Loading...
HomeMy WebLinkAboutCOR-2019-Roof Retro fit Sleepers - Oicles, Dave From: Fyrrce, Groc Sent: Tuesday, April 7, 2020 11:44 AM To: Oicles, Dave Subject: Fw: Salish Inn Construction: RFI #45 has been closed Dave, When you have time will you please lasersquid this along with any of the listed attachments. Thanks! Groc Fyrrce qo � 2 +� Building Inspector City of Anacortes / (360)293-1901 From:Jack Demooy(FABER CONSTRUCTION CORPORATION) <faber_construction_corporation_notifications@procoretech.com> Sent:Tuesday, April 7, 2020 10:52 AM To: Fyrrce, Groc Subject:Salish Inn Construction: RFI #45 has been closed Salish Inn Construction FABEFL CONSTRUCTION View online Open In App RFI #45 - Roof retro-fit has been closed. RFI Details QUESTION 1 Asked By: Jack Demooy (FABER CONSTRUCTION CORPORATION) Date: Wed Mar 18, 2020 at 09:01 am PDT Location: Salish Inn Anacortes 1 Question: Questions from City Inspector on roof retro fit sleepers since sleeper on double TJI can only be nailed from one side due to access issues . On RFI#39 double TJI,s also have full length filler blocking nailed every 6" staggered OC. on floors 3,4 and roof, so does RFI #39 also cover the double TJI that we have West of grid line D 7 Attachments: None Official Response Answered By: David Bradley (BRADLEY ENGINEERING, INC.) Date: Wed Mar 18, 2020 at 03:26 pm PDT Response: Double TJI's only need to be nailed on one side as noted above. No other structural modifications are required. Attachments: None All Replies Answered By: David Bradley (BRADLEY ENGINEERING, INC.) Date: Wed Mar 18, 2020 at 03:26 pm PDT Response: Double TJI's only need to be nailed on one side as noted above. No other structural modifications are required. Attachments: None ADDITIONAL DETAILS Project: Salish Inn Construction Subject: Roof retro-fit Date Initiated: 03/18/20 Created By: Jack Demooy (FABER CONSTRUCTION CORPORATION) Assigned To: King, Dale (FABER CONSTRUCTION CORPORATION) Responsible Contractor: FABER CONSTRUCTION CORPORATION Received From: Jack Demooy (FABER CONSTRUCTION CORPORATION) Distribution List: Bradley, David (BRADLEY ENGINEERING, INC.) Fyrrce, Groc (CITY OF ANACORTES) King, Dale (FABER CONSTRUCTION CORPORATION) 2 Cost Code: 06-50-65 - Engineered Lumber Schedule Impact: TBD Cost Impact: TBD Drawing Number: S4 S5 and S6 View online Open in App Po Bred By Procore su tpo p ) re:com I I s:I1s noc r rocore,cor€i 3 Oicles, Dave From: Fyrrce, Groc Sent: Tuesday, April 7, 2020 11:42 AM To: Oicles, Dave Subject: Fw: Salish Inn Construction: RFI #49 has been closed Dave, When you have time will you please lasersquid this along with the attachments. Thanks! Groc Fyrrce Building Inspector City of Anacortes (360)293-1901 From:Jack Demooy (FABER CONSTRUCTION CORPORATION) <faber_construction_corporation_notifications@procoretech.com> Sent:Tuesday, April 7, 2020 10:50 AM To: Fyrrce, Groc Subject:Salish Inn Construction: RFI#49 has been closed Salish Inn Construction FABER. CONSTRUCTION View online Open In Amp RFI #49 - Clarification of RFI #39 &#45 has been closed. QUESTION 1 Asked By: Jack Demooy (FABER CONSTRUCTION CORPORATION) Date: Wed Mar 25, 2020 at 01:57 pm PDT Location: Salish Inn Anacortes Question: Groc the city inspector wants to be sure that it is ok to have screws on one side of double TJI because we are not 1 able to get both sides of TJI with 3" long #10 screws as indicated on RFI#45 ? For your information I worded RFI#45 with verbage saying ( nailing) on one side should have mentioned screws) per inspector Groc. Attachments: 8C2C973D-1 EB5-4B58-A1 F3-1 BBD6B17EB22.ipeq Official Response Answered By: David Bradley (BRADLEY ENGINEERING, INC.) Date: Wed Mar 25, 2020 at 04:06 pm PDT Response: What is sketched out is structurally acceptable as depicted. Please see attached stamped sketch. Attachments: RFI#45 roof retrofit-signed.pdf All Replies Answered By: David Bradley (BRADLEY ENGINEERING, INC.) Date: Wed Mar 25, 2020 at 04:06 pm PDT Response: What is sketched out is structurally acceptable as depicted. Please see attached stamped sketch. Attachments: RFI #45 roof retrofit -signed.pdf ADDITIONAL DETAILS Project: Salish Inn Construction Subject: Clarification of RFI #39 &#45 Date Initiated: 03/25/20 Created By: Jack Demooy (FABER CONSTRUCTION CORPORATION) Assigned To: Raymond, Cathy (FABER CONSTRUCTION CORPORATION) King, Dale (FABER CONSTRUCTION CORPORATION) Responsible Contractor: FABER CONSTRUCTION CORPORATION Received From: Jack Demooy (FABER CONSTRUCTION CORPORATION) 2 Distribution List: Bradley, David (BRADLEY ENGINEERING, INC.) Carletti, Peter(CARLETTI ARCHITECTS) Fyrrce, Groc (CITY OF ANACORTES) King, Dale (FABER CONSTRUCTION CORPORATION) Raymond, Cathy (FABER CONSTRUCTION CORPORATION) Cost Code: 06-50-30 -Backframing / Blocking Schedule Impact: TBD Cost Impact: TBD View online Open In App Powered By Proton I soh JorM,rocore.com 1 htt :1Fsu.t ort, roccre cOM . 3 RFI #49 SALISH INN 3/25/20 ROOF RETROFIT ROOF DAVID C BRADLEY STATE OF WASHINGTON REGISTERED PROFESSIONAL ENGINEER RFI #49 SALISH INN 3/25/20 ROOF RETROFIT 0 0k es, Dave Frorna: Fyrrce, Groc Sent: Thursday, May 7, 2020 8:38 AM To: Oicles, Dave Subject: Fw: SALISH INN SITE correciton and reponses to city inspections Hi Dave, Will you squidify the emails and the attachments? Thanks. Groc Fyrrce Ruilding Inspector City of Anacortes (360)293-1901 A00%0w.4•4. ZPS` A%Y.>.tii4?"'•K4:4%dOMW&e%%..Al".f-::::: -: ..•••••:>1.?:30.? X.erW»»:.A.v»±:r:±}»:21Xt,:};74%eXv.414 W: S.}'lh:4 w ,-a•aC»{ c»XAY:z'l.%^G::xY.:4x'XtWYriVIAivrllA?7i4EU: X'Yee OWN%fAi:YZX4Ct:aX6•11C :40X40=0.4307[Wx.. }rtx:. % I.AYI.%Ot»r.:.::.:..:.....:...•..::J:^.s%:CY✓.+AXr.:1:30... .:FU]exF}Y.` X4.)::RUANi:_x:-: X _ktoXIOA7DXJ600767H9WTA00:3X-Y.:WiY..Y i=4:G.:)==-X i:%xx From: Fyrrce, Groc Sent: Thursday, May 7, 2020 8:37 AM Jo: Frisinger, Rob Subject: Re: SALISH INN SITE correciton and reponses to city inspections Hi Rob, requested that they send the elevator shop plans, that they were working off of, to the City so that they could be reviewed. I asked you if you received them because I had not. I do not recall ever receiving these. They had built the plans off of them, but they were never approved plans by the City. Hopefully they will send you the plans directly or send to the City. I will check my email again in case i am wrong. Groc Fyrrce Building Inspector City of Anacortes (360)293-1901 «?.i'?titiii . :1!!!.W0!,tlittV . +,iAA.l'A-.F}ivi '!HfY::Cr",iVT7! Pra. a!a-w. :•: r..•PaKWW..pitRt<y+.tysuitir-"xmitAlVean0".•o...vt.m.-...•rr,.e:!a•Jn'iO4!SFe}'r.ra:.-r...-./rs'yi xI.3hrra!V7 rVnn*Y•WW-Vrb,M4V!`+}r?40'=:4!OvrW4X1±c.YM?F4F.”44r- `"? t- From: Frisinger, Rob Sent: Wednesday, May 6, 2020 3:36 PM T o Fyrrce, Groc Subject: FW: SALISH INN SITE correciton and reponses to city inspections Hey Groc, What information had you requested for the elevator? Rob F. From: Dale King <Dale@faberconstruction.com> Sent: Wednesday, May 6, 2020 2:34 PM To: Frisinger, Rob <robf@cityofanacortes.org> Cc: Peter Carletti <peter@carlettiarchitects.com>; Fyrrce, Groc <gfyrrce@cityofanacortes.org>; Measamer, Don <don@cityofanacortes.org>; Jack DeMooy <Jack@faberconstruction.com> Subject: RE: SALISH INN SITE correciton and reponses to city inspections 1 Good Afternoon Rob, Here are the elevator plans and the data forms for the elevator. If you need anything else, please let me know. Thank you, Dale From: Peter Carletti <peter@carlettiarchitects.com> Sent: Wednesday, May 6, 2020 1:55 PM To: Frisinger, Rob <robf@citvofanacortes.org>; Fyrrce, Groc <gfvrrce@citvofanacortes.org>; Measamer, Don <don@citvofanacortes.org>; Dale King <Dale@faberconstruction.com>; Jack DeMooy <iack@faberconstruction.com> Subject: RE: SALISH INN SITE correciton and reponses to city inspections Understood and noted. I see you markups on our letter and the various attachments. Items to still address noted below 0 Faber will email you elevator shops. Groc has that email but they will send direct to you too. Faber has this response AND mark ups from the City and they will provide information in regards to the larger hole sizes for the system. They are aware they have to use a 3M or a HILL product for the fire rated caulking to be rated assemblies. Thanks. Peer Jo CarllettB, LEED Principal • CARLETTI AFICFOTECTS P . CHrrt—C tua :; iN 7a 3OR DaSl , a R..garcLNC www. carlettiarch itects. com Ph: 360-424-0394 ext.101 From Frisinger, Rob rmailto:robf@cityofanacortes.orgl Sent Wednesday, May 06, 2020 1:16 PM To: 'Peter Carletti'; Fyrrce, Groc; Measamer, Don; Dale King; Jack DeMooy Subject RE: SALISH INN SITE correciton and reponses to city inspections Hi Peter, The city accepts most of the responses in your 5-4-20 letter to city. Please see attachments that include our comments. Thanks, Rob Frisinger "1 . ;, ,tea '. -c`. t 4 2 Plans Examiner robf@citvofanacortes.org Office (360) 588-8297 Cell (360) 391-1403 My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56 From: Peter Carletti <peter@carlettlarchitects.com> Sent: Monday, May 4, 2020 11:59 AM a: Frtsinger, Rob <robf@cityofanacortes.org>; Fyrrce, Groc <gfvrrce@citvofanacortes.org>; Measamer, Don <don@cityofanacortes.org>; Dale King <Dale@faberconstruction.com>; Jack DeMooy <Jack@faberconstruction.com> Subject: SAL!SH INN SITE correciton and reponses to city inspections Please see attached. this should address comments and concerns on site. Thanks. Peter Carletti, LEED Principal CAP4t1i''r. ARCHI ACTS MHf EC . RZ-,, TER DE2 ►.GN, & FLU>M`•; LNG www. carlettiarch rtects. com Ph: 360-424-0394 ext.101