Loading...
HomeMy WebLinkAboutPermit File BLD-2021-0065 4305 Cherry Court '' A.--- © City of Anacortes Invoice/Permit#: BLD-2021-0065 904 6th Street Applied date: 01/21/2021 P.O.Box 547 Issue date: 01/27/2021 0 ' Anacortes, WA 98221-0547 Expire date: 07/26/2022 ' '�►>,=`- (360) 293-1901 Job Address: 4305 CHERRY CT Permit Type: Single Family Residence Permit ANACORTES WA 98221 Project: APN: Remarks: NEW SFR ON LOT#6. Owner: LG ANACORTES LLC Contractor: LG ANACORTES LLC Address: 504 E FAIRHAVEN AVE Address: 504 E FAIRHAVEN AVE BURLINGTON WA 98233-1846 BURLINGTON WA 98233-1846 Phone: Phone: (360) 755-9021 License#: General Information: Fees: Occupancy Group it-1 Plan Application Fee 200.00 Use Zone R-1 Building Permit Fee 2,561.75 Flood plain development N Plan Review Fee 1,665.14 New or Replaced Hard Surface 4036 Mechanical Permit Fees 135.20 Lot Area 15277 Plumbing Permit Fee 167.00 1st Floor Square Footage 2838 State Building Code Fee Resi 6.50 Garage Square Footage 821 Sewer Inspection Fee 52.14 Deck Square Footage 261 Storm Drain GFC-Residential 1,746.97 Porch Square Footage 116 Sewer GFC-Residential 9,331.86 Stove,Appliance 1 Park Impact Fee 615.00 Building Valuation 380000 Traffic Impact Fee 2,817.69 #Forced Air Furnace> 100K 1 Non Sprinklered SFR Fire Fee 102.58 #of Backflow Devices 1 EMS Impact Fee 363.70 #of Tubs, bath 2 SFR/duplex: site plan/design 60.00 Stormwater Review 322.88 #of Clothes Dryers 1 #of Clothes Washers 1 Total Calculated: 20,148.41 #of Dishwashers 1 Deposits/Receipts: 0.00 #_of_Gas Outlets 5 #of Gas Fireplace 1 Total Due: 20,148.41 #of Gas Piping 1 #of Gas Water Heaters<= 100k 1 #of Water Piping 3 #of Hose Bibs 2 #of Kitchen Sinks 1 Q to R/idAkliSS..- BLD-2021-0065-2021 5 9 Q1 Iid,�il... 02/02/2021 08:21AM 1 j� we�s, CORTES LLC 1 w orutill SIn c le i1a ionan n_ le Family Residence Permit 1,s it1P At6 Insets (Toilets"' 49.0 3 Tranoaction rno,tnt 0.148.41 CHECK:001359 • Y •0 ' W' , , Invoice/Permit #: BLD-2021-0065 • Applied date: 01/21/2021 Issue date: 01/27/2021 Expire date: 07/26/2022 ' ;' 11 p • Finance Department 021028-0001 Erin W , 02/02/2021 00:21 AM PERMITS AND INSPECTIONS LG ANACORTES L.LC BLO--2021-0065 Single Family Residence Permit NEW SFR ON LOT #6 issued 2021 Item: BLD-2021-0065 Plan Application Fee 200,00 Building Permit Fee 2 ,561 .75 . Plan Review Fee 1 ,665 , 14 Mechanical Permit Fees 135 ,20 Plumbing Permit Fee 167 ,00 State Building Code Fee Resi 6 ,50 Sewer Inspection Fee 52, 14 Storm Drain GFC-Res i dent i a l 1 ,746 ,97 Sewer GFC-Res i dent i a l 9,331 .86 Park Impact Fee 615 .00 Traffic Impact Fee 2 ,817.69 Non Sprinklered SFR Fire Fee 102 .58 EMS Impact Fee 363,70 SFR/duplex : site plan/design 60,00 Sto►r•Iilwate r Review 322,88 Payment Id: 306709 • The issuance or grantin± 20, 19.41 woval of, any violation of this Code or any other ordinance or order of the City, of any state or • decision of the Governor of this State. To the extent the issuance or granting of this permit is 0Ubtota 1 20, 148.41 ime when such construction is prohibited or restricted by any state or federal law, or order, pr 20 its State, this permit shall not authorize such work and shall not be valid. The building offic ' l n 1 where in violation of this Code, any other City ordinances of this jurisdiction or any other ;ral law, or of any order, proclamation, guidance advice or decision of CHECK the Governor. The buil( 20, 148 .41-11 it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplet' Check Nurnbe r001359 )r order, state or federal law, or any order, proclamation, guidance or decision of the Governc „�w__ ,w W_ ithorized is not commenced within 180 days or if construction work is suspended or abandon( change d�� ed. I have read and exam. th s application and know the same to be true and correct. L�i0 Paid by : LG ANACORTES [ LC SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED 2316 Antone Way Tim K. Garrison, P.E. Anacortes,WA 98221 Phone:(360) 708-1865 Professional Engineer TimG@TimKGarrison.com Structural Lateral Analysis: New Home at 4305 Cherry Court, Anacortes, WA Client: LG Anacortes, LLC Job Number: T21004 Building Design:Jack Reinstra Date: January 14, 2021 GAR , 4 f` ,,,.:: 'bA`T s, 25873 ir,,..„1';.",":44,11ZZIN,V,-, '6 , ' iawrw�w«aY•••61 1.0 1 tM.'wlll�r�li INDEX: Design Drawings,Callouts and Specifications. S 1 (24"x36") Calculations. Cl —C5 Total No. of pages excluding cover sheet: 1, 24x36+5, 8.5x11 Notes, Disclaimers: ConstructionCalc, Inc. (CCI)takes responsibility only for items specifically addressed within this report set. This report is valid only for the specific project shown above and herein. Further,this report is valid only if it is stapled or otherwise bound as it originally left this office, and contains all of the sheets as originally bound. Any sheets that are not bound to the original complete set are not valid and shall not be used (excluding authorized, stamped addendums). �4OR CODEC.O 4,4 .e 11Y 0 <' -, CAW rt rn 1891 �� ' coRaw ' Cl - 2316 Antone Way Tim K. Garrison, P.E. Anacortes,WA 98221 P Phone:(360)708-1865 Professional Engineer N TimG@TimKGarrison.com ao Structural Strategy Lateral: Porch roofs, use diaphragms to horizontal cantilever lateral loads back to building. Posts may be pin-pin -okay. Most shear walls with <150 plf applied lateral loads have low unit shear force thus no holdowns are required by inspection(uplift is easily handled by anchor bolts and/or bottom plate attachment to framing below.) • Where plate to plate height of shear panel>3.5:1, use shear transfer around opening(STAO)and height of opening for aspect ratio calc. Use continuous king studs at sides of opening and no joints in sheathing within 2'of opening corners to achieve STAO. • I 2 3 J-1 1 1 4 lI ' V --- — - - - - - I - . -- 11' : ` 1 - --- Iw I I I i ` [/\' - . - -- _'- _-4 - - - - !11 . - II --_IN,: r 11 H Ij i III Th , . ' i h — o irt,a� ✓ • 5 c- Structural Design Loads - IBC 2018 & ASCE 7-16 Seismic Calculations - Per ASCE 7-16 Project New home, Lot 6-LG Job No t20094 Date 1/14/21 Location 4305 Cherry Court,Anacortes,WA USGS 0.2 Second Response Ss= 1.154 %of gravity USGS 1.0 Second Response Si = 0.410 %of gravity No.of stories above ground lev. One Story • Site Class Stiff Soil Profile,D(Typ.) v Risk Factor Comm'l,Industrial,Residential-Med Hazard,II V Equiv Lateral Force Method Seis importance, IE= 1.00 Structural System bearing wall-wood or light steel shear wall v .2 sec response,Ss= 1.154 Ss use for Cs= 1.154 Is structure regular and 5 stories or less? Yes V Use Ss=1.5 max for Cs ca/c 1 sec response,Si = 0.410 • • Site coef, Fa= 1.038 Redundancy factor,p= 1 Site coef, F,= 1.590 Period,long-period(Map,ASCE7-10,p.224,fig 22-12),IL= 16 Response mod coef, R= 6.50 Height of top of building,hn= 22 ft 0-Str factor,S2„= 3.00 Defl Amplf,Cd= 4.00 EQUIVALENT FORCE METHOD,ASCE 7-16 I Ht Limit 65.0 ft Required Seismic Design Category D Spectral accel parameter,Sr is= 1.198 Height Limit(feet) 65 Spectral accel parameter,SM11 = 0.652 Max.Allowable Story Drift 0.015 hsx or L/67 Design spectral parameter,SDs= 0.799 0-Str factor,00 3.00 Design spectral parameter,SD1 = 0.435 Seismic Base Shear,V 0.123 *W I Building period coef,CTS= 0.020 Horizontal Seismic Load Effect,Eh 0.123 *W Approx fundamental period,Ta= 0.203 Vertical Seismic Load Effect, Ev 0.160 *W Upper limit period coef,Cu= 1.400 Seismic Load Effect E=Eh+-Ev 0.283D&-0.037D Building period,use,T= 0.284 LRFD Comb 5 1.36D+Eh+.5L+.2S Csmax= 0.329 LRFD Comb 7 0.74D+Eh Camin= 0.010 ASD Comb 5 1.112D+.7Eh Seis response coef,Cs= 0.123 ASD Comb 6b 1.08D+.525Eh+.75L+.75S Min diaphragm force, Fpx min= 0.16D ASD Comb 8 0.488D+.7Eh Max diaphragm force, Fpx max= 0.32D Wind Loads Per ASCE 7-16 -Analytical Procedure Wind Loads On Buildings-MWFRS, Directional Procedure-All Heights Project New home,Lot 6-LG Job No t20094 Date 1/14/21 Building Wind Exposure Exp B-Mean roof ht.<30',wooded or urban for>1,500 ft. V Enclosure Classification Enclosed Building(Typical) V 3-Sec Gust, Basic .110 mph • ASCE7-16 maps Method ASD,Basic Combos.Stress increases:Ilowed for wood cnly. V Load Comb Factor 0.6 Roof Pitch 1, max. 6.00 /12 Slope 1 9 = 26.6 deg Roof Pitch 2,max. 6.00 /12 Slope 2 0= 26.6 deg ‹.3 Hill Shape Topographic Factor Not Applicable vir L/B 1.93 Building Width Perp.To Ridge B= 46 ft h/L 0.17 Building Length Parallel To Ridge L= 89 ft Gust Effect Factor G= 0.85 Mean Height Of Roof(ft) hin= 15.0 ft 3-Second Gust Power Law Exponent a= 7.0 Eave Height(ft) heave= 10.0 ft Normal Ht.Of Atmosp.Bndry Layer zg= 1,200 ft Directionality Constant Kd= 0.85 Velocity Press.Exposure Coefficient Kh= 0.575 26.8 ASCE 7 Height of Hill or Escarpment(ft) H= • IBC Load Factor for ASD Wind-1605.3.2 co= 0.60 Narrowest Half-Width of Hill at Half-Height(ft) Lh= Topographic Factor Kzt= 1.000 Horiz. Distance From Crest To Bldg.Site(ft) x= Velocity Pressure @ mean roof ht. qh= 15.13 psf Windward Wall Pressures Internal Pressure Intermed. Windward Elev K Value q, Wall Internal Pressure C-15 feet 0.575 9.08 psf 6.17 psf +/-2.72 psf 15-20 feet 0.624 9.86 psf 6.70 psf 20-25 feet 0.665 10.51 psf 7.14 psf Longitudinal (Parallel To Ridge) 25-30 feet 0.701 11.07 psf 7.53 psf 30-40 feet . 0.761 12.02 psf 8.17 psf Leeward Wall Side Walls 40-50 feet 0.811 12.81 psf 8.71 psf -2.42 psf -5.40 psf 50-60 feet 0.8t 1 13.49 psf 9.17 psf (Outward) (Outward) 60-70 feet 0.892 14.10 psf 9.59 psf Roof Pressures- 70-80 feet 0.927 14.65 psf 9.96 psf Based On Posn. Pressure Down Ridge 0 to h/2 -6.95 psf Transverse (Perp.To Ridge) h/2 to h -6.95 psf h to 2h -6.95 psf Leeward Wall Side Walls >2h -6.95 psf -3.86 psf -5.40 psf (Outward) (Outward) Horiz prof 6.17 psf Slope 1 - 12.0 psf 6.00/12 Q' -1.70 psf -4.63 psf 2.08 psf / 7.53 psf ''#,,,0 j 11.4 psf / ,...,,t,‘, 7.14 i '' - \ +/-2.72 psf 1 11.0 psf .. +/-2.72 psf I 6.70 psf -} +/-2.72 psf ���3.86 psf 10.6 psf t �-- +I-2.72 psf 6.17 psf ,,..,.>,,. '." 10.0 psf 46.00 ft IN Roof 1 slope: 6:12 0.46 rads 26.57 deg Roof 2 slope: 6:12 0.46 rads 26.57 deg Press,slope 1,roof,horiz proj: 3.0 psf Press,slope 2,roof,horiz proj: 3.0 psf ConstructionCalc, Inc c.4 Lateral Load Calculator Job No.: t21004 Job Name: Lot 6 Cherry By: tkg Architect/Designer: Reinstra Date: 1/14/2021 Building: house+gar R basic 6.5 rho basic 1.0 SEISMIC LOAD CALCULATOR Seismic Factor: 0.123 (Basic. Ma Roof Snow 25 psf Fir Storage LL Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: n-s e-w Dim 1 4426.00 N Dim 2 1.00 - io Trib Area 4048.g' 0.0 0.0 0.0 0.0 0.0 0.0 0.0 o Dead weight, psf., -15.0 5.0 '-5.0 1.; t.G Jr 1� T.0 1 I. 15.0 o r Seismic factor.I . f a 0.123 I 0.12, 1 3.123 i ".123 i 0.123 I 0.123 1 0.1'.3 A 0.123 Calc'd seis load 9129.8 0.0 0.0 0.G 0.0 0.0 0.0 0.0 Dim 1 318.00 _ Dim 2 4.50 - m Mul factor ..C:3 i.00 1.C3 ..03 1.00 ..00 Trib Area 14 1.J 0.0 0.0 0.G 0.0 0.0 0.0 0.0 w Dead weight, psf.: 10.0 I 10.0 I 10.0 I 10.0 I 10.i) 1 10.0 I 10.0 Y 10.0 Seismic factor.} 0.123 i 0.123 + 0.123 I 0.123 I C.123 0.123 I 0.123 I 0.123 i L J L i • 1 1 i J Calc'd seis load 1760.1 0.0 0.0 0.0 0.0 0.9 0.0 0.0 Dim 1 Dim 2 L Mul factor 1.GC 1.00 1.00 `:.00 1.00 0 1.00 1.00 _oo Trib Area 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 V.. f 7 ; Y T Y Y 1 Dead weight, psf.[ 15.0 I 15.0 I 15.1) I 15A I 15.0 I 15.0 1 15.0 a 15.0 1 Seismic factor.; 0.123 1 0.123 1 0,123 ¢ 0.123 1 0.123 : 0.123 1 0.123 ; 0.123 i Calc'd seis load 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Other GLs 10890.0 Seismic Applied V 10890.0 10890.0 G.0 0.0 0.0 0.0 0.0 0.0 WIND LOAD CALCULATOR Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: :: 0 0 C 0 Dim 1 827.00 308.00 N Dim 2 1.00 1.00 io Mul factor 'i..,0 1.03 1.00 _ ' . ,.. 1..._ •..,:. 1. 3 ;, o Trib Area 827.0 308.0 0.0 0.0 0,0 0.0 0.0 0.0 cc Wind psf load; 3.0 c;.0 r 8,0 y 8.0 I 8.0 r 8.0 I 8.0 I 8.0 Calc'd wind load 6616.0 2464.0 0.0 0.0 0.0 0.0 0.0 0.0 Dim 1 89.00 471.00 _ rn Dim 2 4.50 1.00 _ T- • 1 0• - ,• , r„ , 0 Mul factor .00 C`3 1.Ov i., ! '.�:0 X Trib Area 400.5 471.0 0.0 0.0 0.0 0.0 0.0 0.0 w Wind psf load[ 16.0 I 16.0 13..; 1:5.0 16.0 i 16.0 I 16.0 i 17.0 Calc'd wind load 6408.0 7533.0 0.0 0.0 0.0 0.0 0.0 0.0 Other GLs Wind Applied V 13024.0 10000.0 0.0 0.0 0.0 0.0 0.0 0.0 Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: Gridline: .'-s 0 0 0 0 0 0 Controlling V 13,024 lb 10,390 lb 0 lb 0 lb 0 lb 7 lb 0 lb 0 lb Controlling Force Type wind sei.inc - - - - - - ConstructionCalc, Inc CS Description: n-s Distribution of Lateral Loads Seismic Adjustments per Grid Total V,unfactored _. . . . Building: i+ous•;,.gar R adjust Grid Rho adj Grid Wind or Seis control?(w ore) Total V,factored 7.314 lb Adjst'd multiplier - - Grids 1 4,5 Fercentage V 50% 50% 0`;: Leftover V/grid 3.907 15 3.907'b 0 lb 0 lb 0;b 0 0,1) 0-•> 0 lb 7,811 lb Sum check OK Min. Grid Pnl 1 Pnl 2 Pnl 3 Pnl 4 Pnl 5 Pnl 6 Pnl 7 Pnl 8 Pnl 9 Pnl 10 Sum Eh PW use 4.3 If 4.0 If 4.5 If 6.5 If 6.8 If 2.3.1 If 150 p;f 1 P--i 1 20.0 If 8.0 If 8.0 If b6.0 If 109,-elf 1 )'m' Description: e-w Seismic Adjustments per Grid Total V,unfactored _. . . R adjust Grid Rho adj Grid Wind or Seis control?(w ore) , Total V,factored 7,623 lb Adjst'd multiplier - - Grids a,b c,d Percentage V 50% 50% 0°;, Leftover V/grid 3.811 lb 3,811 lb G;b 0 ib 0 lb 0;5 0'5 0 l5 0 lb 7,323 lb Sum check OK Min. Grid Pnl 1 Pnl 2 Pnl 3 Pnl 4 Pnl 5 Pnl 6 Pnl 7 Pnl 8 Pnl 9 Pnl 10 Sum Eh PW use 5.0 If 7.0 If 7.5 If 7.5 If • 3.8 If 5.0 If 6.0 If 6.5 If 7.0 If 55.3 If . 69 plf i W 4.5 If 6.0 If 6.0 If 3.0If 3.5 If 3.5 If 6.0 If 3.0 If 2.3 If 37.8 If 101 plf '.?'V' Soils Report Linda Spicher, Septic System Designer, License 5100294 CESCL ID# 51838 (360)708-3004 Project/Client: Landed Gentry Homes and Communities �i, Page / of lP Contact: Steve Baughn r r it Site Address: Cherry Court, Anacortes, WA 4 ,o.w44; ++ r*+ if y 1 ;a i Ja Parcel Number: 32077 , � jf►i e 4 Date on Site: 11/24/2020 ����?:�•��„DESIGNER , EXPIRES 09.2 -jam Map Unit, Natural Resources Conservation Service: #18 - Bow gravelly loam, dry, 0 to 3% slopes Hydrologic Soil Group: CID Soil Type' Loading Rate2 Soil Log 1 0 — 7 brown loam, disturbed 4 0.6 7 — 23 brown loam 4 0.6 23 —41 fine sandy silt loam, mottles, roots 5 0.4 41 —45 fine sandy silty clay, mottles 7 not suitable anticipated water table at 23" Soil Log 2 0 — 3 brown loam, disturbed 4 0.6 3 — 16 brown loam 4 0.6 16 — 34 tan loamy fine sandy, roots 4 0.6 34 — 60 gray gravelly silty clay, mottles, 7 not suitable fine roots to 40" anticipated water table at 34" I One of seven numerical classifications of fine earth particles and rock fragments as described in WAC 247-272A-0220 (2)(e). 2 From Chapter 247-272A WAC: "Hydraulic Loading Rate° means the amount of effluent applied to a given treatment step, in this chapter expressed as gallons per square foot per day (gal/sq. ft./day). '• `dvardea7 & t ; �f Parcel: 32077 �!+;y/ •�• Page Z ofirot si' , S.pICHEIt �� r . D DESIGNER Ye EXPIRES 09.29-Z_ Soil Type3 Loading Rate4 Soil Log 3 0 — 7 brown loam, disturbed 4 0.6 7 — 18 red silt loam 5 0.4 18 —25 fine sandy silt loam, mottles, roots 5 0.4 25 — 54 fine sandy silty clay, mottles, fine roots to 45" 7 not suitable 54 — 57 fine sandy silty clay, compact, mottles 7 not suitable anticipated water table at 18" Soil Log 4 0 — 6 brown loam, disturbed 4 0.6 6 — 20 brown loam 4 0.6 20 — 55 tan fine sandy ashy loam, dense, mottles, roots to 48" 5 0.4 anticipated water table at 20" Soil Log 5 0 — 11 brown loam 4 0.6 11 —24 tan fine sandy ashy loam, mottles at 14" 5 0.4 24 —42 very gravelly fine sandy silty clay, fine roots 7 not suitable 42 — 65 gravelly fine sandy silty clay, dense 7 not suitable anticipated water table at 14" Soil Log 6 0 — 15 brown loam 4 0.6 15 — 29 fine sandy loam, mottles at 21" 4 0.6 29 — 36 loamy fine sand, roots, mottles 4 0.6 36 — 52 fine sandy silt loam 5 0.4 52 — 57 fine sandy silty clay 7 not suitable anticipated water table at 21" 3 One of seven numerical classifications of fine earth particles and rock fragments as described in WAC 247-272A-0220 (2)(e). 4 From Chapter 247-272A WAC: "Hydraulic Loading Rate" means the amount of effluent applied to a given treatment step, in this chapter expressed as gallons per square foot per day (gal/sq. ft./day). L.: P12 400 \ li 'p P1 5954. P32P322 P99832P57232 P57231 32139 ] 290 � . P f 2�399 I L 1 925 91 P5723 °` r i -- - - -- w_P123983 1P12402 P1240 0.. I ` P32298 ' i 1. -.�i025 a -- ! 1 _r_ _ \ I I P32125 € 12402: �. r__ 1 I I i' P32 I P123985 Smm I P124047 a322 P12403 3 j129 j IIP124� 4 i, P1240 r - P32297 P32299~'��"`---�, * P32293 P32295 l i 1 P124032 P1240 2 -�-- P3230 •:"F32294 , j P 12398�6•4 P 124027 I P 124042 ' ` P124033 ___._ I i I �. i P 12492 _ ` ! P124028.. ! P1240 1 ` P32126 \ • P123967 1 1 P124034 I -.°`' i €I P32303 P135 156 ' P32123 •; P1-2 022 - P32302 P32296 P124(#3a f _I �� P123988 - P1 Ei --- . P1240 P32301 i - - --Pi1 4021 P12400 P124036 ,., , ` \. P123989 -_. - 1 \ \a 24020 P(2 i Q. -i i • P32079 ---- _ , P124fl3' ! - -_� P32131 ,, P124C1C38 ; I• 124010 - P123990 - P124007' ---- - P32306 P32334 P32127E P1. r, ._P1.2 .p.19 •P124i.., 1 , 4018 iE \ P123991 - - - • P32304 ---- i1j i # Lk-- P1 40 6 P 'D80 Offc�tlFlrie. -. P32319 P32309 P32308t P323D7 1 i P 23992 * .012'0-fi P1240 tI 5 P :082 P32 ;210 6 -P124/114 _____I I P124014 —_.-._., _..____ P 2 393;� ` -- ' P124D�3 -- �'- 1P -_. P124015 � -__ �1 _.___ =ts=1- rl I I cy -P12 41 --.._f-._—_ r •32135 �_�_� P123 �\��- '123997: P124004 P124002 ; I P32314 P32320 P106978 '���, P123999 P323118P32315 �- < <s �4,•�� ... P123998 f 001 P1 :46 - . _ P99114, it e - _ -1-. —r �'3'1622- ""' --� _�� it~ .r o OP � 40„ ,-.A P32625 I l $ 2 r.i P32621 P32673 _ --' u P32624))\LP99115 *v� i '� �- ` P32628 I P32663 I.':7 -",„.„___ : 1 'de�, i r1i t /f f 1 i 4 _.-. � . .eve---_______-1__ 5 0`ram ® r P 2678 I - f / 3 -0- - +,, November 13, 2020 1" = 300' Legend 0 165 330 660 Ft Tax Parcel Numbers � I I I.05 0.1 4.ill . 0 02 km Data Accuracy Warning:All GIS data was created from available public records and Dirt Accounts existing map sources. Map features have been adjusted to achieve a best-fit registration.While great care was taken a this process,maps from different sources Senior Citizen Accounts rare aly agrreee e as3o)feet.precise location of geographic features.Map discrepancies can beCopytlght2016 ilAnhilw F-Inma rinli Accniints 6 '-il -' a,e•wc Ss I Mal ItlelECY ,�+, [ hr es pTar CI ! iv . .+ IEM �i W [R We[xC k [ I. E 1Y DPP MI 0R/"nC •� w•Lr E,Y ron.WI:IWG SD +• .'Rxsi Z �.NORIIi RIM T tlF n � ���� Y9'CAP W R4hu.NIK.COMA a. EILr 1.2”.GE . . 1 T °'ffRl"'PIARD A�`� P.MOT �� .RRM aaulw,Rm� Rom Rrx m wr 1 _- • 'LkR' 11u _ � --_.- i'"p :rr - -- .srr,r�_. J 1/. /,` ... Nlaa . 6 cc F-ra )r- — — -7-, .H i r,__ __ _ _...—__ It ... _ _ a E, , ,,,, I : I ` z,r cw ew wrtn-4a M-.11 r LT.MA ` LO I I I I LOT 6 �! �,7 II RPPRCX.IMAM. oop .141.494.1,4BD +e IllLa 1 .,arlr�r-• TRAC7'I' a`"".,.I e j r Ili /a.00„,E°�`"°" tS ■ lO i �': 7 Ii �Iiu;i I LCT TEST .I.e -II � Illii)ilii' I ,F t LOOM,OF lir -.—. .) 4 o I E /' 1 '. a,wlecnr Ru" • I Qb E LQ1 ` '-.�a. - \/ / 4 .. .-� _. - - ----�`, _ ITRMC£..... �, t3 L.: ` .�I� ', itlYrrR•Rrxo�a'--7 ���I� hl��� I 6 e44144 /DOTS I ara; i I • �� LOT'-2 .!1 A Ili < I`LF_ -_ I- I \ SS aw I :w•a ((�� I� S �'�I � -.�_.. _. ...._ „-.� � E N•r ourtn-s:fiEl� 1 • 1. 7q� El 11 ' �• NR,OL OGbI sl � mkt.'' LOT, IO OTT L i I 11.80' i / I I 44; � e 11 li% %% c,� no.Irean so ter/�E[/. L- a>ooM rn _,,.. Iw w 5 Sa S5 T�.w. - �(+- >T%/ri 1 - -AP 41110- El AO 77a avnik 86 Associates, Ins. .+ors MIER TEM CHERRY COURT 91i°"°"°10M CIVI ENGINEERING & LAND—USEp PLANNING „ OW SHALLOW INFILTRATION TEST HOLES 1�• ,,�,a. DEVELOPED CONDITIONS 103 LI7�UN 3 .`•:µ 5/p ge2��3?x 361 FOR 1E013 .141 • (360)707-2045 FAC 7361])707-22i6 C"°�"" CORNER 9 PROPERTIES, LLC DRAINAGE EXHIBIT DATE:04.37.26 SW 1/4 SECTION 25, T. 35 N., R. 1 E., W.M. 1 Or E Soil Map—Skagit County Area,Washington m (Parcel 32077) en 527410 527440 527470 527500 527530 527500 527590 Sa55, 527650 527650 527710 527740 48°29'11 N & limit 7 i 48°29'11"N * - '4110, j:,.:5:,I . ? : I M , 4 s: - iF. 11., li OPIPr03 IL, ; , ,, , illtlio > ii��iiww r 1^ `•J � %,fir`q rsldKr4 ape r f A sari : 1 1, Y Ai7l>-S -fir- - / .. a jct: ] os]M10 Jfl<3';/J E XO-,7 1�:j'l 317 [k1 i , y]-' A 1 f�S f 48°29'3"N - .,.., 48°29'3"N 1 527410 527440 527470 527530 527530 527560 527590 527520 527650 527E50 527710 527740 `din} a 4 N Map Scale:1:1,640 ff printed on A landscape(Sl"x 8.5")shed Meters N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection:Web Mercator Corner coordinates:WG584 Edge tics:UTM Zone 10N WGSS4 USDA Natural Resources Web Soil Survey 11/16/2020 Conservation Service National Cooperative Soil Survey Page 1 of 3 Skagit County Area, Washington 18—Bow gravelly loam, dry, 0 to 3 percent slopes i, Map Unit Settingor ! • National map unit symbol: 2hty ifir ��` • Elevation: 0 to 200 feet + • Mean annual precipitation: 20 to 40 inches orFw. 1,4 • Mean annual air temperature: 48 to 50 degrees F i • • Frost-free period: 170 to 220 days n e • Farmland classification: Prime farmland if drained I' ��u'SC+ �+ DESIGNER 4Pa Map Unit Composition \f _4MfeI MIL II MI 1:11M I LI II VI 1.1 24- • Bow, dry, and similar soils: 95 percent DES 09- • Minor components: 5 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bow, Dry Setting • Landform: Hillslopes, terraces • Parent material: Volcanic ash, glaciolacustrine deposits, and glacial drift Typical profile • HI - 0 to 7 inches: gravelly ashy loam • H2 - 7 to 17 inches: very gravelly ashy loam • H3 - 17 to 31 inches: clay loam • H4 - 31 to 60 inches: silty clay Properties and qualities • Slope: 0 to 3 percent • Depth to restrictive feature; More than 80 inches • Natural drainage class: Somewhat poorly drained • Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) • Depth to water table: About 6 to 18 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: High (about 10.4 inches) Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 4w • Hydrologic Soil Group: C/D • Forage suitability group: Seasonally Wet Soils (G002XN202WA) • Hydric soil rating: Yes Minor Components Bellingham, undrained • Percent of map unit: 5 percent • Landform: Depressions • Hydric soil rating: Yes CITY OF ANACORTES BUILDING DEPARTMENT �'ii., INSPECTION CARD leW (360) 293-1901 7� - (Card to be on job site at all times) Job Address: 4305 CHERRY CT APN: Permit#: BLD-2021-0065 Issue date: 01/27/2021 Permit Type: Single Family Residence Permit Expire date: 07/26/2022 Remarks: NEW SFR ON LOT#6. Applicant: Contractor: Owner: Lender: LG ANACORTES LLC LG ANACORTES LLC LG ANACORTES LLC 504 E FAIRHAVEN AVE 504 E FAIRHAVEN AVE 504 E FAIRHAVEN AVE BURLINGTON,WA 98233-1846 BURLINGTON WA 98233-1846 BURLINGTON WA 98233-1846 (360)755-9021 (360)755-9021 License#: Provide approved residential sprinkler system per NFPA 13D prior to framing inspection. 1 I Inspector's Inspector's inspection Date Initial Comments Inspection Date Initial Comments Stormwater BMPs* Insulation*** Site, Soil, &Footings** Drywall I Foundation** Roofing Perimeter Drains*** Proper Permeable Soil Depth*** ***Do not cover until signed off. Post Pads** Site Drainage A^ Proper Permeable Soil Depth inspection must pass before Stormwater and Building Plumbing Ground Work** Stormwater Final^^ Final inspections can be passed. ^Do not remove window labels until Slab Insulation** Building Final**** approved. *Do not clear,grade,or dig before Stormwater Underfloor Framing"*" Backflow at boiler? g*�* BMPs inspection passes. Exterior Nailing*** _ _ Public Works **Do not pour concrete until signed off. !Verify backflow assembly and report at Rough Plumbing*** _ Sewer Connection - - in floor heat installations prior to final. _ Gas Piping*** Storm Drain Connection_ *** Do not occupy building Rough Ducts&Vents*** _ Curb Cut _ before final is signed off and Certificate of Occupancy is Fenestration U-Factors A _ _ Public Works Final**** Public Works Inspector 1- issued. Framing*** Call 360-293-1920 SWPPP - EXHIBIT "A" 4305 CHERRY COURT LOT 6, CHERRY COURT SHORT PLAT P Responses to the "Complete Residential Stormwater Plan Checklist— Minimum Requirements 1-5". Brief Description of the Project: To construct one Single-Family Residence (SFR) on a single legal lot within the City of Anacortes. The existing property is P , see Legal Description below. This SFR is being place on Lot 6 of the Cherry Court Short Plat, also known as City of Anacortes Short Plat No. SPL-2020-0003, A.F. NO. . The area of the future Lot 6 is 15,277 square feet (0.3507 acres), and is Zoned R1. LEGAL DESCRIPTON (of Pending Short Plat): Lot 6 of the Cherry Court Short Plat, also known as City of Anacortes Short Plat No. SPL-2020- 0003, A.F. NO. Pre Developed Conditions & Runoff on the future Lot 5: The property is vacant. The site slopes from the southeast to the northwest at a grade of approximately 4.0%. The property is bounded as follows: NORTH: Cherry Lane, a public street. EAST: Tract Y, SPL-2020-0003. South: Future Lot 5, SPL-2020-0003. West: Cherry Court, a public street. Developed Conditions & Runoff of The Site: The proposed improvements are as follows: Construct a SFR with an approximate lot coverage of 26.4%, and an impervious lot coverage of 31.7%. Detention is required for the Short Plat. Roof drains and footing drains will be hard lined to an infiltration bed located in the northerly portion of Lot 6, with an overflow to the existing stormwater collection system and the detention pond. The point of connection for Lot 6 is located in the northwest corner of the lot. After construction, landscaping will be provided to permanently stabilize the site from erosion. Summarize difficult site parameters, the natural drainage system, and drainage to and from adjacent properties, including bypass flows: The site slopes from the southwest to the northeast at a grade of approximately 4.0% and the disturbed soil seeded and/or mulched to reduce erosion. The only significant tributary drainage the lot may receive is from Lot 3. Lots 5 has it's own drainage self-contained prior to construction on Lot 6, so as not to impact Lot 6. Intercept drains may be installed to adequately eliminate impacts as needed. Hydrological Site Plan: Survey: A topographic survey has been performed by Lisser and Associates, showing the pre- developed condition, along with the existing contours at 2-foot intervals. The property is vacant. Soils Report: A Geotechnical Engineering Evaluation report was prepared by Geotest, Inc., dated February 26, and is already part of the record documents provided to the City of Anacortes. Recently we have had Linda Spicher, a septic designer do more detailed test pits to check the availability of infiltration for roof drains on Lots 1 and 6. Preliminary Development Site Plan Layout: An "Erosion Control & Site Plan" has been prepared by Landed Gentry Development, Inc., showing both the existing and proposed improvements as requested. See attached. A "Vicinity Map" has been provided on Sheet 1 of 1 of the "Erosion Control & Site Plan", attached. Construction Stormwater Pollution Prevention Plan (SWPPP): See attached. Other Permits: Building Permit for SFR. SWPPP - EXHIBIT "B" 4305 CHERRY COURT LOT 6, CHERRY COURT SHORT PLAT P Responses to the "13 Elements of SWPPP" (Construction Stormwater Pollution Prevention Plan) ELEMENT 1: Preserve Vegetation/Mark Clearing Limits The clearing limits will be marked by using either BMP C233: Silt Fence, or BMP C103: High Visibility Plastic or Metal Fence, as shown on the Erosion Control Plan. C233 is to be used along the east, west and north property lines and the C103 along the south property line. Preservation of the native top soil will be preserved as much as is practical by use of a stock pile as shown on the Erosion Control Plan. Stock pile location may vary. Stock pile shall be protected as indicated on the Erosion Control Plan. ELEMENT 2: Establish Construction Access BMP C105 shall be used as the construction access. Only one access point is proposed. No wheel wash is proposed. Any track out shall be cleaned daily by shoveling and/or sweeping. More frequent cleaning as necessary. ELEMENT 3: Control Flow Rates No flow rate controls are designed for the individual lot. However, a detention pond and wet pond were constructed with a flow control structure outlet. Erosion control BMPs described in ELEMENT 4, below will reduce velocity of flows. ELEMENT 4: Install Sediment Controls The following BMPs are proposed as temporary sediment controls: C233: Silt Fence To be place along the perimeter of the site to protect downstream properties from the transport of coarse sediment, as well as to mark the clearing limits for the construction crew and to alert the public as to the potential dangers of the ongoing onsite construction activity. C105: Stabilized Construction Entrance To be place in the location of the future driveway to provide a stable and clean point of access for construction vehicles. C121: Mulching To provide immediate temporary protection of exposed soil from erosion, as well as conserving moisture. C123: Plastic Covering Primarily used to protect the stock pile from erosion. May be used as a short term cover of small areas of exposed soil. Not intended for large areas. C140: Dust Control The primary source of dust control will be by spraying of the disturbed area with water. C220: Storm Drain Inlet Protection Onsite inlet protection will use Block & Gravel Curb Inlet Protection. Offsite inlet protection will use Catch Basin Filters manufactured for use at construction sites. C207: Check Dams Where drainage swale are created to convey stormwater, temporary gravel check dams may be used to reduce velocity and to dissipate flow energy. The following BMP improvement(s) are proposed for permanent sediment controls: C124: Sodding Sodding is to establish permanent turf for immediate erosion protection. C125: Top Soiling Provides a suitable growth medium for final site stabilization with vegetation. T5.13: Post-Construction Soil Quality and Depth Establishes soil quality and depth regains greater stormwater functions in the post development landscape, provides increased treatment of pollutants and sediments that result from development and habitation. ELEMENT 5: Soil Stabilization The following are temporary soil stabilization BMPs: C233: Silt Fence To be place along the perimeter of the site to protect downstream properties from the transport of coarse sediment, as well as to mark the clearing limits for the construction crew and to alert the public as to the potential dangers of the ongoing onsite construction activity. C105: Stabilized Construction Entrance To be place in the location of the future driveway on Latitude Circle, to provide a stable and clean point of access for construction vehicles. C121: Mulching To provide immediate temporary protection of exposed soil from erosion, as well as conserving moisture. C123: Plastic Covering Primarily used to protect the stock pile from erosion. May be used as a short term cover of small areas of exposed soil. Not intended for large areas. C140: Dust Control The primary source of dust control will be controlled spraying of the disturbed area with water. C220: Storm Drain Inlet Protection Onsite inlet protection will use Block & Gravel Curb Inlet Protection. Offsite inlet protection will use Catch Basin Filters manufactured for use at construction sites. C207: Check Dams Where drainage swale are created to convey stormwater, temporary gravel check dams may be used to reduce velocity and to dissipate flow energy. The following are permanent soil stabilization BMPs: C124: Sodding Establishes permanent turf for immediate erosion protection. C125: Top Soiling Provides a suitable growth medium for final site stabilization with vegetation. T5.13: Post-Construction Soil Quality and Depth Establishes soil quality and depth regains greater stormwater functions in the post development landscape, provides increased treatment of pollutants and sediments that result from development and habitation. ELEMENT 6: Protect Slopes C235: Straw Wattles Straw Wattles reduce the velocity and can spread the flow of rill and sheet runoff, and can capture and retain sediment. ELEMENT 7: Protect Drain Inlets C220: Storm Drain Inlet Protection Onsite inlet protection will use Block & Gravel Curb Inlet Protection. Offsite inlet protection will use Catch Basin Filters manufactured for use at construction sites. ELEMENT 8: Stabilize Channels and Outlets C207: Check Dams Where drainage swale are created to convey stormwater, temporary gravel check dams may be used to reduce velocity and to dissipate flow energy. ELEMENT 9: Control Pollutants All fuel, lubricants, paint, and/or other hazardous material shall be stored in a lockable, covered storage container if kept on site. ELEMENT 10: Control De-Watering Should dewatering become necessary, it should be pumped and dispersed to a well vegetated area within the project site. ELEMENT 11: Maintain BMPs A trained Certified Erosion and Sedimentation Control Lead (CESCL) will be on the job site. CESCL personnel are trained in and responsible for the proper maintenance of the erosion control BMPs. The CESCL will work with the City of Anacortes Inspector to maintain all BMPs. ELEMENT 12: Manage the Project A trained Certified Erosion and Sedimentation Control Lead (CESCL) will be on the job site. CESCL personnel are trained in and responsible for the proper maintenance of the erosion control BMPs. The CESCL will work with the City of Anacortes Inspector to maintain all BMPs. ELEMENT 13: Protect Low Impact Development BMPs BMP T5.10B Downspout Dispersion and to be implemented on this site. Compaction of soil in dispersion areas to be avoided. EXHIBIT "C" 1602 LATITUDE CIRCLE LOT 18, PLAT OF 48 NORTH P133676 PRIMARY BMPs FoIt CODE C� I �O Y O A�; Storm Water Drainage Minimum Requirements 1 through 5 Amok q g 1891 Minimum Requirement 1 through 9 is93 , �o RCOgS� ENGINEERING DEPARTMENT ✓�`'roF,rLn�� 904 6th Street Anacortes, WA 98221 • www.anacorteswa.gov Post Construction Report-12.21.20 Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: Sediment discharge potential of 80. Part of a common plan of development. Reviewed as #2 only. Project Address: 4305 CHERRY COURT Submittal Date: 1/13/21 Parcel Number: P Revision Number: Permit Number: Reviewer: Rob F. Acceptance Date (COA): 1/26/21 FRONT OF REPORT: Submittal Checklist: (All items listed below are required for a complete submittal) o Cover Sheet (Preparer to Provide): Project title, Location, Revision dates, Engineer's Stamp o TAB 1: Minimum Requirement#1 — Preparation of Stormwater Site Plans o TAB 2: Minimum Requirement#2 — Construction Stormwater Pollution Prevention (SWPP) o TAB 3: Minimum Requirement#3 — Source Control of Pollution o TAB 4: Minimum Requirement#4 — Preservation of Natural Drainage Systems and Outfalls o TAB 5: Minimum Requirement#5 — On-site Stormwater Managements o TAB 6: Minimum Requirement#6 — Runoff Treatment o TAB 7: Minimum Requirement #7 — Flow Control o TAB 8: Minimum Requirement #8 —Wetland Protection o TAB 9: Minimum Requirement #9 — Operation and Maintenance o APPENDIX 1 - Survey performed by a Professional Land Surveyor o APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) o APPENDIX 3 - Model Soil Management Plan for BMP T5.13 o APPENDIX 4 - Determining Construction Site Sediment Damage Potential (Appendix 7) o APPENDIX 5 - Site Plan with all applicable information (Minimum Size 11x17 — 30 scale) o APPENDIX 6 - Documented Site Photos (North, South, East and West) o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. o APPENDIX 8 —Vicinity Map, Aerial Exhibit, Downstream Exhibit and 2007 City of Anacortes Stormwater Comprehensive Plan excerpts o APPENDIX 9 — NRCS/SCS soils information o APPENDIX 10—WWMH Views &WWHM Report o APPENDIX 11 —2014 DOE BMP T5.10B, T5.11, T5.12, and T5.13 o APPENDIX 12 - Excerpts from DOE Manual and City of Anacortes Stormwater Comprehensive Plan Stormwater Management Requirements: 1 o Refer to the 2012\14 Department of Ecology Manual, as amended in 2014 for further required information. o See also, City of Anacortes Municipal Code 19.76 for additional information o See also, current Engineering Development Standards, Chapter 2- Storm Drainage for additional information. Project Description and Summary: Summary Table Existing Proposed Development Type None/Grass/Pasture Single Family Residential Number of Lots 1 (Before Short Plat) 1 (Lot 6 of Short Plat) Lot Acreage in SF 135,648 sf(3.1 acres) 15,277 sf Soil Type(s) #18& #19 per NRCS—Bow Gravelly Loam-Refer to NRCS/SCS info in Appendix 9 and the Geotechnical Report within Appendix#2. Site Sediment Transport Score (High\Low) 100(Of note this number however includes future house construction on the 6 lots which will not occur simultaneously at the same time as plat infrastructure so this number actually is less). Refer to worksheet attached in Appendix 4 Depth to Ground Water Table (Feet and Inches) Refer to Geotechnical Report prepared (See completed Soils Analysis (Volume 1, Chapter 3.1.1) by Geotest Services (page 5)provided at the end of this report in Appendix#2 Infiltration Rate during Rainy Season (Inch\Per Hour) Restrictive layer at various elevations, thus infiltration not generally for the entire site per Geotechnical Report (page 16) copy provided at the end of this report in Appendix#2 however a small amount of infiltration is available per the Linda Spicher Soils testing(Nov 2020) copy is attached. Two lots(Lot 1 and 6) where the restrictive soils are at approximately 41"and 54"inches deep future roof runoff will be mitigated by roof drain infiltration systems as noted Impervious Surface (on-site) 1.083 Acres 0.1112 Acres Impervious Surface (off-site) None None New and Replaced Hard Surface Total (SF) 1.083-acres of"New"road, home and 0.1112 Acres new driveway areas, 0-acres "Replaced" structures, walkway, and driveway. Lot Coverage (Percentage) 18-35% Based on 2014 DOE Rgmt to 26.4% assume use of hard surface per lot as noted further within this report. BMP (Required Minimum Requirement 5) BMP T5.13 Post Construction Soils, BMP T5.13 Post BMP 5.10B Downspout Dispersion, & Construction Soils, BMP T5.11 and T5.12 Hard Surface BMP 5.10A Dispersion, and Downspout/Roof Downspout Drain infiltration systems on Lots 1 Infiltration and 6 2 Water Quality Method (Minimum Requirement 6) Dead Storage Cell to be provided in Dead Storage Cell to pond bottom be provided in pond bottom and hard surface dispersion over vegetated area. Water Quantity Method (Minimum Requirement 7) Detention Pond with control structure Downspout release to existing ditch Infiltration,Detention Pond with control structure release to existing ditch, and hard surface dispersion over y getated area. Existing Site Conditions Summary: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction Phasing\Sequence) See Post Construction Drainage Report, prepared by Ravnik and Associates, dated 12/21/2020. The subject parcel is approximately 0.3507 acres in size. The project is located northeasterly of Cherry Court, approximately 750 feet south of 41st Street. The property is generally high in the southwest corner, and slopes downhill to the northeast to the low point at the northeast corner of the site. The project area is currently covered with grass and contains no existing buildings. Per the DOE Volume 1-Figure I-2.4.1 Flow Chart for Determining Requirements for New Development, all DOE Minimum Requirements (MR) #1-9 apply to "new impervious surfaces and converted pervious surfaces': Existing short grass/pasture areas within the site will remain grass, with the exception of the areas denoted below, such as the new driveway, walkway to house, and house & shop sites. Grass areas, to remain grass/landscape area. Developed Conditions Summary: Development of this property to construct one new residential structure along with a hard surface driveway, and walkway, for a total impervious area of 4,844 s.f The roof area (4,494 s.f) are to be partially infiltrated on-site. The proposed walkway (118 s.f) will be constructed of pervious pavers. The driveway (808 s.f) runoff will be dispursed northerly over the front vegetated area for a distance of 57 1.f (min. 50 1.f). where it will be meet water quality and quantity requirements. Roof downspout infiltration will be used for Lot 6 per BMP T5.10A within the northerly area of the site. That portion of the runoff that is not infiltrated, will be collected and conveyed to the detention system, per above referenced Post Construction Drainage Report. Drainage Basin (2007 Storm Comp Plan — City website\publicworks\engineering\comprehensive plans): What Drainage Basin are you in?Anacortes Subbasin F-4. Identify any downstream drainage issues (Storm Comp Plan: Noted below If so, describe: 3 Addressed in said drainage report by Ravnik and Associates. Complete the Applicability Requirements — Flow Chart (Figure 1-2.4.1 Attached, and Figure 1-2.5.1 Attached) - Refer to attached highlighted Figure I-2.4.1 and Figure 1-2.5.1 which are applicable to this project 4 Start Here IL Does the site have 35% lies Se-e Redevelopment Minimum ix more of existing Requirements and Flaw C hart impervious coverage? (Figure 1-2.4.2 No Does the project convert e - acres ar=re of vegetation to Cis the project result in lawn ar landscaped areas, or 5,0O0.square feet, or No convert 2_5 acres ar=re of greater, of new plus native vegetation to pasture? replaced hard surface - area? / HO Yes .. _ 4 Cis the project result in 2,0OD � square feet, or greater, of new plus 11 Minimum Requirements it menu replaced hard surface area? apply to the new and replaced , hard surfaces and converted vegetation areas_ v No Does the project have land ' Mi nim u rrti Requirements 1 'y disturbing activities of 7,000 through#g apply to the new II square feet or greater? Tres and repla d hard surfaces and the land disturbed_ No Mini-min Requirement 112 applies_ Illi Figure I- _4_1 Flow Chart for Detemlining Requirements for New Development DEPARTMENT OF RE'rkaed June 2a15 E O L 0 GY 3IE3ae€ae h w_ecy. a.gow Giap igtr+.hrimr Iar copyrkjtit notice Inclixllrrg perrrih,sHms, State of mash Ingtan limitation Di Ila ollfty,and dlsolarner. 0oes the project as.ch3rge 1a Flow Control Exempt Via-.Era der Minimum RequirE'rent lMR)#7)? Ves REQUIRED:Implement the ffllowrlq EEMPs No wham=feastlile: • EMP T5.1.3: Post-Canstruction SDII Dually # No{the and Depth Does the proJecl prate + E MP T5.1SA,E.or C:Downs orrl Full lrlgger only kills R1- triggered Innitrallon.Drxwnspc url Dispersion #5? (Per Figure 3.2 or coy ki R# ) .syslerns,or Pei-Waled b-aut Figure.3..3 In Appendix m, No addftlonal •Cannecdians 1 DT the 2013-20 15 requirements + EMP T5.11 ar T5.12:Oancentrabed Flog WWA Phase II Permit Dispersion or Sheet Flow Dispersion a Phase I Permit:. NOT REQUIRED:Achievement Di the LID No i the project rggEred Perrfarmanoe Standard.Applying the ather Ve only Pons1 - .� EMPs In List R1 rx List#2. IE.the prole i Inside the UGA? Did the prcle(t developer Masse 1a meet 17 No Me LID Periorrnanoe Slandard! Yes v Is the praJect an a parcel v No I. or 5 acres a larger? REQUIRE:::Far each Did the progeel developer ...--41: Vet. surtace, consider he €hoasr+ta meet the LID V EMPs In the eider Performance=ndarti? REQUIRED:Meet the LID !Wed In List#1 Far that Perroananoe Standard through Vie aTsurface. Use 'Pies the USE DIM 9hlPis)In the the first t3MP that Is 2(114 SWMMWWW except TN / ccnEd�Feasible. T e N0 Rain Gardens{the use of Eloreteracn Is acceptable}. NOT REOLiI RED: Achievement Wale LID V tr Ma project curt meet the Perfbrrnance Standard. - REQL I RED: For each LID Performance Standard, It V lir~ surface,ccnWder ttre EMPs must aa-0.a n d be granted an REQUIRED: Meet tie LID P+errorrnance In the cider Isted In List 42 exceptloNes nano*. Standard through the USE oT an 8 M Pis)In TN triangle of surrace. uses the 2D14 NW E1x ept for Rain Gardens the NM EMP that is 'REQUIRED:Apply EMP T5.13 (tire use or iloretention is aoceprlable}. considered feasible. Past-Currstnjcticn SDI Cushy and Depth_ REQUIRED Far Progects TrIMgerincp MR R1-9': NOT REQUIRED: Apply EIMP T5.13 Post Construction Soli Achievement of the LID FEIT REQUIRED:Applying the Quality and Depth. Pena-mance ndard. EMPE In List#1 or U l N2. NOT REQUIRED:Applying the El M?sin List 1 a Llsi 1.72. 'Recommended by Ecalcgy for p-oJe s:rggering MRs R1 -#5. Ill Figure 1-2_5_ 1 Flow Cll3rt for Determining LID MR #5 Requirements DEPARTMENT OF Rewts.ed June 2015 ECOLOGY please see ih l _ y.wa.porilcop tatArni?Far copyrkgrit police Including permisslcna, Slate of Washington mitattan DI Utility.and discdarner. TAB 1 (MINIMUM REQUIREMENT#1) • 1-2.5.1 Minimum Requirement#1 — Prepare a Stormwater Site Plan - 1.3— Preparation of a Stormwater Site Plan - 1.3.1 — Stormwater Site Plans: Step-by-Step Note: The level of detail needed for each step depends upon the project size. Provide a narrative description of each step. 1-3.1.1 Step 1 - Site Analysis: Collect and Analyze Information on Existing Conditions Site analysis shall be submitted as part of the Existing Conditions Summary above. Part of the information in this step should be used to help prepare the Construction Stormwater Pollution Prevention Plan. Purpose of the Site Analysis is to provide for a Low Impact Development site design that is intended to compliment the predeveloped conditions of the site. Existinr Condition of the proposed Lot 6 is that the site is vacant, has been stabilized during the plat construction. The site slopes from southeast to northwest at approximately 4.0%. Lot 6 is bounded to the north by Cherry Lane, to the east by Tract Y, to the south by proposed Lot 5, and to the west by Cherry Court. A geotechnical investigation has been conducted onsite which identified an underlying very dense, brown, slightly gravelly silty sand(weathered glacial till) at 3-4 feet below ground surface which has very limited infiltration capacity at depth. Per the geotechnical report(page 16), "conventional infiltration of stormwater on this site is not feasible': Dispersion methods for runoff from roofs and driveways will be promoted as noted further on within this report. Recently we have had Linda Spicher, a septic designer do more detailed test pits to check the availability of infiltration for roof drains on Lots I and 6. With the installation of a perimeter interceptor trench drain this type of onsite stormwater control to mitigate larger house sizes is feasible when accounting for a very small amount of infiltration in these areas. A underlying infiltration rate of 0.0267 in/hr and 0.0401 in/hr (correlating to 4 gallons/sf/day to 6 gallons/sf/day noted on the information provided by Linda Spicher) has been used. The Geotechnical report for this project indicated a perched groundwater elevation, which will be somewhat alleviated due to the interceptor drainage system put in place along the south and west property lines of the project area. Refer to both the septic testing performed by Linda Spicher and the Geotechnical Report prepared by Geotest for this project located within Appendix 2 at the end of this report. 1-3.1.2 Step 2 - Prepare Preliminary Development Layout Based upon the analysis of existing site conditions, locate the buildings, roads, parking lots, landscaping features, on-site stormwater management BMP's, and preliminary location of stormwater treatment and retention/detention facilities for the proposed development. Refer to the attached Erosion Control Plan and Site Plan Exhibit showing the proposed location of new walkway, driveway, SFR, shop, stormwater piping, infiltration area, dispersion area, detention pond, control structure and outlet piping from the site. 1-3.1.3 Step 3 - Perform Off-site Analysis (at Local Agency's Option): Use additional Sheets, if necessary, Per the City of Anacortes Stormwater Comprehensive Plan runoff from this project is discharged to Ace of Hearts Creek, which conveys runoff northeasterly approximately 0.7- miles, towards 32nd and M Avenue, then easterly approximately 0.5-miles east to "T" Avenue. From 32nd and "T"runoff waters are conveyed north in "T"Avenue another 0.2- 7 miles, before being discharged to Fidallo Bay to the northeast. Refer to the Downstream Exhibit attached with this report. 1-3.1.4 - Determine Applicable Minimum Requirements Per the attached Minimum Requirements for new development Figure 2.4.1. Minimum Requirements #1 through #5 apply to new and converted surfaces proposed with this short plat. Refer to attached highlighted Figure 2.4.1. 1-3.1.5 Step 5 - Prepare a Permanent Stormwater Control Plan See Post Construction Drainage Report,prepared by Ravnik and Associates, dated 12/21/2020. 1-3.1.6 Step 6 - Prepare a Construction Stormwater Pollution Prevention Plan (MR#2 — 13 Elements) Refer to Chapter 11-3— Planning for a detailed description of each element. See also attached Tables 4.1.1 (Source Control BMP's by SWPPP Element) and Table 4.2.1 (Runoff Conveyance and Treatment BMP's by SWPPP Element). See attached 13 Elements of a SWPPP, please complete and attached See attached "CHERRY COURT-Rev 01 -SWPPP-LOT 06"and the Erosion Control Plan and Site Plan, Lot 6, Cherry Court. 1-3.1.7 Step 7 - Complete the stormwater site plan The Stormwater Site Plan encompasses the entire submittal to the Local Agency with drainage review authority. Refer to this section of the Manual for further clarification of each item and what is required. See below: • Project Overview • Existing Conditions Summary • Off-site Analysis Report • Permanent Stormwater Control Plan • Construction Stormwater Pollution Prevention Plan • Special Reports and Studies • Other Permits • Operation and Maintenance Manual • Declaration of Covenant for Privately Maintained Flow Control and Treatment Facilities. (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Declaration of Covenant for Privately Maintained On-site Stormwater BMP's (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Bond Quantities Worksheet, if applicable See the attached Erosion Control Plan and Site Plan, Lot 6, Cherry Court. A Deparment of Ecology NOI/NPDES permit has been issued for this site under#WAR309407 1-3.1.8 Step 8 - Check Compliance with all Applicable Minimum Requirements 8 A Stormwater Site Plan as designed and implemented should specifically fulfill all Minimum Requirements applicable to the project. The Stormwater Site Plan should be reviewed to check that these requirements are satisfied. See attached Erosion Control Plan and Site Plan, Lot 6, Cherry Court. 9 TAB 2 (MINIMUM REQUIREMENT#2) • 1-2.5.2 Minimum Requirement#2 — Construction Stormwater Pollution Prevention Plan (SWPP) - All projects are required to complete Minimum Requirement 2. - Refer to the 13 Elements of the SWPP (See document below, complete and attach) - See attached Table 4.1.1, Table 4.2.1 and Table - Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. See attached "CHERRY COURT-Rev 01 -SWPPP-LOT 06"and the Erosion Control Plan and Site Plan, Lot 6, Cherry Court. 10 Table 4.1.1 Source Control BMP's by SWPPP Element Element#1 Element#2 Element#13 Element#5 Element#6 Element#9 Element#11 Element#12 BMP or Element Name Preserve Establish Stabilize Protect Control Maintain Manage the Protect Low VegetatlonfMark Construction Soils Slopes Pollutants BM Ps Project Impact Clearing Limits Access Development BMP'C101: Preserving Natural Vegetation ✓ BMP C102:Buffer Zones V � BMP C103:High Visibility Plastic or Metal ✓ Fence BMP C105: Stabilized Construction Entrance!Exit BMP C106: Wheel Wash J BMP C101: Construction Road/Parking Area Stabilization BMP C120:Temporary and Permanent � V Seeding BMPC121: Mulching � V BMP'C122: Nets and Blankets .I V BMP C123: Plastic Covering ✓ BMP C124: Sodding � BMPC125: Topsoiling/Composting V BMP C126: Polyacrylarride for Soil Erosion Protection BMPC130: Surface Roughening V V BMPC131: Gradient Terraces V V BMP C140: Dust Control � BMPC150: Materials On Hand � J BMP C151: Concrete Handling � BMP C152: Sawcutting and Surfacing ✓ Pollution Prevention BMP C153: Material Delivery,Storage and J Containment BMP C154: Concrete Washout Area J BMP C160: Certified Erosion and Sediment Control Lead BMP C162:Scheduling J 11 Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element . 1 Elainrantle4 EA Eleer'acit ge Element frl nmani El Pk Elormit M7 Element KI Elerrnnk 1a MAP or EIq aaarrthlwor • 0olairol'' t ll Prot I Phrto t 5leblfl�s • Oorytrol Control Do. Praieek low Flow Patin $edprtont Slopes drain Watt {`hanrrara Pollutants klh9tethp IrrQact Ciarillrolit brad Oudels ]4Yeluprrren! gl•UP Cade Irakh elut.a Dike arm&falls d , !MAP C24t_ GrmA Aip.d C hamiels I BAIP CZAR,Channel Litton i !IMP CHOCK: NI' for Bars NI vi • BMP CZINI: Pipe Slope Unarm V I — 8MP C2Od: Sobatrraao brains - i — • BMP ZU : LONe4 9pre:BAer / liMp CM': Chock Dams • 4' I 5F EMP c2ae: Trial gulir MUM c{ootexii14 • Errcaaed ChetirOam) BMP CM: Dudek Prokulion • 6MP 17: 91orrn brain InIot Proteellorr / ' BMP l 231: Brush Barrier I , 1 . • BMP CE.9 : L rhorel Filter Berm ' BhOPG sgt Perim . if I BMP C2347 Vegrialed Strip ve V . 2MP C2 1: 111:-.11tIos I we r r . BMP.089I1 VoglletIve Filtration — i I-. __ . I � - 1 ere C tt SGement Trap i if • BMP C211: Terrryarary St nerrt RIM I ve I 'BMP C2a"_ {`.on'1#tiadriii Skyrrreisier i we I I6MR C251:ConalnicUon 6t,;..rp.:mr ---� Flllrallorr I BAeP CZb 1-iigl1 p11 Neulralleation 1hIrip i IMP CM:pH Control i4r High PH Vitrbir V I 12 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name Property Owner:Ronald Bayek /Project Owner:LG Anacortes, LLC Contact:Anna Nelson Site Address: 4305 Cherry Court,Anacortes, WA (P32077) Prepared By: LG Anacortes, LLC The Stormwater checklist or building permit determined that: ❑ The 13 elements must be addressed These elements must be addressed for construction activity adding under for construction activity adding 2,000 2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, provide the BMP's that will be applicable to your project. Use the attached Tables provided. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits ,IS Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. $5 Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. The clearing limits will be marked by using either BMP C233:Silt Fence, or BMP C103:High Visibility Plastic or Metal Fence, as shown on the Erosion Control Plan. C233 is to be used along the north, west, and east property lines. BMP C103 to be installed along the south property line. Preservation of the native top soil will be preserved as much as is practical by use of a stock pile as shown on the Erosion Control Plan. Stock pile location may vary. Stock pile shall be protected as indicated on the Erosion Control Plan. ELEMENT 2: Establish Construction Access it Limit construction vehicle access and exit to one route, if possible. at Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. ❑ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. IS If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or 13 pick up and transport the sediment to a controlled sediment disposal area. * Conduct street washing only after sediment is removed in accordance with the above bullet. * Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. BMP C105 shall be used as the construction access. Only one access point is proposed. No wheel wash is proposed. Any track out shall be cleaned daily by shoveling and/or sweeping. More frequent cleaning as necessary. ELEMENT 3: Control Flow Rates alle Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. # Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement (e.g. impervious surfaces). * If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. No flow rate controls are designed for the individual lot. However, a detention pond and wet pond were constructed with a flow control structure outlet. Erosion control BMPs described in ELEMENT 4, below will reduce velocity of flows. Down stream, the existing detentionj2ond shall be used to detain developed runoff and provide time for sediment to be filtered out prior to being discharged from the site. ELEMENT 4: Install Sediment Controls 1* Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. * Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BMPs shall be functional before other land disturbing activities take place. $ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. $ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element#3, bullet#1. $ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. 1* Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. * Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. C233:Silt Fence To be place along the perimeter of the site to protect downstream properties from the transport of coarse sediment, as well as to mark the clearing limits for the construction crew and to alert the public as to the potential dangers of the ongoing onsite construction activity. 14 C105:Stabilized Construction Entrance To be place in the location of the future driveway to provide a stable and clean point of access for construction vehicles. C121:Mulching To provide immediate temporary protection of exposed soil from erosion, as well as conserving moisture. C123:Plastic Covering Primarily used to protect the stock pile from erosion. May be used as a short term cover of small areas of exposed soil. Not intended for large areas. C140: Dust Control The primary source of dust control will be by spraying of the disturbed area with water. C220:Storm Drain Inlet Protection Onsite inlet protection will use Block& Gravel Curb Inlet Protection. Offsite inlet protection will use Catch Basin Filters manufactured for use at construction sites. C207: Check Dams Where drainage swale are created to convey stormwater, temporary gravel check dams may be used to reduce velocity and to dissipate flow energy. The following BMP improvement(s) are proposed for permanent sediment controls: C124: Sodding Sodding is to establish permanent turf for immediate erosion protection. C125: Top Soiling Provides a suitable growth medium for final site stabilization with vegetation. Down stream, the existing detention pond shall be used to detain developed runoff and provide time for sediment to be filtered out prior to being discharged from the site. ELEMENT 5: Stabilize Soils $ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early application of gravel base early on areas to be paved, and dust control. 14 Control stormwater volume and velocity within the site to minimize soil erosion. * Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. $ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 — Sept 30): 7 days o During the wet season (Oct 1 —Apr 30): 2 days * Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. St Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. * Minimize the amount of soil exposed during construction activity. ❑ Minimize the disturbance of steep slopes. (NA) N Minimize soil compaction and, unless infeasible, preserve topsoil. The following are temporary soil stabilization BMPs: C233:Silt Fence To be place along the perimeter of the site to protect downstream properties from the transport of coarse sediment, as well as to mark the clearing limits for the construction crew and to alert the public as to the potential dangers of the ongoing onsite construction activity. C105:Stabilized Construction Entrance To be place in the location of the future driveway on Latitude Circle, toprovide a stable and clean point of access for construction vehicles. 15 C121:Mulching To provide immediate temporary protection of exposed soil from erosion, as well as conserving moisture. C123:Plastic Covering Primarily used to protect the stock pile from erosion. May be used as a short term cover of small areas of exposed soil. Not intended for large areas. C140:Dust Control The primary source of dust control will be controlled spraying of the disturbed area with water. C220:Storm Drain Inlet Protection Onsite inlet protection will use Block& Gravel Curb Inlet Protection. Offsite inlet protection will use Catch Basin Filters manufactured for use at construction sites. C207: Check Dams Where drainage swale are created to convey stormwater, temporary gravel check dams may be used to reduce velocity and to dissipate flow energy. The following are permanent soil stabilization BMPs: C124:Sodding Establishes permanent turf for immediate erosion protection. C125: Top Soiling Provides a suitable growth medium for final site stabilization with vegetation. T5.13:Post-Construction Soil Quality and Depth Establishes soil quality and depth regains greater stormwater functions in the post development landscape, provides increased treatment of pollutants and sediments that resultfrom development and habitation. ELEMENT 6: Protect Slopes $ Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). N Divert off-site stormwater (run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. N At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as "landscaped" area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. $ Place excavated material on the uphill side of trenches, consistent with safety and space considerations. N Place check dams at regular intervals within constructed channels that are cut down a slope. N Consider soil types and its potential for erosion. $ Stabilize soils on slopes, as specified in Element 5. $ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. C235:Straw Wattles Straw Wattles reduce the velocity and can spread the flow of rill and sheet runoff, and can capture and retain sediment. 16 ELEMENT 7: Protect Drain Inlets * Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. $ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). $ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. $ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. * Inlets should be inspected weekly at a minimum and daily during storm events. C220:Storm Drain Inlet Protection Onsite inlet protection will use Block& Gravel Curb Inlet Protection. Offsite inletprotection will use Catch Basin Filters manufacturedfor use at construction sites. ELEMENT 8: Stabilize Channels and Outlets $ Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. * Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. $ The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. C207: Check Dams Where drainage swale are created to convey stormwater, temporarj jravel check dams may be used to reduce velocity and to dissipate flow energy. ELEMENT 9: Control Pollutants $ Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. Q Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site 7* in a manner that does not cause contamination of stormwater. 1* Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double-walled tanks do not require additional secondary containment. * Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. ❑ Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. $ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and 17 procedures. ❑ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. N Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. N Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. N Woody debris may be chopped and spread on site. N Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. $ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle. All fuel, lubricants,paint, and/or other hazardous material shall be stored in a lockable, covered storage container if kept on site. Note: The contractor is required to have a spill prevention kit on site at all times. ELEMENT 10: Control De-Watering Not Applicable, no dewaterinj'is anticipated ❑ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. ❑ Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that "surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. ❑ Handle highly turbid or contaminated dewatering water separately from stormwater. ❑ Other treatment or disposal options may include: 1. Infiltration 2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology-approved on-site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ❑ Discharging sediment-laden (muddy) water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration and preserving vegetation. ELEMENT 11: Maintain BMPs 18 II Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. N Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. N Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. N Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. A trained Certified Erosion and Sedimentation Control Lead(CESCL) will be on the job site. CESCL personnel are trained in and responsible for the proper maintenance of the erosion control BMPs. The CESCL will work with the City of Anacortes Inspector to maintain all BMPs. ELEMENT 12: Manage the Project— Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL)for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on-site or on-call at all times. NI Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. N Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued performance of their intended function. N Maintain, update, and implement the SWPPP. N Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). N From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. N The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. The project contractor will prepare a SWPPP that will expand on the site's erosion controls as required. The SWPPP and CESL will assure site is manaj'ed properly Note: The project is required to have a CESCL and will need to maintain a project SWPPP for the duration of construction 19 ELEMENT 13: Protect Low Impact Development BMPS If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the Manual for requirements. BMP T510B Downspout Dispersion and to be implemented on this site. Compaction of soil in dispersion areas to be avoided. Steven Baughn 01/20/2021 Applicant Signature Date TAB 3 (MINIMUM REQUIREMENT#3) • 1-2.5.3 Minimum Requirement#3 —Source Control of Pollution All known, available and reasonable source control BMP's must be applied to all projects. Source control BMP's must be selected, designed, maintained according to the reference Ecology Manual. The intent of source control BMP's is to prevent stormwater from coming in contact with pollutants. They are a cost-effective means of reducing pollutants in stormwater, and, therefore, should be considered in all projects. There is no source control pollution anticipated within this Residential Subdivision and thus this Minimum Requirement is not necessary 20 TAB 4 (MINIMUM REQUIREMENT#4) • Minimum Requirement#4— Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained and discharges from the project shall occur at the natural location, to maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. All outfalls require energy dissipation. The objective is to preserve and utilize drainage systems to the fullest extent because of the multiple stormwater benefits these systems provide; and to prevent erosion at the downstream of the discharge location. Refer to the reference manual for supplemental guidelines and additional information under this section. Will this project disturb the Natural Drainage System or Outfall of the project Site? Yes\No. If yes, refer to section 1.2.5.4 for Supplemental Guidelines for additional information. No. This project will not disturb the natural drainage system or outfall from the project site. Runoff will be detained prior to being released via a control structure at the site's northeast corner, as occurs today. 21 TAB 5 (MINIMUM REQUIREMENT#5) • Minimum Requirement#5 — On-site Stormwater Management This project triggers Minimum Requirements #1 throuih #5, and is on a parcel located within the City limits, this project has the choice to either utilize the On-site Stormwater Management BMP's from List#2 for each type of surface noted on the list; or, can demonstrate compliance with the LID Performance Standard. This project will use List#2 to meet the requirements of On-site Stormwater Management as specified below. Is this project Flow Control Exempt? No (Yes\No) (See Appendix I-E: Flow Control-Exempt Surface Water). If yes, provide reasoning from the applicability section of 1-2.5.7 Minimum Requirement#7: Flow Control). If No, then the project triggers Minimum Requirement#7 (1-2.5.7) and possibly Minimum Requirement#8 (1-2.5.8). Projects triggering Minimum Requirements 1 through 9, must meet the requirements in 1-2.5.5 Minimum Requirement 5—On-site Stormwater Management. To meet the requirements of MR #5 for this project, each surface on List#2, as listed below, will be reviewed and BMP's will be considered in the order listed for that type of surface. The first BMP for the surface that is considered feasible shall be implemented. Lawn and Landscaped Area: • BMP T5.13: Post-Construction Soil Quality and Depth. (Refer to DOE Figure V-5.3.3) Refer to this site for requirements and specifications. All projects are required to utilize this BMP. http://www.soilsforsalmon.orq/pdf/Soil BMP Manual.pdf See Appendix 3 for the "Model Soil Management Plan for BMP T5.13" to be submitted with Drainage Report and Application Material. An alternate document acceptable to the City of Anacortes is a Test Report provided by the Soils Supplier that identifies the soils to be used meet the specifications outlined under Minimum Requirement 5. The specifications are in both WSDOT and CSI Formats. For specifications, refer to the above referenced PDF. This submittal can be a deferred submittal since most projects are not sure who the supplier will be at the time of building permit application. Since this project triggerings Minimum Requirements 1 through 9, the Test Report will be provided to the Engineering Department. This submittal will be deferred since this project is not sure who the supplier will be at this time. 22 List #2 — Project Triggering Minimum Requirement 1 through 9 For each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On-site Stormwater Management BMP is necessary for that surface. Provide feasible detail under each BMP with maintenance and operations specifications in Minimum Requirement 5. Roofs: 1. BMP T5.30: Full Dispersion Feasible\Infeasible If infeasible, explain the criteria: Full Dispersion, BMP T5.30, is not feasible as the site is not retaining at least 65% of its natural forested or native condition. Or, T5.10A: Downspout Full Infiltration Feasible\Infeasible If infeasible, explain the criteria: Full Infiltration, BMP T5.10A, due to the low infiltration rate in the underlying soils this BMP is not required, however will be incorporated into the design for the individual lot development to infiltrate roof water from new houses on Lots 1 and Lot 6 as noted further on in this report as noted. 2. BMP T7.30: Biorention Cells, Swales and Planter Boxes Feasible\Infeasible If infeasible, explain the criteria: Bioretention is not feasible as the site's underlying soils have an infiltration rate less than 0.3 inches per hour. 3. BMP T5.10B: Downspout Dispersion Systems Feasible\Infeasible If infeasible, explain the criteria: Dispersion is being proposed for roof runoff with the exception of Lot I and Lot 6. Lot 1 and 6 will utilize the partial infiltration as mentioned above. 4. BMP T5.10C: Perforated Stub-out Connections Feasible\Infeasible If infeasible, explain the criteria: Not applicable since Downspout Dispersion Systems are proposed Other Hard Surfaces: List#2 1. BMP T.5.30 Full Dispersion Feasible\Infeasible If infeasible, explain the criteria: Full Dispersion, BMP T5.30, is not feasible as the site is not retaining at least 65% of its natural forested or native condition. 2. BMP T5.15: Permeable Pavements Feasible\Infeasible If infeasible, explain the criteria: 23 Permeable Pavement is not feasible per the 2014 DOE Manual as the site's infiltration capacity is less than 0.30 inches per hour, however this BMP can be incorporated using the low infiltration rates available if upon site development it is deemed necessary. 3. BMP T7.30: Biorention Cells, Swales and Planter Boxes Feasible\Infeasible If infeasible, explain the criteria: Just as for Permeable Pavement, Bioretention is infeasible per the 2014 DOE Manual as the underlying soils within the site has a lack of infiltration capacity (less than 0.30 inches per hour). 4. BMP T5.12: Sheet Flow Dispersion Feasible\Infeasible If infeasible, explain the criteria: Sheet Flow Dispersion BMP T5.12 will be used to disperse driveway runoff for Lot 6 along with the disperse sidewalk areas. Lots 1 and 6 will have a sufficient room to provide a 50-foot dispersion area for driveways. Or, BMP T5.11: Concentrated Flow Dispersion Feasible\Infeasible If infeasible, explain the criteria: Lot 6 will not implement Concentrated Flow Dispersion per BMP T5.11. Steven Baughn 01/20/2021 Applicant Signature Date 24 DEFERRED SUBMITTAL: PROVIDE A TEST REPORT FROM SOILS SUPPLIER TO THE ENGINEERING DEPT. PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age# of pages Complete all information on page 1;only site address and permit number on additional pages. Site Address/Lot No.: Permit Type: Permit Number: Permit Holder: Phone: Mailing Address: Contact Person: Phone: Plan Prepared By: ATTACHMENTS REQUIRED(Check off required items that are attached to this plan) Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required) New planting beds and turf areas(amendment required) Type of soil improvement proposed for each area Soil test results(required if proposing custom amendment rates) Product test results for proposed amendments AREA# (should match Area#on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: square feet SCARIFICATION inches(depth)of scarification needed to achieve finished total 12"loosened depth. Subsoil will be scarified PRE-APPROVED inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Topsoil import =cu.yards per 1,000 sq.ft. Amend with compost X ,000s sq.ft. in this area Stockpile and amend =cubic yards of amendment —>—>—>—> QUANTITY: CU.YDS. ( cu.yds. stockpiled) (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil&compost lift X 31 Amend =cu.yards/ 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu.yds. stockpiled) =cubic yards of amendment —*—*—*—*—* QUANTITY: CU.YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) =cubic yards of mulch —*—*—*—*—*—* QUANTITY: CU.YDS. TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only, totaling all areas/pages in this Plan) ❑ Product#1: ❑ Quantity: cu.yds. ❑ Test Results: % organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) ❑ Product#2: ❑ Quantity: cu.yds. ❑ Test Results: % organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) ❑ Product#3: ❑ Quantity: cu.yds. ❑ Test Results: % organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) Date: Inspector: Approved: Revisions Required: 25 Date: Inspector: Approved: Revisions Required: APPENDIX 4— Determining Construction Site Sediment Damage Potential (Appendix 7 — NPDES Phase II Permit) See attached Construction Site Sediment Transport Potential Worksheet as required for this project. ii. 26 111. iv. APPENDIX 7 — Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site-specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. v. STEP 1 —Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near-shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater) associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. Ace of Hearts Creek located approximately 125 feet easterly of the area of the site proposed for development and is noted as a "Fish Bearing"per the Department of Natural Resources FPARS Mapping. Furthermore, the slopes along the edge of Ace of Hearts Creek are slightly steeper than 25% in some locations. vi. STEP 2 — Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel or ditch. August 1, 2013, Modified January 16, 2015 Appendix 7- Determining Sediment Damage Potential Page 1 of 3 27 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: vii. Sheet flow through a vegetated area with dense ground cover viii. Flow through a wetland not included as a sensitive feature ix. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. Discharj'e from the sites proposed detention pond will be be released to an existinj'shallow ditch located along the south side of Orchard Avenue, which conveys runoff easterly to Ace of Hearts Creek as occurs today. x. STEP 3 — Construction Site Sediment Transport Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low ❑100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoff. Refer to the attached worksheet prepared for this project notinj a score of 100 for this site, however this includes the development of all 6-future home sites, which will all not occur concurrently with plat infrastructure construction. Not accounting for home development reduces the total score below the threshold transport rating to "Low". Construction Site Sediment Transport Potential Worksheet A. Existing slope of site (average, weighted by aerial extent): Points 2% or less ...0 >2-5% 5 >5-10% 15 >10-15% 30 >15% 50 B. Site Area to be cleared and/or graded: <5,000 sq. ft 0 5,000 sq. ft. — 1 acre 30 >1 acres* 50 *Now that the plat infrastructure is complete, only future home site construction occur, thus generally less than 1-acre of area will be cleared and/or graded at one time. With this in mind this could be represented as 30 points rather than 50 points as noted here. C. Quantity of cut and/or fill on site: <500 cubic yards 0 500— 5,000 cubic yards 5 >5,000— 10,000 cubic yards 10 >10,000— 20,000 cubic yards 25 >20,000 cubic yards 40 D. Runoff potential of predominant soils (Natural Resources Conservation Service): Hydrologic soil group A 0 Hydrologic soil group B 10 Hydrologic soil group C 20 Hydrologic soil group D 40 E. Erosion Potential of predominant soils (Unified Classification System): GW, GP, SW, SP soils 0 Dual classifications (GW-GM, GP-GM, GW-GC, GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) 10 GM, GC, SM, SC soils 20 ML, CL, MH, CH soils 40 F. Surface or Groundwater entering site identified and intercepted1: Yes 0 No 25 G. Depth of cut or height of fill >10 feet: Yes 25 No 0 H. Clearing and grading will occur in the wet season (October 1 — May 1): Yes 50 No 0 TOTAL POINTS 80 *This now only includes future home site construction, thus generally less than 1- acre of area will be cleared and/or graded at one time. APPENDIX 5 — Site Plan with all applicable information (Minimum Size 11x17 at a legible scale) See attached Civil Plans APPENDIX 6 — Documented Site Photos (Show all directions of the site, including frontage) . r. 3`` r r ' as • Location: View from Orchard Avenue lookink southwest Description of the photo:Subject property looking southwest Photo taken by:HLN r a F x. � .. - ''�a - Hs, .} '.,r.,y. ,ti. rS" '"-- ""' ' v to r �4" '."h'-' aV•N;!'T-.#• +i rh.,<'. T " :..X Location: View from private roadway along south side of site Description of the photo:Subject roperty looking northwest Photo taken by:HLN e vi �I �` f . ,. _ .., Location: View from Orchard Avenue Description of the photo:Subject property lookinj southeast along west property line Photo taken by:HLN r- I,1 g • f f f. n0. h.' � ', ;i, 1., 4 Location: View along north side of Orchard Avenue Description of the photo:Existinj ditch outlet at subject property's northeast corner lookinj east Photo taken by:HLN AulAsaga raj Location: View along north side of Orchard Avenue Description of the photo: From subject property's northeast corner looking west Photo taken by:HLN Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information Plat of Cherry Court, Lot#6 Jack E. Reinstra 4305 Cherry Court 360-755-9021, Ext. #15 Anacortes, WA 98221 jackr@landedgentry.com This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed. In addition, based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative � --"--i-4441-tl Date January 20, 2021 All Climate Zones R-Valuea U-Factora Fenestration U-Factorb n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGCh.e n/a n/a Ceilingk 49J 0.026 Wood Frame Wall9.m" 21 int 0.056 Mass Wall R-Value' 21/21h 0.056 Floor 309 0.029 Below Grade Wall'' 10/15/21 int+TB 0.042 Slabd R-Value& Depth 10, 2 ft I n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1. Small Dwelling Unit: 1.5 credits ❑ Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. 02. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in#1 or#3. Exception: Dwelling units serving R-2 occupancies shall require 2.5 credits. ❑3. Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. 24. Additions less than 500 square feet: .5 credits Table R406.2 Summary Option Description Credit(s) la Efficient Building Envelope la 0.5 0 0.5 1 b Efficient Building Envelope lb 1.0 ❑ lc Efficient Building Envelope lc 2.0 ❑ ld Efficient Building Envelope ld 0.5 ❑ 2a Air Leakage Control and Efficient Ventilation 2a 0.5 0 2b Air Leakage Control and Efficient Ventilation 2b 1.0 0 2c Air Leakage Control and Efficient Ventilation 2c 1.5 0 3a High Efficiency HVAC 3a 1.0 0 1.0 3b High Efficiency HVAC 3b 1.0 0 3c High Efficiency HVAC 3c 1.5 0 3d High Efficiency HVAC 3d 1.0 0 4 High Efficiency HVAC Distribution System 1.0 0 5a Efficient Water Heating 5a 0.5 0 0.5 5b Efficient Water Heating 5b 1.0 0 5c Efficient Water Heating 5c 1.5 0 1.5 5d Efficient Water Heating 5d 0.5 ❑ _ 6 Renewable Electric Energy 0.5 *1200 kwh 0.0 Total Credits 3.50 *Please refer to Table R406.2 for complete option descriptions Table R402.1.1 Footnotes For SI: 1 foot .= 304.8 mm, ci .= continuous insulation, int .= intermediate framing. a R-values are minimums. U-factors and SHGC are maximums. When insulation is installed in a cavity which is less than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table. The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement wall. a R-10 continuous insulation is required under heated slab on grade floors. See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. Reserved. g Reserved. " Reserved. 'The second R-value applies when more than half the insulation is on the interior of the mass wall. Reserved. k For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38. Reserved. `"Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. Table R402.1.3 Footnote a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2015 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, some values will be calculated for you.If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at(360)956-2042 for assistance. Project Information Contact Information 4309 Cherry Court Jack Reinstra Anacortes,WA 98221 360-755-9021,Ext.15 Plat of Cherry Court,Lot#6 jackr@landedgentry.com Heating System Type: 0411 Other Systems °Beat Pump To see detailed instructions for each section,place your cursor on the word"Instructions". Design Temperature Instructions Design Temperature Difference(AT) 46 Anacortes w dT=Indoor(70 degrees)-Outdoor Design Temp Area of Building Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) 2,838 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 25,542 Glazing and Doors U-Factor X Area = UA Instructions u-oz8 .1 0.280 406 113.68 • Skylights U-Factor X Area = UA Instructions 0.50 Insulation Attic U-Factor X Area = UA Instructions R-49 v 0.026 1,686 43.84 61 Single Rafter or Joist Vaulted Ceilings U-Factor X Area UA Instructions R-38 Vented 0.027 1,152 31.10 Above Grade Walls(see Figure 1) U-Factor X Area UA Instructions Lntermedate 0.056 1,844 103.26 411 Floors U-Factor X Area UA Instructions R-38 0.025 2,838 70.95 Below Grade Walls(see Figure 1) U-Factor X Area UA Instructions Select R-value v No144 selection --- Slab Below Grade(see Figure 1) F-Factor X Length UA Instructions Select conditioning v No selection --- Slab on Grade(see Figure 1) F-Factor X Length UA Instructions Select R-Value V No selection --- Location of Ducts Instructions Duct Leakage Coefficient iud0nIce V 1.10 Sum of UA 362.83 Envelope Heat Load 16,690 Btu/Hour Figure 1. Sum of UAX AT Air Leakage Heat Load 12,689 Btu/Hour VolumeX 0.6 X ATX.018 Above Grade Building Design Heat Load 29,380 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 32,318 Btu/Hour Ducts in unconditioned space:Sum of Building Heat Loss X 1.10 Ducts in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 45,245 Btu/Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heat Pump (07/01/13) Window, Skylight and Door Schedule Project Information Contact Information Plat of Cherry Court, Lot#6 Jack E. Reinstra 4305 Cherry Court 360-755-9021, Ext. 15 Anacortes, WA 98221 jackr@landedgentry.com Width Height Ref. U-factor Qt. Feet Inch Feet Inch Area UA Exempt Swinging Door (24 sq. ft. max.) WSEC 0.20 1 3 ° 6 10 20.5 4.10 Exempt Glazed Fenestration (15 sq. ft. max.) 0.0 0.00 Vertical Fenestration (Windows and doors) Component Width Height Description Ref. U-factor Qt. Feet Inch Feet Inch Area UA Entry Door WSEC 0.20 1 3 ° 6 10 20.5 4.10 Bedroom #3 WSEC 0.28 2 3 ° 5 ° 30.0 8.40 Entry Window WSEC 0.28 2 1 ° 6 6 13.0 3.64 Master Bedroom WSEC 0.28 2 3 ° 5 ° 30.0 8.40 Bedroom #2 WSEC 0.28 1 5 ° 5 ° 25.0 7.00 Living WSEC 0.28 3 3 ° 6 ° 54.0 15.12 Dining SGD MFR 0.20 1 9 0 6 10 ' 61.5 12.30 Kitchen WSEC 0.28 1 5 ° 4 6 22.5 6.30 Parlor WSEC 0.28 2 3 ° 6 ° 36.0 10.08 Bedroom #4/Study WSEC0.28 2 3 ° 6 ° 36.0 0.00 Master Bath WSEC 0.28 1 2 ° 3 ° 6.0 1.68 Master Bath WSEC 0.28 1 2 ° 4 6 9.0 2.52 Bedroom #3 WSEC 0.28 3 2 ° 2 ° 12.0 3.36 Dining Transom WSEC 0.28 1 9 ° 0 10 7.5 2.10 Master Bath WSEC 0.28 1 5 ° 4 6 22.5 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 _ 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 _ 0.0 0.00 0.0 0.00 Sum of Vertical Fenestration Area and UA 385.5 85.00 Vertical Fenestration Area Weighted U= UA/Area 0.22 Overhead Glazing (Skylights) Component Width Height Description Ref. U-factor Qt. Feet Inch Feet Inch Area UA 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 Sum of Overhead Glazing Area and UA 0.0 0.00 Overhead Glazing Area Weighted U= UA/Area 0.00 Total Sum of Fenestration Area and UA (for heating system sizing ca►cu►ations) 406.0 89.10 Hydrant Flow Test Report Test Date 12/18/2020 Test Time 9:00 AM Location Tested by 4301 Cherry Lane Mark Taitano Anacortes, WA 98221 Commercial Fire Protection, Inc. 17199 Bennett Rd Mount Vernon, WA 98273 (360)848-9093 Notes Read Hydrant New hydrant in cul-de-sac 37 psi static pressure 18 psi residual pressure hydrant elevation Flow Hydrant(s) Pitot Outlet Elev Size C Pressure Flow #1 3.5 0.93 12 1178 gpm Flow Graph 50 1109.3 gpm at 20 psi 40 30 psi = 20 10 0 500 1000 1500 2000 2500 gpm Created with the free hydrant flow test program from www.igneusinc.corn 4301 Cherry Lane,Anacortes,WA 98221 ! Ilrit ill 1 lippL.. 4301 Cherry Ln, Anacortes,WA 98221 mu .. _. 1 New Hydrant 4• Q Static:37 psi ' m pi J eD Residual 18 psi Flow:1178 gpm - Calculated flow at 20 psi:1109 gpm w if!ti I RNA � • v 11 y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT . '1'1' Mailing Address: P.O. Box 547, Anacortes, WA 98221 i Office Location:904 6th Street,Anacortes WA 98821 \'17111111 Phone: (360)293-1901 <co4 Residential Building Permit Application Submittal Packet New Single Family Residences (SFR) Duplexes Additions and Remodels (SFR & Duplex) Accessory Dwelling Units Manufactured Homes Residential decks and retaining walls SUBMITTAL CHECKLIST Residential Building Permit 0 ° N o L -5 = o 3 _ Submittal Requirement Checklist c . ; i o u Y N _a o — O c 3 w t's .0 U Qv See pages 2-3 of this handout for information about each 3 v u w E C )_ Q U submittal item listed below. Z Q 0 ix 2 = H 2 O Residential Building Permit Application Form X X X X X (FORM BP-1—attached) Structure &Site Information Form X X X X X V (FORM BP-2—attached) Mechanical & Plumbing Fixtures Form X X X V (FORM BP-3—attached) Architectural Plans X X X X X V (requirements listed on FORM BP-4-attached) Stormwater Management Minimum Requirements vDetermination X X X X (FORM BP-5,attached) - / Stormwater Site Plan X X _ X X Site Plan & Landscape Plans X X X X X (requirements listed on Form BP-6) Structural Plans &Calculations X X X X X Energy Code Plans& Forms X X Manufacturer's Specifications/Cut Sheets X Copy of recorded survey X X X X Technical Reports X X X X Other Required Permits X X X X X ADU Affidavit of Owner Occupancy (signed) X Required Number of Copies and Plan Size Fees 2 paper copies of each item above • Plan review deposit is taken at time of Plans must be minimum 11" x 17",to scale, and legible application submittal. 1 reduced size copy(maximum size 11" X 17") of the Site • Permit fees are paid prior to building Plan, Floor Plan and complete Building Plans permit issuance. Page 1 of 18 Res.Building Permit Application Submittal Checklist Updated October 10,2019 C4 y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 v Phone: (360)293-1901 REQUIRED SUBMITTAL INFORMATION Additional details on certain submittal items is provided below to ensure Applicants are fully aware what City staff will be looking for when an application is submitted to the City. FORMS AND PLANS • FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION FORM. Provides key information about your project, including type of permit you are applying for, and property owner, contractor, and contact information. • FORM BP-2: STRUCTURE AND SITE INFORMATION FORM. Provides key information about the proposed structure, including height, floor areas, fire protection proposed, and asks questions about site characteristics that are used to determine whether your project requires any other information or additional permit applications to be submitted. • FORM BP-3: PLUMBING AND MECHANICAL INFORMATION. Form BP-3 provides space for you to fill in fixture information for plumbing and mechanical appliances and equipment that are included as part of your project. • FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS. Form BP-4 contains a list of all the items required to be shown on Architectural Plans. • FORM BP-5: STORMWATER MANAGEMENT DETERMINATION FORM. Most development within the City of Anacortes that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater review. Stormwater review requirements are based on either the amount of soil to be disturbed (grading,vegetation removal), or the amount of hard surface that is created or replaced on a site (building footprint, concrete, asphalt or gravel parking, sidewalk, etc.). Form BP-5 assists you in determining the level of stormwater review (applicable Minimum Requirements) required for your project. • STORMWATER SITE PLAN. The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate your project for compliance with stormwater requirements. The level of stormwater review and contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. Use Form BP-5 to determine the level of stormwater review and then complete the applicable Stormwater Minimum Requirements Form on the Public Works- Engineering Department Forms website and provide required submittal items/plans. • FORM BP-6: SITE PLANS& LANDSCAPE PLANS. Form BP-6 contains a list of all the items required to be shown on Site and Landscape Plans. • STRUCTURAL PLANS: Plans prepared and stamped by a State of Washington licensed professional structural engineer drawn at a scale approved by the Building Official clearly indicating the information required by the "Permits" section of the currently adopted International Building Code and Chapter 19.27 RCW (State Building Code Act, Statewide amendments), and City submittal forms including: structural members labeled as to size and spacing as well as bracing, blocking, bridging, special connectors, and anchor bolts; cross-section details, as needed,to show typical foundation,floor,wall, ceiling and roof construction; insulation of walls,floors and roof/ceiling; and details of stairs,fireplaces and special construction, if any. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 2 of 18 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT — Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; � w� Phone: (360)293-1901 • STRUCTURAL CALCULATIONS: An analysis of loads, materials, etc., prepared and stamped by a State of Washington licensed professional structural engineer. • ENERGY CODE FORMS: The standard Washington State Energy Office form requesting the information required under Chapter 51-11 WAC detailing building components used to comply with the State Residential or Nonresidential Energy Code, as applicable. • MANUFACTURER'S SPECIFICATIONS/CUT SHEETS: A document that summarized the performance and other technical characteristics of a product, machine, component, material, or subsystem (e.g., a power supply) in sufficient detail that allows the City to determine the product will be incompliance with applicable codes. • COPY OF RECORDED SURVEY. A survey of your property is needed so that conformance with minimum setback requirements and other development standards can been confirmed and verified on site by the inspectors. Property markers must be visible on your property. If they are not at the time an inspection is requested, you may need to have a new survey completed. OTHER SUBMITTALS DETERMINED ON A CASE-BY-CASE BASIS TECHNICAL REPORTS Following is a list of technical reports that will be required to be submitted to the City when certain circumstances exist on or near a site an Applicant is planning on making improvements to. The general triggers for each of the listed technical reports I provided below: A. CRITICAL AREAS REPORTS: In general, Critical Area reports are required when wetlands and/or streams are located on or near a site. Critical area mitigation plans may also be required, depending on the project proposal. See Anacortes Municipal Code Ch. 17.70 for additional information. B. GEOTECHNICAL REPORT: In general, Geotechnical Reports are required when work is proposed on or near slopes in excess of 15%and/or known landslide hazard areas. See Anacortes Municipal Code Ch. 17.70 for additional information. OTHER PERMITS DETERMINED ON A CASE-BY-CASE BASIS OTHER FORMS Following is a list of other permits that could be required in certain circumstances. The general triggers for each of the listed permits is provided below. A. FILL AND GRADE PERMIT: Grading(importing, exporting, and/or moving material on a site) of more than 50 cubic yards and/or if grading modifies the existing flow of stormwater or groundwater. B. RIGHT-OF-WAY PERMIT: A right-of-way permit is required anytime the public right-of-way is disturbed or obstructed in any way by private development or the general public. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 3 of 18 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 c• Phone: (360)293-1901 Page left blank intentionally. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 4 of 18 I; Iy PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 1cor. $ Phone: (360)293-1901 I FORM BP-1: RESIDENTIAL BUILDING PERMIT APPLICATION 1. PROPERTY INFORMATION Project Address(Street,Suite#): Assessor Parcel Number: 4305 Cherry Court Subdivision/Lot#: Zoning Designation: Lot area (size): 15,277 s ft. Plat of Cherry Court, Lot#6 R-1 a' 2. TYPE OF PROJECT VI New SFR ❑ New Accessory Dwelling Unit: ❑ Deck/porch (new/repair) ❑ New Duplex El Attached to Primary Unit ❑ Interior remodel E Detached from Primary Unit ❑ New Addition to SFR ❑ Garage, carport or accessory building E Fence or retaining wall or duplex (new/repair) ❑ Other: Project Summary: Construct one SFR on Lot #6, Plat of Cherry Court. Project Valuation: $380,000 3. PROPERTY OWNER INFORMATION Name:LG Anacortes, LLC Phone:360-755-9021 Address(Street,City,State,Zip): Email Address: 504 E. Fairhaven Ave. Burlington, WA 98233 4. CONTRACTOR INFORMATION Name:*LG Anacortes, LLC Phone: Contractor's Business Licenses State License#: City License#: *All Contractors&Subcontractors must have a valid City LGANAAL800NQ of Anacortes business license prior to doing work in the Expiration Date: Expiration Date: City. 8 - 18 - 2022 8 - 31 - 21 Address(Street,City,State,Zip): Email Address: 5. CONTACT PERSON Select one person the city will contact for anything ® Applicant ❑ Property Owner ❑ Contractor related to this project: ❑ Other(list below) Name:Jack E. Reinstra Phone:360-420-9542 (cell #) Address(Street,City,State,Zip): Email Address: 504 E. Fairhaven Ave. Burlington, WA 98233 jackr@landedgentry.com Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 5 of 18 11 Y 0 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT ��'� Mailing Address: P.O. Box 547, Anacortes, WA 98221 1 Office Location:904 6th Street, Anacortes WA 98821 Y; $' Phone: (360)293-1901 6. LENDER INFORMATION RCW 19.27.095 requires the City to obtain information with regard to lenders. If there are no lenders involved with your project, write"no lenders"on the Name Line below. Name:People's Bank Phone:360-404-2204 Address Street,City,State,Zip): Email Address: 1801 Riverside Drive Mount Vernon, WA 98273 7. ACKNOWLEDGEMENTS & SIGNATURE Read and initial each of the following statements prior to signing this application: I understand that when a building permit application is taken in over the counter it does not mean the application has been deemed technically complete and sufficient for staff review. I understand that if I submit incomplete, inaccurate, and/or erroneous information it will take the City longer to process my permits. pI understand and acknowledge that I could be responsible for providing as-built drawings (on paper or electronically) as part of the project's certificate of occupancy process. I understand and acknowledge that Special Inspections could be required as part of my project, and 9,(=x if needed I will be required to pay for the cost of these inspections. I understand and acknowledge that financial securities could be required as part of the work I am completing and I agree to provide the items needed for the City to calculate these securities and to provide the securities themselves. I understand that if permits are reviewed concurrently such as design review, site plan,traffic concurrency, etc., any required revisions to one permit may affect the entire plan set and could add costs and time to the project. I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. ne, 2C� January 21, 2021 nature Date Jack E. Reinstra Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 6 of 18 I;G � PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 1co�. `� Phone: (360)293-1901 FORM BP-2: STRUCTURE AND SITE INFORMATION 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4305 Cherry Court PARCEL NUMBER(S) 2. DETAILED PROPOSED STRUCTURE INFORMATION Complete the following information as it relates to your project. Mark items that are not applicable with "N/A". Structure height: 22,-1„ AREA SQUARE FOOTAGE OCCUPANCY GROUP CONSTRUCTION TYPE OCCUPANT LOAD 1st Floor: 2,838 2nd Floor: N/A 3rd Floor N/A Basement: N/A Garage: 821 Total deck: 261 (Back Patio) Total porch: 116 (Front Porch) Other: Other: Other: 3. QUESTIONS ABOUT THE PROPOSED STRUCTURE Is a fire sprinkler system being installed? ❑ YES 12 NO Is a monitored fire alarm being installed? ❑ YES 12 NO Are retaining wall(s) being built? ❑ YES 12 NO Are structural plans required? 12 YES ❑ NO 4. PROJECT SITE INFORMATION A. Is work within the City's right-of-way proposed? If yes, you will be required ❑ YES 12 NO to submit a right-of-way permit application. If you have already submitted a ROW permit, list the permit number here: B. Is the property located in a flood zone? ❑ YES 12 NO If yes, list the flood zone designation: C. Are there slopes in excess of 15%on or abutting the site? If yes, a ❑ YES 2 NO geotechnical report will likely need to be submitted. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 7 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 9111111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; %' Phone: (360)293-1901 D. Are there critical areas or buffers on or abutting (within 300-feet of)the ❑ YES 12t NO project site? If yes, a critical areas report will likely need to be submitted. E. Is the lot less than 5,000 sq. ft. in area? ❑ YES 12 NO If yes,your site and building will need to comply with the standards in AMC 19.43.010.C. F. Is your project involving an accessory dwelling unit? El YES 12 NO If yes,your site and building will need to comply with the standards in AMC 19.47. G. Will more than 2-acres be cleared and/or more than 5,000 board feet ❑ YES 12 NO (about 1 log truck load)of timber be harvested? If so you may need to obtain a forest practices permit from DNR. H. Is this project subject to the SEPA process? If yes, you will be required to ❑ YES 12 NO submit a SEPA checklist. If you have already completed the SEPA process, list the permit number here: 5. REQUIRED SIGNATURE I hereby declare that I am either the owner of the property listed on this application or the owner of this property has authorized me to be their representative to act for them. I also declare under penalty of perjury under the laws of the State of Washington that all of the statements and answers contained herein, and the information submitted with this application form is in all respects,true, correct, and complete to the best of knowledge and belief. January 21, 2021 .gnature Date Jack E. Reinstra Printed Name Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 8 of 18 I;GI (�� PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 1cor. $ Phone: (360)293-1901 FORM BP-3: PLUMBING AND MECHANICAL FIXTURES imiiM MECHANICAL Equipment Type: Appliance/Equipment Information (new and relocated): Total #: Furnace: Gas#: 1 Elec#: BTU: > 10,000 Other#: 1 Wall Heater: Gas#: Elec#: Other:#: Location(s): Gas Water #: 1 Location(s): Garage 1 Heat Pump: Elec#: Other It Capacity: Air Conditioning: Elec#: Other#: Capacity: Radiant/Hydronic Gas#: Elec#: Other:#: Location(s): Exhaust Fans: Bath#:4 Laundry#: 1 Other: 5 Range Hood: #: 1 Location(s): Kitchen Fireplace: Gas#: I Elec#: Other:#: Location(s)Living 1 Clothes Dryer& Duct: Gas#: 1 Elec#: Other:#: Location(s):Laundry 1 Stove/Range/Oven: Gas#:1 Elec#: Other:#: Location(s):Kitchen 1 Gas Piping/Outlet(s): _ #: 5 Location(s): _ ; g; Boiler Gas#: Elec#: BTUs: Location(s):GarageKitchen;Laundry 1 Other: #: Location(s): mii--iii mi. TOTAL MECHANICAL OUTLETS: 11 PLUMBING Fixture Type(new and relocated): Total#: Fixture Type(new and relocated): Total#: Water Closet(Toilet): 3 Refrigerator water supply(for water/ice 1 Kitchen Sink: 1 Pressure Reduction Valve/Pressure Regulator: 1 Utility Sink: 1 Water Service Line: 1 Tub: 2 Water Piping: Hand Sink: 5 Clothes Washer: 1 Shower: 1 Electric Water Heater: Tank-less? Yes ❑ Dishwasher: 1 Backflow Prevention Assembly: 1 Hose Bib: 2 Other: TOTAL PLUMBING FIXTURES: 21 Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 9 of 18 I;GI � PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 $ Phone: (360)293-1901 FORM BP-4: ARCHITECTURAL PLAN REQUIREMENTS 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4305 Cherry Court PARCEL NUMBER(S) 2. GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant architectural plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11" x 17" and drawn in an architectural scale. • Architectural plans for structures 4,000 square feet or larger are required to be prepared and stamped by an architect licensed in the State of Washington. • Structural plans must be stamped by a structural engineer licensed in the state of Washington. 3. REQUIREMENTS FOR ALL ARCHITECTURAL PLANS COMPLETE REQUIREMENTS PAGE#ON ? YOUR PLANS Cover (or 1st page) must include: A2.1 • Site address • Parcel number • Lot number(if applicable) • Lot size • Lot coverage • % impervious surface coverage Floor plans with existing (if applicable) and proposed building layout with square footages and with the use of each room/area labeled. A3.1 Window and door sizes labeled and window ventilation area. Commercial, VMulti-Family, and Mixed-Use Structures must also include door and window schedules. A3.1 VPlumbing, duct, and electrical layout. Penetration protection must be shown. E1.1 VOpening headers, size, and material. A3.1 Cross section details, showing typical foundation,floor, wall, ceiling and roof construction and insulation. A5.1 Structural members labeled as to size and spacing as well as bracing, blocking, VARIOUS bridging, special connectors, and anchor bolts. SHEETS VDetails documenting energy code compliance. Exterior building elevations demonstrating compliance with applicable structure A6.1;A6.2 type design standards (small lot, duplex, or ADU) and maximum building height Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 10 of 18 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 1rt w� Phone: (360)293-1901 Building height (see AMC 19.42.120 for measurement methods,exceptions and modifications). A6.1 • Label the building height at the highest point of the structure from the average of the natural topography at the foundation at the front of the building. • Label the average elevation of the natural topography at the front of the building. • Label the elevation at the center of all exterior walls of the proposed building. • For ADUs only, include elevations demonstrating compliance with the height/setback plane(see AMC 19.47.030(C)(6)). Special details as needed (i.e., stairs,fireplaces, special construction). VARIOUS SHEETS VInsulation and insulation values of walls, slab,floors, and roof/ceiling. A3.1;A5.1 V Existing and proposed grades with slope of lot shown. ,ITE PLAN Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 11 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 9111111‘4 Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Y; %" Phone: (360)293-1901 FORM BP-5: STORMWATER MANAGEMENT MINIMUM REQUIREMENTS DETERMINATION 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4305 Cherry Court PARCEL NUMBER(S) 2. GENERAL INFORMATION Most development within the City of Anacortes that involves disruption of soils, or construction of buildings, streets, parking lots,etc. requires a Stormwater review. Stormwater review requirements are based on either the amount of soil to be disturbed (grading,vegetation removal),or the amount of hard surface that is created or replaced on a site(building footprint,concrete,asphalt or gravel parking,sidewalk,etc.) This form is largely targeted for small projects and single family residences. For larger projects and more information please refer to the Anacortes Municipal Code(Chapter 19.76 Stormwater Management)and the latest Washington State Department of Ecology Stormwater Management Manual for Western Washington (Ecology Manual). 3. HARD SURFACE AREA CALCULATION Please calculate your project's hard surface amount;guidance is provided on the next page of this document. Use your project's total hard surface calculation to follow the flow chart(s) in this packet and determine the level of stormwater management required for you project. When determining your permit level or if stormwater thresholds are met or exceeded the entire project must be considered. A project is that portion of a property, properties,or right of way subject to land disturbing activities, new hard surfaces and replaced hard surfaces. The hard surface on your property will determine the storm water utility fees and the stormwater general facility charge. All new or replaced hard surfaces should be accounted for. Below are excerpts from the Anacortes Municipal Code and Ecology Manual that may assist you in preparing this information. "Hard surface area"means an impervious surface, a permeable pavement, or a vegetated roof. "Impervious surface"means a non-vegetated surface area which either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non-vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. "Replaced impervious surface"means,for structures, the removal and replacement of impervious surfaces down to the foundation. For other impervious surfaces, the removal down to bare soil or base course and replacement. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 12 of 18 1� PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT 1` Mailing Address: P.O. Box 547, Anacortes, WA 98221 ‘7%� ;� Office Location: 904 6th Street, Anacortes WA 98821 �( car Phone: (360)293-1901 Land disturbance Description Total (SF) 15,277 Total Area of Land disturbing activity 10,433 Total area converted from vegetation to lawn or landscaped areas Hard surface area calculation Existing Removed Proposed Proposed Description (SF) (SF) Replaced New (SF) (SF) Non Pollution Generating Hard 0 0 0 4,036 Surface Area (Sidewalks, paths, patios,etc.) Pollution Generating Hard Surface 0 0 0 808 Area (Driveways, parking areas, etc.) Total Hard Surface 0 0 0 4,844 Site Size 15,277 Existing impervious surface coverage% 0 (sq.ft. hard surface/site size) Use the information in the above table to navigate the flow chart(s) on the next page and determine the applicable stormwater management minimum requirements for your project. Then complete the applicable Stormwater Minimum Requirements Form on the Public Works - Engineering Department Forms website and provide required submittal items/plans. Check applicable box Minimum Requirements Determination ❑ Minimum Requirements#1-9. Minimum Requirements #1-5. Res.Building Per�Application Submittal checklist Updated October36,2019 Minimum Requirement#2. Page 13 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT l.. 9�'� Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 Villieircv Phone: (360)293-1901 FLOW CHART FOR DETERMINING REQUIREMENTS FOR NEW DEVELOPMENT Start Here Does the site have 35% Yes See Redevelopment Minimum or more of existing ► Requirements and Flow Chart impervious coverage? (Figure I-2.4.2). No Does the project convert 3/4 acres or more of vegetation to Does the project result in lawn or landscaped areas,or 5,000 square feet,or No convert 2.5 acres or more of greater,of new plus ► native vegetation to pasture? replaced hard surface area? \ No Yes Yes Does the project result in 2,000 r square feet,or greater,of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted vegetation areas. Yes No Does the project have land Minimum Requirements#1 disturbing activities of 7,000 through#5 apply to the new YeS square feet or greater? and replaced hard surfaces and the land disturbed. No V Minimum Requirement#2 applies. Figure 1-2.4.1 Flow Chart for Determining Requirements for 641 New Development DEPARTMENT OF Revised June2015 ECOLOGY Please see http./Avww,ecy,wa gov/cnpyrighthtml for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 14 of 18 y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 kz Office Location:904 6th Street, Anacortes WA 98821 Phone: (360)293-1901 FLOW CHART FOR DETERMINING REQUIREMENTS FOR REDEVELOPMENT Does the project result in 2,000 square feet,or more,of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet or greater? v Yes No Minimum Requirements#1 through#5 apply to the new and replaced hard Minimum Requirement#2 applies. surfaces and the land disturbed. Next Question Does the project add 5,000 square feet or more of new hard surfaces? OR Convert 34 acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? Yes No All Minimum Requirements apply Next Question Is this a road to the new hard surfaces and the related project? \No converted vegetation areas. Yes Does the project add 5,000 square feet or more of new hard surfaces? Yes No Is the total of new plus replaced hard surfaces Do the new hard . 5,000 square feet or more, surfaces add 50%or No No additional No AND more to the existing 110requirements. does the value of the proposed improvements hard surfaces within -including interior improvements-exceed the project limits? 50%of the assessed value(or replacement value)of the existing site improvements? Yes�� All Minimum Requirements apply to the new and replaced hard surfaces and converted vegetation areas. --)Yes Figure 1-2.4.2 Flow Chart for Determining Requirements for Redevelopment DEPARTMENT OF Revised June 2015 ECOLOGY Please see htfp./Nuww.ecy.we.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability,and disclaimer Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 15 of 18 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT — Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 `4 86�� Phone: (360)293-1901 FORM BP-6: SITE PLAN REQUIREMENTS 1. PROPERTY WHERE WORK IS OCCURRING ADDRESS: 4305 Cherry Court PARCEL NUMBER(S) 2. GENERAL INFORMATION This form is intended to assist applicants in creating complete, code compliant site plans. Please check the plans you wish to submit to make sure they contain each of the listed items. To the right of the Requirements column is space for you to list the sheet number of the plan set where the listed information is shown. • Minimum Plan Size: 11"x 17" and drawn in an engineering or architectural scale. 3. INFORMATION REQUIRED ON ALL SITE PLANS COMPLETE? REQUIREMENTS PAGE#ON YOUR PLANS Cover sheet must contain all of the following: SITE PLAN • Vicinity Map • Name of the project V • Name, address, and telephone number of owner and agent(s) • Name, address, and telephone number of Applicant (if different from the owner) • Zoning designation of the site • Area, in square feet and acreage, of the project site • Reference to the Building Code used • Proposed use • Occupancy group • Construction type • Square footage and height of each individual building • Percent lot coverage • Percent impervious surfaces Scale and North Arrow SITE PLAN Property features: Location, identification, and dimensions of all property lines and SITE PLAN Veasements. All easements shown on the title report, Record of Survey, or plat must be dimensioned and shown. Location and dimensions of existing critical areas (wetlands, streams, steep slopes) and their associated buffers. Location of Ordinary High Water Mark and shoreline jurisdiction limits (if adjacent to a shoreline). Existing and proposed contours and site elevations (i.e. finished SITE PLAN Vgrades) at 5-foot minimum increments. The horizontal and vertical control datum must be clearly shown. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 16 of 18 ; Iy PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 k Aco�. Phone: (360)293-1901 Structures: Location, identification, dimensions and size of all existing and ✓ proposed buildings and other structures. SITE PLAN Location of existing and proposed retaining walls, rockeries, and _ ✓ Location, identification, and dimensions of all setbacks. SITE PLAN Show proposed projections into required setbacks, including dimensions (see AMC 19.44.140) Utilities & Easements: Location and dimensions of existing and proposed stormwater, SITE PLAN V sanitary sewer, potable water, and fiber lines/facilities. All wells and septic systems located on or near the project site must also be identified. Location of all existing and proposed fire hydrants within 300 feet of the boundary of the project site. V Location and dimensions of existing and proposed freestanding lighting fixtures, utility junction boxes, public utility transformers. SITE PLAN Stormwater Proposed Temporary Erosion and Sediment Control Measures, if not located on other plans. SITE PLAN V Proposed permanent stormwater management BMPs. PROVIDED Access, Circulation & Parking Location, identification, and dimensions of all existing and proposed SITE PLAN on-site and adjacent streets and alleys, including the location and LANDSCAPE ✓ dimensions of all existing and proposed curbs,gutters,sidewalks, PLAN median islands, and street trees. Show existing and proposed vehicular access to the site, including the size and location of driveways and curb cuts. SITE PLAN Show existing and proposed parking spaces, including surface material and dimensions of spaces. SITE PLAN Open Space (ADUs, Small Lots, and Duplexes) Show calculations, location, dimensions and provided square footage of required open space area per AMC 19.43.010.C, E, or AMC 19.47, as applicable. Landscaping Show the location and design of landscape areas to be preserved and planted, and a plant list to include the location, number,size and type LANDSCAPE of plant material by botanical and common name. PLAN Location of irrigation system if a permanent or temporary system is proposed. Show the location of existing trees to be retained in conformance LANDSCAPE Vwith AMC 16.50, and tree protection measures to be implemented, PLAN when applicable. Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 17 of 18 Y o PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location:904 6th Street, Anacortes WA 98821 \' iv Phone: (360)293-1901 coW Provide a maintenance plan for any infiltration-based stormwater best management practices (BMPs) built as part of the landscaping design, including the specifications and maintenance procedures of any soil amendments. Show new trees to be planted and tree unit credit calculations, in LANDSCAPE conformance with AMC 16.50 Tree preservation,when applicable PLAN The following table, with project specific information filled in, must be placed on the site plan: LANDSCAPE Required Landscaping For Example PLAN Calculations Site Area 7,500 sq.ft. %of site area to be landscaped (per 20%-R2A zone AMC Tables 19.42.020-.030) 1,500 sq.ft. required 1,850 sq.ft. provided Compliance with AMC Ch. 16.50 Tree unit credits required: Tree Preservation. • 8 tree units required Tree unit credits retained: • 2 trees 6"dbh=4 tree unit credits retained Tree unit credits provided: • 2 new deciduous trees(min. 2" caliper @ 6" above ground) • 2 new evergreen trees(8' in height) Number of required street trees 1 per 30'of frontage 60 lineal feet of frontage=3 street trees Res.Building Permit Application Submittal Checklist Updated October 10,2019 Page 18 of 18