Loading...
HomeMy WebLinkAboutPermit File BLD-2020-0613 2320 26th Street (2) .f7 0 . City of AnacortesBLD-2020-0613 Invoice/Permit #: BLD2020 904 6th Street Applied date: 10/12/2020 P.O.Box 547 Issue date: 10/15/2020 Anacortes, WA 98221-0547 1891 a Expire date: 04/13/2022 '' (360) 293-1901 Job Address: 2320 26TH ST Permit Type: Single Family Alteration/Repair Permit ANACORTES WA 98221-2490 Project: APN: P110576 Remarks: REMODEL BATHROOM, INSTALL WALK-IN SHOWER, SINK, RELOCATE TOILET, AND INSTALL TWO WINDOWS. Owner: SUSAN MILLER Contractor: TBD Address: 2320 26TH ST Address: ANACORTES WA 98221-2490 Phone: (951) 237-1562 Phone: . License #: General Information: Fees: Building Valuation 17300 Building Permit Fee 293.25 # of Hand Sinks 1 Plan Review Fee 190.61 # of Water Closets (Toilets) 1 State Building Code Fee Resi 6.50 # of Showers 1 Plumbing Permit Fee 41 .00 Total Calculated: 531 .36 Deposits/Receipts: 0.00 Total Due: 531 .36 I - BLD-?f�20-0613.- �� 10 fici §fi e'b 'granting o hNs permits a I not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of 0230GlichrbfaiiPiti3Viibr.f6Bgraf4Wv9613634AVIorder, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or 9139airiig sfjJkpgfinjtinterpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal l�/�, pr ,orb_er,,,pr�o�clai a i r i���ianw �coronpr decision of the Governor of this State, this permit shall not authorize such work and shall not be ali�'-"1 �UilAr ofcia is au home to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jilr,i9dtetithrAarcariYother ordinarAlo+executive order of the City, or of any state or federal law, or of arty order, proclamation, guidance advice or decision of tiaraasAsrAi-T4itbuilding offl.j authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate ncomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or 6- � :oqi e Governor. This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and exa • this application and know the same to be true and correct. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUE