Loading...
HomeMy WebLinkAboutCOR-2020-PWs Final Civil Inspection - ANACORTES PUBLIC WORKS DEPARTMENT 111( ° Fred Buckenmeyer, Public Works Director P.O. BOX 547, ANACORTES, WA 98221 PH(360) 293-1919 ,w 9Co0 Email: fredb@cityofanacortes.org 12-22-2020 Kuljit Shoker EK Tera Asara, LLC 905 20th Street Anacortes, WA 98221 Subject: PWs Final Civil Inspection —Salish Motel (PW#18-151-DCM) Dear Kuljit, On December 21, 2020, the Public Works Engineering Department held a final inspection of the infrastructure work for all City Departments for the Salish. There were no deficiencies identified. At this time, the Public Works Engineering needs the following documents in order to close out this project to completion: 1. 2-year Maintenance Bond in the amount of$53,000.00. A letter was sent to EL Tera Asara, LLC on December 22, 2020; 2. As-built drawings, photos, Final Inspection Guidelines (Completed and Signed), compaction testing reports, and; 3. Erosion and Sedimentation reports. It is understood that the landscaping portion of the project is being performed by others and will be reviewed at the final inspection of the building. If you have any questions regarding this, please contact me at 360.299.1983 or via email at stevel(�cityofanacortes.orq Sincerely, CITY OF ANACORTES teven Lange Senior Engineering Tech cc: Fred Buckenmeyer, Eric Shjarback, Wil Ludeman, Don Measamer, Justin Symonds, Dave Oicles, Dale King (FABER), Greg Faber(FABER) E , s\�d gr \ten • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation •Equipment • Capital Projects • Development Services qp