From: Fyrrce, Groc
Sent: Tuesday, April 7, 2020 11:44 AM
To: Oicles, Dave
Subject: Fw: Salish Inn Construction: RFI #45 has been closed
Dave,
When you have time will you please lasersquid this along with any of the listed attachments. Thanks!
Groc Fyrrce qo
� 2
+�
Building Inspector
City of Anacortes /
(360)293-1901
From:Jack Demooy(FABER CONSTRUCTION CORPORATION)
<faber_construction_corporation_notifications@procoretech.com>
Sent:Tuesday, April 7, 2020 10:52 AM
To: Fyrrce, Groc
Subject:Salish Inn Construction: RFI #45 has been closed
Salish Inn Construction FABEFL
CONSTRUCTION
View online Open In App
RFI #45 - Roof retro-fit has been closed.
RFI Details
QUESTION 1
Asked By: Jack Demooy (FABER CONSTRUCTION CORPORATION)
Date: Wed Mar 18, 2020 at 09:01 am PDT
Location: Salish Inn Anacortes
1
Question: Questions from City Inspector on roof retro fit sleepers since
sleeper on double TJI can only be nailed from one side due to
access issues .
On RFI#39 double TJI,s also have full length filler blocking
nailed every 6" staggered OC. on floors 3,4 and roof, so does
RFI #39 also cover the double TJI that we have West of grid line
D
7
Attachments: None
Official Response
Answered By: David Bradley (BRADLEY ENGINEERING, INC.)
Date: Wed Mar 18, 2020 at 03:26 pm PDT
Response: Double TJI's only need to be nailed on one side as noted
above. No other structural modifications are required.
Attachments: None
All Replies
Answered By: David Bradley (BRADLEY ENGINEERING, INC.)
Date: Wed Mar 18, 2020 at 03:26 pm PDT
Response: Double TJI's only need to be nailed on one side as noted
above. No other structural modifications are required.
Attachments: None
ADDITIONAL DETAILS
Project: Salish Inn Construction
Subject: Roof retro-fit
Date Initiated: 03/18/20
Created By: Jack Demooy (FABER CONSTRUCTION CORPORATION)
Assigned To: King, Dale (FABER CONSTRUCTION CORPORATION)
Responsible Contractor: FABER CONSTRUCTION CORPORATION
Received From: Jack Demooy (FABER CONSTRUCTION CORPORATION)
Distribution List: Bradley, David (BRADLEY ENGINEERING, INC.)
Fyrrce, Groc (CITY OF ANACORTES)
King, Dale (FABER CONSTRUCTION CORPORATION)
2
Cost Code: 06-50-65 - Engineered Lumber
Schedule Impact: TBD
Cost Impact: TBD
Drawing Number: S4 S5 and S6
View online Open in App
Po Bred By Procore su tpo p ) re:com I I s:I1s noc r rocore,cor€i
3
Oicles, Dave
From: Fyrrce, Groc
Sent: Tuesday, April 7, 2020 11:42 AM
To: Oicles, Dave
Subject: Fw: Salish Inn Construction: RFI #49 has been closed
Dave,
When you have time will you please lasersquid this along with the attachments. Thanks!
Groc Fyrrce
Building Inspector
City of Anacortes
(360)293-1901
From:Jack Demooy (FABER CONSTRUCTION CORPORATION)
<faber_construction_corporation_notifications@procoretech.com>
Sent:Tuesday, April 7, 2020 10:50 AM
To: Fyrrce, Groc
Subject:Salish Inn Construction: RFI#49 has been closed
Salish Inn Construction FABER.
CONSTRUCTION
View online Open In Amp
RFI #49 - Clarification of RFI #39 - has been closed.
QUESTION 1
Asked By: Jack Demooy (FABER CONSTRUCTION CORPORATION)
Date: Wed Mar 25, 2020 at 01:57 pm PDT
Location: Salish Inn Anacortes
Question: Groc the city inspector wants to be sure that it is ok to
have screws on one side of double TJI because we are not
1
able to get both sides of TJI with 3" long #10 screws as
indicated on RFI#45 ?
For your information I worded RFI#45 with verbage
saying ( nailing) on one side should have mentioned
screws) per inspector Groc.
Attachments: 8C2C973D-1 EB5-4B58-A1 F3-1 BBD6B17EB22.ipeq
Official Response
Answered By: David Bradley (BRADLEY ENGINEERING, INC.)
Date: Wed Mar 25, 2020 at 04:06 pm PDT
Response: What is sketched out is structurally acceptable as
depicted.
Please see attached stamped sketch.
Attachments: RFI#45 roof retrofit-signed.pdf
All Replies
Answered By: David Bradley (BRADLEY ENGINEERING, INC.)
Date: Wed Mar 25, 2020 at 04:06 pm PDT
Response: What is sketched out is structurally acceptable as
depicted.
Please see attached stamped sketch.
Attachments: RFI #45 roof retrofit -signed.pdf
ADDITIONAL DETAILS
Project: Salish Inn Construction
Subject: Clarification of RFI #39 -
Date Initiated: 03/25/20
Created By: Jack Demooy (FABER CONSTRUCTION CORPORATION)
Assigned To: Raymond, Cathy (FABER CONSTRUCTION
CORPORATION)
King, Dale (FABER CONSTRUCTION CORPORATION)
Responsible Contractor: FABER CONSTRUCTION CORPORATION
Received From: Jack Demooy (FABER CONSTRUCTION CORPORATION)
2
Distribution List: Bradley, David (BRADLEY ENGINEERING, INC.)
Carletti, Peter(CARLETTI ARCHITECTS)
Fyrrce, Groc (CITY OF ANACORTES)
King, Dale (FABER CONSTRUCTION CORPORATION)
Raymond, Cathy (FABER CONSTRUCTION
CORPORATION)
Cost Code: 06-50-30 -Backframing / Blocking
Schedule Impact: TBD
Cost Impact: TBD
View online Open In App
Powered By Proton I soh JorM,rocore.com 1 htt :1Fsu.t ort, roccre cOM .
3
RFI #49 SALISH INN 3/25/20
ROOF RETROFIT
ROOF
DAVID C BRADLEY
STATE OF WASHINGTON REGISTERED PROFESSIONAL ENGINEER
RFI #49 SALISH INN 3/25/20
ROOF RETROFIT
0
0k es, Dave
Frorna: Fyrrce, Groc
Sent: Thursday, May 7, 2020 8:38 AM
To: Oicles, Dave
Subject: Fw: SALISH INN SITE correciton and reponses to city inspections
Hi Dave,
Will you squidify the emails and the attachments? Thanks.
Groc Fyrrce
Ruilding Inspector
City of Anacortes
(360)293-1901
A00%0w.4•4. ZPS`
A%Y.>.tii4?"'•K4:4%dOMW&e%%..Al".f-::::: -: ..•••••:>1.?:30.? X.erW»»:.A.v»±:r:±}»:21Xt,:};74%eXv.414 W:
S.}'lh:4 w ,-a•aC»{ c»XAY:z'l.%^G::xY.:4x'XtWYriVIAivrllA?7i4EU: X'Yee OWN%fAi:YZX4Ct:aX6•11C :40X40=0.4307[Wx.. }rtx:. % I.AYI.%Ot»r.:.::.:..:.....:...•..::J:^.s%:CY✓.+AXr.:1:30... .:FU]exF}Y.` X4.)::RUANi:_x:-: X _ktoXIOA7DXJ600767H9WTA00:3X-Y.:WiY..Y i=4:G.:)==-X i:%xx
From: Fyrrce, Groc
Sent: Thursday, May 7, 2020 8:37 AM
Jo: Frisinger, Rob
Subject: Re: SALISH INN SITE correciton and reponses to city inspections
Hi Rob,
requested that they send the elevator shop plans, that they were working off of, to the City so that they
could be reviewed. I asked you if you received them because I had not. I do not recall ever receiving
these. They had built the plans off of them, but they were never approved plans by the City. Hopefully they
will send you the plans directly or send to the City. I will check my email again in case i am wrong.
Groc Fyrrce
Building Inspector
City of Anacortes
(360)293-1901
«?.i'?titiii . :1!!!.W0!,tlittV . +,iAA.l'A-.F}ivi '!HfY::Cr",iVT7! Pra.
a!a-w. :•: r..•PaKWW..pitRt<y+.tysuitir-"xmitAlVean0".•o...vt.m.-...•rr,.e:!a•Jn'iO4!SFe}'r.ra:.-r...-./rs'yi xI.3hrra!V7 rVnn*Y•WW-Vrb,M4V!`+}r?40'=:4!OvrW4X1±c.YM?F4F.”44r- `"? t-
From: Frisinger, Rob
Sent: Wednesday, May 6, 2020 3:36 PM
T o Fyrrce, Groc
Subject: FW: SALISH INN SITE correciton and reponses to city inspections
Hey Groc,
What information had you requested for the elevator?
Rob F.
From: Dale King <Dale@faberconstruction.com>
Sent: Wednesday, May 6, 2020 2:34 PM
To: Frisinger, Rob <robf@cityofanacortes.org>
Cc: Peter Carletti <peter@carlettiarchitects.com>; Fyrrce, Groc <gfyrrce@cityofanacortes.org>; Measamer, Don
<don@cityofanacortes.org>; Jack DeMooy <Jack@faberconstruction.com>
Subject: RE: SALISH INN SITE correciton and reponses to city inspections
1
Good Afternoon Rob,
Here are the elevator plans and the data forms for the elevator. If you need anything else, please let me know. Thank
you,
Dale
From: Peter Carletti <peter@carlettiarchitects.com>
Sent: Wednesday, May 6, 2020 1:55 PM
To: Frisinger, Rob <robf@citvofanacortes.org>; Fyrrce, Groc <gfvrrce@citvofanacortes.org>; Measamer, Don
<don@citvofanacortes.org>; Dale King <Dale@faberconstruction.com>; Jack DeMooy <iack@faberconstruction.com>
Subject: RE: SALISH INN SITE correciton and reponses to city inspections
Understood and noted. I see you markups on our letter and the various attachments.
Items to still address noted below
0 Faber will email you elevator shops. Groc has that email but they will send direct to you too.
Faber has this response AND mark ups from the City and they will provide information in regards to the larger
hole sizes for the system. They are aware they have to use a 3M or a HILL product for the fire rated caulking to
be rated assemblies.
Thanks.
Peer Jo CarllettB, LEED
Principal
• CARLETTI
AFICFOTECTS P
. CHrrt—C tua :; iN 7a 3OR DaSl , a R..garcLNC
www. carlettiarch itects. com
Ph: 360-424-0394 ext.101
From Frisinger, Rob rmailto:robf@cityofanacortes.orgl
Sent Wednesday, May 06, 2020 1:16 PM
To: 'Peter Carletti'; Fyrrce, Groc; Measamer, Don; Dale King; Jack DeMooy
Subject RE: SALISH INN SITE correciton and reponses to city inspections
Hi Peter,
The city accepts most of the responses in your 5-4-20 letter to city. Please see attachments that include our comments.
Thanks,
Rob Frisinger
"1
. ;, ,tea '. -c`. t
4
2
Plans Examiner
robf@citvofanacortes.org
Office (360) 588-8297
Cell (360) 391-1403
My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56
From: Peter Carletti <peter@carlettlarchitects.com>
Sent: Monday, May 4, 2020 11:59 AM
a: Frtsinger, Rob <robf@cityofanacortes.org>; Fyrrce, Groc <gfvrrce@citvofanacortes.org>; Measamer, Don
<don@cityofanacortes.org>; Dale King <Dale@faberconstruction.com>; Jack DeMooy <Jack@faberconstruction.com>
Subject: SAL!SH INN SITE correciton and reponses to city inspections
Please see attached. this should address comments and concerns on site.
Thanks.
Peter Carletti, LEED
Principal
CAP4t1i''r.
ARCHI ACTS
MHf EC . RZ-,, TER DE2 ►.GN, & FLU>M`•; LNG
www. carlettiarch rtects. com
Ph: 360-424-0394 ext.101