Loading...
HomeMy WebLinkAboutBLD-2026-0191 - FENCEPlease request inspections online through the permit portal. If that is not possible please call (360) 293-1901 for Building or Planning inspections. For Public Works inspections, please call (360) 293-1938. PARCEL: P59245 LEGAL DESCRIPTION: LOT 30, SKYLINE NO. 4, AS PER PLAT RECORDED IN VOLUME 9 OF PLATS, PAGES 61 AND 62, RECORDS OF SKAGIT COUNTY, WASHINGTON. APPLICANT: Bassart, Mike 4410 Queen Ann Way Anacortes, WA 98221 3603951917 OWNER: BASSART MIKE BASSART BLYTHE ANACORTES, WA 98221 FEES:Paid Due Fence Permit Fee $15.00 $0.00 $0.00Totals : REQUIRED INSPECTIONS Fence Final CONSTRUCTION CONTRACTOR:JTI FENCE LLC 6775 Guide Meridian Rd LYNDEN, WA 98264 3605262628 License: JTIFEFL752MA Expires: 07/01/2027 $15.00 BLD-2026-0191 FENCE ISSUED: EXPIRES: 04/01/2026 04/01/2028 PROJECT NAME: FENCE SITE ADDRESS: 4410 QUEEN ANN WAY ANACORTES * Per AMC 19.70.330(B)(3)(f), the proposed fence shall not be placed within 15ft of a watercourse (Clyde Creek). * Per AMC 19.70.330(B)(3)(f), the proposal must meet the following criteria: - The feature is constructed on a lot that has been in existence as a legal building site consistent with AMC 19.49.040. - The feature: (A) Does not contain floor area; (B) Does not remove trees or native vegetation; (C) Does not block wildlife movement through the riparian management zone; (D) Mitigates impacts to ecological functions. To satisfy all these requirements, the City encourages the use of wildlife friendly fencing (panels that are not solid). CONDITIONS Page 1 of 1Printed by : Jennifer Watson on: 05/01/2026 09:50 AM City of Anacortes, WA 904 6th Street Anacortes, WA 98221 (360) 293-1901 http://cityofanacortes.org/ JTI Fence www.jtifence.com 360-526-2628 6775 Guide Meridian Rd, Suite F Lynden, WA 98264 Proposal Number: 266095-2 Prepared for: Mike Bassart 4410 Queen Ann Way Anacortes,WA 98221 (360) 395-1917 mikebassart@gmail.com Proposal Date: 03-18-2026 Evaluated By: Tony Rossi  360-927-8535 Tony@jtifence.com Overview of Your Project Proposed Scope of Work: JTI Fence proposes to furnish all materials, equipment and labor necessary to complete the following work: Install an estimated 61’ of 4’ vertical privacy black vinyl. Qty (2) 3-4’ single walk gates. Fence will be constructed using driven 2 3/8 sch40 galvanized post with 5x5 vinyl posts sleeved over on posts collars. Fence panels will be constructed with aluminum rail stiffeners, T/G infill, external fit post cap and top lock tie. Demo and disposal of existing fence line is included. Project Total: $9,043 +tax (50% Due upon Acceptance of Proposal) JTI Fence Proposal For Mike Bassart:266095-2 This proposal, prepared by Tony Rossi and is valid for seven (7) days from 03-18-2026. This Proposal is given with the intent that the receiver is the owner of the property. If not, we require a written agreement from the property owner prior to the start of the project. Once you have reviewed and accepted the proposal we will need to obtain the following two items to secure a spot on our schedule and procure materials: Signed copy of final proposal 50% non refundable deposit Once your signed proposal and deposit have been received our team will reach out to start our project kickoff steps. Schedule Your Project 811 Locate (Public Utilities) Project Install Final Invoice A 1 Year Craftmanship Warranty is included with all of our installations. This warranty will begin on the day of completion. A signed change order will be required to document the changes being made, as well as any resulting changes in cost. Changes made during the course of a project may require an additional deposit, but will otherwise be reflected on the final invoice. If you have any questions or would like to see revisions made to your Proposal, please do not hesitate to reach out.  Tony Rossi 360-927-8535 Tony@jtifence.com Project Total: $9,043 + tax 50% Deposit (Non-refundable): $4,521 50% Balance (Due on final invoice):$4,521 + tax Signature Your Signature indicates you have reviewed the entirety of the Proposal and Construction Agreement, and are ready to proceed. Client Signature: {{signnow_customer_signature}} Date: {{signnow_customer_date}} • • 1. 2. 3. 4. Mike Bassart 2026-03-25 07:13 AM UTC Construction Process & Procedure Agreement Please review our Construction Process and Procedure Agreement. Procedure To accept the attached proposal, please sign and date both the proposal and this construction  process document and return them along with your down payment to our office (via mail, email, drop-off or Payment Portal). Once we have received these documents, you will be contacted by our team to  schedule the installation. Lead times vary for many reasons (weather, material availability, ground  conditions, etc.) Weather dependent projects (such as staining or concrete curbing) may be  scheduled last-minute to accommodate for breaks in the weather. Utilities & Undergrounds  JTI will be responsible for locating from the road/alley to the meter on the property for all public utilities such as: power, natural gas, phone, water, and cable. JTI is not liable for damages to unmarked or privately installed underground utilities, such as: sprinkler systems, drains, sewer lines, septic systems, propane lines, well water lines, private water association  lines, or any other privately installed underground utilities or structures hit while digging.  It is the customer's responsibility to identify and mark such utilities before work begins.  If you know where any of your private underground utilities or structures (mentioned above) are  located, please mark them and/or inform our crew of their presence. Any included drawings are for  informational purposes only and not a scaled representation of exact fence layout. Final field  adjustments may be made by the foreman on site. Any layout adjustments do not exclude the private  or unmarked utilities responsibility held by the customer. Hydro excavation, core drilling, saw cutting,  or hand digging required due to the presence of unforeseen utilities is not included. JTI will not be  responsible for costs associated with unsuitable soils or the presence of hazardous materials. Permits & Engineering  JTI will not be responsible for acquiring permits, surveying, or engineering. If required, these must be  obtained by the customer at their own cost, unless otherwise stated by a JTI representative in writing.  Customers will also be responsible for following any HOA regulations, easements, zoning codes,  and/or property lines and informing JTI when applicable.   Fence Construction  Excess dirt from post holes will be raked out. Removal is not included unless specified in the attached  proposal for an additional cost. Posts must not be disturbed or moved once placed. If posts have  been moved from their original placement before being fully set, additional charges will apply to have  them re-set.  In the case of uneven ground, the bottom of the fence will be placed in as close proximity to the  ground as possible, following either straight lines or gentle grade changes. By default, your fence will follow the natural grade of the ground.  If you prefer an alternative approach (e.g., stepped installation), please notify us before work begins.Ground with rolls, hills, or dips  underneath the fence span will likely need to be filled. Fenceline clearing, grading, filling, trenching,  and other dirtwork is not included unless specified in the attached proposal for an additional cost.  Some wood fencing styles can either roll along the grade or be stepped by section; our crew will  determine which method works best in each situation unless a preference has been previously  indicated by the customer. Demo/disposal of existing fence(s) not included unless specified above. Client Initials: {{signnow_customer_initials}}MB