HomeMy WebLinkAboutCOR-2020-2Yr Maintenance Bond - ANACORTES PUBLIC WORKS DEPARTMENT
81Y 0 Fred Buckenmeyer, Public Works Director
9 -,. _._to P.O. BOX 547, ANACORTES, WA 98221 PH(360) 293-1919
v w
90°16 Email: fredb@cityofanacortes.org
12-22-2020
Kuljit Shoker
EK Tera Asara, LLC
905 20' Street
Anacortes, WA 98221
Subject: 2-Year Maintenance Bond —Salish Motel (PW#18-151-DCM)
Dear Kuljit,
Thank you for working with us to move forward to Final project acceptance. The work
performed to install the infrastructure improvements have been inspected and accepted
by the City of Anacortes Public Works Engineering Department on December 21, 2020.
Per the City of Anacortes Municipal Code to you are required to provide a 2-year
Maintenance Bond. The bond is based on 10% of the construction cost of the
development.
The construction cost that was presented for the infrastructure improvements for the
Salish Motel project is $530,000.00. At 10% of the construction cost, your bond amount
is $53,000.00.
Your project requires the two-year bond to satisfy the maintenance of the infrastructure
improvements. This bond will be used at the discretion of the official to correct
deficiencies in the maintenance affecting public health, safety and welfare and will be
posted and maintained throughout the two-year maintenance period.
Thank you for your attention to this. If you have any questions, please do not hesitate to
call me at 360-661.3468.
Sincerely,
OF ANACORTES
Steven Lange
Project Manager
cc: Fred Buckenmeyer, Eric Shjarback, Wil Ludeman, Don Measamer, Libby Grage
Enclosed
up��`�O A q
.. n • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste
Q i • Transportation•Equipment • Capital Projects • Development Services
4`w P`
Gib Y-94i
ANACORTES PUBLIC WORKS DEPARTMENT
IN9 f;47-.
you ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES
I I
SITE INFORMATION AND PROJECT VALUE
OWNER:
SITE ADDRESS: 4 Z `yC •
PROJECT DESCRIPTION: -lS PA6°cet.. (Qi,J#1`13-1
PROJECT VALUE [PV]: Gjfj p Vow r
r (Page 3 of 3 Total Cost) ! I
ENGINEERING PLAN REVIEW FEE
ENGINEERING PLAN REVIEW FEE (.005 of Project Value)
—
TOTAL ENGINEERING REVIEW FEE $ Z.lnSh
DUE AT TIME OF SUBMITTAL OF PLANS FOR REVIEW
CONSTRUCTION INSPECTION FEE
CONSTRUCTION INSPECTION FEE BASE FEE $ 500.00
CONSTRUCTION INSPECTION FEE (.015 of Project Value) $ 1, la.
CONSTRUCTION INSPECTION FEE SUBTOTAL $ zolSb
95
REDUCTION* $
TOTAL CONSTRUCTION INSPECTION FEE $ $ztSrb r
DUE UPON CONSTRUCTION PLAN APPROVAL
* SUBJECT TO THE DIRECTOR OF ENGINEERING&DEVELOPMENT SERVICES APPROVAL,A 50%
REDUCTION TO THE CONSTRUCTION INSPECTION FEE MAY BE ASSESSED IF THE DEVELOPER
PROVIDES ON-SITE CONSTRUCTION INSPECTION AND CONSTRUCTION ENGINEERING THROUGH
PRIVATE CONSULTANTS TO THE SAME STANDARD AS THAT OF THE CITY.
Plan Review Fee:$ 2c,�ti +Construction Inspection Fee:$ Jvr =$ 11, 1QO C J
Page 1 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number 17`") DCYr
APPENDIX C: INSP-05 (JULY 2011)
Lange. Steve
From: Dale King <Dale@faberconstruction.com>
Sent: Monday,October 21, 2019 10:58 AM
To: Lange, Steve
Subject: RE: PW Civil and Drainage Review- Salish Motel
,a,2\ .t°\
Good Morning Steve,
The budget we have put together for the Salish Inn onsite and offsite civil was rig at$530k. Ple se let me know if you
have any questions.
Thank you,
l.�
Dale King I Faber Construction
From: Lange,Steve<stevel@cityofanacortes.org>
Sent:Sunday,October 20, 2019 2:09 PM
To: Dale King<Dale@faberconstruction.com>
Cc:'Ravnik Office'<Office@ravnik.net>;John Ravnik(jravnik@ravnik.net)<jravnik@ravnik.net>;Shjarback, Eric
<erics@cityofanacortes.org>; Symonds,Justin<justins@cityofanacortes.org>; Oicles, Dave
<daveo@cityofanacortes.org>; Frisinger, Rob<robf@cityofanacortes.org>
Subject: PW Civil and Drainage Review-Salish Motel
Dale,
I have completed my review of both the Civil Plans and Drainage Report and signed them as Accepted. I will route over
to Dave Oicles and Rob Frisinger in the Building Department for them to issue the permit when they are ready.
I left you a voice message. I do not see in my files an Engineer's Estimate of Construction or a Cost Estimate from FABER
for all on-site\off-site civil improvements.This is needed to establish the Plan Review and Construction Inspection Fees
for the Engineering Department.These fees will be made part of the overall building permit fee.
Thanks,
Steven Lange
Project Manager\Engineering Tech IV