Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit File BLD-2021-0264 5117 Maritime Court
City of Anacortes Invoice/Permit#: BLD-2021-0264 904 6th Street Applied date: 04/07/2021 P.O.Box 547 Issue date: 04/15/2021 _ 0, Anacortes, WA 98221-0547 (360) 293-1901 Expire date: 10/12/2022 445/ Job Address: 5117 MARITIME CT Permit Type: PV Solar Permit ANACORTES WA 98221-3052 Project: APN: P120227 Remarks: Install 18 solar panels on roof mounted system. Owner: THOMAS MACARTHUR Contractor: TML INTERNATIONAL LLC Address: 5117 MARITIME CT Address: 6405 E MILL PLAIN BLVD ANACORTES WA 98221-3052 VANCOUVER WA 98661 Phone: (425)308-1794 Phone: (775)842-1905 License#: TMLINIL813JT General Information: Fees: Building Valuation 4182 Building Permit Fee 111.25 Plan Review Fee 72.31 State Building Code Fee Resi 6.50 Total Calculated: 190.06 Deposits/Receipts: 0.00 Total Due: 190.06 The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to be true and correct. ,% 4. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY PHOTOVOLTAIC ROOF MOUNT SYSTEM comEEK 18 MODULES - SYSTEM SIZE STC (5.58 kW DC / 6 kW AC) 00_HO FF1 Y O CI 5117 MARITIME CT, ANACORTES, WA 98221 , USA (48.49717, -122.67497) [ [�[Eilo1 2 SYSTE Y STC DC/AC SAFETY PLANS LOCATION OF NEAREST URGENT CARE FACILITY SHEET INDEX GREEN THINK ENERGY LLC NOTES: NAME: PV-1 SITE PLAN&SAFETY PLAN 50 HARRISON STREET, PV-2 ROOF PLAN WITH MODULES SUITE 202B (5.58 k • INSTALLERS SHALL DRAW IN DESIGNATED SAFETY AREA AROUND HOME. ADDRESS: PHONE NUMBER: HOBOKEN,NJ 07030 • INSTALLERS SHALL UPDATE NAME,ADDRESS AND PHONE NUMBER OF PV-3 ATTACHMENT DETAIL G'; y C� www.GreenThinkEnergy.com • 1 x STRING L0 I ED IN PARALLEL NEAREST URGENT CARE FACILITY RELATIVE TO THE SITE BEFORE PV-4 SINGLE LINE DIAGRAM STARTING WORK. PV-5 WIRING CALCULATION CONTRACTOR • 1x STRING O '2/CON CTED IN PARALLEL PV-6 PLACARDS PV-7+ EQUIPMENT SPECIFICATION NAME:N/A - (18) Suntech STP310S-20 Wfb MODULES NOTES :AC DISCONNECT LOCATED WITHIN 10 FT OF UTILITY METER. ADDRESS:N/A - (5) Hoymiles HM-1200N MICROINVERTERS PHONE#:N/A STC DC: (18) 310 = 5.58 kW LICENSE it N/A STC AC: (5) 1200 = 6 kW REVISIONS PROJECT ID: N/A DESCRIPTION DATE REV GOVERNING CODES MARITIME CT AHJ: ANACORTES 2015 WASHINGTON STATE ENERGY CODES CITY OF ANACORTES �" j ARRAY LOCATION rat 2015 INTERNATIONAL BUILDING CODE (��$ - 2015 INTERNATIONAL EXISTING BUILDING CODEPLANNING AND BUILDING DEPT: w PROPERTYLINE --'"` SIGNATURE&SEAL 2015 INTERNATIONAL FIRE CODE z r ! 41� t'' 2015 INTERNATIONAL RESIDENTIAL CODE APPROVED PLANS } Jo I 2015 UNIFORM PLUMBING CODE REVIFWFn FnR CQI�F CQMPI IANCF • PERMIT#: BLD-2021-0264 W' ADDRESS: 5117 Maritime CT °1 ���� i i * .ter) ;• '. - ' '� CL i iiI APPROVED BY: //L(�V ♦♦♦ON I i SUBJECT TO FIELD INSPECTION.APPROVED PL S SHALL NOT 111`Ii I PROJECT NAME BE ALTERED WITHOUT AUTHORIZA ON. ',,) ! - _ I- - - 6,4k4 7.-9". ,- } . E Q GENERAL NOTES: o 'a -; + I 2 • ALL PANELS,SWITCHES,ETC.SHALL HAVE SUFFICIENT GUTTER -- I j J • ( H SPACE AND LUGS IN COMPLIANCE TO UL REQUIREMENTS TO I ACCOMMODATE CONDUCTORS SHOWN. - CN • THIS SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL 2 HOUSE PHOTO Q w 00 FROM THE LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. Z C • ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT I. SCALE: NTS 0 INCLUDING THOSE THAT ARE EXPOSED TO OUTSIDE I ENVIRONMENT SHALL BE WEATHERPROOF AND SHALL BE ' MMIMEMM LISTED BY"UL"FOR THE TYPE OF APPLICATION AND"UL"LABEL I I SHALL APPEAR ON ALL ELECTRICAL EQUIPMENT. 22-7" w • WIRING METHOD SHALL BE EMT ABOVE GROUND MOUNTED IN .'O 2 W CONCEALED SPACES(UNLESS APPROVED OTHERWISE)AND •SCHEDULE-40 PVC FOR BELOW GROUND INSTALLATION -- -- -- -- -- -- -- -- -- -- -- -- -- -- - 0_UNLESS NOTED OTHERWISE. 75'_$" PROPERTY LINE - Q .— IY • AN OSHA APPROVED LADDER PROVIDING ACCESS TO ALL PROJECT SITE O PORTIONS OF THE ARRAY SHALL BE SECURED IN PRIOR TO /// W 0 1: REQUESTING INSPECTION. • IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL A 0 z SUPPLEMENTAL GROUNDING ELECTRODE CONDUCTOR IF ; r < NECESSARY. 0 0 H M SP MAIN SERVICE PANEL AC AC DISCONNECT INV (0)INVERTER SUB SUB-PANEL EE EXISTING ROOF ATTACHMENT ---------- PROPERTY LINE V-I Arac EQUIPMENT r CP SHEET NAME EXISTING (200A) UNFUSED N/A N/A N/A m . Ail LOAD CENTER UM UTILITY METER ACF AC DISCONNECT LC (COMBINER PANEL) DCD DC DISCONNECT • OPTIMIZER — // —DIMENSIONS FENCE m .r7�i MSFI f I m SITE PLAN & EXISTING FUSED NEW _ NEW N/A 7 SAFETY PLAN L CI, ArlacortEs, WA,.. PM PRODUCTION METER IB JUNCTION BOX S M DCC METER CC DC COMBINER MICRO-INVERTER PV MODULE GATE N/A NEW N/A N/A SHEET SIZE BAT BATTERY AT AUTO TRANSFORMER BLp BACKUP LOAD PANEL ' p A ANSI B 11" X 17" N/A NIA N/A SITE PLAN & SAFETY PLAN 3 VICISCALENITYS MAP SHEET NUMBER SCALE: 1/32" = 1' PV 1 MODULE AREA&WEIGHT CALCULATIONS NOTES :AC DISCONNECT LOCATED WITHIN 10 FT OF UTILITY METER. OydEEK PANEL TYPES(COUNT,AREA,WEIGHT): C •(18x)Suntech STP310S-20 Wfb(65"x 39.1",40.3 LBS) ATTACHMENT COUNT:61 MARITI IV E CT IH_HE MOUNTING SYSTEM WEIGHT/MODULE:1.5 LBS TOTAL ROOF ARoAO348 p �O (E) EKONT YARD ( EHElow TOTAL ARRAY AI VA". x `36-317.69 SF TOTAL ARRAY VI IC. j'y15=752.4 LBS 11 WEIGHT AT EAd 0 TI . 4S/61 =12.33 LBS GREEN THINK ENERGY LLC DISTRIBUTED LOAD: .6 SF=2.37 PSF 1'-6" 9" 50 HARRISON STREET, v 8.7% /� 13'-3" SUITE 202B ROOF AREA COV B. .69 SF/3660 SF= 4,0 HOBOKEN,NJ 07030 P6. , \ ,- �5 www.GreenThinkEnergy.com ��� t'_'_ , ERIALS X \ A-- w SOLAR PV MODUL'ES ' . g Suntech STP310S-20 Wfb 4 H CONTRACTOR to MICRO INVERTERS Hoymiles HM-1200N y -———I�- m NAME:N/A LOAD CENTER 01 AC COMBINER PANEL(MIN RATING 25A) - - .-•-4-0-0 1 117 ADDRESS:N/A PV VISIBLE LOCKABLE -G+-fit�•�rSd PHONE#:N/A LABELED DISCONNECT • • 1 #:LICENSE it AC DISCONNECT 01 \\ ... .. I I LL . . v REVISIONS (60A FUSED 1PH 240VAC) "Ii . - ATTACHMENTS 61 IronRidge-FlashFoot2 --LI+-++--IV- DESCRIPTION DATE REV RAIL - IronRidge-XR10 i'_Iit `" N - .-•_�� 1> —-—— ``01a 0O —— • fY SIGNATURE&SEAL V 1'-6' / 49'-7" /—10'-11"—/--/ \\\\\\\\\\\\MM\\MMO\\\\,"`1, ' ,'- \\\\\\\\\\\\\\\\IM MOW - I` I ° 1 1 1 I I I 11 I I I I I. Q I I I 1 En o ° I I I I I I I I I I t _L' __L, PROJECT NAME 1 1 1 I 1 1 i I i , i1 i ROOF#1 1 t D w I 1 I t 1 1 N D IIIIII I U N l I Q w CN I U < < Q : 2 .< w LoO z I a ROOF DESCRIPTION MAIN SERVICE PANEL AC DISCONNECT (0)INVERTER SUB-PANEL EXISTING ROOF ATTACHMENT MSP AC INV SUB EE — MODULE ARRAY TRUSSES TRUSSES SPACING EXISTING (200A) UNFUSED N/A N/A N/A EQUIPMENTi— ITI ROOF COUNT TILT AZIMUTH SIZE (ATTACHMENT SPACING) LOAD CENTER C) SHEET NAME UTILITY METER AC DISCONNECT (COMBINER PANEL) DC DISCONNECT • OPTIMIZER —DIMENSIONS ROOF RAILS u J #1 06 20° 180° 2"X4" 24"OC(48") UM �ACF FUSED NEW LC NEW DCD N/A — // M ROOF PLAN WITH EXISTING #2 12 20° 90° 2"X4" 24"OC(48") Z MODULES pm PRODUCTION METER J g JUNCTION BOW SM SOLARED NEAMETER DCC DC COMBINNER le MICRO-INVERTERPV MODULE f///FIRE SETBACK 0 N/A SHEET SIZE BAT BATTERY AT AUTO TRANSFORMER gip BACKUP LOAD PANEL AANSI B N/A N/A N/A 11" X 17" I ROOF PLAN WITH MODULES SHEET NUMBER SCALE: 1/16" = 1' PV-2 tiffil_ EK PV MODULE ICJ _HE ti;' COD CO A -- SEE (2/PV-3) FOR /�- rrl ENLARGED VIEW GREEN THINK ENERGY LLC 50 HARRISON STREET, SUITE 202B Y� 1891 C�r� HOBOKEN,NJ 07030 rG�✓� gCOgS �`p www.GreenThinkEnergy.com ,rroFlELn«t5e� — (E) SINGLE LAYER OF CONTRACTOR -A COMPOSITE SHINGLE NAME:N/A ADDRESS:N/A O • PHONE#:N/A LICENSE#:N/A TRUSSES REVISIONS �' MF DESCRIPTION DATE REV SIGNATURE&SEAL 1 ATTACHMENT DETAIL SCALE: NTS PROJECT NAME I: Q PV MODULES I IRONRIDGE INTEGRATED H N GROUNDING & END/MID 11 CLAMP Q W cO IRONRIDGE XR10 RAIL 0 j 2 Q U) (E) SINGLE LAYER OF 2 W COMPOSITE SHINGLE (n 1..ila.,0004 Q Ct -1111111111111111111111111111111111111111111 2 7) 8 ALUMN. "L" BRACKET = Q • W/3/8" SS BOLT & NUT IRONRIDGE FLASH FLASHING SHEET NAME FOOT2 ATTACHMENTS : - ATTACHMENT 5/16"x3.5" SS LAG BOLT ii__IDETAIL WITH MIN 2%2" THREAD EMBEDMENT, SEALED SHEET SIZE IllO PENETRATION ANSI B 11" X17" 2 ATTACHMENT DETAIL (ENLARGED SECTION VIEW) TRUSSES SHEET NUMBER PV-3 SCALE: NTS NOTES :AC DISCONNECT LOCATED WITHIN 10 FT OF UTILITY METER. NOTE: NOTE:• ALL GROUNDING TO COMPLY WITH NEC 690.47. GROUNDING ELECTRODE CONDUCTOR/SYSTEM o U)gE��nn ^\I • ROOF TOP CONDUIT SHALL BE LOCATED MIN.7/8" BONDING JUMPER NOT REQUIRED FOR SOLAREDGE EL LLL ABOVE ROOF SURFACE. POWER OPTIMIZER.PROPERLY INSTALLED SYSTEM �n =n n n • ALL TERMINALS SHALL BE MIN.90 DEG.C RATED. MEETS THE REQUIREMENTS OF NEC 690.35 FOR II�JLnJLI II�JI^\\l`�JI�II�JV,\/U UNGROUNDED PV POWER SYSTEMS.PROVIDE EW���F1� Y O 445 QIPREMT GROUNDING PERA MANUFACTURER'S I EH E ilon�7 04t CODE C REQUIREMENTS IN COMPLIANCE WITH THE NEC. u^u U�lU�\\��VV// Alik J' . ".2- , ' GREEN THINK ENERGY LLC ENPHASE ENCHARGE-10-1 P-NA (3)#10 AWG THWN-2 50 HARRISON STREET, (10.08kWh),NEMA 3R (1)#8 AWG GND SUITE 202B J�lj, 1891 �C�r�O� 3/4"PVC OR EMT CONDUIT RUN HOBOKEN,NJ 07030 ✓. iCOg �` U �� I > I www.GreenThinkEnergy.com �tO FIELO�y5e� IZI 0 CONTRACTOR NAME:N/A ADDRESS:N/A (3)#10 AWG TC-ER TRUNK CABLE — PHONE#:N/A (1)#6 BARE COPPER GND 1`T"`I (N)ENPHASE ENPOWER SMART 11 (OPPOSITE END OF BUS LICENSE it N/A WIRELESS COMMS KIT SWITCH,MICROGRID INTERCONNECT FROM MAIN BREAKER DEVICE,200A RATED 240V REVISIONS DESCRIPTION DATE REV 12 MODULE IN BRANCH CIRCUIT 1 r 1 J` ` 35A 0 (3)#6 AWG THWN-2 ■60A " (1)#8 AWG GND (N)125A ENPHASE IQ 1"PVC OR EMT CONDUIT RUN • • • COMBINER 3 BOX en-1 , ° o—. o SIGNATURE&SEAL JUNCTION BOX 10A -- -- -- 600 V,NEMA 3 o o—. —o UL LISTED �o FUSED AC DISCONNECT, 20A o0 60A,2P,SIEMENS o Lo_B B e I I Q n o o--. #GF222NR,240V 3R FUSED U10A�J - I 0—• 30A ,N 60A FUSED 'I PANEL,PA ELI 200A RATED, 10A n p I �.e I 240V 4 MODULE IN BRANCH CIRCUIT 2 V o o--. V r V C _ ) • (N)MAIN BREAKER TO BE PROJECT NAME . . . (ENPHASE ENVOY DERATED 240 V,175A/2P (BOTTOM FED) (3)#1 AWG THWN-2 Q (1)#6 AWG GND UTILITY:PSE l�/ l�/ • 3/4"PVC OR EMT CONDUIT RUN METER NO:-N/A D (3)#10 AWG THWN-2 �B B e (3)#10 AWG THWN-2 (3)#10 AWG THWN-2 H I— rml— (1)EGC#8 THWN-2 (1)#8 AWG GND SOME LOADS FROM MSP n/ 0 N v 3/4"PVC OR EMT CONDUIT RUN 3/4"PVC OR EMT CONDUIT RUN _p TO BE RELOCATE TO THIS I w NEW SUB PANEL TO UTILITY GRID co 2 MODULE IN BRANCH CIRCUIT 3 �° U ja �. Q Et "" -0 O 2 w Cn tiF— �� l�� (N)125A SUB PANEL,240V Q (BACKUP LOADS PANEL) O ER B B U 0 Q I — 04-HOYMILES:HM-1200N(240V) Q INVERTERS F- — 01 -HOYMILES:HM-600N(240V) INVERTER SHEET NAME SINGLE LINE DIAGRAM INTERCONNECTION 120%RULE-NEC 705.12(D)(2) SHEET SIZE r UTILITY FEED+SOLAR BACKFEED ANSI B 175A+60A=235A 11" X 1 7" BUS RATING x 120% 1 ELECTRICAL SINGLE LINE DIAGRAM 200Ax120%=240A J SHEET NUMBER SCALE: NTS PV-4 AC CONDUCTOR AMPACITY CALCULATIONS: AC CONDUCTOR AMPACITY CALCULATIONS: INVERTER SPECIFICATIONS ' o MANUFACTURER/MODEL# HM-1200NHOYMILES (, � ��� FROM ROOF TOP JUNCTION BOX TO IQ COMBINER BOX FROM ENPHASE EMPOWER SWITCH TO MSPM NOMINAL OUTPUT CURRENT 5 AMP \ II n I\' E AMBIENT TEMPERATURE ADJUSTMENT FOR EXPOSED CONDUIT NOMINAL OUTPUT VOLTAGE 240 VAC ���J U�� 7 PER NEC 310.15(B)(2)(c): + 22° EXPECTED WIRE TEMP(°C): 22° I`J�V�JI JTf.J\�"J/ EXPECTED WIRE TEMP (°C): 22° +22° TEMP CORRECTION PER NEC TABLE 310.15: 1.05 INVERTER SPECIFICATIONS TEMP CORRECTION PER TABLE 310.15: 0.82 CIRCUIT CONDUCTOR SIZE: 6 AWG MANUFACTURER/MODEL# HM-600N HOYMILES GREEN THINK ENERGY LLC #OF CURRENT RYING CO DUCTORS: 6 CIRCUIT CONDUCTOR AMPACITY: 65A 50 HARRISON STREET, CONDUIT FILRECTIOI ER NEC 310.15(B)(2)(a): 0.80 #OF CURRENT CARRYING CONDUCTORS: 3 NOMINAL OUTPUT CURRENT 2.46 AMP SUITE 202B 7030 CIRCUIT CONDOR SIZE: , AWG HOBOKEN,kENJ ergy CONDUIT FILL PER NEC 310.15(B)(2)(a): 1 NOMINAL OUTPUT VOLTAGE 240 VAC www.GreenThinkEnergy.com CIRCUIT CONDUCTOR AMP,4TY: 35 A REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690.8(B): 1.25 X OUTPUT CURRENT OF LOAD CENTER+ ENPHASE ENCHARGE CONTRACTOR REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690.8(A&B): PEAK OUTPUT CURRENT NUMBER OF CURRENT NAME:N/APERCENT OF CARRYING CONDUCTORS IN ADDRESS:N/A 1.25 X MAX AC OUTPUT CURRENT X#OF INVERTERS PER STRING 1.25 X(22.46 +24.6)= 58.82A PHONE#:N/A STRING 1 : 1.25 X 5 X 3 = 18.75A VALUES EMT LICENSE#:N/A STRING 2 : 1.25 X 5 X 1 = 6.25A 80 46 70 7-9 REVISIONS STRING 3 : 1.25 X 2.46 X 1 = 3.07A DERATED AMPACITY OF CIRCUIT CONDUCTORS PER NEC TABLE 310.15: DESCRIPTION DATE REV TEMP CORR. PER NEC 310.15 X .50 10-20 DERATED AMPACITY OF CIRCUIT CONDUCTOR PER NEC TABLE 310.15 CONDUIT FILL CORR. PER NEC 310.15(B)(2)(a)X TEMP CORR. PER NEC TABLE 310.15 X CIRCUIT CONDUCTOR AMPACITY= AMBIENT TEMPERATURE SPECS CONDUIT FILL CORR. PER NEC 310.15(B)(2)(a)X 1.05 X 1.00 X 65 =68.25A RECORD LOW TEMP -9 CIRCUIT CONDUCTOR AMPACITY= 0.82 X 0.80 X 35 =22.96A SIGNATURE&SEAL AMBIENT TEMP(HIGH TEMP 2%) 22° CONDUIT HEIGHT 0.5' AC CONDUCTOR AMPACITY CALCULATIONS: ROOF TOP TEMP 44° - FROM IQ COMBINER BOX TO ENPHASE CONDUCTOR TEMPERATURE RATE 75° EMPOWER SWITCH EXPECTED WIRE TEMP (°C): 22° TEMP CORRECTION PER NEC TABLE 310.15: 1.05 PROJECT NAME I CIRCUIT CONDUCTOR SIZE: 10 AWG �/ CIRCUIT CONDUCTOR AMPACITY: 35A L.L Q #OF CURRENT CARRYING CONDUCTORS: 3 D (/) CONDUIT FILL PER NEC 310.15(B)(2)(a): 1 I D REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690.8(B): 1.25 X OUTPUT CURRENT OF LOAD CENTER N RI 1.25 X 22.46=28.07A C)DERATED AMPACITY OF CIRCUIT CONDUCTORS PER NEC TABLE 310.15: Q W co TEMP CORR. PER NEC 310.15 X 0 Q � < CONDUIT FILL CORR. PER NEC 310.15(B)(2)(a)X CIRCUIT CONDUCTOR AMPACITY= < 1.05 X 1.00 X 35=36.75A 2 w C Lo 0 ELECTRICAL NOTES O z 2 Q 1.)ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL,AND LABELED FOR ITS APPLICATION. I- 2.)ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET ENVIRONMENT. 3.)WIRING,CONDUIT,AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY SHEET NAME TO,AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. WIRING 4.)WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL CALCULATION COMPLY WITH NEC 110.26. 5.)DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS.CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS,SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL SHEET SIZE APPLICABLE CODES AND STANDARDS. ANSI B 6.)WHERE SIZES OF JUNCTION BOXES, RACEWAYS,AND CONDUITS ARE NOT SPECIFIED,THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. 1 1" X 17" 7.)ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE.. SHEET NUMBER PV-5 AWARNING AJVARNINGPHoToVoLTAICPoWERSoURCE � K CAUTIONM HE A • •TOVOLTAIC SYST , PHOTOVOLTAIC SYSTEM �IJ LJ_ c07'�"-,ACK COMBINER PANEL LABEL LOCATION:DC CONDUIT JUNCTION BOX NO MORE THEN 10FT ���J U�� yt,0' J CODE REF: NEC 690.13(B) ( `J�V�J JiflUn\`VJ/ LABEL _OC.1/4TIt ,: :A T ', 3 =AKER DO NOT ADD LOADS CODER : .IEC 705.2(4 GREEN THINK ENERGY LLC e. LABEL LOCATION:AC COMBINER PANEL A PHOTOVOLTAIC SYSTEM 50 HARRISONREET, SUITETE202B STREET, vITY 1891 — CODE REF:NEC 690.12(B) L DIii9rd NNECT SWITCH www.GBOenThinNJ 070y0com AWARNING CONTRACTOR A AWARNING LABEL LOCATION AC DISCONNECT INVERTER OUTPUT CONNECTION CODE REF: UTILITY NAME:N/A ADDRESS:N/A 1 O PHONE#:N/A DO NOT RELOCATE THIS ELECTRICAL SHOCK HAZARD LICENSE#:N/A OVERCURRENT DEVICE TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN REVISIONS LABEL LOCATION:BACKFED BREAKER THE OPEN POSITION DESCRIPTION DATE REV CODE REF:2017 NEC 705.12(2)(3)(b) DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE AWARNINGCAUTION : WARNING EXPOSED TO SUNLIGHT A A GENERATION SCOURCE IS CONNECTED TO THE SUPPLY(UTILITY) LABEL LOCATION:DC DISCONNECT,COMBINE BOX ELECTRICAL SHOCK HAZARD 3 SIDE OF THE MAIN SERVICE DISCONNECT.FOLLOW THE PROPER CODE REF:NEC690.13(B) POWER TO THIS SERVICE IS ALSO SUPPLIED SIGNATURE&SEAL LOCK-OUT/TAG-OUT PROCEDURES TO ENSURE THE PHOTOVOLTAIC IF GROUND FAULT IS INDICATED SYSTEM UTILITY DISCONNECT SWITCH IS OPENED PRIOR TO FROM THE FOLLOWING SOURCES WITH PERFORMING WORK ON THIS DEVICE ALL NORMALLY GROUNDED A PV SOLAR BREAKER CONDUCTORS MAY BE DISCONNECTS AS SHOWN LABEL LOCATION: (IF APPLICABLE)SUPPLY SIDE TAP UNGROUNDED AND ENERGIZED LOAD PANEL CODE REF:UTILITY DO NOT RELOCATE THIS �\ OVERCURRENT DEVICE LABEL LOCATION:AC DISCONNECT _ COMBINER BOX SERVICE PANEL PV ARRAY / PROJECT NAME A PHOTOVOLTAIC AC DISCONNECT CODE REF: NEC 690.5(C) RATED AC OPERATING CURRENT: 22.46 AM LABEL LOCATION:MAIN PANEL JUNCTION BOX — DEAD FRONT Q II NOMINAL OPERATING AC VOLTAGE: 240 VAC CODE REF:NEC 705.12(B)(2)(3)(B) D j LABEL LOCATION:MAIN PANEL AC DISCONNECT(S) CODE REF: NEC 690.54 11 ~ 1— CAUTIONK • LLJ N A DUAL POWER SOURCE SECOND Q O� ARAPID SHUTDOWN SWITCH «ttttt`SCORCE IS PHOTOVOLTIC Q � FOR SOLAR PV SYSTEM LABEL LOCATION:SERVICE METER MAIN PANEL S Q U7 CODE REF: UTILITY — G 2 w LABEL LOCATION:MAIN PANEL ti CODE REF:NEC 690.12 — 0 2 Lc) U A WARNING — - 0 Q z A I a ELECTRICAL SHOCK HAZARD — F- TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED SHEET NAME IN THE OPEN POSITION — PLACARDS LABEL LOCATION:COMBINER PANEL AC DISCONNECT I ( I I ios. W JUNCTION BOX INVERTER(S) UM ACFl_ccpuelBATEESSr CODE REF:NEC 690.13(b) SHEET SIZE ANSI B APHOTOVOLTAIC LLLOAD CENTER 11" X 17" SYSTEM METER FUSED AC SHEET NUMBER UTILITY — DISCONNECT PV-6 0 ,,,,-„,,,,,,, - - IIIH_HE oFogcon ,o ,L, EHEhoow . , ,I di, •• - P310S - 20/Wfb J SUNTECH HyPro STP310S - 20/Wfb J SUNTECH ., AK 3055 - 20/Wfb STP305S - 20/Wfb GREEN THINK ENERGY LLC N '� 1891 ,1 P300S - 20/Wfb STP300S - 20/Wfb 50 HARRISON STREET, SUITE 202B HOBOKEN,NJ 07030 G�✓� gCOgS �p www.GreenThinkEnergy.com Electrical Characteristics e , 310 Watt STC STP3105-20/ STP305S-20/ STP3005-20/ CONTRACTOR r0FIELDIv- 991139.1142[0.081 Wfb Wfb Wfb 942137.11s110.041 Mli NAME:N/A MONOCRYSTALLINE SOLAR MODULE °� ,nos -• .• Maxirnum Power at STC(Pmax) 310W i 305W 300W ADDRESS:N/A /- \ I' Optimum Operating Voltage(Vmp) 33.1 V 32.8 V9.30 32.5 V PHONE#:N/A ®\\ / 8-05.100.1 croaualebe LICENSE#:N/A cramro Haas Features Optimum Operating Current(Imp) 9.37 A 32.8 A 9.23 A \ 8-14X910.55X0.351 Bantle- Open Circuit Voltage(Voc) 40.2 V 39.8 V 39.6 V REVISIONS High module conversion PID resistant I*j� Short Circuit Current(Isc) 9.87 A 9.80 A 9.72 A DESCRIPTION DATE MI IJ) efficiency Advanced cell technology Module efficiency up to PID and qualified materials lead to Module Efficiency 18.9% 18.6% 18.3%-is.-�$•9% 8esistant _ 18.9%achieved through high resistance to PID _ Operating Module Temperature -40°Cto+85°C advanced cell technology and A FliA (Back View) F. Maximum System Voltage 1000V DC(UL) : manufacturing capabilities _ - Section A-A E I,73Maximum Series Fuse Rating 20 A } _ Power Tolerance 0/+5 W SIGNATURE&SEAL Positive tolerance p © Suntech current sorting laJ I„III.III1ij� STC:Irradiance 1000 W/m',module temperature 25°C,AM=1.5; Positive tolerance of up to p p process m I" Tolerances of Pmav,hoc and lsc are all within*1-5%. 0/+SW SW delivers higher outputs 2% System output maximized by _ 1a6104151 �IIIIIII reliablity reducing mismatch losses up 350.381 • (Front view) vlor STP310S-20/ STP3055-20/ STP3005-20/ to 2%with modules sorted& IIIIII I III _ Note:mm[inch] - Wfb Wfb Wfb packaged by amperage Maximum Power at NMOT(Pmax) 232.6 W I 228.3 W 225.0 W Extended load tests Withstanding harsh Optimum Operating Voltage(Vmp) 30.8V 30.5 V 30.3 V riModule certified to withstand ® environment Optimum Operating Current(Imp) 7.55 A 7.49 A 7.43 A front side maximum static Reliable quality leads to a 3800Pa a h P 9 Open Circuit Voltage(Voc) 37.6V 37.1 V 37.0 V x 5400Pa test load(5400 Pascal)and """men` better sustainability even in Current-Voltage&Power-Voltage Curve(3105) Short Circuit Current(Isc) 7.97 A 7.92 A 7.85 A PROJECT NAME rear side maximum static test harsh environment like desert, 32 3. 3n 3ao NMOT,Irradiance 800 W/ma,ambient temperature 20 c,AM=1.5,windspeed1 Ms; loads(3800 Pascal)* farm and coastline Q 1�l +** a Temperature Characteristics 2. CertificationslEC61215,lE 61730,standards: lor SA. C iE I I Mcs �e� Nominal Module Operating Temperature(NMOT) 42±2°C IEC61215,IEC61730,conformity roCE ` I I c us J 3 '°° Temperature Coefficient of Pmax -0.37%/°C E \ me 1 Temperature Coefficient of Voc -0.304%/°C H H 7 Trust Suntech to Deliver Reliable Performance Over Time Special 5 busbardesign d Temperature Coefficient of Ix 0.050%NC U N •World-class manufacturer of crystalline silicon photovoltaic modules The unique cell design leads I ao w 00 •Unrivaled manufacturing capacity and world class technology reduction in electrodes ' I "^ Qr , •Rigorous quality control meeting the highest international standards: resistance,shading area and 1�1 Mechanical Characteristics V Q 0 ISO 9001:2008,ISO 14001:2004 and 15017025:2005 raise in conversion efficiency. 0 0 20 20 30 .d Solar Cell Monocrystalline silicon 6 inches Y Residual stress distribution can votage m •Regular independently checked production process from international No.of Cells 60(6 x 10) be more even,reducing the -t000 -a00W/m-a0, 0w/as-,00won,-200wom, Dimensions P Y wm Diions 1650 x 992 x 35mm(65.0 x 39.1 x 1.4 inches) Q •Tested for harsh environments(salt mist,ammonia corrosion and sand micro cracks risks. C U) accredited institute/company Weight 18.3 kgs(40.3 lbs.) G U J blowing testing:IEC 61701,IEC 62716,DIN EN 60068-2-68)*** Front Glass 3.2 mm(0.13 inches)tempered glass (1) •Long-term reliability tests •2 x 100%EL inspection ensuring defect-free modules Frame Anodized aluminium alloy Q Dealer information Junction Box IP68 rated(3 bypass diodes) N- O Industry-leading Warranty based on nominal power IP68 Rated Junction Box 2 Lo U Output Cables 4.0 mm2(0.006 inches'),symmetrical lengths(-)1000mm(39.4 •97.5%in the first year,thereafter,for The Su ntech IP68 rated inches)and(+)1000mm(39.4inches) 0 Q years two(2)through twenty-five junction box ensures an Connectors MC4 compatible Z (25),0.7%maximum decrease from outstanding waterproof Q Industn Ieadin MODULE's nominal power output level,supports installations r year,ending wit the 80.7% in all orientations and E w 91inearKarranty i the25thyea afteh hedefined reduces stress on the cables. Packing Configuration s -... WARRANTY STARTING DATE.**** High reliable performance, Container SHEET NAME 1 10 25.12-year product warranty low resistance connectors Pieces per pallet 30 30 •25-year linear performance ensure maximum output Pallets per container 6 28 EQUIPMENT warranty for the highest energy production. Pieces per container I 1s0 840 SPECIFICATION Information on how to install and operate this product is available in the installation instruction.All values indicated in this data sheet are subject to change without prior announcement.The specifications may vary slightly.All specifications are in accordance with standard EN 50380.Color differences of the modules relative to the figures as well as discolorations of/in the modules which do not impair their proper functioning are possible and do not constitute a deviation from the specification. *Please refer to Suntech Standard Module Installation Manual for details. **WEEE only for EU market. SHEET SIZE ***Please refer to Suntech Product Near-coast Installation Manual for details. ****Please refer to Suntech Product Warranty for details. ANSI B 11" X17" ©Copyright 2019 Suntech Power www.sunt-ch-power.com UL-STP-Wfb-NO2.01-Rev 2019 ©Copyright 2019 Suntech Power www.sunt-ch-power.com UL-STP-Wfb-NO2.01-Rev 2019 SHEET NUMBER PV-7 ia, or _....., c. :Q;.MR*5 ho miles The World's Safest te' I.IE11I1 ,:v...t ,rv .v u ,t IM ,,e, 9y. solar solution for you and your family M GREEN THINK ENERGY LLC 50 HARRISON STREET, SUITE 202B ( HOBOKEN,NJ 07030 MOMM----- 4 Cn .,- `��' Model HM-1000 HM-1200 HM-1500 www•GreenThinkEnergy.com 76 f,11 I V)1�-\� CONTRACTOR • -.....-.- NAME:N/A 1� Input Data (DC) ADDRESS:N/A Commonly used module power(W) 200-310 240-380 300-470 PHONE#:N/A Module compatibility 60-cell or 72-cell PV modules 60-cell or 72-cell PV modules 60-cell or 72-cell PV modules LICENSE#:N/A iii ••r ' Peak power MPPT voltage range(V) 27-48 29-48 36-48 REVISIONS l Start-up voltage(V) 22 22 22 DESCRIPTION DATE REV 11 i Operating voltage range(V) 16-60 16-60 16-60 Maximum in put voltage m (V)P 9 ( ) 60 60 60 llr Maximum input current(A) 4*10.5 4*11.5 4*11.5 f Output Data (AC) SIGNATURE&SEAL •a ! 'm Rated output power(VA) 1000 1200 1500 fi Rated output current(A)range(V) 4.5550/45-55 4.351or 60/55-65 4.17 1 5.4550/45-55 51.2or2 60/55-65 5 1 6.8250/45-55 1 6.52or 60/55-65 6.25 1 Z el Nominal output voltage/range(V) 220/180-275' 2301180-275'240/180-275' 220/180-275' 230n80-275' 240/180-275' 22on80-275' 230n80-27s' 240/180-275' Nominal frequency/ �i� ‘41 FPI Power factor(adjustable) >0.99 default >0.99 default >0.99 default 1111•11111111r4/,a 0.8 leading...0.8 lagging 0.8 leading...0.8 lagging 0.8 leading...0.8 lagging Total harmonic distortion <3% <3% <3% x Maximum units per branch 2 5 5 5 4 4 4 3 3 3 PROJECT NAME z 4 Efficiency Q 'W CEC peak efficiency 96.70'36 96.70% 96.70% U) �' CEC weighted efficiency 96.50% 96.50% 96.50% D Y 25 E - Nominal MPPT efficiency 99.80% 99.80% 99.80% I—WARRANTY/ H M-1000/1200/1500 Nighttime power consumption(mW) <50 <50 <50 n/ 0 N Mechanical Data L<L LLJ 00 The Best in Its Class! The Microinverter Ambient temperature range(°C) -40--+65 '`v Q with reactive power control for 4 solar panels Dimensions(WxHxD mm) 280 x 176 x 33 I \ Weight(kG) 3.75 < S Enclosure rating Outdoor-NEMA(IP67) 2 Q (/) Highlights Cooling Natural convection-No fans �^ • Easy installation, just plug and play Features �J, ~ • External antenna for stronger communication with DTU Communication 2.4GHz Proprietary RF(Nordic) C ' 0 • Power factor (adjustable) 0.8 leading......0.8 lagging Monitoring Hoymiles MonitoringSystem G ix) g...... gg' g 0 Q VDE-R-N 4105:2018,EN 50549-1:2019,VFR 2019, • The highest power density microinverter on the market Compliance 2 ZZ IEC/EN 62109-1/-2,IEC/EN 61000-6-1/-2/-3/-4,IEC/EN 61000-3-2/-3 • Compliant with VDE-AR-N 4105: 2018 8/ EN50549-1: 2019 "1 Nominal voltage/frequency range can be changed due to the requirements of local power department. H "2 Refer to local requirements for exact number of microinverters per branch. • High reliability; NEMA (IP67) enclosure; 6000V surge protection _ High Reliability Based on World's Top Supplier Part ers SHEET NAME Wk Safer 4Smarter at More Powerful \�/a More Reliable EQUIPMENT Iiir MICROCHIP CREE= EPCOS SPECIFICATION O sales@hoymiles.com © +86-571-28056101 O www.hoymiles.com Infineon— situ�afa I S NIPPON t SHEET SIZE Ilrsrtwrms ICHEMI CONI ANSI B 11" X 17" SHEET NUMBER PV-8 0 0 EEEK Datasheet Datasheet III LJ_ I\V ;�` ., XR Rails e — �u�u���uuuuuU �I (1 /� FORcoo�,�, IDGE Flush Mount System ��1u� � 11 z A*, 9 rrl XR10 Rail XR100 Rail XR1000 Rail Bonded Splices GREEN THINK ENERGY LLC 50 HARRISON STREET, SUITE 202B Yam}— -891—�"� �rl� _- 4 HOBOKEN,NJ 07030 PG Y `p i www.GreenThinkEnergy.com ............„H 0�4 COR e�� CONTRACTOR rO FIELD t�sI...> �` , NAME:N/A � -- ADDRESS:N/A PHONE#:N/A ,, A low profile mounting rail The ultimate residential A heavyweight mounting All rails use internal splices for regions with light snow. solar mounting rail. rail for commercial projects. for seamless connections. ucENSE#:N/A • 6'spanning capability • 8'spanning capability • 12'spanning capability • Self-drilling screws REVISIONS • Moderate load capability • Heavy load capability • Extreme load capability • Varying versions for rails DESCRIPTION DATE REV • Clear and black finish • Clear and black finish • Clear anodized finish • Forms secure bonding -- Clamps &Grounding O — SIGNATURE&SEAL UFOs Stopper Sleeves Grounding Lugs Microinverter Kits - - �..••••...— !— till � Universal Fastening Objects Snap onto the UFO to turn Connect arrays to Mount Mls or POs to XR • bond modules to rails. into a bonded end clamp. equipment ground. Rails. PROJECT NAME • Fully assembled&lubed • Bonds modules to rails • Low profile • Bonds devices to rails • Single, universal size • Sized to match modules • Single tool installation • Kit comes assembled < • Clear and black finish • Clear and black finish • Mounts in any direction • Listed to UL 2703 D Built for solar's toughest roofs. I Attachments e - IronRidge builds the strongest mounting system for pitched roofs in solar. Every component has been tested to ^� U N the limit and proven in extreme environments. FlashFoot2 Slotted L-Feet Bonding Hardware Flush Standoffs Q W 03 Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings, and — — is also why our products are fully certified, code compliant and backed by a 20-year warranty. I � 0 < - i. CC Strength Tested PE Certified — 4t l _ - G W Cn I- eaAll components evaluated for superior Q Pre-stamped engineering letters Flash and mount XR Rails Drop-in design for rapid rail Bond and attach XR Rails Raise Flush Mount System Q structural performance. available in most states. with superior waterproofing. attachment. to roof attachments. to various heights. 5 8 • Twist-on Cap eases install •• Secure rail connections •• T&Square Bolt options •• Works with vent flashing U • Wind-driven rain tested •• Slot for vertical adjusting •• Nut uses 7/16"socket •• 4"and 7"lengths 0 Q Class A Fire Rating Certified to maintain the fire resistance hDesign Assistant • Mill and black finish • Clear and black finish • Assembled and lubricated • Ships assembled I Q 6Certified to maintain the fire resistance ® Online software makes it simple to 1 rating of the existing roof. create, share, and price projects. Resources SHEET NAME _ _. ` Design Assistant NABCEP Certified Training es..PRO, UL 2703 Listed System 20-Year Warranty -- Go from rough layout to fully a' oP Earn free continuing education credits, EQUIPMENT NABCEP O Entire system and components meet 0 Twice the protection offered by = engineered system. For free. while learning more about our systems. SPECIFICATION 'a�0 i0 IfOilr;i Ga C�e.COYii/G>✓Slgn ,Li,� t.i V:"aitll i-.:+'t„j:S..a,Jlf:/-'.ii.�B➢zt➢y newest effective UL 2703 standard. competitors. I SHEET SIZE ANSI B 11" X 17" ' - reserved.Visit www.ironridge.com or call 1-800-227-9523 for more information.Version 1.30 SHEET NUMBER PV-9 0 ,,,„,„,,,, ,... IH_HE ,FORCo;7ca,A (1 EIJIJEJULJ IJ /i ' . r IDGE Integrated Grounding System Installation Overview M GREEN THINK ENERGY LLC 50 STREET, ,� � Install Roof Attachments HO HARRISONARRIS NJ TREE + 1891 4�y Si t�✓' `��ing • Install appropriate roof flashing and/or standoff for roof type. i www.GreenThinkEnergy.com SUITE 202B F-r -•FIO*sty & Lower Cost 1 •Attach L-Feet to flashing or standoff. � CONTRACTOR NAME:N/A Traditionally, solar modules are grounded by attaching � fr ADDRESS:N/A lugs, bolts or clips to the module frame, then connecting PHONE#:N/A Prepare Rail Connections LICENSE REVISIONS DESCRIPTION DATE REV these to a copper conductor that runs throughout the '-'.�l1„.. . �• �� array.This process adds time and cost to the installation, cilr • Insert splice into first rail, then secure with Grounding Strap and (! and often results in improper grounding, creating self drilling screw. significant long-term safety risks. • Slide second rail over splice,then secure with opposite end of \ The IronRidge Integrated Grounding System solves these Grounding Strap and self drilling screw. challenges by bonding modules directly to the mounting _ SIGNATURE&SEAL rails.This approach eliminates separate module L. Mount&Ground Rails grounding hardware, and it creates many parallel III grounding paths throughout the array, providing •Attach rails to L-Feet and level rails. ri• greater safety for system owners. Grounding Mid Clamp • Install one Grounding Lug per row of modules. Each Grounding Mid Clamp pierces through the • Connect GroundingLugto groundingconductor. anodized coatings of both the module frame and ff the mounting rail to form secure electrical bonds, which are repeated throughout the array. ifi, Install Install Modules&Clamps PROJECT NAME � /I ' �� �� 'I/ �4 • Install first module usingEnd Clamps and GroundingMid Clamps. -41P 7 ry/ %� l�� // 1 ��I� � ����� %j •• Install additional modules using Grounding Mid Clamps. D ®1� 1/ � 1 1/ �1�0i �1 /ii�iii/��i �/ �/ � �1� ��� /���� ��:� •�•//�//�// • Finish row with a second pair of End Clamps. Oj �/ ///��j�i/ /1 �� ��/�/I/ 1/ ii I// /I// I/ Oil / 1/ l 0 N �j�►j� Ii �I/ I �O� 1/� //1/��i, w co IOZI %� ��I �y �j Testing & Certification Q �i �jj�I ®r -- �.� I/ 1 1// I BCompatibility #/ �/�� w �� /® �� •� � /•�/ IronRidgeIntegratedGrounding r Module Frame .� The _ � ® / / / �� ����/ / ��� '� �� �/�// /di System has been tested and certified to _ Dimension Range �j �/ �® / �/ UL 2703 by Intertek Group plc. 2 Q Uj �i/� �`� /, '�� �� A 31.0mm -51.0mm �/ ����. �f/ ' A B 5.08mm (minimum) 2 w / 4 ', UL 2703 is a proposed UL standard _ (� N— f ��. / for evaluatingsolar module mountingQ /� \ Any module frames whose parameters are not listed in the �� � •. and clamping devices. It ensures these provided table have not been tested for compatibility. Q f` devices will maintain strong electrical and \�� ��� 3 mechanical connections over an extended 0 Z Iperiod of time in extreme outdoor The Grounding Clamp has proven robust in grounding 60-cell and 72-cell solar module frames with box construction and a range of = Q /���, A environments. anodization thicknesses. H © ME - , 1/0.14, The testing process closely mirrors that All solar modules listed to UL 1703 and with frame construction . Grounding Strap , of UL 1703,the solar module testingSHEET NAME within the parameters stated above are compatible with the 4/ ,� Grounding Straps are used to standard, includingtemperature and Y -' bond rail-to-rail connections. Grounding Lug p IronRidge Integrated Grounding System. EQUIPMENT humiditycycling, electricalmechanical They are only required on the eectrica and rail with the groundinglug. Asingle Grounding Lug i SPECIFICATION _, load testing, and manufacturing quality O Go to ironridge.com/ig IIIIIconnects an entire row of PV modules to the reviews. grounding conductor. _I SHEET SIZE ANSI B 11" X17" ©2013 IronRidge,Inc.All rights reserved.Visit www.ironridge.com or call 1-800-227-9523 for more information. SHEET NUMBER PV-10 AN oi-idEEK 1=1- IL . , 'IIJLJ_HE /l 0,,,cjimpo RIDGE UFO Family of Components System Diagram ( EHLEIo7 a � 9„ GREEN THINK ENERGY LLC 50 HARRISON STREET, SUITE 202B SI •. - • .� c rig for Every Application E• 0: _ _m_ _ =0 0 • ' = HOBOKEN,NJ 07030 N 1891 G Y C- www.GreenThinkEnergy.com The f� ponents eliminates the need for separate7grpq,ynhardware by bonding solar modules �_ �_a CONTRACTOR directlyto IronRidge XR Rails.All system types that feature NAME:N/A g Y YP ADDRESS:N/A the UFO family—Flush Mount,Tilt Mount and Ground PHONE#:N/A Mount—are fully listed to the UL 2703 standard. LICENSE#:N/A �Will I 1: : —m_ _ :I I ( = REVISIONS UFO hardware forms secure electrical bonds with both the DESCRIPTION DATE REV module and the rail, resulting in many parallel grounding paths throughout the system. This leads to safer and more reliable installations. ( .....m. _. a--• Assimmos - - -m- - -O 0 • 4. - SIGNATURE&SEAL Of.) Stopper Sleeve Universal Fastening Object(UFO) The Stopper Sleeve snaps The UFO securely bonds solar modules to XR onto the UFO,converting it into Rails.It comes assembled and lubricated,and _ _ _ _ _ _ _ a bonded end clamp. can fit a wide range of module heights. O O— _ _m_ _ _O O , ,4:,.;;Apc ���� PROJECT NAME � ® �:��/' ' Irt� 0 UFO ( Stopper Sleeve • Grounding Lug Bonded Splice —L Ground Wire P /j�/- 41P�/� ,0 '' -`/ 4. I— ,��y j�Qy l < 4 Approved Enphase microinverters can provide equipment grounding of IronRidge systems,eliminating the need for N 0 N �j���/ - '/ G!" - -- ; grounding lugs and field installed equipment ground conductors(EGC).A minimum of two microinverters mounted to the L.L /�j/ �ft 'j % e / 0 same rail and connected to the same Engage cable is required. Refer to installation manuals for additional details. Q - i ' ' UL Certification -- Q E J { X Cross-System Compatibility G C Q u) , it.*J ,, � The IronRidge Flush Mount, Feature Flush Mount Tilt Mount Ground Mount 2 w All // Tilt Mount, and Ground Mount XR Rails XR1000 Only U) N- r Bonded Splice ,At,' Systems have been listed to UL Each Bonded Splice uses UFO/Stopper �/ �/ �/ C O " self-drilling screws to form �;;m 2703 by Intertek Group plc. pp c U a secure connection.No //L Bonded Splice V V N/A bonding strap needed. / �` M UL 2703 is the standard for 0 Z /� evaluating solar mounting Grounding Lugs 1 per Row 1 per Row 1 per Array I Q systems. It ensures these devices microinverters Enphase M250-72, M250-60, M215-60, C250 72 I— will maintain strong electrical and &Power Darfon-MIG240, MIG300, G320, G640 Grounding Lug mechanical connections over Optimizers SolarEdge P300, P320, P400, P405, P600, P700, P730 T- of A single Grounding Lug Bonded Attachments p g SHEET NAME an extended period of time in connects an entire rowThe bonding bolt attaches Fire Class A Class A N/AEQUIPMENT PV modules to the and bonds the L-foot to the extreme outdoor environments. Rating — grounding conductor. rail.It is installed with the Tested or Evaluated with over 400 Framed Modules SPECIFICATION same socket as the rest of the 1 Modules system. O Go to IronRidge.com/UFO Refer to installation manuals for a detailed list. i SHEET SIZE � ANSI B ©2016 IronRidge,Inc.All rights reserved.Visit www.ironridge.com or call 1-800-227-9523 for more information.Version 1.0 //AWk! 1 1 X 1 7 SHEET NUMBER PV-11 71 Data She:.•FORCODc04Af Enphase Encharge 10 a ��� J. Enph � � 9� M GREEN THINK ENERGY LLC MODEL NUMBER 50 HARRISON STREET, ENCHARGE-10-1 P-NA Encharge 10 battery storage system with integrated Enphase Microinverters and battery SUITE 202B 1891 `, management unit(BMU).Includes: HOBOKEN,NJ 07030 NG `av �y p- Three Encharge 3.36 kWh base units(603-A01-US00-1-3) www.GreenThinkEnergy.com �.i4, 4C IDg 6s -One Encharge 10 cover kit with cover,wall mounting bracket,watertight conduit hubs,and -rr0 FIELD Iv-- interconnect kit for wiring between batteries(B10-C-1050-0) CONTRACTOR ACCESSORIES NAME:N/A Enphase M ENCHARGE-HNDL-R1 One set of Encharge base unit installation handles ADDRESS:N/A The Enphase Encharge 10 all-in-one AC-coupled OUTPUT(AC) @ 240 VAC' LICENSE#:PHONE#:N/A /A storage system is reliable,smart,simple,and safe. It is Rated(continuous)output power 3.84 kVA Encharge 10 comprised of three base Encharge 3"storage units,has Peak output power 5.7 kVA(10 seconds) REVISIONS a total usable energy capacity of 10.08 kWh and twelve Nominal voltage/range 240/211—264 VAC DESCRIPTION DATE REV Nominal frequency/range 60/57—61 Hz embedded grid-forming microinverters with 3.84 kW Rated output current 16 A power rating. It provides backup capability and installers Peak output current 24.6A(10 seconds) can quickly design the right system size to meet the Power factor(adjustable) 0.85 leading...0.85 lagging SIGNATURE&SEAL Maximum units per 20 A branch circuit 1 unit(single phase) needs of both new and retrofit solar customers. Interconnection Single-phase Maximum AC short circuit fault current over 3 cycles 69.6 Arms Round trip efficiency2 89% BATTERY Reliable Total capacity 10.5 kWh Usable capacity 10.08 kWh • Proven high reliability IQ Series Microinverters Round trip efficiency 96% • Ten-year limited warranty Nominal DC voltage 67.2 V • Three independent Encharge storage base units Maximum DC voltage 73.5 V PROJECT NAME • Twelve embedded IQ 8X-BAT Microinverters Ambient operating temperature range -15°C to 55°C(5°F to 131°F)non-condensing Et • Passive cooling(no moving parts/fans) Optimum operating temperature range 0°C to 30°C(32°F to 86°F) Q Chemistry Lithium iron phosphate(LFP) D CO MECHANICAL DATA Smart Dimensions(WxHxD) 1070 mm x 664 mm x 319 mm (42.13 in x 26.14 in x 12.56 in) • Grid forming capability for backup operation Weight Three individual 44.2 kg(97.4 Ibs)base units plus 21.1 kg(48.7 Ibs)cover and mounting ~ (N • Remote software and firmware upgrade bracket;total 154.7 kg(341 Ibs) U N • Mobile app-based monitoring and control Enclosure Outdoor—NEMA type 3R 11J 00 • Support for self consumption IQ 8X-BAT microinverter enclosure NEMA type 6 r , 2 • Utility time of use(TOU)optimization Cooling Natural convection—No fans v Q Altitude Up to 2500 meters(8200 feet) Q N IA— Mounting Wall mount Q Simple FEATURES AND COMPLIANCE C w Compatibility Compatible with grid-tied PV systems.Compatible with Enphase M215/M250 and IQ Series G • Fully integrated AC battery system Micros,Enphase Enpower,and Enphase IQ Envoy for backup operation. • Quick and easy plug-and-play installation Communication Wireless 2.4 GHz • Interconnects with standard household AC wiring Services Backup,self-consumption,TOU,Demand Charge,NEM Integrity is) S% Monitoring Enlighten Manager and MyEnlighten monitoring options;API integration 0 Compliance UL 9540,UN 38.3,UL 9540A,UL 1998,UL 991,NEMA Type 3R,AC156 Safe EMI:47 CFR,Part 15,Class B,ICES 003 z Cell Module:UL 1973,UN 38.3 �l • Cells safety tested Inverters:UL 62109-1,IEC 62109-2,UL 1741SA,CAN/CSA C22.2 No.107.1-16,and IEEE 1547 • Lithium iron phosphate(LFP)chemistry for maximum LIMITED WARRANTY 1 safety and longevity Limited Warranty' >70%capacity,up to 10 years or 4000 cycles SHEET NAME 1.Supported in backup/off grid operations 2.AC to Battery to AC at 50%power rating. EQUIPMENT 3.Whichever occurs first.Restrictions apply. SPECIFICATION To learn more about Enphase offerings,visit enphase.com EN P H AS E. ©2021 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Encharge 10,and other trademarks or service names are the trademarks E N P H AS E. To learn more about Enphase offerings,visit enphase.com `/ of Enphase Energy,Inc.Data subject to change.2021-03-01 %./ ANSI B 11" X17" L ;NUMR HE BE -12 00T-_,AEEK 11E-HE ,1 FD4tCODCQ EHEhoow Data' ? 1'T Y .c Enphase Enpower• Enphhs- L.:-mble-, _, anagement system rri MODEL NUMBER GREEN THINK ENERGY LLC EP260G141-M240US4l Enphase Enpower smart switch with neutral-forming Ira ns former(NFT),Mlcragrid Interconnect Device(MID), 50 HARRISON STREET, breakers,and screws.Streamlines grid-I nde pendent capabllltles of PVand storage Installations SUITE 202B 1891 � ACCESSORIES and REPLACEMENT PARTS HOBOKEN,NJ 07030 PG S y p www.GreenThinkEnergy.com .'1.-/r..,�4C Og 6` K/s-E3-PCBA-ENS Replacement Enpa wer.coMmller prl Hied circuit board `''r01'fELU 1�5e� EP200G NA-HD 20 ciA Eaton type BR circuit breaker hold-down screw kit,BRHDKl25 CONTRACTOR EP206G-11NDL-R1 Enpower Installation handle kl't(order separately) NAME:N/A 2 3 ADDRESS:N/A The EnphaseEn ower'v smart switch connects the Circuit breakers(as needed}' Not included,mustorder separately: Enphase p p BRK-IDDA-2P 240V •Main breaker,2 pole,1COA,25kAI C,CSR21/0 PHONE#:N/A home to grid power,the Enc[rarge storage system, BRK-125A-2P-240V •Main breaker,2 pole,125A,25kAEC,CSR2125N LICENSE it N/A BRK-175A-2R-24DV •Main breaker,2 pole,150A,25kALC.CSR2159N REVISIONS Enpower and solar PV. It provides microgrid interconnection BRK-175q 2P-24V •Ma In breaker,2 po le,175A,25kA€C,CSR2175N BRK•200A-2P•241DV •Main breaker,2 pale,24 OA,25kAIC.CSR229tN DESCRIPTION DATE REV device(MID)functionality by automatically detecting 9RK-20A 2P-240V-B •C.Ircult breaker,2 pain,26A,16k AEC,BR2208 and seamlessly transitioning t he home energy system BRK•30A-2P-240V •Circuit breaker.2 pole,30A.10/Alt,BR230E BRK-411A•2P•249V •Circuit breaker.2 pole,44A,15/AIC,882488 from grid power to backup power in the event of a grid BRK-6DA•2P-240V •Circuit breaker,2 pole,59A,10kAIC,BR260 BRK-89A•2P•245V •CircuR breaker,2 pale,5OA,1t]kAIC,BR280 failure. It consolidates interconnection equipment into SIGNATURE&SEAL ELECTRICAL SPECIFICATIONS a single enclosurel ms and streamlines grid independent Assembly rating Continuous operational its call F capabilities of I V and storage installations by Nominal walla ge/range(L-L} 240VAC/100-310VAC Voltage rneasureme nt accuracy 11 d V nominal(t1.2V L-N end 22.4V L-L) providing a consistent, pre-wired solution for Aux111arycontant for load control anti exoesspvicentrel 24V.iA residential applications. Ncmlrtal frequency/range 50 Hz l55.63 Hz Frequency measurement accuracy ±0.1 Hz Maximum coot moos current rating 159A Maximum i npul overcurrent protection device 249A Maximum outpulovercurrent prated londevlae 209A PROJECT NAME Reliable Maximum overture nt protectiondevlce rating for storage branch elrcuit4 BOA • DurableNEMAtype3Renclosure Maximum overcurrentprotectiondevlceralingforPVcombinerbranchclrcull4 80A Q^ --- Neutral Forming Transformer(NFT) ••Breaker rating natal led}:49Abetwean Ll and Neutral;44A between L2and Neutral V J 1 ▪ Ten-year limited warranty ^ 6 •Continuous ra[ed power:3609VA D •Maximum continuous unbalance current 39A I l 12CV •Peak rated pourer.B864VA for 34 seta nds Il`[ Smart •Peak unbalanced current 84A(a120V for 80seconds I- H N— e,ENPHASE MECHANICAL DATA I U N • Contra's safe connectivity to the grid Dimensions(WxHoD) 50cm 081.5cmx24.5cm(19.7 In x361n x9.7In) ,/ W CO • Automatically detects grid outages GI` Weight 38.5kg(651bs} • Provides seamless transition to backup U I j Amblerdtemperatcre range -Cr -40°Fto 122 F) S Cooling Natural convection.plus heal shield Q Et ill Simple Enclosure environmental rating Outdoor;AEMAtype 3R,polycarbo nate co Waruetian Altitude To25110 meters(8200 tent) W Connects to the load or service equipment)side of WIRE SIZES t� the main load panel Connections •Male ugcand backup load lugs CWAI:I AWG-390 KCM[L I_ F- Centered mounting brackets support single stud (All lugs are rated to 90C) COP breakers Cu/AI:2AWG-390 KCMFL Q mounting •BR breakers(wire provided) SAWS ' O •AC cambi Her lugs Encharge lugs,and gerrerator lugs 14AW/3-2 AWG 2 Ls) 0 • Supports conduit entry from the bottom,bottom left •Neutral(large lugs) Cu/AI:6AWG-3o0.KCMIL 0 0 side,and bottom right side Neutral and ground bars Large hu les(5/16-24UNF) 14AWG-1/0 AWG l • Supports whole home and partial home backup and Small holes(14-32UNF) 14AWC-6 AVM Q t subpanel backup COMPLIANCE • Up to 200A main breaker support Compliance LPL 1741,DL1741 SA,UL1741 RCS,UL1998,UL859A',UL57',UL50B.5,UL5R0 Immil • Includes neutral-forming transformer far split phase CSA221 No 1371.47 CFR.Part 1R Class B,ICES 943,AC'156_ 1 20/240V backup operation 2 Compatible with B RH DK125 Hold-Dawn Kit to comply with 2017 NEC 7,4.15E for back-Fed cimu It breakers- SHEET NAME 3.The En power Is ra fed 22 kAI C 4 Nol Included.!natal ler must provide properlyrated breaker per circuit breaker list above. EQUIPMENT 5.Sections from these standerds were used during the safety evaluation and Included In the UL1741 listing. SPECIFICATION 1.Enpower is not suitable for use as service equipment in Canada. To learn more about Enphase offerings,visit enphase.com ENPHASE. �2dzlEnphannEergy.AllrlghsresepedEnphase,theEnphasalnp,Enpower,andalhertralemarksorservicenargesarathevarfarraksof5/nphase EN PHASE. SHEET SIZE To learn more about Enphase offerings,visit phase.COm �� Energy,Inc.Data subjnctco change.2C/21_D1-25 ANSI B 11 t! X 17" SHEET NUMBER PV-13 To Be Completed By the Applicant Project Address: 5117 Maritime Court Anacortes, WA 98221 Project Applicant: Maggie Ludden for TML International LLC Applicant Email: permit@infinityd2d.com Phone No.: (360)836-1729 Site Owner Name:Thomas Macarthur PV system Description: Installation of 18 solar panels in 2 arrays on a roof mounted PV system. Determine if your project is eligible for an over-the-counter Permit(Check Yes or No) Yes No 1. PV System is designed and proposed for a detached single-family house,duplex or p ❑ town home. 2. PV System is designed for rooftop of house in general compliance with applicable p ❑ codes. 3. Mounting system is engineered and designed for PV. p ❑ 4. Rooftop is made from light weight material such as shingles. p ❑ 5. PV system will be permitted and pre-approved by Labor& Industries Electrical p ❑ division. 6. To address uplift, panel are mounted no higher than 18"above the surface of the p ❑ roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. 7. Total deal load of panels,supports, mountings, race ways,and all other p ❑ appurtenances weight no more than one of the following. IF Yes, indicate which: o No more than three and one half(3.5 pounds per square foot(PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5) PSF o Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0) PSF 8. Supports for solar panels are installed to spread the dead load across as many p ❑ roof-framing members as needed to ensure that no point loads in excess of fifty (50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. p ❑ 10. Panels are mounted no higher than the roof ridge or apex of roof(applies only to p ❑ pitched roofs). Comments: Ci1.rpm. By Checking this box, I certify that all of the information provided on this form is correct. If you answered yes to all of the above questions,your PV installation is eligible for an over-the-counter building permit. To apply please bring in this completed form to our permit center at City Hall for an over-the-counter permit. To be Completed By Staff Project is eligible for over-the-counter permit? ❑Yes ❑ No I;GI � PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 \Z",..111tCr.47 Phone: (360)293-1901 FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION 1. PROPERTY INFORMATION Project Address(Street,Suite#): Assessor Parcel Number: 5117 Maritime Ct., Anacortes, WA 98221 P 120227 Subdivision/Lot#: Zoning Designation: Lot area (size): LOT 4 Anacortes sq.ft. 2. TYPE OF PROJECT ❑ New SFR ❑ New Accessory Dwelling Unit: ❑ Deck/porch (new/repair) ❑ New Duplex E Attached to Primary Unit ❑ Interior remodel E Detached from Primary Unit ❑ New Addition to SFR ❑ Garage, carport or accessory building E Fence or retaining wall or duplex (new/repair) • Other: Solar Project Summary: Installation of 18 solar panels in 2 arrays on a roof mounted PV system. Project Valuation: $$4,182.00 3. PROPERTY OWNER INFORMATION Name:Thomas Macarthur Phone:(425) 308-1794 Address(Street,City,State,Zip): Email Address: 5117 Maritime Ct. thmacarthur@gmaiI.corn 4. CONTRACTOR INFORMATION Name:*TML International LLC Phone:(360)836-1729 Contractor's Business Licenses State License#:TMLINIL807PW City License#: 603 506 437 *All Contractors&Subcontractors must have a valid City of Anacortes business license prior to doing work in the Expiration Date: 10/20/22 Expiration Date: 1 0/3 1/2 1 City. Address(Street,City,State,Zip):5117 Maritime Court Email Address:thmacarthur@gmail.com 98221 5. CONTACT PERSON Waco es, Select one person the city will contact for anything 0 Applicant ❑ Property Owner ❑ Contractor related to this project: _ ❑ Other(list below) Name:Maggie Ludden for TML International LLC Phone:(360)836-1729 Address(Street,City,State,Zip):6405 E Mill Email Address: permit@Inflnityd2d.COm Plain Blvd. Vancouver, WA 98661 Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 5 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 4111‘, Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Phone: (360)293-1901 6. LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lenders involved with your project, write"no lenders"on the Name Line below. Name:No Lenders Phone: Address(Street,City,State,Zip): Email Address: 7. ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: ML I understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. M L I understand that if I submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. ML I understand and acknowledge that I could be responsible for providing as-built drawings (on paper or electronically) as part of the project's certificate of occupancy process. M L I understand and acknowledge that Special Inspections could be required as part of my project, and if needed I will be required to pay for the cost of these inspections. ML I understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. ML I understand that if permits are reviewed concurrently such as design review, site plan,traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. 4/6/21 Signature Date Maggie Ludden Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 6 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 4111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; `,:7 Phone: (360)293-1901 D. Are there critical areas or buffers on or abutting (within 300-feet of)the ❑ YES 1=1 NO project site? If yes, a critical areas report will likely need to be submitted. E. Is the lot less than 5,000 sq. ft. in area? ❑ YES 0 NO If yes,your site and building will need to comply with the standards in AMC 19.43.010.C. F. Is your project involving an accessory dwelling unit? ❑ YES ❑� NO If yes,your site and building will need to comply with the standards in AMC 19.47. G. Will more than 2-acres be cleared and/or more than 5,000 board feet ❑ YES ❑� NO (about 1 log truck load)of timber be harvested? If so you may need to obtain a forest practices permit from DNR. H. Is this project subject to the SEPA process? If yes, you will be required to ❑ YES ❑� NO submit a SEPA checklist. If you have already completed the SEPA process, list the permit number here: 5. REQUIRED SIGNATURE I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. 4/6/21 Signature Date Maggie Ludden Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 8 of 18