Loading...
HomeMy WebLinkAboutPermit File BLD-2019-0413 1319 6th Street (2)City of Anacortes 904 6th Street P.O.Box 547 Anacortes, WA 98221-0547 (360) 293-1901 Invoice/Permit # Applied date Issue date Expire date BLD-2019-0413 07/02/2019 08/12/2019 02/07/2021 Job Address: 1319 6TH ST Permit Type: Single Family Alteration/Repair Permit ANACORTES WA 98221-1723 Project: APN: P55645 Remarks: Demo Garage and replace with new garage /shop. Owner: KATHLEEN DICKINSON Contractor: KREIDER CONSTRUCTION Address: 1709 6TH ST Address: 1010 22ND ST ANACORTES WA 98221-1744 ANACORTES WA 98221-2521 Phone: Phone: (360) 707-5588 License #: General Information: Fees: Building Valuation 175000 Building Permit Fee 17413.75 # of Boilers <= 100,000 BTU 1 Plan Review Fee 918.94 # of Radiant Hydronic Piping 1 State Building Code Fee Resi 6.50 # of Ventilation Fans 3 Mechanical Permit Fees 80.10 # of Gas Piping 1 Plumbing Permit Fee 41.00 # of Water Closets 1 Total Calculated: 27460,29 # of utility Sinks 1 Deposits/Receipts: 918.94 # of Water Piping 1 #_of Gas Outlets 1 Total Due: 1,541.35 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIO -ANY OTHER STATE OR LOCAL LAW REGU I G ONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. (�(GNA�URE OF OWNER OR AUTHORIZED AGENT IS Permits and Insp... -BLD-2019-0413 - 2019 019316-0012 Carla Br... 08I1312019 02:25PM 12376 - KATHLEEN DICKINSON BLD-2019-0413 Single Family AlterationlRepair Permit Payment Amount: 1,541.35 Transaction Amount: 1541.35 CHECK: 5142 Site Address H• Building Permit - __ � : _ -->- ..-�• -.:q; ���! _ �—.�:=wee Public Works r COL U, JCeZ f gc.� 4Qx 2I:L w l- 4 F?SM LZiN�= i i Planning Stormwater Fire Project Inter -Departmental Plan Review Tracking +C3 City of Anacortes Invoice/Permit #: BLD-2019-0413 G 904 6th Street Applied date: 07/02/2019 P.O.Box 547 Anacortes, WA 98221-0547 Issue date: Expire date: 12/28/2020 (360) 293-1901 c0 , Job Address: 1319 6TH ST Permit Type: Single Family Alteration/Repair Permit ANACORTES WA98221-1723 Project: APN: P55645 Remarks: Demo Garage and replace with new garage /shop. Owner: KATHLEEN DICKINSON Contractor: KREIDER CONSTRUCTION Address: 1709 6TH ST Address: 1010 22ND ST ANACORTES WA 98221-1744 ANACORTES WA 98221-2521 Phone: Phone: (360) 707-5588 License #: General Information: Fees: Building Valuation 175000 Building Permit Fee 13413.75 Plan Review Fee 918.94 State Building Code Fee Resi 6.50 Total Calculated: 21339,19 Deposits/Receipts: 0.00 Total Due: 27339.19 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY Permits and Insp... -BLD-2019-0413 - 2019 019253-0063 Carla Br... 07IO2t2019 04:58PM 12376 - KATHLEEN DICKINSON BLD-2019-0413 Single Family Alteration/Repair Permit Payment Amount: 918.94 Transaction Amount: 918.94 CHECK: 020229 � Wwwwo� zv � OVIr L�%- 6 0 4 I ._ PL ,O& NWY, & ECONOMIC DE LOF RESIDENTIAL BUILDING PERMIT APPLN Mailing Address: P.O. Box 547, Anacortes, WA 982 Office Location: 904 6`h Street, Anacortes WA 9881 Phone: (360) 2934901 2019 � PLEASE REFER TO THE RESIDENTIAL BUILDING PERMIT CHECKLIST BELOWFOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite #): U31q OH STREET Subdivision/Lot #: APPLICANT: KATKL9E.N ► lC1;W50 J Address (Street, City, State, Zip): 1109 1PT4 54TREET AKAC0121r=5 PROPERTY OWNER: SAW AS Af"4GA14T Address (Street, City, State, Zip). CONTACT PERSON: Address (Street, City, State, Zip): 2415 7 AWN4E 5u1TE LENDING AGENCY: KA Address (Street, City, State, Zip): �c�Z ANnGo2T�,S CONTRACTOR: �Z�iD�1Z COtJ�ot�,UGt►Oti1 Address (Street, Ci , State, Zip): 1010 22 Nn S�ieCE T AWAC.OQ ES *All Contractors &Subcontractors must have a valid City of Anacortes business license prior to doing work in the City. Contact the City's Finance Department at (360) 299=1968. PROPOSED WORK: 0EMat MI EXISTIN42 44B SF lst Floor SQ': 2°d Floor SQ': Fire Sprinkler: PARCELS) #: �5(Dy5 PROJECT VALUATION& $ M K Phone: Email Address: Phone: Email Address: Phone: 3Coo Z9 3 O►o(v mail Address: roods G brm ooks i61dXt+oI)ordi4ed- Phone: Email Address: G Phone: 3Cr� col 558� Email Address: 61rc9 e i,r >✓tcwconslrut6nr com rofessional License #: Exp. Date: K1WbC1021 M 10 30 2011 Business License M Exp. Date: W1887 12 3 1 31 2019 i06E" nL)%Lf) NEW 61'S` 5F 5ROp/GARM Garage /Carport SQ': �3 �{ Deck/ Covered Porch/ Patio SQ': El Yes 0 No Lot Area SQ': (p000. , I declare under penalty of perury that the information I have provided on this form/application is true, correct, and j complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Anacortes. Print Name_ NOW M 1000fN Owner Id Agent ❑ (specify): ARGUI'TVC4 Signature Date: 20I ojuN� 20V j Page 1 of 5 Total Disturbed Land/Soil SQ': E Xrtj11NO I MPEw IM) New hard surfaces (pervious & impervious) t4b CHANGE N Tot at Proposed: Land converted from native vegetation to lawn or landscaping SQ' Land converted from native vegetation to pasture SQ' O Equipment Type: 55 coY Appliance/Equipment Information (new and relocated): Furnace: Gas #: Elec #: Wall Heater: Gas #: Elec #: Gas Water Heater: #: Heat Pump: Elec #M A]L-0 *` Y �c; � _ETC \�•c. / Radiant /Hydronic Heating: Gas #: j Exhaust Fans: Bath #: j Location(s): Other #: Other #: BTU: Other #: Other: #: Location(s): Elec #: Other: #: Location(s): S1i0P Laundry #: Other: GARA&E, �9000 Range Hood: #: Location(s): Fireplace: Gas #: Elec #: Clothes Dryer & Duct: Gas #: Elec #: She/Range/Oven: Gas #: Elec #: /Gas PipjueOutlet(s): #: Location(s): Td Boiler Gas #: Elec #: Other: #: Location(s): Fixture Type (new and relocated): Water Closet (Toilet): Kitchen Sink: Utility Sink: Tub: Hand Sink: Shower: Dishwasher: Hose Bib: Other: #: Location(s): Other: #: Location(s): Other: #: Location(s): b►AWT KAM UNIT BTUs: Location(s): TOTAL MECHANICAL OUTLETS: S Fixture Type (new and relocated): Refrigerator water supply (for water/ice dispenser): Pressure Reduction Valve/Pressure Regulator: Water Service Line: Water Piping: Clothes Washer: Electric Water Heater: Tank -less? Yes ❑ No ❑ Backflow Prevention Device: Other: TOTAL PLUMBING FIXTURES:,] Page 2 of 5 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT RESIDENTIAL BUILDING PERMIT CHECKLIST Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6ah Street, Anacortes WA 98821 Phone: (360) 293-1901 Plans shall be of sufficient clarity to indicate the location, nature, and extent of the work proposed, and conform to the provisions of the adopted International Codes and City Ordinances, PERMIT TYPE: SUBMITTAL REQUIREMENTS: p c. pot o The number indicates the number of ; ara copies for submittal (if applicable). a b 0IL Residential Building Permit Application 1 1 1 1 1 Site Plan (Drawn to Scale & Surveyed —if 2 2 0 2 2 applicable) Building Plans (Drawn to Scale) 2 2 2 2 2 Reduced Site Plan (I I" X 1751) 2 2 0 1 1 Reduced Floor Plan (11" X 17") 2 2 2 2 1 o' Structural Calculations (if applicable) 2 2 2 2 2 N N Energy Code Compliance (shown on plans) ✓ ✓ ✓ Stormwater Minimum Requirements 1-5 3 3 3 3 9 Landscape Plan FAISTIN& LANPSCppG 2 2 2 N N Grading Plan/Cut/Fill 2 2 2 Critical Areas Report (if applicable) 1 1 1 1 N Geotechnical Report (if applicable) 1 1 1 1 Plan Review Deposit (due upon submittal) ✓ ✓ ✓ ✓ ✓ Page 3 of 5 Y PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT RESIDENTIAL BUILDING PERMIT SITE PLAN CHECKLIST Mailing Address: P.O. Box 547, Anacortes, WA 98221 q w Office Location: 904 0 Street, Anacortes WA 98821 Phone: (360) 2934901 SITES PLANS MUST BE ACCURATE, CLEAR, AND DRAWN TO SCALE. DRAWINGS SHALL INCLUDE: i! 1. Draw plans to a standard engineering (i.e., 1" =10', 1" =20', etc.) or architectural scale. List the graphic scale used on the site plan. r 2. Include landowner name(s), parcel number, &site address on the site plan ✓ 3. Provide north arrow on site plan � 4. Show property lines (from a recorded survey), lot dimensions, property corner locations, & adjoining street name(s) oNot 5. Provide a co of a survey of the subject property with the site plan SU►tuEtrE� copy Y j p p Y CoR1�r<,I (AW4C� 6. Show the location, dimensions, and distances to property line of all existing and proposed structures, drain -fields, septic tanks, and wells. Additionally show zone's setback lines. IAA 7. Location of rock construction entrance ,/ 8. List lot size square footage &acreage ND 9. Provide corner elevations of the site & lot topography of existing & proposed grading GRApE (drawn at either 2 or 5 foot contours) C14AO 6 H" 10. Location of proposed soil stockpile area 11. Location of decks & patios (existing & proposed; covered &uncovered) ✓ � 12. Location of driveway (existing &proposed) ✓ 13. Sidewalk /walkway location (existing &proposed) NA 14. Retaining wall /bulkhead location (if applicable) Na 15. Location of existing septic system &/or well 16. Provide lot coverage calculations for existing & proposed buildings ✓ I 17. Provide impervious surface calculations (existing &proposed) ✓ 18. Location & name of streets /alleys (existing & proposed) 19. Location & purpose of easements (public & private) —if applicable PAGE 1 OF 2 20. Show the location of drainage, catch basins, low impact development (i.e., rain gardens & ✓ bio-swales) —include a complete stormwater plan (see residential stormwater application checklist for more information) EI41kE 21. Show proposed Ian cj caRinR (along street frontage, around perimeter, & internally to PJ FoW%l property) either on t�e site plan or as a separate landscape plan. List the plants chosen kw4)iu�'It common name &/or species). Provide landscape area square footage /calculations and how the required minimum landscaping is met. Native plants are preferred. ✓ 22. Show the location of utilities (existing &proposed), connection to the sanitary -sewer, storm -water, and potable water service connections 23. Show the distance that the front of the building is to the nearest fire hydrant 24. Show the location of critical areas (i.e., streams /creeks, wetlands, and geologically �Q hazardous areas/ steep slopes) that are either on the subject property or within 300 feet of it —include a critical area report if applicable 25. If the subject property abuts a shoreline, show the location of the shoreline, bulkhead, ordinary high water mark (OHWM) and setback. List the percent slope as measured from UA top of bank landward. Provide impervious surface calculations for existing & proposed development (from top of bank landward). A shoreline exemption may be required — inquire with PCED for what this entails. PAGE20F2 PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT DEMOLITION & OIL TANK DECOMMISSIONING PERMIT CHECKLIST Mailing Address: P.O. Box 54 7,Anacortes, WA 98221 lot Office Location: 904 6`" Street, Anacortes WA 98821 Phone: (360) 2934901 UTILITY DISCONNECTION: WATER DEPARTMENT GAS: ❑ YES i NO C N/A ❑ YES Cd NO CABLE TV ELECTRICITY ❑ YES C�NO ❑ YES I� NO PERNIIT TYPE: rA A9 t� p C n � SUBMITTAL REQUIREMENTS: d d c 0 (The number indicates the number of copies for o `� submittal -if applicable).. emit&o � W. a � ara .' Demolition Permit &Oil Tank Decommissioning Application 1 1 1 or/ Site Plan 1 1 1 NA Pedestrian Safety Plan (for Demolition Permits) 1 Asbestos Survey —Prepared by a Washington State Certified Asbestos 1 1 Abatement Contractor (for Demolition Permit) via Provide Proof of NWCAA Demolition Permit Approval' �0/ Na City of Anacortes Fire Department Tank Removal Permit2 If the building is 50 or more vears old, provide evidence that the '0 Department of Archaeology and Historic Preservation (DAHP) has determined the building to be insignificant/significant. If the building is v� determined to be significant, SEPA environmental review may be required. NOTE: 1. Please contact the Northwest Clean Air Agency (NWCAA) located in Mount Vernon, Washington at (360) 428-1617 or online at http://nwcleanairwa.gov. Unless deemed exempt by the NWCAA, all city required demolition permits also reauire a demolition permit from the NWCAA. You can also contact the NWCAA for a list of WA State Certified Asbestos Abatement Contractors if needed. 2. Oil Tank Decommission Permits also require a "Tank Removal Permit" from the City of Anacortes Fire Department. Please contact the Fire Department at (360) 293-1925 to obtain a permit application. Page 2 of 2 1— �� 0 z 0 0 z m 3�I�a� 9 3dd0� i e� Q w N �_ a 'a- 4M h? � f f O \\ �� .- M �� M `n Ln —� �® �n �. �_ —. I I I I �(�`-`� "d b'80T 1-,---� 3�I1Jb Z'OiT I J ` I I I_ _ __ ._-��--� i yi - — — � I I I I I I I � _-,_� IInI- �I1.Jd 9 1-'-� \ I --' rna j-�]3ddtl� O'8ti1 I � I oC I � t �- - — — a_ _' "l l � �Jd2iJ 'JNOI '89h II I� _ ' 1-- o I I-----1n N1J'd b'[�T `-' I I I �+ — — — ai I f`-. _ -- I '-- d0) 3 �l l `� I I I i � 'iw aid J 0 I f��' I � I oa Il�il �-- ado I -L� I � �73dd1iJ b'I£K 1�— j �- I � I 1H —I — — — i135d�0) I CO VV��� l�O o I-,13iu�d cn M � � '. I I - Q rla � I I � �' I I Q 1 — — � — --._ --Q �._ — ._ � I � J � � � �- I f � o v ?j � > w Z � o I I � cn "7...-.-------------- ._ I I w � ..�.� I f�I �'C M — /2f — M/21 —� � —M/b � I ' 1 � — _� — � - oo f � M _..�.�...._._._.�.�.. M _ �- - � j � 1 { � ,-�!� �/ 1. I nc v� a¢ Op ¢gyp = m �' �`'S,G ��C.-.�.., � w- O w w l- mppW�U�O O r 0y � Z w p Q w >azazw`� a .¢ I-�� �- �o �G ' �� H J ' vcc�� ww oa o�vwia aucn L9'. Z'96Z C r r r aH —Mhl— M/b J 1319 6th STREET KEYSTONE BUILDING SERVICES BLD-2015-0572 1319 6th STREET KEYSTONE BUILDING SERVICE REVISED AAS BUILD L AVE 1319 6TH ST SIDEWALK DOLLY HEIN Q JUL 0 2 2019 Lll Storm Water Minimum Require ENGINEERING DEPARTMENT 904 6th Street Anacortes, WA 98221 www.anacorteswa.gov FILE COPY Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: Project Address: _1319 6th Street_ Parcel Number: _P55645 Permit Number: [ UD , ZO\9 - r"13 Submittal Date: _July 1,2019 Revision Number: Acceptance Date (COA): 05vC9 I Reviewer: FRONT OF REPORT Submittal Checklist: o TAB 1 - Drainage Analysis — Minimum Requirement #2 " o APPENDIX 1 - Survey performed by a Professional Land Surveyor o APPENDIX 2 -Model Soil Management Plan for BMP T5.13 o APPENDIX 3 -Determining Construction Site Sediment Damage Potential (Appendix 7) o APPENDIX 4 -Site Plan with all applicable information (Minimum Size 11x17 — 30 scale) o APPENDIX 5 -Documented Site Photos (North, South, East and West) 'Project Description: (What is it you are looking to do? Provide details regarding, but not limited to, Lot SF, Home SF, New and Replaced Hard Surface) The project is located in the Southeast corner of 6th Street and "L" Avenue. This project is to construct a 934 square foot garage/shop that will replace an existing 448 square foot garage and will access from "L" Avenue to the West. The existing 2,047 square foot house will not be changed. The new shop will also replace a portion of the existing concrete driveway. An additional 18 feet by 20 foot wide concrete apron will be replaced on the west side of the new shop accessing "L" Avenue with pavers. Total new and replaced hard impervious area including the new pavers will be 1,294 square feet. * = wHs % ouh Yz 6 nr poCRTF. MJt t o1 ` fir ti ( &L0,- Existing Site Conditions Summarv: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction Phasing lSequence) The existing house was remodeled after 2015. The proposed shop lies on the south uphill side of the property with 6th street being the the downhill side of the property. "L" Avenue lies to the West of the house and a gravel alley on the south uphill side of the house. The proposed garage and shop will access "L" Avenue and not utilize the gravel alley. Version Date: December 19, 2018 Developed Conditions Summarv: (Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard surfaces, proposed contours) The developed summary was identified in the Project Description above. A total of new and replaced hard surfaces will total 1,294 square feet. The drainage from the new garage/shop will connect to the roof drainage system in the house that is connected to the drainage system in 6th Street. The new hard surfaces between the garage and 11th Street is pavers that will slope to the northwest and to 11th street and into adjacent planters. The area of the proposed garage/shop is relatively flat to the existing terracing of the site. Site Sediment Transport Score: _35_Total Points (High\Low) (See Determining Construction Site Sediment Damage Potential (Appendix 7) Complete the Applicability Requirements —Flow Chart (Figure I-2.4.1 Attached, Figure I-2.4.2 Attached and Figure I-2.5.1 Attached) - Highlight the path and attach DOE Stormwater Management Manual Minimum Requirements: (MR#1 to MR#5 only). Refer to the 2012 Department of Ecology Manual, as amended in 2014 for further required information. Version Date: December 19, 2018 star# :Herhe Does the site have 3F 9 or more of existing impertrious coverage? W Does the project result in. 5,000 square feet, or No, greater, of new plus replaced hard surface area? ,all Mirri.mum Requirements apply to me new and replaced hard, surfaces and converted vegetation f EP' RTb1E1'tiIT aF : iateai as Irl tar areas_ es See Redevelopment inimurn % Requirements and Flow Chart f1=►gore I-' : #.2}. Dues the project convvert acres or more of vegetation to lawn or landscaped areas, or convert 2_5 acres or more of motive vegetation t,a pasfi.iram? Minin unr F equireanents ; '1 thrae glr #5 applyr to the newr and repla-ced hard surfaces and the land disturbed. Does the project result in ,l l} square feet, or greater, of new plus replaced hard surface area? Does the project have land disturbing activities of?,(}a square feet or greater? Minimum ILecqu irernent #2 applies_ Fi r Fly h t fir terminiffl,g Re :ir t fir New DeVE)Jopniellt Please e hr :,r • ..eL, . a.gav, eaa}er At. hf MJ far ^npy rig ht nutl, Inclu lr gi Ferm slc ., lirnit3lon c i 113 IIIt , 3;9d i115E131mer. TAB 2 (MINIMUM REQUIREMENT #2) • 1=2.5.2 Minimum Requirement #2 — Construction Stormwater Pollution Prevention Plan (SWPP) All projects are required to complete Minimum Requirement 2. Refer to the 13 Elements of the SWPP (See document below, complete and attach) See attached Table 4.1.1, Table 4.2.1 and Table Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. Version Date: December 19, 2018 abTe4.1.1 Source• • 61TIr s by RUP or Elernent Name Preserve Establish StablitEe protect Control Maintain Manalle the Prouct Low %%getalloniMark Constniction sags Slopes Pollubm amps project Impact ., , ie Llffft Access [ a zn-nT BLIP C102: Bufierlonea ✓ + BMP C103: High VYlbl tyr Plastic or Met•i ✓ Fence BHP C105: StablkedConstructlon ✓ Emrana / Edt BHP C105: M&mlV*mh ✓ BHP CIM Construction RoadlParki ng ✓ Area 5ta611zadon BHP C120:Teroporaryand Permanent ✓ Seeding BHP C72le Mulching ✓ ,/ BMP C122: H40 and Bic nkeft ✓ ✓ 0MP C122: Plaatk Covering ✓ BMP C124L Sodding ✓ BMP C129t Topeelling/Composting ✓ BMP C720: Po"rytonide for Sall Erosion ✓ Protedlon BMP C130a Surface Roughening ✓ / BMP C131: GradlentTerram ✓ ✓ BMP C140: DuatControl we 0MP C100t Matarlole On Hand ✓ n/ BMP C131: Concrete Handling ✓ BMP Ciff2: Saaneutting and Suriecing ✓ Pollution Preventlon BMP C153: Matarlal Delivery, Storage and ✓ Conwilm itt 0MP CIM Concrete Washout Are@ ✓ BMP C160: Certillod Eroalonand ✓ Sediment Control Load BMP C162: Scheduling ✓ Version Date: December 19, 2018 Table 4.2.1 Runoff Conveyance and Treatment BIVIP's by SWPPP Element t]salbnt WC Ele;n► nttalx Elornanttfl3 ElanwantM Elen*MK6 EltowntN711Eierlarntif9 Clanrxnt trg Install SGibillzu Prolut, Low amp or41wwntNw* control rJlh nN Ii Fata91, Falar- Chal,rwlS I contfW aPankrofDam Ida Flow Raws Slopes gain InIalx Pollutants Mtering Can rats and 4udefs ]eYelupuient We CMOF jnj&mtpkw EkIke and awple IMP C20Z Channel Una ve RMP C21M, WPatgr Bwpg ve .IS : 1 •:h: utr c. a r. Llgaelt Cy ns BNIIP C.2 : Tr anerdar Alt l Er►tad d 1',Hrn la+efrwj 6Ml' G2alB; {iUtlist Pt ts tia i BMP G xa: 5 r rrn fpraln Inlet IRr ita t rt• BMF" 23t: Etru aYrior Bh1P+ G]ra el F11bee Bacm BMP C2!M Sift Fenno ""77 I Moe I w VPF BMPG 3 4, llse 9lalad;a`trip , BMP' C23& VhI tles v+ BMP C231k VaUltudwo FNltrartlan OMP C2I0t Sadimnnt Trap rfi 9MP C.741; TmMorark ge+dlnwit Pund rf L3Mp l, I>P' CWetUtlurililli 31OrW I'IeariGlil rgah►1a rtt - I .BMP G]lSl: ConMcuorl ston"Ma or Flltrs 9lcln ' BMP C252: High PH Neu4raateailcae Lhing f%f%, !-BMP C25& PH C[ntrod for High vH YAW Version Date: December 19, 2018 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name: Kathleen Dickinson Site Address: 1319 61" Street Prepared By: Dale Herrigstad P.E. The Stormwater checklist or building permit determined that: X The 13 elements must be addressed for construction activity adding under 2,000 sq. ft. of hard surface area. ❑ These elements must be addressed for construction activity adding 2,000 sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, explain the best management practices (BMPs) used or lustifv reasoning for those that will not be used. If needed, please attach a narrative to further explain plans or justification. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits ❑ Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. ❑ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. The construction limits will be identified along the alley and the adjacent property to the east as possible. Little if any existing vegetation will be disturbed due to the small foot print of the site. No trees will be disturbed. ELEMENT 2: Establish Construction Access ❑ Limit construction vehicle access and exit to one route, if possible. ❑ Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. ❑ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. ❑ If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or pick up and transport the sediment to a controlled sediment disposal area. ❑ Conduct street washing only after sediment is removed in accordance with the above bullet. ❑ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging Version Date: December 19, 2018 into systems tributary to waters of the State. Construction will be accessed from "L" Avenue to the west. The existing concrete apron may be retained until the building construction is completed or replaced with a construction entrance. Due to the small footprint there is little concern to track sediment off site. 5rAp e.toSN cNOJ ELEMENT 3: Control Flow Rates ❑ Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. ❑ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement (e.g. impervious surfaces). ❑ If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. The catch basin in the southeast corner of the intersection of 6t" and "L" Avenue will require a catch basin insert with the WSDOT catch basin insert Standard Plan 1-40.20=00. No temporary ponds are proposed. F3m? c-2Za- S'rbyLn % c"tR .a %N%.*T Facbmeemb" . ELEMENT 4: Install Sediment Controls ❑ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. ❑ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BMPs shall be functional before other land disturbing activities take place. ❑ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element #3, bullet #1. Locate BMPs intended to trap sediment on -site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off -channel areas or drainages. ❑ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. ❑ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. Due to the close proximity of the project to the existing house and small footprint of the project the sediment controls will need to be addressed as the project progresses. It is unlikely silt fencing will be possible. Sediment traps will not be practical and will only disturb additional area. 6MVI c.Z25! W AMWJE, i . $IMP G Z20* 5JV24vN lt4 ET f bT4E JU&m i /ELEMENT 5: Stabilize Soils ❑ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early application of gravel base early on areas to be paved, and dust control. ❑ Control stormwater volume and velocity within the site to minimize soil erosion. ❑ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. Version Date: December 19, 2018 ❑ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 — Sept 30): 7 days o During the wet season (Oct 1 — Apr 30): 2 days ❑ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. ❑ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. ❑ Minimize the amount of soil exposed during construction activity. ❑ Minimize the disturbance of steep slopes. ❑ Minimize soil compaction and, unless infeasible, preserve topsoil. Little or no soil will be disturbed except for possibly just adjacent to the new foundation for the garage/shop. LEMENT 6: Protect Slopes ❑ Design and construct cut -and -fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). ❑ Divert off -site stormwater (run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off -site stormwater should be managed separately from stormwater generated on the site. ❑ At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as "landscaped" area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. ❑ Place excavated material on the uphill side of trenches, consistent with safety and space considerations. ❑ Place check dams at regular intervals within constructed channels that are cut down a slope. ❑ Consider soil types and its potential for erosion. ❑ Stabilize soils on slopes, as specified in Element 5. ❑ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. There are no steep slopes to protect. ✓ELEMENT 7: Protect Drain Inlets ❑ Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ❑ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). ❑ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ❑ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains Version Date: December 19, 2018 without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. ❑ Inlets should be inspected weekly at a minimum and daily during storm events. The catch basin in the southeast corner of the intersection of 6th and "L" Avenue will require a catch basin insert with the WSDOT catch basin insert Standard Plan 1-40.20=00. No temporary ponds are proposed. r/ ELEMENT 8: Stabilize Channels and Outlets ❑ Design, construct, and stabilize all on -site conveyance channels to prevent erosion from the following expected peak flows: o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. ❑ Provide stabilizationincluding armoring material, adequate to prevent erosion of outlets, adjacent , streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. ❑ The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. There are no channels or outlets to stabilize. ELEMENT 9: Control Pollutants ❑ Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. ❑ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on -site in a manner that does not cause contamination of stormwater. ❑ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On -site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double -walled tanks do not require additional secondary containment. ❑ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. ❑ Discharge wheel wash or tire bath wastewater to a separate on -site treatment system that prevents discharge to surface water, such as closed -loop recirculation or upland land application, or to the sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. ❑ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and procedures. ❑ Use BMPs to prevent contamination of stormwater runoff by pH -modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. ❑ Assure that washout of concrete trucks is performed off -site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. ❑ Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. ❑ Woody debris may be chopped and spread on site. Version Date: December 19, 2018 ❑ Conduct oil changes, hydraulic system drain down, solvent and de -greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. ❑ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on -site using temporary plastic placed beneath and, if raining, over the vehicle. No additional protection is proposed than noted above. Lxnr G15q Lx*.jWtjL Wwss}txSV AR.F. -b k5T'U%1 0jG 441OD4 Qob .S - t ACIt Z 'ham USE AtA: o (-VNVE e+%-SITE AT ALL Tnm ES A 5PILL- ELEMENT 10: Control De -Watering 4voo,q-, ❑ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. ❑ Discharge clean, non -turbid de -watering water, such as well -point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de -watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that "surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. ❑ Handle highly turbid or contaminated dewatering water separately from stormwater. ❑ Other treatment or disposal options may include: 1. Infiltration 2. Transport off -site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology -approved on -site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ❑ Discharging sediment -laden (muddy) water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration and preserving vegetation. If dewatering of the foundation is required it should be pumped or discharged into downhill vegetation. 1Jt (?Ek 'C 11. 1 IS A•tiTL. .Ti 'p a..► 'TIi S FiZo.)t - , + ELEMENT 11: Maintain BMPs ❑ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed 4- El Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. ❑ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. ❑ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. BMP's should be inspected and maintained after each storm event as condition require. Gra+'tRA Li2 p+ e1t- o T`1 awNE1L SvBM \T G11 1C1.Y tot- Ati j P1 M4-•'l1Plld1- Kev%xvIrs Wes U4 Tb Tl' - $ fllpl/ iV Qom' .ti rv d-T Version Date: December 19, 2018 ELEMENT 12: Manage the Project — Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL) for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on -site or on -call at all times. ❑ Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. ❑ Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued performance of their intended function. ❑ Maintain, update, and implement the SWPPP. ❑ Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). ❑ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt -laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. ❑ The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. A Certified Erosion and Sediment Control Lead (CESCL) is not required for this project due to the size of the project under the 5,000 square foot threshold. "fYiE L' 't L, AM ow1AEQ UQJLA.. MANP4=e. ark CiZz 1 ELEMENT 13: Protect Low Impact Development BMPS ❑ If implementing any bioretention faces or rain gardens, refer to the applicable BMP sections of the Manual for requirements. None are required due to the size of project under 2,000 square feet of new or replaced hard surfaces. Applicant Signature Date Version Date: December 19, 2018 TAB 5 (MINIMUM REQUIREMENT 45) • Minimum Requirement #5 — On -site Stormwater Management All sites are required to utilize BMP 1 5.13 — Post Construction Soil Quality and Depth. For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that is considered feasible. No other on -site Stormwater Management BMP is necessary for that surface. Feasiblity shall be determined by evaluation against: 1. Design criteria, limitations and infeasty criteria idened for each BMP in this manual, and; 2. Competing needs criteria listed in Chapter V-5 — On -site Stormwater Management. Lawn and Landscaped Area: • BMP T5.13: Post -Construction Soil Quality and Depth. (Attach Detail in Report) Refer to this site for requirements and specifications. All projects are required to utilize this BMP http://www.soilsforsalmon.orp/pdf/Soil BMP Manual.pdf See below for the "Model Soil Management Plan for BMP T5.13" to be submitted with Drainage Report and Application Material. Little or no soil will be disturbed except for possibly just adjacent to the new foundation for the garage/shop. PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age # of pages Complete all information on page 1; only site address and permit number on additional pages. Version Date: December 19, 2018 Site Address / Lot No.: GZ12e > oe. ro I T74. L kTL I a 11 TD ZJ IkL Dopl k Permit Type: Permit Holder: Mailing Address: Contact Person: Plan Prepared By: Permit Number: Phone: Phone: ATTACHMENTS REQUIRED (Check off required items that are attached to this plan) Site Plan showing, to scale: _Areas of undisturbed native vegetation (no amendment required) New planting beds and turf areas (amendment required) Type of soil improvement proposed for each area Soil test results (required if proposing custom amendment rates) Product test results for proposed amendments AREA # (should match Area # on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: square feet SCARIFICATION Subsoil will be scarified PRE -APPROVED AMENDMENT METHOD: Topsoil import Amend with compost Stockpile and amend ( cu. yds. stockpiled) CUSTOM AMENDMENT _ Topsoil import Topsoil & compost lift Amend _ Stockpile and amend ( cu. yds. stockpiled) MULCH nished total 12" loosened depth. inches (depth) of scarification needed to achieve fi inches of compost or imported topsoil applied X 3_1 (conversion factor, inches to cubic yards) PRODUCT: = cu. yards per 1,000 sq. ft. X ,000s sq.ft. in this area = cubic yards of amendment QUANTITY: CU. YDS. (needed to cover this area to designated depth) Attach test results and calculations. inches organic matter or topsoil import PRODUCT: X 3_1 = cu. yards / 1,000 sq. ft. X _,000s sq.ft. in this area = cubic yards of amendment QUANTITY: CU. YDS. ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch —> —> —> QUANTITY: CU, YDS, TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL. AREAS (complete on page 1 only, totaling all areas/pages in this Plan) ❑ Product #1: ❑ Test Results: %organic matter ❑ Product #2: ❑ Test Results: % organic matter ❑ Product #3: ❑ Test Results: % organic matter Date: Inspector: Date: Inspector: C:N ratio <25:1 (except mulchor <35:1 for native plants) ❑ Quantity: cu. yds. , ❑ Quantity: cu. yds. C:N ratio <25:1 (except mulch, or <35:1 for native plants) El Quantity: cu. yds. C:N ratio <25:1 (except mulch, or <35:1 for native plants) Approved: Revisions Required: Approved: Revisions Required: "stable" (yes/no) "stable" (yes/no) "stable" (yes/no) !I Version Date: December 19, 2018 N 89.2240' W 379,76' FOUND CONCRETE MONUMENT IN CAST WITH COVER 10-14-20I5 T—F - 40.00' I 3 I 2 j 1 I I I I I I I I I I I I I I I I FOUND CONCRETE MONUMENT IN CAST WITH COVER 10-14-2015 — — SMEWALK I 1 _ 40.00' .. 59.95 ¢ le • o+ 'J I m aJ I 9 10 8 I HOUSE vm 1319 6TH STREET + Cr a 1 I z a6' - I 1.2, CaGARAGE I, AyI aRIVEVAY 81N 9'23'24' W 59.95 I — FOUND HAR015 NAIL _ 10-14-2015 'S CERTIFICATE K. HERRIGSTAD, P.L.S. 6TH STREET N 89622'58' W 379,69' (380' PLAT) FOUND BRASS POINT SET IN CONCRETE IN MONUMENT CAST WITH COVER 10-14-2015 _ 239J4' 7 1 6 5 4 3 2 1 a FENCE I I I I 41,oa I i I I I I I I ENE WEST I I I I I CROP. I I I I I I P w I I I .elf lFna•'+'¢;., +' ,"`ll', I I I I I A1L A — — ' 23 75 16' ALLEY BLOCK 101 I I I I I ,p' 1f 1 12 1 13 1 14 1 15 1 16 1 17 1 16 I 49 ` 1 20 I I I I9' 1? I I I I I I I I I I I I BY ME OR UNDER ENTS OF THE HEIN IN OCTOBER FOUND BRASS POINT SET IN CONCRETE IN MONUMENT CAST WITH COVER 10-14-2015 GRAPHIC SCALE AUDIT❑RS CERTIFICATE RECORD OF SURVEY AT THE R&Etl M, DALE K. HERRIGSTAD 54agi1 Cgrli ltY AGfi,y. . '.t. $157.00 DEPUTY AUDIT❑R t 10, Block 101, "MAP OF THE CITY OF in Volume 2 of Plats, page 4, records of ALS(I;;,,thFF poiv'4pri";pf tract of land included in that certain strip of land which is shown ,1 nd'pdesigbdted on said Map of the City of Anacortes as "Reserved a right of" for the Seattle and Northern Railway," described as follows: k 1369im1in%At the southeast comer of said Lot 9, Block 101, said point being on #F blaitheasterly boundary line of said strip of land designated 'Reserve a right of way for the Seattle d: Northern Railway thence South on the East line of said Lot 9 produced to a point where it intersects the North line of the alley running through said Block 101 produced; thence West along said North line produced a distance of 60 feet; thence North to the Southeast comer of said Lot 10. Block 101; thence Westerly along the Southerly corner of said Lot 10, Block 101; thence Westerly along the Southerly fine of said Lots 9 and 10. Block 101, to the point of beginning. Situate in the City of Anacortes, County of Skagit, State of Washington. NOTES.- 1. LEGAL DESCRIPTION WAS AQUIRED FROM A STATUTORY WARRANTY DEED UNDER AUQDITOR'S FILE NUMBER 201509100019. 2.L FOUND CONCRETE MONUMENT IN CASE 10-14-2015. 3. NAIL FOUND AS NOTED 10-14-2015. 4.9 SET REBAR k CAP 27807 ON 10-15-2015. 5. EQUIPMENT USED: CARLSON CR2, 2' Total Station. 6. ERROR OF CLOSURE MEETS WASHINGTON STATE SURVEY STANDARDS. 7. SURVEY METHOD: STANDARD FIELD TRAVERSE. B. BASIS OF BEARINGS: ASSUMED 9. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A CURRENT TITLE REPORT. THIS SURVEY DOES NOT PURPORT TO SHOW ALL EASEMENTS RESTRICTIONS, RESERVATIONS, PROVISIONS, COVENANTS OR CONDITIONS WHICH MAY AFFECT THE PARCELS SHOWN HEREON. 10. THIS IS A BOUNDARY SURVEY ONLY, UTILITIES WERE NOT INVESTIGATED. 11. THIS SURVEY HAS DEPICTED EXISTING OCCUPATIONAL LINES IN ACCORDANCE WITH WA.C.CH. 332.130. THESE OCCUPATIONAL INDICATORS MAY INDICATE A POTENTIAL FOR CLAIMS OF UNWRITTEN TITLE OWNERSHIP. THE LEGAL RESOLUTION OF SUCH CLAIMS HAS NOT BEEN RESOLVED BY THIS BOUNDARY SURVEY. RECORD OF SURVEY FOR: Dolly Hein 4220 Marine Heights Way Anacortes, WA 98221 A PORTION OF THE SE 1/4, SECTION 13, TOWNSHIP 35 N„ RNG, 1 EAST, W,M, SKAGIT COUNTY, WASHINGTON SHEET I OF 1 OWN BY: DKH CHECK BY: DH DATE: Oct 2015 SECTION 13, TOWNSHIP 35 N, RNG 1 EAST HERRIGSTAD ENGINEERING & SURVEYING SCALE 1'=40 4320 Whistle Lake Road, Anacortes, WA 98221 (360) 293-8804 2015-94 APPENDIX 2 - Model Soil Management Plan for BMP 15.13 Note: Document is provided under Minimum Requirement 5 in this document Little or no soil will be disturbed except for possibly just adjacent to the new foundation for the garage/shop. Version Date: December 19, 2018 i APPENDIX 3 — Determining Construction Site Sediment Damage Potential (Appendix 7 — NPDES Phase II Permit) Note: See attached i. APPENDIX 7 - Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site -specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. , P 1 — Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near -shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater) associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. STEP 2 —Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight -lined to the feature or flows to the feature through a channel or ditch. August 1, 2013, Modified January 16, 2015 Potential Page 1 of 3 Appendix '- Determining Sediment Damage Version Date: December 19, 2018 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: iv. Sheet flow through a vegetated area with dense ground cover v. Flow through a wetland not included as a sensitive feature vi. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. . STEP 3 —Construction Side Sediment Transnort Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low ❑ 100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoffI Construction Site Sediment Transport Potential Worksheet A. Existina slope of site (averaae, weighted by aerial extent): Points 2% or less .. 0 >2-5%.............................................................................................. 5 >5-10%.......................................................................................... 15 >10-15%.......................................................................................a 30 >15%.............................................................................................50 B. Site Area to be cleared and/or qraded: <5,000 sq. ft...................................................................................... 0 5,000 sq. ft. — 1 acre, I I I I I I I I I I I I I d 1 0 a 8 a a 9 1 0 a a 9 a 0 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 a a a 0 2 0 a 0 a 0 a 0 a 0 a 4 4 0 P a 1 30 >1 acres.........................................................................................a 50 C. Quantity of cut and/or fill on site: <500 cubic yards............................................................................... 0 500 — 5,000 cubic yards"........ ........ M .... M & M M a a a a a 0 a a a 0 a a a ......... 5 >5,000 — 10,000 cubic yards.......................................................... 10 >10,000 — 20,000 cubic yards ........................................................ 25 >20,000 cubic yards............................................2.........................9 40 I Runoff potential of predominant soils (Natural Resources Conservation Service): Hydrologic soil group A................................................................... 0 Hydrologic soil group B...........................................................0..... 10 Hydrologic soil group C...........................................................0..... 20 Hydrologic soil group D..............................................................a" 40 E. Erosion Potential of predominant soils (Unified Classification Svstem): GW, GP, SW, SP soils, I I I a a 0 M a 0 a 0 0 0 0 0 a a a a a 0 a a 0 0 a 0 0 a . . . . . . . a M , M M d a a a 0 0 a a 0 0 0 0 a , 0 . . . . . . . . . . . . . A . . . . . am 0 Dual classifications (GW-GM, GP -GM, GW-GC, GP -GC, SW-SM, SW -SC, SP-SM, SP-SC)........................... 10 GM, GC, SM, SC soils, I I I I I M a a d a 0 0 a 9 1 a 1 0 0 4 a a a a 0 0 a a 0 .............. ..... 20 ML, CL, MH, CH soils...................................................................0 40 F. Surface or Groundwater enterinq site identified and interceptedl: Yes. a 0 a a I I I I I I I I 1 11 1 1 1 1 1 1 a 4 at 0 M M a a 0 a 0 a 0 1 0 1 0 w a No 0 . . . . . . . . . . . . . . M d 0 4 a 0 a 8 a a 0 0 a I 1 0 a 4 1 , a . . . . . . . . . . . . . . . . . . . d 0 No... low, ''I'll 11 1 11 11 11 I'D& on so 0 2 0 a I a a a a a 4 0 0 a K . . . . . K . . . . . . K a a M a a 0 0 a 0 a a a a 0 0 1 0 a I . . . . . . . . . . . . . . . . . . . . a 25 G. Depth of cut or height of fill >10 feet: Yes................................................................................................ 125 No............................................................................................................. 0 H. Clearing and gradinq will occur in the wet season (October 1 — Mav 1): Yes 50 No..................................................................................... I ....................... 0 TOTALPOINTS............................................................................................. 1 If no surface or groundwater enters site, give 0 points. 0£3 .a9 • t9 'ONWl- Sit E 51i 'ti'i o F a, 2 cN 'tti`aL- 1-iN Tesc i U:: AVENUE I TV. It plot -- Lu ..4.IR. ,.. .0 -,:R, i IL tilt i Fir o.. n,, .rv + I r G c h __ ___ Y __-- - ... ., 5 ypn p , -., = , .... --- IN51/ W- NyE w nor d— (-- -— ,. n,,.p a —ENE ON al -xi t-ppFNEo4j qp _ C1 _ .»Q _- EINCEN TIP / l ten::„m _ I IN - FIN 8 " I IOil u, e I I ( r — .ryPC ... _erg .a.., I I 'C -- I I .j 4 I WI- I ..ff -'Ge ,.,n. ., .,,,x Mal lit Col aoj AN IN WEEN FEE ru JOIN IN H I - __ i• I - I ,,w.... PENN 1, I I N it - L. _ ` sx - I DON L ON 11 IN 61 it oIt III N"I IN It I _ ALL Hun i l'ENU X : ,y APPENDIX 5 - DOCUMENTED SITE PHOTOS (SHOW ALL DIRECTIONS OF THE SITE, INCLUDING FRONTAGE) LOCATION: ALLEY AND "L" AVENUE LOOKING NORTHEAST DESCRIPTION OF THE PHOTO: GARAGE AND PARKING TO BE REPLACED PHOTO TAKEN BY: DALE HERRIGSTAD 7-1-2019 Location: Alley and "L" Avenue looking east Description of the photo: Garage and parking to be replaced. Photo taken by: Dale Herrigstad 7-1-2019 Location: Alley and east property line looking northwest Description of the photo: Garage to be replaced. Photo taken by: Dale Herrigstad 7-1-2019 A1.1 A2.1