ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. The construction entrance will be limited to one location at the top of the existing concrete driveway on the north side of the project with BMP C105 or C107 (Construction Entrance.) Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Any dirt or mud that is tracked onto the roadway will be clean immediately. To be installed prior to construction. BMP to be monitored daily and repaired as needed. ELEMENT 3: Control Flow Rates ❑ Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. ❑ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement (e.g. impervious surfaces). ❑ If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. BMP C233, Silt Fence will also be installed along the west and north downslope perimeter of the construction site. The majority of the site will be disturbed. ELEMENT 4: Install Sediment Controls ▪ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. ❑ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BMPs shall be functional before other land disturbing activities take place. ❑ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. ❑ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element#3, bullet#1. ❑ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. ❑ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. ❑ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. BMP C233, Silt Fence will also be installed along the west and north downslope perimeter of the construction site. To be installed prior to the start of construction. BMP to be monitored daily and repaired as needed. BMP C162 Scheduling. ELEMENT 5: Stabilize Soils ❑ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early application of gravel base early on areas to be paved, and dust control. ❑ Control stormwater volume and velocity within the site to minimize soil erosion. ▪ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. ❑ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 — Sept 30): 7 days Version Date: October 7, 2019 Previous Version Date: February 20, 2019 o During the wet season (Oct 1 —Apr 30): 2 days ❑ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. ❑ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. ❑ Minimize the amount of soil exposed during construction activity. ❑ Minimize the disturbance of steep slopes. ❑ Minimize soil compaction and, unless infeasible, preserve topsoil. Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching and plastic covering. Install plastic covering per BMP C123 on Soils Stockpiles. BMP to be monitored daily and repaired as needed. Refer to Table 4.1.1 in MR#2. ELEMENT 6: Protect Slopes ▪ Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). ❑ Divert off-site stormwater (run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. ❑ At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as "landscaped" area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. ▪ Place excavated material on the uphill side of trenches, consistent with safety and space considerations. ❑ Place check dams at regular intervals within constructed channels that are cut down a slope. ❑ Consider soil types and its potential for erosion. • Stabilize soils on slopes, as specified in Element 5. ▪ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. The site has an average slope of 9% and slope protection will be installed as need during and after excavation of the house sites with plastic sheeting and/or much depending on the site conditions. ELEMENT 7: Protect Drain Inlets ❑ Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ❑ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). ❑ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 ❑ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. ▪ Inlets should be inspected weekly at a minimum and daily during storm events. Per detail 1-40.20-00 Storm Drain Inlet protection devices will be installed at existing catch basins in the immediate vicinity of the project. To be installed prior to the start of any construction. Nearest CB is at the base of the concrete driveway at Oakes Avenue. BMP to be monitored daily and repaired as needed. ELEMENT 8: Stabilize Channels and Outlets ▪ Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. ❑ Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. ❑ The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. No stormwater runoff will be conveyed off site via channels, swales, or streams. ELEMENT 9: Control Pollutants L Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. ❑ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site in a manner that does not cause contamination of stormwater. o Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double-walled tanks do not require additional secondary containment. ❑ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. ❑ Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. ❑ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and procedures. L Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. ❑ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 ❑ Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. ❑ Woody debris may be chopped and spread on site. ❑ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. ❑ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle. Per BMP C154 a Concrete Washout Area is to be installed onsite to capture contaminated water from concrete washouts. To be installed prior to foundation / concrete installation. BMP to be monitored daily and repaired as needed. Contractor is to provide spill prevention kits for excavation and concrete crews are required on Site. ELEMENT 10: Control De-Watering ▪ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that "surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. ❑ Handle highly turbid or contaminated dewatering water separately from stormwater. ❑ Other treatment or disposal options may include: 1. Infiltration 2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology-approved on-site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ▪ Discharging sediment-laden (muddy)water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration and preserving vegetation. If dewatering is needed all discharge will be directed to a temp. sed. trap BMP C240 prior to discharge to the city storm drainage system. The sediment trap will be designed for a typical 4,600 sf impervious area or 0.11 acres where the developed 2 year flow is 0.03 cfs X 2080 sf/cfc flow = 62 sf surface area plan or 8'x8' square surface pond area minimum. ELEMENT 11: Maintain BMPs n Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. ❑ Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. ❑ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be Version Date: October 7, 2019 Previous Version Date: February 20, 2019 examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. ❑ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. BMP to be monitored daily and repaired as needed and or as required by the City of Anacortes. Weekly reports are required to be submitted to the building department. ELEMENT 12: Manage the Project— Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL) for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on-site or on-call at all times. Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. ❑ Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued performance of their intended function. Maintain, update, and implement the SWPPP. Li Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). ❑ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. ❑ The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. BMP to be monitored daily and repaired as needed and the responsibility of the owner. Project does require a certified CESCL. ELEMENT 13: Protect Low Impact Development BMPS If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the Manual for requirements. No LID BMPS are proposed. Applicant Signature Date Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 3 (MINIMUM REQUIREMENT #3) • 1-2.5.3 Minimum Requirement#3 — Source Control of Pollution All known, available and reasonable source control BMP's must be applied to all projects. Source control BMP's must be selected, designed, maintained according to the reference Ecology Manual. The intent of source control BMP's is to prevent stormwater from coming in contact with pollutants. They are a cost-effective means of reducing pollutants in stormwater, and, therefore, should be considered in all projects. All Commercial Properties, Industrial Properties, and Multi-Family Properties, Boatyards, Sand and Gravel Mining Operations are required to comply with this Minimum Requirement. Refer to Chapter IV-2.1 Applicable (Mandatory) Operational Source Control BMP's Single family homes are exempt from this requirement. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 4 (MINIMUM REQUIREMENT #4) • Minimum Requirement#4— Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained and discharges from the project shall occur at the natural location, to maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. All outfalls require energy dissipation. The objective is to preserve and utilize drainage systems to the fullest extent because of the multiple stormwater benefits these systems provide; and to prevent erosion at the downstream of the discharge location. Refer to the reference manual for supplemental guidelines and additional information under this section. Will this project disturb the Natural Drainage System or Outfall of the project Site? NO. If yes, refer to section 1.2.5.4 for Supplemental Guidelines for additional information. No change in natural drainage from this site is proposed. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 5 (MINIMUM REQUIREMENT#5) • Minimum Requirement#5— On-site Stormwater Management Project thresholds that trigger Minimum Requirements #1 through #5, shall utilize the On-site Stormwater Management BMP's from List#1 for all surfaces within each type of surface in List#1; or, Demonstrate compliance with the LID Performance Standard. Projects selecting this option cannot use Rain Gardens. They may choose to use Bioretention BMP's as described in Chapter V-7 — Infiltration and Bioretention Treatment Facilities to achieve the LID Performance Standard. Refer to this section of the reference Manual for all Feasibility or Infeasibility Criteria for List#1 and List#2. Is this project Flow Control Exempt? Yes (See Appendix l-E: Flow Control-Exempt Surface Water). If yes, provide reasoning from the applicability section of 1-2.5.7 Minimum Requirement#7: Flow Control). If No, then the project triggers Minimum Requirement#7 (1-2.5.7) and possibly Minimum Requirement#8 (1-2.5.8). The flow from this site is an enclosed drainage system to Fidalgo Bay and a flow control exempt body of water. If the project is Flow Control Exempt, select from the list below (Skip List 1 and List 2). o BMP T5.13 Post Construction Soils Quality and Depth o BMP T5.10A: Downspout Full Infiltration, or; o BMP T5.10B Downspout Dispersion Systems, or; o BMP T5.10C: Perforated Stub-out Connections, or; o BMP T5.11 Concentrated Flow Dispersion, or; o BMP T5.12 Sheet Flow Dispersion Version Date: October 7, 2019 Previous Version Date: February 20, 2019 All sites are required to utilize BMP T5.13 — Post Construction Soil Quality and Depth. For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that is considered feasible. No other on-site Stormwater Management BMP is necessary for that surface. Feasiblity shall be determined by evaluation against: 1. Design criteria, limitations and infeasiblity criteria identified for each BMP in this manual, and; 2. Competing needs criteria listed in Chapter V-5 — On-site Stormwater Management. Lawn and Landscaped Area: • BMP T5.13: Post-Construction Soil Quality and Depth. (Attach Detail in Report) Refer to this site for requirements and specifications. All projects are required to utilize this BMP. http://www.soilsforsalmon.org/pdf/Soil BMP Manual.pdf See Appendix 3 for the "Model Soil Management Plan for BMP T5.13" to be submitted with Drainage Report and Application Material. An alternate document acceptable to the City of Anacortes is a Test Report provided by the Soils Supplier that identifies the soils to be used meet the specifications outlined under Minimum Requirement 5. The specifications are in both WSDOT and CSI Formats. For specifications, refer to the above referenced PDF. This submittal can be a deferred submittal since most projects are not sure who the supplier will be at the time of building permit application. For projects that trigger Minimum Requirements 1 through 5, the Test Report will be provided to the Building Department. Projects triggering Minimum Requirements 1 through 9, the Test Report will be provided to the Engineering Department. Applicant Signature Date Version Date: October 7, 2019 Previous Version Date: February 20, 2019 13MP T5.13: Post-Construction Soil Quality and Depth Purpose and Definition Naturally occurring (undisturbed)soil and vegetation provide important stormwater func- tions including:water infiltration; nutrient,sediment,and pollutant adsorption;sediment and pollutant biofiltration;water interflow storage and transmission;and pollutant decom- position.These functions are largely lost when development strips away native soil and vegetation and replaces it with minimal topsoil and sod. Not only are these important stormwater functions lost,but such landscapes themselves become pollution generating pervious surfaces due to increased use of pesticides,fertilizers and other landscaping and household/industrial chemicals,the concentration of pet wastes,and pollutants that accompany roadside litter. Establishing soil quality and depth regains greater stormwater functions in the post devel- opment landscape, provides increased treatment of pollutants and sediments that result from development and habitation,and minimizes the need for some landscaping chem- icals,thus reducing pollution through prevention. Applications and Limitations Establishing a minimum soil quality and depth is not the same as preservation of nat- urally occurring soil and vegetation. However, establishing a minimum soil quality and depth will provide improved on-site management of stormwater flow and water quality. Soil organic matter can be attained through numerous materials such as compost,com- posted woody material, biosolids,and forest product residuals. It is important that the materials used to meet the soil quality and depth BMP be appropriate and beneficial to the plant cover to be established. Likewise, it is important that imported topsoils improve soil conditions and do not have an excessive percent of clay fines. This BMP can be considered infeasible on till soil slopes greater than 33 percent. Design Guidelines . Soil retention. Retain, in an undisturbed state,the duff layer and native topsoil to the maximum extent practicable. In any areas requiring grading remove and stock- pile the duff layer and topsoil on site in a designated,controlled area, not adjacent to public resources and critical areas,to be reapplied to other portions of the site where feasible. . Soil quality. All areas subject to clearing and grading that have not been covered by impervious surface, incorporated into a drainage facility or engineered as struc- tural fill or slope shall,at project completion,demonstrate the following: 1. A topsoil layer with a minimum organic matter content of 10% dry weight in planting beds,and 5%organic matter content in turf areas, and a pH from 6.0 2014 StormwaterManagement Manual for Western Washington Volume V- Chapter 5-Page 911 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 to 8.0 or matching the pH of the undisturbed soil.The topsoil layer shall have a minimum depth of eight inches except where tree roots limit the depth of incorporation of amendments needed to meet the criteria. Subsoils below the topsoil layer should be scarified at least 4 inches with some incorporation of the upper material to avoid stratified layers,where feasible. 2. Mulch planting beds with 2 inches of organic material 3. Use compost and other materials that meet these organic content require- ments: a. The organic content for"pre-approved"amendment rates can be met only using compost meeting the compost specification for BMP T7.30: Bioretention Cells, Swales,and Planter Boxes(p.959),with the excep- tion that the compost may have up to 35% biosolids or manure. The compost must also have an organic matter content of 40%to 65%, and a carbon to nitrogen ratio below 25:1 . The carbon to nitrogen ratio may be as high as 35:1 for plantings com- posed entirely of plants native to the Puget Sound Lowlands region. b. Calculated amendment rates may be met through use of composted material meeting (a.)above; or other organic materials amended to meet the carbon to nitrogen ratio requirements, and not exceeding the contaminant limits identified in Table 220-B, Testing Parameters, in WAC 173-350-220. The resulting soil should be conducive to the type of vegetation to be established. . Implementation Options:The soil quality design guidelines listed above can be met by using one of the methods listed below: 1. Leave undisturbed native vegetation and soil, and protect from compaction during construction. 2. Amend existing site topsoil or subsoil either at default"pre-approved"rates, or at custom calculated rates based on tests of the soil and amendment. 3. Stockpile existing topsoil during grading, and replace it prior to planting. Stockpiled topsoil must also be amended if needed to meet the organic mat- ter or depth requirements, either at a default"pre-approved"rate or at a cus- tom calculated rate. 4. Import topsoil mix of sufficient organic content and depth to meet the require- ments. 2014 Stormwater Management Manual for Western Washington Volume V- Chapter 5-Page 9/2 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 More than one method may be used on different portions of the same site. Soil that already meets the depth and organic matter quality standards, and is not com- pacted, does not need to be amended. Planning/PermittingllnspectionNerification Guidelines & Procedures Local governments are encouraged to adopt guidelines and procedures similar to those recommended in Guidelines and Resources For Implementing Soil Quality and Depth BMP T5.13 in WDOE Stormwater Management Manual for Western Washington. This document is available at: http:llwww.soilsfcrsalmon.org/pdf!Soil BMP Manual.pdf Maintenance • Establish soil quality and depth toward the end of construction and once estab- lished, protect from compaction,such as from large machinery use, and from erosion. • Plant vegetation and mulch the amended soil area after installation. . Leave plant debris or its equivalent on the soil surface to replenish organic matter. • Reduce and adjust,where possible,the use of irrigation,fertilizers, herbicides and pesticides, rather than continuing to implement formerly established practices. Runoff Model Representation Areas meeting the design guidelines may be entered into approved runoff models as "Pasture" rather than "Lawn." Flow reduction credits can be taken in runoff modeling when BMP T5.13: Post-Con- struction Soil Quality and Depth is used as part of a dispersion design under the con- ditions described in: • BMP T5.10B: Downspout Dispersion Systems(p.905) . BMP T5.11 : Concentrated Flow Dispersion (p.905) • BMP T5.12: Sheet Flow Dispersion (p.908) • BMP T5.18: Reverse Slope Sidewalks (p.937) • BMP T5.30: Full Dispersion (p.939)(for public road projects) 2014 Stormwater Management Manual for Western Washington Volume V- Chapter 5-Page 913 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Figure V-5.3.3 Planting bed Crass-Section MuIc — r..__, Clii $11 Loose sot with visible dark organic matter } 4'' Loose or 1 fractured subsoil Reprinted from Guidelines and Resources For implementing Soil Quality and Depth EI MP T5.13 in WDOE Stormwater Management Manual for Western NOT TO SCALE Washington,2010.Washington Organic Recycling Council MOM= Figure V-5.3.3 ullgi Planting Bed Cross-Section DEPARTMENT OF Revised January 2016 ECOLOGY Please see hffpllwww.ecy.wa.godcopyright.hfmlfa copyright notice including permissions. State Of Washington limitation of liability.and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume V- Chapter 5-Page 914 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 111-3.1.3 Perforated Stub Out Connections (BMP T5.1OC) A perforated stub out connection is a length of perforated pipe within a gravel filled trench that is placed between roof downspouts and a stub out to the local drainage sys- tem. Figure III-3.1 .8 Perforated Stub-Out Connection (p.466)illustrates a perforated stub out connection.These systems are intended to provide some infiltration during drier months. During the wet winter months,they may provide little or no flow control. Applications & Limitations Perforated stub-outs are not appropriate when seasonal water table is less than one foot below trench bottom. In projects subject to 1-2.5.5 Minimum Requirement#5: On-site Stormwater Management (p.55), perforated stub-out connections may be used only when all other higher priority on-site stormwater management BMPs are not feasible, per the criteria for each of those BMPs. Select the location of the connection to allow a maximum amount of runoff to infiltrate into the ground (ideally a dry, relatively well drained, location). To facilitate maintenance, do not locate the perforated pipe portion of the system under impervious or heavily com- pacted (e.g.,driveways and parking areas)surfaces. Use the same setbacks as for infilt- ration trenches in 111-3.1.1 Downspout Full Infiltration Systems(BMP T5.10A) (p_452). Have a licensed geologist, hydrogeologist,or engineering geologist evaluate potential runoff discharges towards landslide hazard areas. Do not place the perforated portion of the pipe on or above slopes greater than 20%or above erosion hazard areas without evaluation by a professional engineer with geotechnical expertise or qualified geologist and jurisdiction approval. For sites with septic systems,the perforated portion of the pipe must be downgradient of the drainfield primary and reserve areas. This requirement can be waived if site topo- graphy will clearly prohibit flows from intersecting the drainfield or where site conditions (soil permeability, distance between systems, etc.) indicate that this is unnecessary. Design Criteria Perforated stub out connections consist of at least 10 feet of perforated pipe per 5,000 square feet of roof area laid in a level,2 foot wide trench backfilled with washed drain rock. Extend the drain rock to a depth of at least 8 inches below the bottom of the pipe and cover the pipe. Lay the pipe level and cover the rock trench with filter fabric and 6 inches of fill (see Figure 111-3.1.8 Perforated Stub-Out Connection (p.466)). Runoff Model Representation Any flow reduction is variable and unpredictable. No computer modeling techniques are allowed that would predict any reduction in flow rates and volumes from the connected 2014 Stormwater Management Manual for Western Washington Volume 111- Chapter 3-Page 465 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 area. Figure III-3.1.8 Perforated Stub-Out Connection random fill He'::nY ''-' -= •::t'fk:+: 6^ :-t, ' yrnn:�,. . s"c Ff" •.-.--'may filter fabric K�;lfe-Ilteli; 4"pert pipe 15 min. r�fi�Fiel .tea is frail;`� .:fir r+��e fl�r �� 1%"-X"washed rack I- 24"min. Trench X-Section slope to road ~ drainage system 2'x 10'' level trench wlperf pipe Plan View of Roof NOT TO SCALE Ma.= Figure III-3.1 .8 ulUI Perforated Stub-Out Connection DEPARTMENT O F Revised December 2015 ECOLOGY Please see httpi/www.ecy.wa.goulcopyright.htmt for copyright notice including permissions. State of Washington limitation of liability,and disdaimer. 2014 Stormwater Management Manual for Western Washington Volume 111- Chapter 3-Page 466 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 6— (MINUMUM REQUIREMENT 6 - RUNOFF TREATMENT) Refer to 1.2.5.6 and provide the required information for this Minimum Requirement. Threshold requirements for determining the applicability of runoff treatment. Projects in which the total of pollution-generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or Projects in which the total of pollution-generative pervious surfaces (PGPS)-not including permeable pavements-is three-quarters (3/4) of an acre or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. This project will add 3,050 square feet of concrete driveway and below the 5,000 square feet requiring runoff treatment. Runoff Treatment is not required. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 TAB 7 — (MINUMUM REQUIREMENT 7 — FLOW CONTROL) Refer to 1.2.5.7 and provide the required information for this Minimum Requirement. Threshold requirements for determining the applicability of flow control. • Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or • Projects that convert 3/4 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold dis-charge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or • Projects that through a combination of effective hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second increase in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one-hour time steps (or a 0.15 cfs increase using 15-minute time steps). The total proposed new or replaced impervious hard surfaces is 9,310 square feet and below the 10,000 square feet threshold discharge area. The site also discharges directly to Guemes Channel through enclosed storm piping. Flow Control is not required and the project is Flow Control Exempt. TAB 8 — (MINUMUM REQUIREMENT 8 —WETLAND PROTECTION) Refer to 1.2.5.8 and provide the required information for this Minimum Requirement. There are no wetlands down stream of this site before discharge to the Guemes Channel. TAB 9 — (MINUMUM REQUIREMENT 9 — OPERATION AND MAINTENANCE) Refer to 1.2.5.9 and provide the required information for this Minimum Requirement. There are no maintenance requirements for a perforated stub out. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 FELT RAKES AVENUE BOUNDARY LINE ADJUSTMENT AUDITCIRS CERTIFICATE IN THE S.E. 1/4, SEC. 22, TI9P 35 N., RNG 1 E., W.M. RECORD IT SURVEY AT THE REQUEST OF DALE K.HERRIGSTAD CITY OF ANACORTES, WASHINGTON 1..i.co.,,r Arrest • tI Z912ef1 vep. e,�y 2 err Zl`y \� + \ L iTS ..• •RENAs \ r"'', T '.,` \ 1.\ `'% 't 5 � Es PW> '. KI A\ 22 `. . D 1 {7Q !���t s J '�roum7 ��,ens N \\ .' Js r DEelAt?---1,11,. YUDOR '+ 5'r C+ \ Y►E /C��', eat \ . ' CS` 5t• eX +3 21 \ / '3!f.OTES. .' ''r .• '�� `` ?•13 nVID I. .c".: ,' 4 '+ V s;A:.SFT GLP 1127807, {LT T_, sri'� J+. 00,,,, J N 70Fv7[ 2 __ - yI.s FOiel FLIT IN CAS£on 4-22-2416. � ""1, / �_1 L' .''Ap3 L L mvi wl� _ I ' BAA OP` NGS:Font boonddaary of properlyROSE. 1 i _ P56563 M \ LOT 1` AD PAW 1 ' 1 T— OQ9C7220033. y 9c,EQUIPMENT USED:CR2 2"TOTAL STATION. �T -' - 1 1 .ERROR OF CLOSURE MEETS WASHINGTON STATE SURVEY }• Lr 1+ ' L}10,900 SF:1« LW 20 I STANDARDS. METHOD:STANDARD FIELD TRAVERSE ' `-+ `�--¢'1 '+ O1 \ .,.,, '+ ' GJ ' P316DI I INVESTIGATED. THIS TTEVDNdM1T'SURVEY ANO ALL UTILITIES WERE NOT (I .-----1- \0119. 9 o's L it 5 - 9.THIS SURVEY FIA9 DEPICTED IXISTING OCCUPATIONAL LINES dJ L rL _"* `1 Ip"� ,\� ' + a +J - PRELIMINARY PLAT L ACCORDANCE WMTI W.AC.CH.332.130. THESE OCCUPATIONAL i % Y OF 48 NORTH IHOICATO8S MAY INDICATE A POTENTIAL FOR CAMS OF UMYRPTEN a a) ,f/+�� r +IL LI 5 ENCIEKIIIEW''AN \ u. ` t. r �ezrar a++ 19 NOTDEM MU ERESOLVED BY THIS BOUNDARY SURVEY. CLAMS>us 1 1 (, I i+ 4ps� � - ~_�` rL g 'L P'''r 1 ROS 200807220033 ICO)0 li "�` r _ l +,, pas 1 1 }'� + 'r�A y TAjg3a� , L� 'r cj 'L LOT 2 'L r I bit �. +.--gs+ —S_- +1, i1 .% A+ 24,834 SF`, _I GENERAL NFQ$MAT ON I yP r("' +l3 4 i` Epv.6'I' `PARCEL 'B' \ 'i 1. Thin Boundary Line Adjustment is for She purpose Ni , +r 1A tl + 11 5L 1, LL 18 ` identifying 2 buik[ng parcels from 11 arty Iota In 9cvcke 1906 (a r7t �`�" + do 1907 of the plot of'BARING AOOITIONI TO AHACORTES, 1.1�] +5 ` y+T�93 A- * 1 rl ��". WASHINGTON'. Il� L 1 ry + _ - 2. Asseesar'e Account No. txRAi7,3774-906-047-0009. { +1 y 1 , + O{ L y - - 3. Long Oescopsion information Is from the Land Tide& C + N ca Lt`1g 5r } �� \ w Compooy.order No: 14974E-0AE doted June 15, 2015. O +'L\\:: +` '' `I `r Y ' .'. 4. Zoning: (R2)ResidenNol Low Density. r t t+ \+ • -' S. Water 5uppy. Cif.of Anocortes- U) I 1r + \ -- D7-"V • -'•1 S. Sewer Disposal: City of Metartes N I + r �� + l -_?� m / r` "ti- 7. Storm Sewer: City Ni Anacartee. ' �+'s a -C r L $ .+ - 14 B. Me Is a boundary sunny or y. Not oil utietlas were y 1+ 1 ,�A Yet _ I Investigated. O L$ '1 1'� �` • r` ��ap r..% 5 SECTIl7! TIE SEE L. t - *' �3�UQovA ° - 17 ROD AF R200807220033 a 1-'-'-' �� '7 1 -i 1 .+ pk57 I- 16 1 L9 p3 �r ;�3 5 I I \ PROPERTY AREA BEFORE BLA y�SN� t; L51\A '+ rl 5 no6Rra l 1 35,734 SF (0.82 ACRES) _�- - 1 t r clue 1 L '+ 's ` I ' — - ADDRESSES!+ r + _•.'H,,PLAT OF CLEARILGE➢IV II LOT 1 4317 OAKES AVENUE _ - - 1 + r OF 48294226013 ME d `E t , , 1`I --5?'"!�� - P82597 1 P82596 LOT 2 4319 OAKES AVENUE w I O ' \ _-3-.- 1 I REVISED FROM EXISTING rt {N HOUSE ADARESS OF O 4403 OAKES AVENUE O. SECTION 22,TOWNSHIP 35 N., 0 2s GRAPHIC SCALEE PROPERTY OWNERS CRY Of 0 Chris R Cheryl Felt SKAGIT COUNTY,WASHINGTON. 16839 Kart Road CO )c-....," u I or rim 1 Mount Vernon, WA 98273 BLA-2016-1009 I Inch. 50 SL I SURVEYOR'S CERTIFICATE HERRIGSTAD BOUNDARY LINE ADJUSTMENT THIS MAP CORRECTLY REPRESENTS A SURVEY WOE eY NE OR UNDER FOR X L� K°'IERRIGSTAD P.L.S. A._ lAY DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE Q 1 Ff ,• ,,p WI" SURVEY RECORDING ACT AT THE REQUEST OF CHRIS a T N JUNE ENGINEERING AND SURVEYING CHRIS FELT y43e0 WHISTLE LAKE ROAD i1 I' i �1. 2016- � �� 7r 4320 WHISTLE LE LASE ROAD, ANACORTES WA SCALE DATE: JOB NO: Z ACORTES WA 98221 te . DALE I.HERRIOSTAO,P.LS J^� �' Noted Nov.2016 2415_62 W 360-299-8804 I� PHONE (380) 299-8804 a i_yam Odle � �� ���7 - SAWN BY: CHKD ern SHEET: OF: EL Out H. DIN 1 2 Q I APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) Soils Report Linda Spicher, Septic System Designer (360)708-3004 Project/Client: Chris Felt Page / of/1 Cascade Building Designs, Inc. 16839 Kamb Road Mount Vernon, WA 98273 Site Address: 4319 Oakes Ave., Anacortes, WA 98221 , w eo Parcel Number: 133694 Date on Site: 12/17/17 s D DESIGNER Map Unit, Natural Resources Conservation Service: EC Iles os 29.;g #30 - Clallam gravelly loam, 8 to 15% slopes This area has been altered by logging, and by back-blading to smooth the soil surface. Soil Log 3 likely represents an area of historic fill,with the brown silt loam horizon, found at 24", the original surface soil. The vegetation of the area is mostly field grass and blackberries. Soil Types Loading Rate Soil Log 1 0—6 brown silt loam 5 0.4 6— 16 brown fine sandy silt loam 5 0.4 16 21 red medium sandy loamy clay 7 not suitable 21+ gray ashy clay 7 not suitable anticipated water table at 16" observed water table at 21" Soil Log 2 0—7 brown silt loam 5 0.4 7—23 brown medium sandy silt loam, roots 5 0.4 23—25 gray ashy clay 7 not suitable anticipated water table at 23" observed water table at 23" One of seven numerical classifications of fine earth particles and rock fragments as described in WAC 247-272A-0220(2)(e). 2 From Chapter 247-272A WAC: "Hydraulic Loading Rate"means the amount of effluent applied to a given treatment step, in this chapter expressed as gallons per square foot per day(gal/sq.ft.Iday]_ Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Chris Felt, Page ZL of// Soil Lod 3 0—4 brown silt loam 5 0.4 4—24 clay loam, mottles, roots 6 0.2 24—50 brown silt loam, fine roots 5 0.4 50—60 fine sandy ashy clay, mottles 7 not suitable anticipated water table at 50" observed water table at 59" Soil Log 4 0—9 brown medium sandy silt loam 5 0.4 9— 19+ tan clay loam, roots to 17", mottles 6 0.2 anticipated water table at 17" observed water table at 19" iR��! sr • "�yy..„F OL!SPICNER r ��m, ■DE57GNEilt EXPIRES o9-79-/F Version Date: October 7, 2019 Previous Version Date: February 20, 2019 ' P130302 P130302 P131821 ! . P130304 P131820 .. • P31678 P58421 P131798 °• P131619 ?o P131798 P131817 P31689 P131911801 P131799 P131819 P31fi80 • P31669 P131801 P131474 P131B75 P131388 P53s800 P13i873 P131818 ((�� P107754 P111386 lv:' P131390 P131868 `P131874 P56426 0 P137351 .P131190 P1118-76 P131878 •P31585." l P131889 ,, P131393. P131391 •.[f p131810 P739897:Pi3]877 p3758fi EV. P131393 P131392,;:�c'••pt31809 P731889 P131877. P.1584 Pt13445 P131391 P131808 p137886 P131887 P'131878 P37586 P56428 P128Q91 P161804 10131878 ;r P33583�::.� 1031662 P128691 P131g�4 P131012 P131886 P9396T9 P31583 • •...1 10128121 PiP828993P]31802 13431803 P739614 P131875 p131878 ;P133650 P728093 P131402 P131802 P131805 P131815 P111884 •P933690 P133652 •P58435 P928097 P137806 P130999P730999 p P13188d,...;:' P13366i F128097 P131402 10131807 p130010 P131884 P133689 10133667 10133863 fr} 10128094 P131401 131682 P128095 P12809fi P130663 P737069 P131 P13188T P133689 P133659 P133663 • P130504 P130604. P73Q616 P131 O7P131882..• P133664 •P133664 P128099 P126098..•`.• 1305144 P133688 P.133680 P11664 P58440 10139394 10131394 131001 pS30672 P130674 P733 0 P105956 P131395 ' P128099 P�}}26115 31002. -4P`66 2 P1 6 133667 P133687 P13685 P131395 P131400 10728170 P12$'114 P428175 P130505 P59564 P133687 P73368t# 10931396 10131389 P12871y P730607 P13660 P 67B P13 1 P133666 • P128114 P5 P133565 P133666 P5.8445 P931397 10137398 P131399.pt2A713 P7308. P1336 7 P1283D7 P 1574 367 33fi82 P133604 P133667 P1287 0; 10131398 P12891 P128111 P128103 P128102,4�.4 P722 7 P722 3 P13 83 P13366A P113666 P128110 p12z6q-�0 P128120 R°'` • 731676 P1336 .P133683 P133668 P128108 P128111,,•P12811A i '1'122994 5 P120130 5. P82608 P315 10133 10133669 9733669 P1 8.168 P128118 P122995 P1336T1 P130610P130610 10128104 •p82508 P12 95 P56573P133674 33672 P130815 P128106 PA2808 P56577 P 336737t3167i P133670 srr P128105 P82fi07 P12299fi 933874 P131007 P128106 P128705: P82879 P56577 P12297 P122998 P82595 .a g P130675 P128107 P82610 p629�7 P12298T P P P82595 P62594 P108225 P131422 Pi306t18 PB2612 - P111421 P131420 P13100PF131004 6P82614 6P826S3 12 4282:6 55 P58579 P82601 P8 82589 P82596 P62595,�.� P82593 1082593 �,..• P82602. 525w P62596 '1 P82590 P82592 P mg 11 ..0 2.„,. . P1314 P131008' P82614 1082604 .P82802 1082591 Dee 7314DG P82615 P1314 SP131403 P82616 .1082627 P62603 P82589 P82591 P131406 .21• P52615 P82826 1082627 P52803 P82661 P62588 P106215 P82617 P82625 P105818 p8 50 PB25B8 P131406 P82628 P82656.P82662 NA P62617 P82528 P82625 P108170 P82618 P82623 P8262g P105818 P82648 P826-09 • P82587 P82586 P32372 1082618 P82623 P82529 1082647 1082846 • Zr� P105260• P82619 P82822 P82824 P826dd P826d7 P108171 P105260 P82679 PB2831 P82630 P82644 P81733 P82585 1 P82622 P82631 P82643 P91732 ` P82621 • P8�,37 P82643 P81731P81734 P82584 P108172 P82620 P82632 . P105261 P82627 p32633 P82642 P81727 P81736 P82583 P31684 P82fi-00 P81726 P81728 P81735 1082583 P82634 P82640 P31094 December 18,2017 1"=300' 11) ',l Le a 0 165 330 650 Fl Tax Parcel Numtlets Building Orly Accounts a Structures I I I 1 f t 1 1 i ['v Dirt Accounts •_• 0 0.05 0,1 0.2 km Tax Parcels Trails a nnno,g acyVdmfnp•All et8 eau was erensee[rem avaiabea Wgkreeareaone fS Senior Cllzcn Accounts towing may women.>�}Mares nave Doan Kluged.a m Wien•a l o.9ri Li County Boundary — Rivers and Slreenrs reolsimlon u a prat um was M Mao h u,is Grooms,macs r a4arpn s,8 ve' }army area b mY#QadM laafim d caw'aaakamerM Map dlwmmocros MOM Home OM Accounts - &Beams .• 20 fool contours be as malaf aOa roe, CaAtyM12018 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 aFrke-/s- . .57"-dAZ"' // NU LLUAL 1 / `` r N'SE5 a� 0• a ° s Mr4s's4•w \ 20 c. t c_L 47.72' \ iLoOS _` ..- PPR� ' 21 \ `�f' ,- F' /, V Ma.29' P56562 _ .' ....„ , . , - , . ,1 7.7 TOTAL HOUSE 1 ' P56563 , AND GARAGE ! — —\\\ , LflT1 e2957 SF\, 10,900 SF N F 20 .�1ss &Rsns' 446 Op��. P3168I 1 20A .. ,5C'5b4 ;'� ` a PRELIMINARY-PLAT v. FENCROACHMENT ? '' o OF 48 NORTH p 0 ENc2� t 1 7• . 19 I L. .�i° 1 ... ROS 200807220033 J )0005 s e 1 \\ LOT 2 i7 - ._ , _ z ASP O��o� ',1'�24,834 SF ,,Po5p5900 `$ It g . ]8 PARCELS 1 P122993 - . 1,r sawn �AND t �� \ sa SFHRE MNMNEWAY AHQ L ,�\ . unurr EASEMENT L S 70'26'59'V 1�k•`� `L%�'.y� '. �� 17.74' $1 �9, m F40,64' r 1O / CFs _ ,, r'' ..�. 3 — + SLR 7 Ip 0:. L o A w )_ ..„�� ,000a6c 05 A 4 -� 17 I -- *' x `••'Mr■ N . ff A.. P ' w z ,` , • SPICHER 1 q I r y:x • .DESIGNER ■e I 14� 'rlRIII I lig I AI LWrLtIL\ I 1 el�?. g J -1/16TH CORNER! EXPIRES 69.29-/ `_ 9-OU 17. P56573 --s 0'4654•v ' L s�50 0§ GRAPHIC SCALE p� 5 �v��nr a 30 0 30 60 20 S , _ f 1 ( EN FEET ) PLAT OF CLEARIIIGE DIV II E inch - 60 ft. ' - AF #8204220013 1 Ni 5,P 70644r42 clf. "/ HERRIGSTAD ENGINEERING & SURVEYING Proposed access & Utilities 4320 RUSTLE LAKE EOM �F-7 /WP to Felt Property P56573 ANACQRTES, WA 98221 299-8804 9/ ai7 e-. • October 5, 2016 - Version Date: October 7, 2019 Previous Version Date: February 20, 2019 ,ter, X;- 07 Soil Map—Skagit County Area,Washington 4319 Oakes Ave. Map Unit Legend Map Unit Symbol Map Unit Name Acres in A01 Percent of A0I 25 Calla gravelly fine sandy loam, 0.4 12.3% 0 to 8 percent slopes 30 Clallam gravelly loam,8 to 15 2.8 87.7% percent slopes Totals for Area of Interest 3.2 100.0% ► 1 w 'ai „' SPICHER ,,.s . DESIGNER �� IL% M% ILVILIMMIL IL EXPIRES 09-29-/g USDA Natural Resources Web Sait Survey 12/18f2017 Conservation Service National Cooperative Soil Survey Page 3 of 3 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Skagit County Area, Washington 25—Catla gravelly fine sandy loam, 0 to S percent slopes • :1 Map Unit Setting �:, ff • National map unit symbol: 2hv6 r •o,w 1� y 1. • Elevation: 50 to 500 feet c _T •,' ' r • Mean annual precipitation: 21 inches jL•e" lk • Mean annual air temperature: 48 degrees F 7 tav smote' +� • Frost-free period: 170 to 200 days 47. ' •°ENE • Farmland classification: Prime farmland if drained DOFM O9-29-/S Map Unit Composition • Catla and similar soils: 95 percent • Minor components: 5 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Catla Setting • Landform: Flillslopes • Parent material: Glacial drift Typical profile • Hi - 0 to 6 inches: gravelly fine sandy loam • H2 - 6 to 11 inches: gravelly fine sandy loam • H3 - 11 to 17 inches: very gravelly loam • H2 - 17 to 60 inches: gravelly fine sandy loam Properties and qualities • Slope: 0 to 8 percent • Depth to restrictive feature: 10 to 20 inches to densic material • Natural drainage class: Moderately well drained ■ Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately low (0.00 to 0.06 in/hr) ■ Depth to water table: About 6 to 18 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: Very low (about 1.4 inches) Interpretive groups Version Date: October 7, 2019 Previous Version Date: February 20, 2019 C�erS � 0'' 4.4—/7 • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 6w • Hydrologic Soil Group: D • Other vegetative classification: Wet Soils (GOO2XN1O2WA) • Hydric soil rating: No Minor Components Coveland • Percent of map unit: 5 percent • Landform: Depressions • Other vegetative classification: Wet Soils (GOO2XNI02WA) • Hydric soil rating: Yes +�� A:0 ar of T yy� . 14, jef • tt , .t'SPICHER , ❑DESIGNER 'AM 141M.ILILWOLa 4 EXPIRES 0949-/13 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 T�i9rva'/4 Skagit County Area, Washington 30—Clallam gravelly loam, 8 to 15 percent slopes •• ' Map Unit Setting : `cr �,■ r�n Or w ! • National mapunites symbol: 2hvd 4.% ` !. y r . ice .- �! • Elevation: 30 to 500 feet �.��! • Mean annual precipitation: 23 inches - ,OESIGH f • Mean annual air temperature: 48 degrees F 4hnimmuawmmiwwf�, • Frost-free period: 160 to 200 days DEMO 09-29-Fi3 • Farmland classification: Farmland of statewide importance Map Unit Composition • Clal/am and similar soils: 90 percent • Minor components: 10 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Clallam Setting • Landform: Hillslopes • Parent material: Glacial drift Typical profile • Hi - ❑ to 11 inches: gravelly ashy loam • H2 - 11 to 27 inches: very gravelly loam • H2 -27 to 60 inches: very gravelly sandy loam Properties and qualities • Slope: 8 to 15 percent • Depth to restrictive feature: More than 80 inches; 20 to 40 inches to densic material • Natural drainage class: Moderately well drained • Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately low (0.00 to 0.06 in/hr) • Depth to water table: About 18 to 36 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: Very low (about 2.6 inches) Interpretive groups • Land capability classification (irrigated): 4e Version Date: October 7, 2019 Previous Version Date: February 20, 2019 C. ,�r5EsEoG If • Land capability classification (nonirrigated): 4s • Hydrologic Soil Group: C • Other vegetative classification, Limited Depth Soils (G002XN30ZWA) • Hydric soil rating: No Minor Components Bow • Percent of map unit: 5 percent • Landform: Terraces • Other vegetative classification: Seasonally Wet Soils (G002XN202WA) • Hydric soil rating: Yes Copeland • Percent of map unit: 5 percent • Landform: Depressions • Other vegetative classification: Wet Soils (G002XN102WA) • Hydric soil rating: Yes o(w SPICHER DESIGNER EXPIRES 09-29-fg3 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 APPENDIX 3 — Model Soil Management Plan for BMP T5.13 An alternate document acceptable to the City of Anacortes is a Test Report provided by the Soils Supplier that identifies the soils to be used meet the specifications outlined under Minimum Requirement 5. The specifications are in both WSDOT and CSI Formats. For specifications, refer to the above referenced PDF. This submittal can be a deferred submittal since most projects are not sure who the supplier will be at the time of building permit application. For projects that trigger Minimum Requirements 1 through 5, the Test Report will be provided to the Building Department. Projects triggering Minimum Requirements 1 through 9, the Test Report will be provided to the Engineering Department. DIFFERED SUBMITTAL TO END OF PROJECT Version Date: October 7, 2019 Previous Version Date: February 20, 2019 DEFERRED SUBMITTAL: PROVIDE A TEST REPORT FROM SOILS SUPPLIER TO THE BUILDING DEPT. PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age# of pages Complete all information on page 1;only site address and permit number on additional pages. _ Site Address/Lot No.:_5304 Sterling Drive /Lot#55 Skyline No.3. Permit Type: Permit Number: Permit Holder: Phone: Mailing Address: Contact Person: Phone: Plan Prepared By: ATTACHMENTS REQUIRED(Check off required items that are attached to this plan) Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required) 1 L _New planting beds and turf areas(amendment required) Type of soil improvement proposed for each area Soil test results(required if proposing custom amendment rates) Product test results for proposed amendments AREA# (should match Area#on Site Plan) PLANTING TYPE Turf _Undisturbed native vegetation Planting Beds _Other: SQUARE FOOTAGE OF THIS AREA: square feet SCARIFICATION _inches(depth)of scarification needed to achieve finished total 12"loosened depth. Subsoil will be scarified PRE-APPROVED inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Topsoil import =cu.yards per 1,000 sq. ft. _Amend with compost X ,000s sq.ft. in this area _Stockpile and amend =cubic yards of amendment —*—*—*—*—* QUANTITY: CU.YDS. ( cu.yds. stockpiled) (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil&compost lift X 3_1 Amend =cu.yards/1,000 sq.ft. Stockpile and amend X ,000s sq.ft. in this area ( cu.yds. stockpiled) =cubic yards of amendment ——*—* —+ QUANTITY: CU.YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) =cubic yards of mulch ——————* QUANTITY: CU.YDS. TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only, totaling all areas/pages in this Plan) ❑ Product#1: ❑Quantity: cu.yds. ❑ Test Results: % organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) ❑ Product#2: ❑Quantity: cu.yds. ❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) ❑ Product#3: ❑Quantity: cu.yds. ❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: Version Date: October 7, 2019 Previous Version Date: February 20, 2019 APPENDIX 4— Determining Construction Site Sediment Damage Potential (Appendix 7 — NPDES Phase II Permit) Note: See attached. All projects within the City of Anacortes are required to complete that document under Appendix 4. Western Washington Phase II Stormwater Permit i. APPENDIX 7 - Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site-specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. ii. STEP 1 — Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near-shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater) associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. iii. STEP 2 — Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel or ditch. August 1, 2013, Modified January 16, 2015 Appendix 7- Determining Sediment Damage Potential Page 1 of 3 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: iv. Sheet flow through a vegetated area with dense ground cover v. Flow through a wetland not included as a sensitive feature vi. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. vii. STEP 3 — Construction Site Sediment Transport Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low 100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoff. Construction Site Sediment Transport Potential Worksheet A. Existing slope of site (average, weighted by aerial extent): Points 2% or less .. 0 >2-5% 5 >5-10% 15 >10-15% 30 >15% 50 B. Site Area to be cleared and/or graded: <5,000 sq. ft 0 5,000 sq. ft. — 1 acre 30 >1 acres 50 C. Quantity of cut and/or fill on site: <500 cubic yards 0 500 — 5,000 cubic yards 5 >5,000 — 10,000 cubic yards 10 >10,000 — 20,000 cubic yards 25 >20,000 cubic yards 40 D. Runoff potential of predominant soils (Natural Resources Conservation Service): Hydrologic soil group A 0 Hydrologic soil group B 10 Hydrologic soil group C 20 Hydrologic soil group D 40 E. Erosion Potential of predominant soils (Unified Classification System): GW, GP, SW, SP soils 0 Dual classifications (GW-GM, GP-GM, GW-GC, GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) 10 GM, GC, SM, SC soils 20 ML, CL, MH, CH soils 40 F. Surface or Groundwater entering site identified and intercepted1: Yes 0 No 25 G. Depth of cut or height of fill >10 feet: Yes 25 No 0 H. Clearing and grading will occur in the wet season (October 1 — May 1): Yes 50 No 0 TOTAL POINTS 125 1 If no surface or groundwater enters site, give 0 points. APPENDIX 5— Site Plan with all applicable information (Minimum Size 11x17 at a legible scale) APPENDIX 6 — Documented Site Photos (Show all directions of the site, including frontage) (Insert Photo Here) Location: 4401 Oakes Avenue Description of the photo: Lot 2, Looking West Photo taken by: Dale Herrigstad, 12-16-2019 IPIL - art,- s. �0-- - 'C '1 I��- Lot 1, Looking Southeast. ik it .,_4 II I I . s Lookin s up center of existin. concrete drive to center of lots. Alp - Top of concrete drive looking north to Oakes Avenue at bottom of concrete drive. 174 -.a, g`- APPENDIX 7 — Drainage BMP Facility Maintenance Covenant Note: To be recorded prior to: 1) Temporary Certificate of Occupancy; 2) Final Certificate of Occupancy, and or; 3) Final Acceptance of the project. This is Covenant is required for any Permanent Stormwater Facility constructed on a project site. The applicant should work with the the City of Anacortes Engineering Department on formalizing the document for recording. No Maintenance Covenant needed for perforated stub outs. F E L T L I I 1 1 I 71 ./ LAT _,, 5c) � � �p°2�' 0 N 2°57'00" E E 1 /4 � ': ECTIIN 22 , T �� 5 / / W® M® °� 118.29' 9 AT, 9 I -,, Z o up_ P56562 0 4317 OAKES AVECID '/ 0�0 7o V o LOT 1 0 0 i \�� %Py / \ -`�- J co N 201702090059ct I tl S� -3 C 0 FENCE X X X 0 \\�� PNP %,, ��\ j / GAS 23,00' \�P�E (\���� O-\ O � * 3 � / POWERROUND UGP LINE TABLE 2�' PsSPNOccP\'P \' 503�0 SOW SS \ SEVER ss BEARING DISTANCE P�� \��N� - P\� 2�� 87, 2 Q STORM SD 1 S 19°33'00" E 10.06' �pS� °�,��� ` ,. c9 1 OA PF \ 133680 SEWER �� n 44 \G y WATER W SS 113 r_ O OQ� / l�� P MAIN ^CC\�/ IN. rr'\.V 1 � � . N� - �/ cA(�S - Catch Basin 0 \v P�� P \�\ �a IX t�� w G'' I F • / y �V Sanitary Sewer Clean Out ° ?� -\\\— G� cO'S' .. �\ I Sanitary Sewer Man Hole%\ "� i \ Fire Hydrant f� �� p' Qo \ -'-' c .��� i Water Gate Valve D4 �SM� 9p l �, / 0 -\-'' �� V \ 21 \ Water Meter ® or i5 -c� C Q' W\ � 1 E / \ N iZ ' � � ' S- SET3ACK -• P -j 15°3 � \ M 2 ,� �'l,•o �� \ ��, $ / • F_ ( 9-1\ °°,1/ N 2°57'00" E o, / I LOT 1 I ' rL0 D��j Q\�S �0 18.29' 1 z I � w z0 <,� �j c)1 v, ,�� \ / 5' VIII.---\ o� 4319 Oakes I 3 44 o `��' � 3 `�' 0\,6,3\ \ SET3AC'K \ 13,923 SF E �J� / SS i P C. � ce P5656z • \ \ o �\ In '''.1 � c� vi t�, / �� coN O\NN o cam\ \ \ , \ �\ gl Id pZ / \S� SN o 0 4317 BAKES AVE \ \ I d- �` �� N�\ ( g°° �\ LOT 1 \ D 13 3 6 7 8 �, LOT 2 �\ o � '' \ OR \ \ o N iv) 44 `�P7 � \ \ SNP0�0 EX\S�' BLA AF# EX. FIRE s 401 Oake• Vii) / „ �� \ w� „ Ss o \ (Al d `� \ 0910 SF \ . F 6 201702090059 HYDRANT \ / c'1'• \ \ \ S ' SO �� o 0 N,fl\ \ 40' SOW \ / \ 6 , o \P..-11# \ \ \ ` / J S\OES \ 23,00 \I � ' \ ` \<_S \ � �- - IMPERVIOUS AREAS o \� � M PN° \ \ \ ` OP F- E \ SA \N - \� -\\3 i ' I �\ ,51 �, > I PROPOSED PAVED ROAD AREA = 3,050 SF �� R� S� \ S� \ AV 2 HOME SITES COMBINED 6,260 SF EACH E `� '''' I FND CONCRETE \1\- ? FENCE \ \ 43,0 9.,15 19 I TOTAL IMPERVIOUS = 9,310 SF G� \ MON IN CASE \ \ ENCROACHMENT \ �E�NP� SF-- P �98 �, o P133677 I 2\ o00 '\- 1, 1 \ \ \ \\ \'\, \S ' s ' sHP ASS�' 16� 1 R T 026 5`� c�\ , P°° // , ad a d .,L.ECI o - L - _ 1 BOTH HOUSES WILL s �, 1 \ \ P� o \ \-� \ No REgPg569 o��w� ii.-( / � � , �, �� = 801705080088 �' HAVE FIRE SPA NKLE�S SET3AC <S (Sc EASEV E \TS (777 o 0, 11 �' - I 0 I \ \3 00 9 0 i LOT \\t1 _, 1 \ 3 r T • 4319 Oa is I N� Z � � „G491 Ivi \ 590 S ` ; v ROOF I u) o�z ,4 co co O c aII i /\, D \,-c ji i\ 2 \\ \ \- , \\ .04 \:::::::: : : •00-10\ , '''sco � /\ '�3 \ 2 \ 0�,00 �� \\ ,\‘ .: ,.... ...A.. 410 SF I I _ c���` i TAFF\ 0 P LOT 2 , �y \ \ \ P 0�� , ,`./PROPOSED 18 ' '\ \ �P 1g0 401 Oake l v . )/ / z • ,P 5\ /. HOUSE '\ O5 \ \ a•\ .f EAGLE VIEW CT.(PR ..)\ S\�0 r 0 PROPOSED 0,910 SF , 1... \ //� 133676 ���� \ \ PF \ HOUSE \\'' \ \ �j `� EXIST. ��° — .� i © <\�j ` EXISTING WATER G�� 4 • _ , \ �6 \ \ \ 122 - / WATER METERS FOR �� ,...„,_ 17 1 t\ \-- \ \ � ,j// ` Xr1ST. SERVICE 4401 AND 4319 \ ��o����` ` ��P� .';�°`�•\ EX ST. ` QQ ��GRASS LINES OAKES AVENUE G�z o� , oP �i ,�FND CONC \ \ I �R �� �,` /� / �, o — — iI� I - o4-9- , '�i \ \\ �.i i . ° GON IN CA ' \- `� . \ �. \ \ if•,► Sf�RMEPI�\� s0 9e°P@ ' 1JI / -. , - \ \ 2 pp W \ia PRIVATE 20' SHARED ACCESS & . P \ \ \ \ \P1 � % ,26'S`� UTILITY ESMT AF 201702240096 w °��� \ \ \ \ \ -EXISTING \ \ S 70°26'S9" W S �° �c�°°�� \ FIRE HYDRANT 1 / Ct \ \ -5 1774' \/ ICI � ' \ HIDBEY CT, __\ \ / 1 \ -________--- \ J i ��p� cr / 1 . CO a \ \ \ EgFRC6g \ 3 ilkP�°Q1 \ tp- \jS \ \ I \ \ I GC� S# 417 1 Q A \ \ \ ?bb \ \c \ , "' IP X V . • " \ \ \ OVT\\- 0 \ i it „1 4) 17 i V / \ 2 ? C `(\, j P 7 \ . ** # S Applicant Owner (2)9 (3\?) 1 1336 5 � ' \ v' �A CND /► \� Chls Felt \ \ I P13367 \- �- � \ \r-3 \ \'�, �I '� � 16839 Kamb Road Mount Vernon, WA 98273 \ -'0 \ �5 \ 9 1/16TH CORNER ® a \�-C- ' \ \ \ Z�j o \ \ , 360-661 -4176 \ '\� \ \ P12 \ _ �O \ ' FND REBAR NO C) \ y \ \ �` \ CAP 0.50 EAST \ \ \ �� \ Un 1. ` 1 \c° \ \ \ \ / \ ; OF LINE _ �� / / \ \ l� \ \ \ I 7___ , Engineer & Surveyor \ \ \ I Dale Herrigstad PE, PLS \ 4320 Whistle Lake Road \ \ \ \ S 0°46'S4" W \ \ \ 20,04' \ \ \ \/ICI \ TY PLA\ 360c 299 80498221 R2 ZONING (RESIDE\TIAL LOW DE\STY) GRAPHIC SCALE SHEET NO. , TOTAL NET AREA = 24,833 SF (0.57 ACRES) 30 0 15 30 60 120 ; ,������I������������HE�� HER/ i Parcel P133694 Legal DescriptionF wAsRjc�� of WASti�G�� TOTAL GROSS AREA I \CLUDING 1 /2 OF ADJACENT ROW � � �� =R ti�� � 7' �P ~� �' d q Z REV.. - ( IN FEET ) Lot 2 of Felt Oakes Avenue Boundar Line Adjustment, as shown on the Record of Surve recorded on '' 26 189 SF (0. 60 ACRES) 1 inch = 30 ft. y y • �� 1 =� C February 9, 2017, under Auditor's File No. 201702090059, being a portion of Lot 7, Block 1906 and Lots 5 °14 F �'4'�STERF- ''� y \ *, 27807 JOB NO: 2017-132 VAXI V U vl DENSITY (4 DU/AC �E) MAXIMUM IMPERVIOUS SURFACE AREA through 10, inclusive, Block 1907, "BARING ADDITION TO ANACORTES, WASH," as per the plat, recorded in ^ SS/ANAL LAN�SJ� �FSs�c STE�NG���`� DATE: Feb. 2020 Volume 2 of Plats, page 20, records of Skagit County, Washington. ONAL SCALE: Noted 4 X 0. 60 = 2.4 UNITS Based on Storm Water Report """"""".....,.... p 2 UNITS PROPOSED Total new impervious area allowed 9,310 square feet Situate in the City of Anacortes, County of Skagit, State of Washington. 2-1-2020 2-1 -2020 DRAWN: D. HERRIGSTADCHECK: D. HERRIGSTAD v \ IVUV LOT SIZE 7,500 SF February 1 , 2020 SHEET 1 of W E NO CD F\ �o ) It ) *0 0 ,--, L _ EROSION CONTROL NOTES / — —\ A. A CERTIFIED ER❑SI❑N AND SEDIMENTATI❑N CONTROL SUPERVIS❑R (ESC) IS REQUIRED. V `4 , THE ESC SUPERVIS❑R MUST HAVE ATTENDED A CERTIFIED ER❑SI❑N AND SEDIMENTATI❑N / FENCE X x x CONTROL CALSS WITHIN 3—YEARS FROM TODAY'S DATE. MUST PR❑VIDE CERTIFICATI❑N / �06 GAS G CARD. p I\\\0 UNDERGROUND 00, UGP �� POWER B. THE CERTIFIED ER❑SI❑N AND SEDIMENTATI❑N CONTROL SUPERVIS❑R WILL OVERSEE AND SANITARY BE RESP❑NSIBLE FOR ALL ER❑SI❑N CONTROL. THE FACILITIES SHALL BE INSPECTED DAILY -6;\4 10�5' p / 3 3 6 / 9 SEWER ss— AND MAINTAINED TO ENSURE PROPER FUNCTI❑NING, WRITTEN RECORDS SHALL BE KEPT STORM SD OF WEEKLY REVIEWS AND AFTER EVERY SIGNIFICANT STORM EVENT OF THE ESC FACILITIES G9 20 STORM DRAIN CATCH SEWER DURING THE WET SEASON (OCTOBER 1 TO APRIL 30), MONTHLY REVIEWS DURING THE ,--) BASIN INLET PROTECTION WATER w DRY SEASON (MAY 1 TO SEPTEMBER 30). WRITTEN RECORDS SHALL BE TURNED INT❑ THE O / MAIN PROJECT MANAGER OR INSPECT❑R ON A WEEKLY BASIS AT THE WEEKLY SCHEDULED SS WSDOT STND PLAN Sanitary Sewer Clean Out o PROJECT MEETINGS. °� W Ge \SC' '''' S� - - i 140.20 00 \ \ Sanitary Sewer Man Hole C. ER❑SI❑N CONTROL MEASURES SHALL BE IN PLACE PER THE APPROVED SET OF PLANS A-' O O Fire Hydrant f� �, '--a � t7 Water Gate Valve M PRI❑R TO ANY C❑NSTRUCTI❑N START. G� \ / Water Meter ® w0A3\1 D. THE ER❑SI❑N CONTROL SHALL BE INSPECTED ONCE A DAY AND M❑DIFIED TO MEET THE / SURR❑UNDING C❑NDITI❑NS AS NEEDED. � \ E. PR❑VIDE A SIGN DISPLAYING A 24—HOUR CONTACT NUMBER AND NAME OF THE ESC , W SS ?CD6363 SUPERVIS❑R. THE LETTER SIZE SHALL BE A MINIMUM OF 2—INCH LETTERS. THIS SHALL BE 1� t S� Cn 0 IN PLACE PRI❑R TO C❑NSTRUCTI❑N START. REMEMBER, THE LOOK OF THE SIGN WILL BE A W E� / L-, REFLECTI❑N OF THE CONTRACTORcf) , DEVELOPER AND DEVELOPMENT. = 22 w \ P ' 3 3 6 / 8 F. THE STORM DRAIN SYSTEM AND EXISTING DITCHES SHALL BE CLEANED DAILY (SECTI❑N 7— � ; E� / 0 07,3), ALL DRAINAGE SYSTEMS SHALL BE CLEANED TO THE ACCEPTANCE OF THE CITY OF �� O \ o O ANACORTES PRI❑R TO THE ACCEPTANCE OF THE PROJECT. W CD L) 0 G. STABILIZED C❑NSTRUCTI❑N ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING ��, OF C❑NSTRUCTI❑N AND MAINTAINED DURING THE DURATI❑N OF THE PROJECT. ADDITI❑NALLt / o MEASURES MAY BE REQUIRED SUCH AS WASH PADS TO ENSURE THAT ALL PAVED AREAS ARE (4 KEPT CLEAN. NO MUD IS ALLOWED TO ENTER ONTO CITY STREETS. 44 H. ANY S❑ILS EXPOSED THAT WILL NOT BE DISTURBED FOR TWO (2) DAYS DURING THE WET SEASON OR SEVEN (7) DAYS IN THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH C APPROVED ESC METHODS (SEEDING, MULCHING, PLASTIC C❑VERING, ETC.) \ \/ J I. TWO (2) WEEKS PRI❑R TO THE BEGINNING OF THE WET SEASON (OCTOBER 1), ALL DISTURBED \ OP`\ AREAS SHALL BE REVIEWED TO IDENTIFY WITHCH ONES CAN BE SEEDED IN PREPARATI❑N FOR O� THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE (1) WEEK OF THE �\ BEGINNING OF THE WET SEAS❑N, A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE PROJECT MANAGER. THE PROJECT o o Imo\ BMP C233 MANAGER CAN REQUIRE ADDITI❑NAL AREAS IN ORDER TO PROTECT SURFACE WATERS, ADJACENT SILT FENCE '� BMP T5.13: ?C-D63 PROPERTIES OR DRAINAGE FACILITIES. C 107 0 �, POST CONSTRUCTION SOIL \ J. PENALTIES FOR AN ER❑SI❑N CONTROL VI❑LATI❑N ARE SUBJECT TO A $300 TO $1,000 FINE BMP C 105/ / UNDER CHAPTER 17,66 — PENALTIES FOR VI❑LATI❑N (AMC). EACH DAY IS C❑NSIDERED CZ CONSTRUCTION QUALITY AND DEPTH FOR ALL A DIFFERENT 'VIOLATION. C� DISTURBED SOILS ENTRANCE K. REMOVE ALL TEMPORARY EROSION CONTROL MEASURE WHEN THE SITE IS LANDSCAPED ANDCQ d co SOILS ARE STABILIZED. BMP C233 , 150 SF� _\ BMP T5.1OC SILT FENCE ?i,/,14,A,,r/ '� �►�� via/_.1, '\b`3 L. ALL DEWATERING SHALL DISCHARGE INTO A SEDIMANT TRAP OR SEDIMENT POND. Ct PERFORATED STUB �S CK '��/ 3 3 6 / / M• THE CONTRACTOR IS TO PROVIDE TO THE CITY INSPECTOR THEIR SPILL PREVENTION PROGRAM\ ,� "•� ��5�� I , , TO BE INPLACE DURING CONSTRUCTION. OUT CONNECTION 1,-------: / / � '/� --- BMP C240 8 X 8 SEDIMENT \ FOR EACH HOUSE �� ,�, TRAP AS NEEDED AND PLACED X Galt 'C4rOgrarill ON FLAT GROUND. a `t °'/ � rA ROOF / � � 10 SF /� CONNECTI�iN I/ �, g CIS , /� / ' TO STOR' I v '�. co 0 \5� \ jam / / / . ate / ° Qa � SYSTEM I v \ \ � `� E� / / \ 4 a a LOT 1 I BMP C154 CONCRETE 4319 Oakes 0 �\ \ ReOF \ ° `S°C0 I I WASHOUT TUB o \ as d ONNECTION \ • 139 3 SF I PROPOSED TO STORM J� \ a Z SYSTE a PROPOSED HOUSE II \ / I Ic= 0 SLOT 2HOUSE -1—) , 1 �4 BMP C233 4401 Oakes z ,./- /) )/) 8 i ROOF SILT FENCE \ 10,910 SF .\ :' °� , / �/ \ / a 3410 SF� p / 3 % / 6 ,\� ROOF /a ° / ? /\- ZZ993 2590 SF\ \ <0 \ \ \ •< .X / / d /� • \ / / BMP C103 HIGH 1 BMP C123 COVER i y/ ' l VISIBILITY FENCE i // / / STOCK PILES AND \ \o / / / ' STEEP SLOPES 4,,, I �� /_ ____, / I— — 3 4\\-------- / o / / / / /A / • .„_ cL) 0 Q BMP T5.13: �� 1\14 J� / 0 Applicant Owner PP \ '�2 POST-CONSTRUCTION SOIL O'ANSFORMEf Chis Felt \ \ QUALITY AND DEPTH FOR ALL \/ / ` — — — — — — — — — - 16839 Kamb Road -) DISTURBED SOILS / �IVATE 205 SHADED ACCESS I Mount Vernon, WA 98273 _ ® a ' v TLTY ESVT AF 2017022L-009 360-661 -4176 Ct S 70°26 '59' W � on UfD � fl17 7L Engineer & Surveyor ® �Dale Herrigstad PE, PLS Un CO 4320 Whistle Lake Road 7 Anacortes, WA 98221 -\ k- , ', , �, 360-299-8804 GRAPHIC SCALE SHEET NO. 20 0 10 20 1w140 80 P LI: 1, ( IN FEET ) �� 1P /1/ oZ C 2 REV.: — , -1 1 inch = 20 ft. iz- qWJOB N0: 2017-132 kt27807 MAXIMUM I MPERVI0US SURFACE AREA RFCSTEREO DATE: Feb. 2020 S/ONAL LNG\� SCALE: Noted Based on Storm Water Report 2-1 -2020 DRAWN: D. HERRIGSTAD Total new impervious area allowed 9,310 square feet CHECK: D. HERRIGSTAD February 1 , 2020 SHEET 2 OF 2