Loading...
HomeMy WebLinkAboutPermit File BLD-2019-0587 2215 Lake Park Drive 0 ` City of Anacortes Invoice/Permit#: BLD-2019-0587 904 6th Street PO Box 547 Applied date: 09/05/2019 ' . . Issue date: 02/11/2020 Anacortes, WA 98221-0547 Expire date: 08/09/2021 �' (360) 293-1901 Job Address: 2215 LAKE PARK DR Permit Type: Single Family Alteration/Repair Permit ANACORTES WA 98221-8733 Project: APN: P99134 Remarks: Build an addition to garage and build a new covered patio. Owner: JOHN GRAYSON Contractor: Address: 2215 LAKE PARK DR Address: ANACORTES WA 98221-8733 Phone: (360) 708-1577 Phone: License#: General Information: Fees: Deck Square Footage 270 Building Permit Fee 853.75 Building Valuation 80000 Plan Review Fee 554.94 Garage Square Footage 540 State Building Code Fee Resi 6.50 Total Calculated: 1,415.19 Deposits/Receipts: 554.94 Total Due: 860.25 n� ��M f q PP), C`77t M I'ssr` • Permits and Insp...-BLD-2019-0587-2020 020060-0009 Keri Kna...02/14/2020 03:04PM 10769-JOHN GRAYSON I Ig 2FGj 7 u nliNL tEr t /l38i-PFerJbRK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF (M:CNIB< ) PI!J N OR WORK TSCS.LTSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I lif_fr4Mig.rEK IFia�itTHAT I HA\kpfxj4D AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS g6,44L OFDASP RfrMfi DOES NOT PRES MEI TOT GIEVEO UT ORITYWITO VIOLA EPOR CANICEL THETPROVISS OCSIOF ANYOTHEER STATEOR E LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. S ATURE OF OWNER OR AUTHORIZED AGENT ISSUED B , City of Anacortes Invoice/Permit#: BLD-2019-0587 904 6th Street Applied date: 09/05/2019 P.O.Box 547 Issue date: ►�"` = ? Anacortes, WA 98221-0547 r Expire date: 03/03/2021 ` 'W=` (360) 293-1901 Job Address: 2215 LAKE PARK DR Permit Type: Single Family Alteration/Repair Permit ANACORTES WA 98221-8733 Project: APN: P99134 Remarks: Build an addition to garage and build a new covered patio. Owner: JOHN GRAYSON Contractor: Address: 2215 LAKE PARK DR Address: ANACORTES WA 98221-8733 Phone: (360) 708-1577 Phone: License#: General Information: Fees: Deck Square Footage 270 Building Permit Fee 853.75 Building Valuation 80000 Plan Review Fee 554.94 Garage Square Footage 540 State Building Code Fee Resi 6.50 Total Calculated: 1,415.19 Deposits/Receipts: 0.00 Total Due: 1,415.19 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY ! hZLrTTTrT}T :CC NIU£0 00.00Z :Iunowv uonoesueii 00.00Z :lunowv tuaWAed 1luaaad iledai/uoi eaa1IV Al!wed albuiS L890-6I.OZ-C110 NOSAVIJ NHOf— 69L0I• Nd9C:Zo 61.oZ/90/60 elae0 17I.o0-79C61,0 61 OZ - L890-61.0 -CI1B - ...dsul pue S1IW ad Permits and Insp... - BLD-2019-0587 - 2019 019354-0015 Carla Br... 09/05/2019 02:38PM 10769 - JOHN GRAYSON BLD-2019-0587 Single Family Alteration/Repair Permit Payment Amount: 354.94 Transaction Amount: 354.94 03FINCC: y`*****1t}7241 Site Address �, _ _� y.,,.,„(')(�2Project Building Permit # 'C'S\_ ^?0\ -GI) d,S s_cm_- _-_ - . _- _ Building /4'4 / J l/ ' 6:e ,,t --- iy c- d odji__1_--_,_ _! /� � ,'1 t - c ci Ictd ___1 a _g; _ 1 i, G ,,,t 0‘ 1 1 , i ---1 , , Public Works rtifi ' 1551E5 r 1 I , r- A 11 l Planning `v� �� V 1 i 1 1 I 1 ----.� — — I i 1! 5`o �n�rmt-r � /7 Z0 062 gzcf-CcOfd �1 i I —5- — --- - 1 04 j G,o ill _ _ i 1 1 1 Fire I i i I 1 Project Inter-Departmental Plan Review Trackung G1T Y O( Storm Water Drainage Report Minimum Requirements 1 through 5 ,� Minimum Requirement 1 through 9 ENGINEERING DEPARTMENT C 0 g` 904 6th Street Anacortes, WA 98221 FILE COPY www.anacorteswa.qov Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: Project Address: 2215 Lake Park Drive Submittal Date: I 7 — ZOZO Parcel Number: P99134 Revision Numb i/ rL Permit Number: is_ 201 q -0687 Reviewer: i� ✓�' Acceptance Date (COA): 2/4. z.o FRONT OF REPORT: Submittal Checklist: (All items listed below are required for a complete submittal) o Cover Sheet (Preparer to Provide): Project title, Location, Revision dates, Engineer's Stamp o TAB 1: Minimum Requirement#2 —Construction Stormwater Pollution Prevention (SWPP) o APPENDIX 1 - Survey performed by a Professional Land Surveyor o APPENDIX 2 - Model Soil Management Plan for BMP T5.13 o APPENDIX 3 - Determining Construction Site Sediment Damage Potential (Appendix 7) o APPENDIX 4 - Site Plan with all applicable information (Minimum Size 11x17—30 scale) o APPENDIX 5 - Documented Site Photos (North, South, East and West) Stormwater Management Requirements: o Refer to the 2012\14 Department of Ecology Manual, as amended in 2014 for further required information. o See also, City of Anacortes Municipal Code 19.76 for additional information o See also, current Engineering Development Standards, Chapter 2- Storm Drainage for additional information. JAN 0 7 2020 pJ CITY OF ANACOR1i`s Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Project Description and Summary: Summary Table Existing Proposed Development Type Single Family Home Addition Number of Lots 1 Lot Acreage in SF 18,001 SF Soil Type(s) Site Sediment Transport Score (High\Low) Low 90 Depth to Ground Water Table (Feet and Inches) N/A (See completed Soils Analysis(Volume 1, Chapter 3.1.1) Infiltration Rate during Rainy Season (Inch\Per Hour) N/A Impervious Surface (on-site) Impervious Surface (off-site) New and Replaced Hard Surface Total (SF) 1,293 SF Lot Coverage (Percentage) BMP (Required Minimum Requirement 5) BMP T5.13 Post Construction Soils Existing Site Conditions Summary: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction PhasinglSequence) This site has an existing single family home that will not be disturbed on an existing developed lot. Developed Conditions Summary: (Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard surfaces, proposed contours) This proposal is to add a single car garage and covered patio area for a total of 1,293 square feet of new or replace impervious area. Complete the Applicability Requirements —Flow Chart (Figure 1-2.4.1 Attached, Figure 1-2.4.2 Attached and Figure 1-2.5.1 Attached) - Highlight the path and attach Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Figure 1-2.4.1 Flow Chart for Determining Requirements for New Development Start Here Does the site have 35% Yes See Redevelopment Minimum or more of existing Requirements and Flow Chart impervious coverage? (Figure 1-2_4.2). No Does the project convert /. q acres or more of vegetation to Does the project result to lawn or landscaped areas. or 5.000 square feet. or No convert 2.5 acres or more of greater, of new plus ► native vegetation to pasture? replaced hard surface area? \No Yes Yes Does the project result in 2 000 • square feet. or greater. of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted Yes No vegetation areas. Does the project have land Minimum Requirements#1 disturbing activities of 7.000 through #5 apply to the new 4 Yet square feet or greater? and replaced hard surfaces and the land disturbed. No • Minimum Requirement#2 applies. Figure i-2.4.1 Flow Chart for Determining Requirements for New Development DEPARTMENT OF Revised June2015 ECOLOGYPlease see httplAwirw.ecy.wa.gov/copyright.html wrw_ecy.wa.gov/copyright.html for copyright notice including permissions. State of Washington limitation of liability, and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume I - Chapter 2 - Page 37 version uate: uctooer r , vrevious version uate: reoruary zu, zul� TAB 1 (MINIMUM REQUIREMENT#2) • 1-2.5.2 Minimum Requirement#2—Construction Stormwater Pollution Prevention Plan (SWPP) - All projects are required to complete Minimum Requirement 2. - Refer to the 13 Elements of the SWPP (See document below, complete and attach) - See attached Table 4.1.1, Table 4.2.1 and Table - Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Table 4.1.1 Source Control BMP's by SWPPP Element Element el Element in Elementa13 Prwerw EstablishElement115 ElementN Element/9 Elementtlll Elemental2 Protect Low BMP or Element Name St.blize Protect Control Ydntein Manage this VegetetbnlMark Constnnetbn Sob Sbpes Pollutions BAN Project Impact Cleminullph Amen Development SUP C101: Preserving Natural Vegetation ✓ BYP C102:Buffer Zones ✓ ✓ BLIP C103:High L4lbllty Plstk or Mete! ✓ ✓ Fence BMP C105: Stabilised Construction ✓ Entrance I Exit IMP C103:WheelWsh ✓ IMP C10T:Comtructbn RoadlPakIig ✓ Area Stebllratton BLIP C120:Temporary and Permanent ✓ ✓ Seeding IMP C121: Mukhing ✓ ✓ BLIP C122: Net and Bhmkete ✓ ✓ BLIP C123: Plonk Covering ✓ BMP C124: Sodding ✓ BMP C125:TopsollIng/Composting ✓ IMP C121: Polyecrplorrlde for Soll Erosion ✓ Protection IMP C130: Surface Roughening ✓ ✓ BMP C131:Gradient Terraces ✓ �/ SUPC110: Duet Control ✓ BMP C130: LI.Mrbb On Hand ✓ ✓ BMP C151:Concrete Handling ✓ IMP C152: Seeeuttng and Surfacing ✓ Polutbn Prevention BMP C133: MiMrlI Ulm,Storage and ✓ Containment IMP C13i:Concrete WbehornArea ✓ IMP C140:Certified Erosion and ✓ ✓ Sediment Control Lead BLIP C142:Scheduing ✓ Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element Bernard"3 Benoit."-ElementA6 Element#1 t3emantrB 13e ieitt Elementl10 6M.ranlNla BMP or Element dame • Control install Protect PI'at ct 9lebllhrs Control Control De- Protect Low' Flaw Rabe* ad' Slopes _Drain bdub end Outlets PollutPollutants' ' Watering ant 2tralose 1011AP C200:Intorceplor Dike end Saville ✓ d 1341P C201: Cass-Lined Chminsla ✓ 1311P C2,Q:Channel lining ✓ BMP CMS;Water Bars J ✓ AMP CAA Pipe Slope Drains ✓ SNP CAM Sulmu fa.s Drains - ✓ BMP COX:Level Spreader ✓ IMPCSOT:Check Dome ✓ ✓ BMP C9011: Trlanpt arellt Dias{tieol.atls Pncaeed Oaeca Derail 1 BMP CONIC Oult rE PirdeC6ae ,l BMP C291h Storm Drain Inlet Protection- ✓ BMP C231: ?Mali Bawler ✓ ./ BMP C23t Gravel Filler Bonn I BMP C233: Sint Fence ✓ { SNIP C23QC V.pe led tltrip BMPC23&mows ✓ BalP C Vegitethrs Filtration ,! BMP C2i0: Sediment Try f ✓ BMPC241:Temporary Setbilent Peed ,/ f IMP C2Sle Construelina Slomwrtaler ✓ Chasid tre.hne.t 13MP C2i1:Construction Btenartialer FIMratioa • BMP CMi%High pH Neutralisation Using V CO2 • .BMP CM pH Control for High pH Nader ✓ Version Date: October 7, 2019 Previous Version Date: February 20, 2019 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWVV). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name: John & Kimverly Grayson Site Address: 2215 Lake Park Drive Prepared By:_Dale Herrigstad P.E. The Stormwater checklist or building permit determined that: Li The 13 elements must be addressed ❑ These elements must be addressed for construction activity adding under for construction activity adding 2,000 2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, provide the BMP's that will be applicable to your project. Use the attached Tables provided. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits ❑ Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. ❑ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. _A silt fence BMP C233 will be installed along the east boundary of the project to indicate the clearing limits. ELEMENT 2: Establish Construction Access LI Limit construction vehicle access and exit to one route, if possible. Li Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. ❑ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. • If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or pick up and transport the sediment to a controlled sediment disposal area. 11 Conduct street washing only after sediment is removed in accordance with the above bullet. u Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. The construction entrance will be limited to one location at 2215 Lake Park Drive with BMP C105 or C107 (Construction Entrance.) Any dirt or mud that is tracked onto the roadway will be clean immediately. To be installed prior to construction. BMP to be monitored daily and repaired as needed. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 ELEMENT 3: Control Flow Rates ❑ Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. ❑ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement(e.g. impervious surfaces). ❑ If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. The area of construction is flat. A silt fence BMP C233 is to be installed along the east side of the property. ELEMENT 4: Install Sediment Controls ❑ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. ❑ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BM Ps shall be functional before other land disturbing activities take place. ❑ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. ❑ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element#3, bullet#1. ❑ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. ❑ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. ❑ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. Per BMP C233 a silt fence will be installed as noted in element 3. To be installed prior to the start of construction. BMP to be monitored daily and repaired as needed. BMP C162 Scheduling. ELEMENT 5: Stabilize Soils ❑ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early application of gravel base early on areas to be paved, and dust control. ❑ Control stormwater volume and velocity within the site to minimize soil erosion. ❑ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. ❑ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 — Sept 30): 7 days o During the wet season (Oct 1 —Apr 30): 2 days ❑ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. ❑ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be Version Date: October 7, 2019 Previous Version Date: February 20, 2019 located away from storm drain inlets, waterways, and drainage channels. ❑ Minimize the amount of soil exposed during construction activity. ❑ Minimize the disturbance of steep slopes. ❑ Minimize soil compaction and, unless infeasible, preserve topsoil. Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching and plastic covering. Install plastic covering per BMP C123 on Soils Stockpiles. BMP to be monitored daily and repaired as needed. Refer to Table 4.1.1 in MR#2. ELEMENT 6: Protect Slopes ❑ Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). El Divert off-site stormwater(run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. D At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as "landscaped" area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. • Place excavated material on the uphill side of trenches, consistent with safety and space considerations. Cl Place check dams at regular intervals within constructed channels that are cut down a slope. ❑ Consider soil types and its potential for erosion. ❑ Stabilize soils on slopes, as specified in Element 5. • BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. The site is flat with a 1 to 2% slope and slope protection will not be an issue. ELEMENT 7: Protect Drain Inlets ❑ Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ❑ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). • Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ❑ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. ❑ Inlets should be inspected weekly at a minimum and daily during storm events. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Per detail 1-40.20-00 Storm Drain Inlet protection devices will be installed at existing catch basins in the immediate vicinity of the project. To be installed prior to the start of any construction. The closest down hill catch basin is west of the driveway on Lake Park Drive approximately 165 feet. BMP to be monitored daily and repaired as needed. ELEMENT 8: Stabilize Channels and Outlets ❑ , Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. ❑ Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. ❑ The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. No stormwater runoff will be conveyed off site via channels, swales, or streams. ELEMENT 9: Control Pollutants ❑ Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. ❑ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site in a manner that does not cause contamination of stormwater. ❑ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double-walled tanks do not require additional secondary containment. ❑ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. • Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. ❑ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and procedures. ❑ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this • contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. ❑ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. ❑ Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. ❑ Woody debris may be chopped and spread on site. ❑ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel Version Date: October 7, 2019 Previous Version Date: February 20, 2019 tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle. Per BMP C154 a Concrete Washout Area is to be installed onsite to capture contaminated water from concrete washouts. To be installed prior to foundation/ concrete installation. BMP to be monitored daily and repaired as needed. Contractor is to provide spill prevention kits for excavation and concrete crews are required on Site. ELEMENT 10: Control De-Watering ❑ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. Li Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that"surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. • Handle highly turbid or contaminated dewatering water separately from stormwater. ❑ Other treatment or disposal options may include: 1. Infiltration 2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology-approved on-site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ❑ Discharging sediment-laden (muddy) water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration and preserving vegetation. The excavation is small and dewatering will not be an issue. ELEMENT 11: Maintain BMPs ❑ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. iL Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. LI Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. C_ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 BMP to be monitored daily and repaired as needed and or as required by the City of Anacortes. Weekly reports are required to be submitted to the building department. ELEMENT 12: Manage the Project—Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL) for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on-site or on-call at all times. ❑ Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. ❑ Inspection and monitoring— Inspect, maintain, and repair all BM Ps as needed to assure continued performance of their intended function. ❑ Maintain, update, and implement the SWPPP. ❑ Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). ❑ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. ❑ The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. BMP to be monitored daily and repaired as needed and the responsibility of the owner. Project does not requires a certified CESCL. ELEMENT 13: Protect Low Impact Development BMPS ❑ If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the Manual for requirements. No LID BMPS are proposed. plicant Signature Date Version Date: October 7, 2019 Previous Version Date: February 20, 2019 0 25 50 100 150 Plat 1....B./......00=1 SCALE NW 1 /4, NW 1 /4, SECTION 36 , T. 35 N . R . 1 E . , W. M . SKAGIT COUNTY, WASHINGTON • • 3 100.00' i I• 160.66' • '..I^_ b 290.03' re) 30.00'.: '." _ ( 30.00 0 1':•30.00' M N p. o . 88° DESCRIPTION N 88° 36' • 33" E. c - o 1 N. 136' 33" E. "'o N. 88° 36' 33" E. I: a N N � 'I. 130.27' PARCEL"A" N a •, 127.81' 132.08' °•,.'• I "' i.:••20.0 p. The Northwest Quarter of the Northwest Quarter,East of the road In • 2� • • I.. _ x R conveyed to Skagit County by deed recorded under Auditor's File No. Sk_ 0 1 '?D, `'� SO' 151090, Records of Skagit County,Washington, in Section 36, 50 'P,� 00 1 I - 48° SS' 25" I Township 35 North, Range 1 East of the Willamette Meridain. R ' Sp? r !N= 47°27' 21" • L = 42.69• o I 1 /L1 = 53° 47' S0" L = 41.41' i` o " « C� /- PARCEL, B �, \ / L = 46.95' - 13 �'� R = 25.00' `t `r' That portion of the South 10 rods of the Southwest Quarter of the 1 v, ►� `r' S40 ► 48° 11' 23" Southwest Quarter of Section 25,Township 35 North, Range 1 East of • \, R = 25.00' N R '- 1 '�� 2 �I in t = the Willarnrtte Meridian, described as follows: - , p = 48° 11' 23" t,9° I o N t L = 21.03' I 1 `C D' 1\03 ;,, a Beginningat the Southwest corner of said Section 25; thence North I L = 21.03' �*+ " r.; 88°36'33' East 30.00 feet along the South line of said Section 25: i 25' 25' ,r^ ~ s - o �i N. 88° 36' 33" E. thence North 0°23 77' West.1g6.53 feet; thence South 89°36'33" t 1 N. 89° 16' 22" E. N. 88° 36' 33" E. z c; ., i West 30 feet, more or less, to the West line of said Section 36; I 150.56' o, 167.58' 1 I••. 155.01' thence Southerly along said West line to the Point of Beginning; I I I o. .0 1'1'IS' " , - - ••�• /9.4.0. 30' EXCEPT any portion thereof within the road known as A Avenue. rn 1 I `� o I m IO' UTILITY______ __ o `=' - - I Situate in Skagit County,Washington. EASEMENT _ n , a cy, 0 fY °� 9 m 12 N N -,r - G �' } I 30" a Ln o: co o ° I ^ a r' J 3 DEDICATION `"� U 1 W ' r' "' r, 1 Q Know All Men by these Presents that we, the undersigned owners in 1 o "' i 4 cc I Q the fc' simple or contract purchaser and or mortgage holder of the I • o o ° „ 1 land hereby platted, do hereby declare this plat and dedicate to the rI o N. 89° 56' 16" E. N. 89 58 05 E. r Id., N. 88° 36' 33 ' E. use of the public forever all roads and ways, except private and r * ' 150.42' ° 166.94' , �S 25' - .'I 164.96' 1 corporate roads, shown hereon with the right to make all necessary 1 N I s ° r •,••"R,;• r'. 4 , slopes for cuts and fills, and the right to continue to drain said • W 1 r -' i 4 oO roads and ways over and across any lot or lots, where water might o1 i� 10' UTILITY EASEMET z - 1 64 , 1 O 3 take a natural course, in the original reasonable grading of the 1 �► , o :,1 - f 6 2-, - i roads and ways shown hereon; and do hereby dedicate to the use 1,, a "'rr,I "r " NI of the public forever the 10' BRIDLE PATH EASEMENT shown r I >' ' 10 o m 1 1 R = 425.00' r 00' e� o 1 L a, hereon for use as a pedestrian and horse riding hail. ` s m a " N = 3° 22' 53" Q U o "' Following original reasonable grading of roads and ways hereon, no 1 z -_, I p �; L = 25.08' ":"'1•••• - rn z r 3 o drainage waters on any lot or lots shall be diverted or blocked I W I 1c�p Ni; t' • - .l / /"t: r - from their natural course so as to discharge upon any public road 1 e= - I (L , qt.° , o R = 25.00' ... ' ► = 6° 17' 39" N right-of-way, or to hamper road drainage. Any enclosing of drainage • l 1\ D , ��. .� !1= 82° 07' 14,' 9 in' 1 = 41.20' m waters in culverts of drains or rerouting shall be done by and at • _ __ - -' I \-__ _ _ _ _ -- - - - - - - - - - - -L = 35.83'- '� I the expense of such owner. - - - - - ( t 123.48' 132.33' I ,�' m I N. 88° 36' 33" E. 0 IN WITNESS WHEREOF we have hereunto set"our hands and seals irt r, this Arrt day of - ,19_-`i I `LL + 285.89' w, 5.70'.. 'cnr 1`�' a 1 187.87' ,• N• 107.69' 380.00' ____ - . I = PUGET SOUND DEVELOPMENT, a General Partnership. - _____ - �_ .; = 1 m CURVE . •.. LAKE... N. 89° 56' 16" E. PARK 493.39' DRIVE N �, � � � R = 400.00' �t A.c� .- � 444.85' ', io . -c70 "' p = 19° 13' 09" - -i - - _ _115.65'_ _ _ _ _ __ _ _ __ __120.00'- - - ---- - - - - -T20.00'- - - - - - - - -89.20'- -- - �. �,' �'• „ � L a 13�.i7' / . re) a SAS Io' UTILITY 15-, c)`I - r�l J zi : -� 'a' T = 67.72' o - ACKNOWLEDGEMENT 00 •O ' EASEMENT � '' ° O V 1' c- t O 43 . 7 , ,CS -)�1 , 1v -1 0 State of Washington . S 9 t eel t c\1 County of 3 \ . 1• w r. 1 cer fy that I know or have satisfactory evidence that W 25�O''.,, 1 �' . rT N. 88° 36' 33" E. tr.a.ld A . lJ.:,po 1�uQ r-i-h 31 30 29 a ' 29 I - I signed this instrument, on oath stated that (he/ )was 33 �, r,•, , •.r o 0 3° 0 I 181.95' Sp authorized to execute th instrument and acknowledged it as the ,'• a c a m p 2261' ► Q ty ��t �a ( -t�� - cv�r � o 0 - o 1. of PUGET SOUND DEVELOPMENT,a General Partnership z 0 0 3 I Ir•--10' UTILITY EASEMENT I to be the free and voluntary act of such party o z t ma's I 1 for the uses and purposes mentioned in the instrument. \rel. . t o Dated Sa.,,.��r13 as. 144 I z • _5 I C Q a Signature of 4"1' E. C o a' m. 1 U N Notary Public LL k1 121.24' 120.OW - - - �- - 120.00' - -- - - - -1 N' B1° '00' t1 `D m Title mar e - 130. t z My appointment expires to-.ag 3 381.24' N. 89° 56' 16" E. Ft---- -- N. 89° 56' 16" E. -- ' I� 1 1 i �-15' t 15' It `_� 25' ► 25 t SURVEYOR CERTIFICATE 10' DRAINAGE t� 2 Q II N. 88° 36' 33" E. 1 hereby certify that the plat of PARKSIDE is based upon an actual EASEMENT I U 1 Li-JQ N 166.47' survey and subdivision of Section 36,Township 35 North, Range 1 TRACT I �� I- East, W.M.; that the courses and distances are shown correctly on ' the ground; and that I have fully complied with the pro of R t.2.5.00:1 d i the statutes and platting regulations. fit; il. "' C`�44° 40 54 Ii 79 f •r�f'�;rt: 2� t 477-,-r"rk:,,, te IV `�, O.BB• / © - I Certificate No, 9� •.) f p 11° 56' 19" 35.93' ► Date �=�,,=%� is i;�9! , SEMRAU & LISSER t 6'1.1Z /\\ 3 I a� fir I .I- L 1 �► 9F F° SURVEYING • ENGINEERING • PLANNING G�7 i �, DRIVE ,. I {*, C'ST�`i ' 2118 RIVERSIDE DRIVE - SUITE 104 p MOUNT •VERNON WA 98273 \ G�OR� N N. 85°3g_41 E"t2 `"4 u, } 206-424-9566 \ , N� �------ ' ` , PARKSIDE SHEET 3 OF JOB NO. 9-002 i, Gar 77/2. APPENDIX 2— Model Soil Management Plan for BMP T5.13 An alternate document acceptable to the City of Anacortes is a Test Report provided by the Soils Supplier that identifies the soils to be used meet the specifications outlined under Minimum Requirement 5. The specifications are in both WSDOT and CSI Formats. For specifications, refer to the above referenced PDF. This submittal can be a deferred submittal since most projects are not sure who the supplier will be at the time of building permit application. For projects that trigger Minimum Requirements 1 through 5, the Test Report will be provided to the Building Department. Projects triggering Minimum Requirements 1 through 9, the Test Report will be provided to the Engineering Department. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 DEFERRED SUBMITTAL: PROVIDE A TEST REPORT FROM SOILS SUPPLIER TO THE BUILDING DEPT. PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age# of pages Complete all information on page 1;only site address and permit number on additional pages. Site Address/Lot No.: Permit Type: Permit Number: i Permit Holder: Phone: 'C Mailing Address: Contact Person: Phone: Plan Prepared By: ATTACHMENTS REQUIRED(Check off required items that are attached to this plan) Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required) New planting beds and turf areas(amendment required) _Type of soil improvement proposed for each area Soil test results(required if proposing custom amendment rates) Product test results for proposed amendments AREA# (should match Area,+1 on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: square feet SCARIFICATION inches(depth)of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Topsoil import =cu.yards per 1,000 sq.ft. Amend with compost X ,000s sq.ft. in this area Stockpile and amend =cubic yards of amendment -->—>—>-->—> QUANTITY: CU. YDS. ( cu.yds. stockpiled) (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil&compost lift X 3.1 Amend =cu. yards/1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu.yds. stockpiled) =cubic yards of amendment -->—>——>-* QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) =cubic yards of mulch —>—>-->——>—> QUANTITY: CU. YDS. TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only, totaling all areas/pages in this Plan) ❑ Product#1: ❑Quantity: cu.yds. ❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(ves/no) ❑ Product#2: 0 Quantity: cu.yds. ❑ Test Results:—%organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) ❑ Product#3: 0 Quantity: cu.yds. ❑ Test Results:_%organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no) Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: Version Date: October 7, 2019 Previous Version Date: February 20, 2019 APPENDIX 3— Determining Construction Site Sediment Damage Potential (Appendix 7—NPDES Phase II Permit) Note: See attached. All projects within the City of Anacortes are required to complete that document under Appendix 4. Version Date: October 7, 2019 Previous Version Date: February 20, 2019 Western Washington Phase II Stormwater Permit i. APPENDIX 7 - Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site-specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. i. STEP 1 —Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near-shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater) associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. ii. STEP 2— Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel or ditch. August 1, 2013, Modified,January 16, 2015 Appendix 7- Determining Sediment Damage: Potential Page 1 of 3 Version Date: October 7, 2019 Previous Version Date: February 20, 2019 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: iv. Sheet flow through a vegetated area with dense ground cover v. Flow through a wetland not included as a sensitive feature vi. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. vii. STEP 3—Construction Site Sediment Transport Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low 11 100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoff. Construction Site Sediment Transport Potential Worksheet A. Existing slope of site (average, weighted by aerial extent): Points 2% or less .. 0 >2-5% 5 >5-10% 15 >10-15% 30 >15% 50 B. Site ite Area to be a cleared and/or graded: <5,000 sq. ft 0 5,000 sq. ft. — 1 acre 30 >1 acres 50 C. Quantity of cut and/or fill on site: <500 cubic yards 0 500—5,000 cubic yards 5 >5,000— 10,000 cubic yards 10 >10,000—20,000 cubic yards 25 >20,000 cubic yards 40 D. Runoff potential of predominant soils (Natural Resources Conservation Service): Hydrologic soil group A 0 Hydrologic soil group B 10 Hydrologic soil group C 20 Hydrologic soil group D 40 E. Erosion Potential of predominant soils (Unified Classification System): GW, GP, SW, SP soils 0 Dual classifications (GW-GM, GP-GM, GW-GC, GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) 10 GM, GC, SM, SC soils 20 ML, CL, MH, CH soils 40 F. Surface or Groundwater entering site identified and intercepted1: Yes 0 No 25 G. Depth of cut or height of fill >10 feet: Yes 25 No 0 H. Clearing and grading will occur in the wet season (October 1 —May 1): Yes 50 No 0 TOTAL POINTS 90 1 If no surface or groundwater enters site, give 0 points. i. 0 _ 1 War C. 15 4 .....------------- ' a2AZA ET A 120.00E 1----- 40 V 7 -r V 5, Aio T nq /j - -- -- ` N 8 V 1 a7 V 4!•• . .��ME. � .Mt IMAM . p i '`�' rI i A Rib E.- /r. k ' ZQ'SETBACK EXISTING K 1 /1,,11� 1) 4d ��1 50F1 '.. GC2 7 coNCDRE ` LiV/V f �V V WA/ fps" r \ I PROPOSED- W CONC. < BMP C1231 DRIVE I K TEMPORARY :,oil STOCKPILE - ---___-� EXTENSION 1 i LOCATION: COVER w/ STRAW { OR vISOLIEEN & SILT FENCE hla G01VPI SLOFE I - I�_-_._._.. YF `1'r':;'.'i r: :4, { aRbU BMP FT l: 0,+=w'r ; 1. SILT FENCE 1` ,1,. PROPOSED 1°} ' \� GARAGE ui cni-- i Alo i 'EXISTING ;m. J \ yr�^rt r MI ,`' `..RESIDENCE Iz �C 4 i^ '/1 \` •.\ ''. II \ II`r- IF/ \`. 'ii�i:?L:iti j�::iry�fr \._-- STING PROPOSED �.+ .`-- CONc. COVERED ; PATIO CONC. t • PATIO �.. �-__ _ -- --_,, C 5' I a - S (FK LOT 30 --X Jo'X I PARKSIDE SETB'A K • 1 I LI _. — \ _ ._-- - - - - - - ..._ _ _ _ _ _ _ _ _ _ _ J I • I 20'SETBACK BMP C2331 I i 120,00E ir SITE PLAN . 11 1EE= 20E-D" .6 D X APPENDIX 6—Documented Site Photos (Show all directions of the site, including frontage) (Insert Photo Here) 1 I Location: 2215 Lake Park Drive Description of the photo: Location of Garage Addition Photo taken by: Dale Herrigstad 12-24-2019 • if< ' I � wit , Figure 11-4.1.1 Stabilized Construction Entrance NOT TO SCALE rik0000. eso- •00110 it;Y // 1III�I /.0 10. ��••Y�Y�ri•Y�Y� 100'min. '�...�..�.•�.•�..I. Install driveway • � � �' �Yad• culvert if there is a roadside ditch present ��•� 4"-8"quarry spats Geotextile �'!i!�`a�'aY•�r•*1. '1' A dd.1•• 1110. f `. 10 a:a:ft aft " .lam Notes: 15'min. 1. Driveway shall meet 12"minimum thickness the requirements of the permitting agency. 2. It is recommended that Provide full width the entrance be of ingress/egress crowned so that runoff area drains off the pad. m..► ll3111 Figure 11-4.1 .1 Stabilized Construction Entrance DEPARTMENT OF Revised June 2015 ECOLOGYPlease see hftp://www.ecy.wa.gou/copyright.html for copyright notice including permissions, State of Washington limitation of liability,and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume II- Chapter 4 -Page 273 BMP C1O7: Construction Road/Parking Area Stabilization Purpose Stabilizing subdivision roads, parking areas, and other on-site vehicle transportation routes immediately after grading reduces erosion caused by construction traffic or runoff. Conditions of Use Roads or parking areas shall be stabilized wherever they are constructed, whether per- manent or temporary, for use by construction traffic. . High Visibility Fencing (see BMP C103: High Visibility Fence (p.269)) shall be installed, if necessary, to limit the access of vehicles to only those roads and park- ing areas that are stabilized. Design and Installation Specifications . On areas that will receive asphalt as part of the project, install the first lift as soon as possible. . A 6-inch depth of 2-to 4-inch crushed rock, gravel base, or crushed surfacing base course shall be applied immediately after grading or utility installation. A 4-inch course of asphalt treated base (ATB) may also be used, or the road/parking area may be paved. It may also be possible to use cement or calcium chloride for soil stabilization. If cement or cement kiln dust is used for roadbase stabilization, pH monitoring and BMPs (BMP C252: High pH Neutralization Using CO2 (p.409) and BMP C253: pH Control for High pH Water(p.412)) are necessary to evaluate and minimize the effects on stormwater. If the area will not be used for permanent roads, parking areas, or structures, a 6-inch depth of hog fuel may also be used, but this is likely to require more maintenance. Whenever possible, construction roads and parking areas shall be placed on a firm, compacted subgrade. . Temporary road gradients shall not exceed 15 percent. Roadways shall be care- fully graded to drain. Drainage ditches shall be provided on each side of the road- way in the case of a crowned section, or on one side in the case of a super- elevated section. Drainage ditches shall be directed to a sediment control BMP. . Rather than relying on ditches, it may also be possible to grade the road so that run- off sheet-flows into a heavily vegetated area with a well-developed topsoil. Land- scaped areas are not adequate. If this area has at least 50 feet of vegetation that water can flow through, then it is generally preferable to use the vegetation to treat runoff, rather than a sediment pond or trap. The 50 feet shall not include wetlands or their buffers. If runoff is allowed to sheetflow through adjacent vegetated areas, it is vital to design the roadways and parking areas so that no concentrated runoff is created. 2014 Stormwater Management Manual for Western Washington Volume II- Chapter 4 -Page 277 • Storm drain inlets shall be protected to prevent sediment-laden water entering the storm drain system (see BMP C220: Storm Drain Inlet Protection (p.357)). Maintenance Standards Inspect stabilized areas regularly, especially after large storm events. Crushed rock, gravel base, etc., shall be added as required to maintain a stable driving surface and to stabilize any areas that have eroded. Following construction, these areas shall be restored to pre-construction condition or bet- ter to prevent future erosion. Perform street cleaning at the end of each day or more often if necessary. BMP C120: Temporary and Permanent Seeding Purpose Seeding reduces erosion by stabilizing exposed soils. A well-established vegetative cover is one of the most effective methods of reducing erosion. Conditions of Use Use seeding throughout the project on disturbed areas that have reached final grade or that will remain unworked for more than 30 days. The optimum seeding windows for western Washington are April 1 through June 30 and September 1 through October 1. Between July 1 and August 30 seeding requires irrigation until 75 percent grass cover is established. Between October 1 and March 30 seeding requires a cover of mulch with straw or an erosion control blanket until 75 percent grass cover is established. Review all disturbed areas in late August to early September and complete all seeding by the end of September. Otherwise, vegetation will not establish itself enough to provide more than average protection. • Mulch is required at all times for seeding because it protects seeds from heat, mois- ture loss, and transport due to runoff. Mulch can be applied on top of the seed or simultaneously by hydroseeding. See BMP C 121: Mulching (p.284)for spe- cifications. • Seed and mulch, all disturbed areas not otherwise vegetated at final site sta- bilization. Final stabilization means the completion of all soil disturbing activities at the site and the establishment of a permanent vegetative cover, or equivalent per- 2014 Stormwater Management Manual for Western Washington Volume ll- Chapter 4-Page 278 Figure 1I-4.1 .7a Concrete Washout Area ■► 3m Minimum -a - o 0 0 ° Lath and flagging 0 ( ) J ( ) 0 /� on 3 sides Sandbag \ y y / t o ° Berm Sandbag >---- 10 mil plastic lining Varies O A Lii o � 0 1m 0 Berm o 0 a C 0 o Section A-A 10 mil plastic lining Plan Notes: 1. Actual layout determined in the field. Type "Below Grade" 2. A concrete washout sign shall be installed within 10 m of the +i 3m Minimum t temporary concrete washout facility. ea fa el va Wood frame B l B securely fastened t___,H 1around entire EHEI- ' perimeter with two _ 13 stakes rlVaries �, 10 mil ` ;, plastic liningtr `�.ice. .� .!f�� < \- Stake (typ.) El El 1,1 Section B-B 10 mil plastic lining Two-stacked 2x12 rough Plan wood frame Type "Above Grade" with Wood Planks NOT TO SCALE 110111 "'" Figure II-4. 1 .7a ligNiiii Concrete Washout Area DEPARTMENT OF Revised June 2015 ECOLOGY Please see http:/www.ecy.wa.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability, and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume II - Chapter 4 - Page 322 Figure 11-4.1 .7b Concrete Washout Area Straw bale 10 mil plastic lining Binding wire Staples Native material (2 per bale) (optional) WitWood or �■I■ Plywood metal stakes 711/L. •�I� 1200 mm x 610 mm �_._ —____,_r.�l■ Wood post (2 per bale) I painted white (89 mm x 89 mm Lag screws x 2.4 m) Section B-B (12.5 mm) CONCRETE Black letters WASHOUT � 150 mm height 915 mm I ' 1915mm 3m Minimum Concrete Washout Sign Stake (typ) Detail (or equivalent) Bl ■ llB 1 ■ T Varies �— 50 mm ■ 200 mm steel wire • ■ ■ ■ ■ ■ . ■ ■ I . Staple Detail 10 mil plastic lining Notes: Straw bale 1. Actual layout (typ.) determined in the field. Plan 2. The concrete washout sign shall be installed within 10 m of the temporary concrete washout facility. Type "Above Grade" with Straw Bales NOT TO SCALE Figure II-4. 1 .7b °VW' Concrete Washout Area DEPARTMENT OF Revised June 2015 ECOLOGYPlease see http://www,ecy.wa.govicopyright.html for copyright notice including permissions, State of Washington limitation of liability, and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume Il - Chapter 4 - Page 323 Figure I1-4.2.12 Silt Fence Joints in filter fabric shall be spliced at posts. Use staples, wire rings or equivalent to attach fabric to posts 2"x2" by 14 Ga. wire or equivalent, if standard strength fabric used '`,it' t **i.D♦♦%, '♦� ♦ ' :y�♦♦vui. Lfi_ - ' 1 ' ,. ♦♦ ♦♦t ♦ ♦ . ' . IL i .,':'`"�O '♦$• ♦ .'944 At'O:+�O • __ I i ♦v• : A.,• At . • ... `�14: ,-> :� 'O♦o ♦ •$ • .' • S S . ,,fir; ■■ 1 F ii •///2,%/>,/, /.,/Ai [A////,. ///s, A //\///. /1,:':‘ /,' 4/2/ ‘,/,/,‘,/, , , z' , / / ,'‘,, z'1 -- —rr 1 Minimum j I ~ 6' max �l t 4"x4" trench I I I 77 Post spacing may be increased 2"x2" wood posts, steel to 8' if wire backing is used fence posts, or equivalent 2"x2" by 14 Ga. wire or equivalent, if standard strength fabric used I �2\ \ Fitter fabric i V , 2' min Backfill trench with /%�/,�\/.\�� .__ native soil or !4" - '`/ e :. /, 1.5" washed gravel '•'12"/min/\� ' \/�~`• // 's4/sN• \,.. \/,/- Minimum y,>,y/, 4"x4" trench 2"x2" wood posts, steel fence posts, or equivalent NOT TO SCALE llEIN r' III Figure 11-4.2 . 12 I:Will Silt Fence DEPARTMENT OF Revised October 2014 ECOLOGY Please see http://www.ecy.wa.gov/copyrighf.html for copyright notice including permissions, State of Washington limitation of liability, and disclaimer. 2014 Stormwater Management Manual for Western Washington Volume Il - Chapter 4 - Page 369