HomeMy WebLinkAboutPermit File BLD-2019-0716 3937 Rock Ridge Parkway (3) 'f r Storm Water Minimum Requirements #2
ENGINEERING DEPARTMENT
� OCT: 3 0 2019 904 6�' Street Anacortes,WA 98221
www.anacorteswa. ov
�• � i OCT 31 2019 g
C 0 3, ANACORTES
'�Y
CITY OF ANACORTES FILE COPY
Official Use
Only:
(Information to Inspectors)
p )
Required Storm Water Facility and other related requirements:
Project Address: 3937 Rock Ridcie Parkway Submittal Date: 10/30/2019
Parcel Number: P134313 Revision Number:
Permit Number: X/Dy2O(7 O 7/C Acceptance D COAL: tV//`4 '
Reviewer:
FRONT OF REPORT
Submittal Checklist:
o TAB 1 - Drainage Analysis— Minimum Requirement#2
o APPENDIX 1 - Survey performed by a Professional Land Surveyor
o APPENDIX 2 - Model Soil Management Plan for BMP T5.13
o APPENDIX 3 - Determining Construction Site Sediment Damage Potential (Appendix 7)
o APPENDIX 4 - Site Plan with all applicable information (Minimum Size 11x17 —30 scale)
o APPENDIX 5 - Documented Site Photos (North, South, East and West)
Project Description: (What is it you are looking to do? Provide details regarding, but not limited to, Lot SF,
Home SF, New and Replaced Hard Surface)
Construction of a new 3,034 SF home on a 9,203 SF lot. The new and hard replaced surface is 4,322 sq.ft. for
the house and deck with an additional 1,538 sq.ft. in driveway. This is a total of 5,860 sq.ft.
Existing Site Conditions Summary:
(Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography,
vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed,
Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction PhasinglSequence)
The site was developed under Rock Ridge Phase 5, which had all the appropriate permits and has been
accepted by the City of Anacortes City Council and recorded.
The site is sloping mostly from center to south and west sides of lot. The average sloping grade is around 1%
to 22%. 51% at the edge.
This site is part of a Common Plan of Development. The development had the detention pond upsized for flow
control for both Rock Ridge Phase 4 and 5. This was accepted April 12, 2018. The report is part of the
recorded subdivision and covered Minimum Requirements 1, 3, 4, 5, 6, 7, 8 and 9 for each lot. Therefore, this
project is submitting Minimum Requirement 2 only
Version Date: December 19, 2018
A soils analysis was not done for this site since it is solid rock and is identified as impervious surface.
There are no known critical areas adjacent to this property that would offer any concern by building on this
property, or any Erosion problems by building on this site.
Construction Sequencing: (Note: sequence may not fall in this order, but close)
o Installation of Erosion and Sedimentation BMP's.
o Minor rock excavation work to ensure compliance with required BMP's under Minimum Requirement 5
and 6.
o Installation of the footings and foundations.
o Construction of the home.
o Connection of the utilities to the home.
o Installation of MR#5 required BMP's
o Backfill of site with BMP T5.15 Post Construction Soils, Landscaping, driveway, driveway access. See
Appendix - Model Soil Management Plan for BMP T5.13
Developed Conditions Summary:
(Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard
surfaces , proposed contours)
Proposed slopes on hard surfaces are showing. Site proposed final grade plan is showing proposed grade
and slopes. Cut and fill dependent on how much rock needs to be chipped out, but general a general cut and
fill calc. has been given.
Site Sediment Transport Score: >100 Total Points (High\Low) (See Appendix 4- Determining
Construction Site Sediment Damage Potential(Appendix 7)
Drainage Basin (2007 Storm Comp Plan — City website\publicworks\engineering\comprehensive plans):
What Drainage Basin are you in? GB Identify any downstream drainage issues (Storm Comp Plan: Yes,
Identified If so, describe:
Problem Area#13—Oakes Avenue and Georgia Avenue
Problem:A natural depression exists on a parcel that will soon be developed. A pipe drains the depression to
the north side of Oakes Avenue.
Solution: Install a trash rack like that described for Area#5 to keep pipe inlet clear of debris.
Response: The natural depression was filled in revising the natural drainage path for this parcel insofar as
raising the elevation. The natural discharge is still at the same location. This issue has been resolved with
development and does not affect this project.
Problem Area #28—Kansas Avenue and West 6th Street
Problem:A shallow manhole is located at the intersection.
Solution: The City has preliminary plans for the new storm system in this area. The new system will divert
existing flows to lllinios Avenue. The downstream system should be analyzed for capacity.
Version Date: December 19, 2018
Start Here
Does the site have 35% Yes see Redevelopment Msnurr
or more of existing Requirements and Flow Chart
impervious coverage? Fgure 1-2.4.2)-
No
Does the project convert 3 j
• acres or more of vegetation to
Does the project resul: r lawn or landscaped areas. or
5.000 square feet. or No convert 2_5 acres or more of
Brea?er. of new pi us 10 native vegetaEon ' pastLire^
-eolaced hard surface
area?
No
Yes
Yes Does the project result in 2.CCIC
• square feet, or greater, of new pi us
111,
All Minimum Requirements 'replaced hard surface area"
apply to the new and replaced
hard surfaces and converted Yes/ No
vegetation areas.
•
Does the project have land
Minimum Requirements *1 01' disturbing activities of 7,000
through #5 apply to the new ♦ Yes square tee: or greater?
and replaced hard surfaces
and the land disturbed. No
T
Minimum Requirement#2
applies_
11111 Figure I-2.4_1
Flow Chart for Determining Requirements for
New Development
DEPARTMENT OF Revises..une:1'215
ECOLOGY Diem:2 see ' hwm a ma.crt,too .ham'tor copyright to ioe inducing perr^issiceis
State o° ritror tr'la011trf aridttsclarrer.
version uaie: uecemoer f�, zu-i o
DoS _ __.. . . = :t,:L sq-.3-e feet or more of new plus replaced hard surface
OR
Does the hand disturbing activity total 7.000 square feet or greater?
v Yes No
M.rpm jrr- Requirements#t through 40E
apply tc Pe new and replaced hard Minimum Requirement*2 applies_
s_rra sac and the land disturbed.
Next Question
V
Does the project add 5.000 square feet or more of new hard surfaces?
OR
Convert 34 acres or more of vegetation to Lawn or landscaped areas?
OR
Convert 2.5 acres or more of native vegetation to pasture?
T Yes No
AD Minimum Requirements apply Next Question is this a road
to the new hard surfaces and the lM NO
converted vegetation areas. project-
Yes
Does the project add f,OC'3 square feet or more of new hard surfaces''
Yes
No is the togai of near plus replaced hard si.fa.,-
Do the new na- t 5.000 square feet or more
surfaces ace ^{' AND
more to �' - - - _ NO No additional ENO does the value of the proposed verre-
hard surf All minimum req. are taken care of by - including interior improvements -exceed
the prof common plan of development. Only 50%of the assessed vakie for repiacem --
minimum req. #2 is needed. value' cf the e, 7 'S -1provements
Yes AM Minimum Requirements apply to the new and replaced
hard surfaces and converted vegetation areas. Yes
Figure 1-2.4.2
Flow Chart for Determining Requirements for
Redevelopment
DEPARTMENT OF =.=.shy 3ry::if
ECOLOGY Please zee,, ,,,anew ecy.wa.gowcopy-gn►-,hrrn;for Dopyrltytt 1Qiicz rowing cer nissicela
Slate of M13s1 11 gton tr!Manor c9Itaolttyr,and disclaimer.
Version Date: December 19, 2018
TAB 2 (MINIMUM REQUIREMENT #2)
• 1-2.5.2 Minimum Requirement#2 —Construction Stormwater Pollution Prevention Plan (SWPP)
- All projects are required to complete Minimum Requirement 2.
- Refer to the 13 Elements of the SWPP (See document below, complete and attach)
- See attached Table 4.1.1, Table 4.2.1 and Table
- Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions,
Waterways and Runoff/Stormwater Detention Calculations.
The site was developed under Rock Ridge Phase 5, which had all the appropriate permits and has been
accepted by the City of Anacortes City Council and recorded.
The site is sloping mostly from center to south and west sides of lot. The average sloping grade is around 1%
to 22%. 51% at the edge.
This site is part of a Common Plan of Development. The development had the detention pond upsized for flow
control for both Rock Ridge Phase 4 and 5. This was accepted April 12, 2018. The report is part of the
recorded subdivision and covered Minimum Requirements 1, 3, 4, 5, 6, 7, 8 and 9 for each lot. Therefore, this
project is submitting Minimum Requirement 2 only
A soils analysis was not done for this site since it is solid rock and is identified as impervious surface. There
has been a soils analysis done on the soil stock pile that is used for fill on the Rock Ridge lots and is included
in appendix 2
There are no known critical areas adjacent to this property that would offer any concern by building on this
property, or any Erosion problems by building on this site.
See attached 13 Elements of a Construciton SWPPP. The Site Plan will be added to the Appendix 4.
BMP C162 Scheduling:
Construction Sequencing: (Note: sequence may not fall in this order, but close)
o Installation of Erosion and Sedimentation BMP's.
o Minor rock excavation work to ensure compliance with required BMP's under Minimum Requirement 5
and 6.
o Installation of the footings and foundations.
o Construction of the home.
o Connection of the utilities to the home.
o Installation of MR#5 required BMP's
o Backfill of site with BMP T5.15 Post Construction Soils, Landscaping, driveway, driveway access. See
Appendix 2 and MR# 5 Model Soil Management Plan for BMP T5.13
Version Date: December 19, 2018
Table 4.1.1 Source Control BMP's by SWPPP Element
Version Date: December 19, 2018
Element#1 Element#2 Element#13
Element#5 Element#6 Element#9 Element#11 Element#12
Preserve Establish Protect Low
BMP or Element Name Stabilize Protect Control Maintain Manage the
Vegetation lark Construction Soils Slopes Pollutants BM Ps Project Impact
Clearina Limits Access Development
BMP C101: Preserving Natural Vegetation ✓
BMP C102:Buffer Zones V ✓
BMP C103:High Visibility Plastic or Metal ✓
Fence
BMP C105: Stabilized Construction ✓
Entrance /Exit
BMP C106: Wheel Wash ✓
BMP C107: Construction Road/Parking ✓
Area Stabilization
BMP C120:Temporary and Permanent ✓ ✓
Seeding
BMP C121: Mulching ✓ V
BMP C122: Nets and Blankets ✓ ✓
BMP C123: Plastic Covering ✓
BMP C124: Sodding ✓
BMP C125: Topsoiling /Composting ✓
BMP C126: Polyacrylamide for Soil Erosion ✓
Protection
BMP C130: Surface Roughening ✓ ✓
BMP C131: Gradient Terraces ✓ ✓
BMP C140: Dust Control ✓
BMP C150: Materials On Hand ✓ ✓
BMP C151: Concrete Handling ✓
BMP C 152: Sawcutting and Surfacing ✓
Polution Prevention
BMP C153: Material Delivery, Storage and ✓
Containment
BMP C154: Concrete Viashout Area ✓
BMP C160: Certilied Erosion and ✓ ✓
Sediment Control Lead
BMP C162: Scheduling V
Table 4.2.1. Runoff Conveyance and Treatment BMP's by SWPPP Clement
Version Date: December 19, 2018
B in=A BadarrtiFt B1am=HNl Manta w 6eanrs** ebasntON _trp
IMP or!Maur!Naar - Colrol batch P r log Plaint Sbb_ Control Coabvi Br Prated I
aw
• lib Rain
armob 0 Iswassuunt
Cantrob
oar COW bla oaplot OIr a=kola ✓ I
OUP C M Graesa.iaed Ctrannalo ✓
Bir Calk Omani tI ✓
MVP
CM Water Oars 1
011kiCak P=glom Of ✓
IOW C ✓
BOP COM Level Sprsadu I
OOP CIO?:Clock grater ✓ ✓
BOP PM Td1■ir SM Deo CGsvleidSo ✓ • . ✓
Hama t Chock
MP CM: OWht Prr+lma= I
IMP CZ! glom Dada blot Prvbdlbn ✓
OMP C2a1: knish Iardar ✓ ✓
BMP C231k gram!FMK Shea ✓ 1
OOP calf SM Fenn ✓ ✓
OOP Mk v ON=Ilklp - ✓ ✓
OOP cOM Nala.a ' ✓
IMP COM V►p W=FNbaak= ✓
O OP CSM Sadiw.4 Trams ✓ ✓ •
BOP CNN Tenoa'Oy ierBari*Peed ✓ ✓
IMP CM&Clo akrnlba Shur a ka ✓
Chemed Tarminst
O OP tilt:Cookucgan OOnarawlvr i
Flrollen
O OP=OHIO pM Neese Unto
COI
BOP COO pM Caned for HI.pi Mbar ✓
13 Elements of SWPPP
Version Date: December 19, 2018
(Construction Stormwater Pollution Prevention Plan)
Please check off boxes to show that each element has been read and understood. Provide details where
applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the
correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington
(SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic
Development Department, as well as under Stormwater on the Engineering Division of Public Work's page.
Owner Name: Royal and Diane Reinsch
393 I
Site Address: en Rock Ridge Parkway
Prepared By: Jason Sterling
The Stormwater checklist or building permit determined that:
❑ The 13 elements must be addressed ❑ These elements must be addressed
for construction activity adding under for construction activity adding 2,000
2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area.
This means that an attached narrative
and site plan are required with this
document.
Under each element, explain the best management practices (BMPs) used or justify reasoning for
those that will not be used. If needed, please attach a narrative to further explain plans or justification.
ELEMENT 1: Preserve Vegetation/Mark Clearing Limits
❑ Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing
limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area.
❑ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum
degree practical.
Site was cleared in approximately 2010 prior to the construction of Rock Ridge Phase V being
constructed. Under a Clear and Grade permit for Rock Ridge Phase V, under brush and alder trees that
had grown in the last 7 years was cleared off the lot.
ELEMENT 2: Establish Construction Access
❑ Limit construction vehicle access and exit to one route, if possible.
❑ Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize
tracking onto roads.
❑ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in
preventing tracking sediment onto roads.
❑ If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more
frequently as necessary (ex: wet weather). Remove sediment from roads by shoveling, sweeping, or
pick up and transport the sediment to a controlled sediment disposal area.
❑ Conduct street washing only after sediment is removed in accordance with the above bullet.
❑ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging
into systems tributary to waters of the State.
We will utilize BMP C107 Construction Road\Parking Area Stabilization. The installation and j
maintenance specifications are attached to the 13 Elements.
Version Date: December 19, 2018
ELEMENT 3: Control Flow Rates
❑ Protect properties and waterways downstream of development sites from erosion and the associated
discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater
runoff from the project site.
❑ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities
as one of the first steps in grading. Assure that detention facilities function properly before constructing
site improvement (e.g. impervious surfaces).
❑ If permanent infiltration ponds are used for flow control during construction, protect these facilities from
siltation during the construction phase.
Since the site is solid rock with a layer of soil on top of the rock, The site will utilize BMP C162
Scheduling to help with flow control. Gutters will be installed with temporary downspouts to the gutter
downspout piping to convey any potential increase in runoff away from the site.
The project will utilize existing BMP C233 Silt Fence along the west, south, and east boundary.
Additionally, the project will utilize BMP C212 Mulching along the west, south and east boundaries,
along with BMP C235 Wattles if necessary.
(kJ
The lot slopes mostly towards the west and south and some towards the east. If BMP C24Y
necessary, the proposed location will be in the west/south portion of the lot, near bottom of slope. This
BMP will need to be designed and reviewed by the COA prior to implementation.
ELEMENT 4: Install Sediment Controls
❑ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge
of pollutants.
❑ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in
grading. These BMPs shall be functional before other land disturbing activities take place.
❑ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and
sediment controls must address factors such as the amount, frequency, intensity and duration of
precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of
soil particle sizes expected to be present on the site.
❑ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment
removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility.
Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet
the flow control performance standard in Element#3, bullet#1.
❑ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of
juvenile salmonids attempting to enter off-channel areas or drainages.
❑ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to
increase sediment removal, and maximize stormwater infiltration.
❑ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid
discharging sediment that is still suspended lower in the water column.
The sediment controls have been identified on the site plan and are included in Appendix 4 of this
report. BMP's that will be on-site for additional protection are: BMP C235 Straw Wattles, BMP C240
Temporary Sediment Trap (if necessary).
ELEMENT 5: Stabilize Soils
❑ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable
BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic
covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early
application of gravel base early on areas to be paved, and dust control.
❑ Control stormwater volume and velocity within the site to minimize soil erosion.
Version Date: December 19, 2018
❑ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize
erosion at outlets and to minimize downstream channel and stream bank erosion.
❑ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent
erosion.
o During the dry season (May 1 — Sept 30): 7 days
o During the wet season (Oct 1 —Apr 30): 2 days
❑ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather
forecast.
❑ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be
located away from storm drain inlets, waterways, and drainage channels.
❑ Minimize the amount of soil exposed during construction activity.
❑ Minimize the disturbance of steep slopes.
❑ Minimize soil compaction and, unless infeasible, preserve topsoil.
Exposed stock piles will be covered with BMP C123 Plastic Covering and other exposed areas with
BMP C121 Mulching.
ELEMENT 6: Protect Slopes
❑ Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include,
but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope
steepness, and roughening slope surfaces (Ex: track walking).
❑ Divert off-site stormwater (run-on) or ground water away from slopes and disturbed areas with
interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from
stormwater generated on the site.
❑ At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion.
o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10-
minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition.
Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff
model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing
land cover condition for predicting flow rates from tributary areas outside the project limits. For
tributary areas on the project site, the analysis must use the temporary or permanent project
land cover condition, whichever will produce the highest flow rates. If using the Western
Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as
"landscaped" area.
o Where 15-minute time steps are available in an approved continuous runoff model, they may be
used directly without a correction factor.
❑ Place excavated material on the uphill side of trenches, consistent with safety and space
considerations.
❑ Place check dams at regular intervals within constructed channels that are cut down a slope.
❑ Consider soil types and its potential for erosion.
❑ Stabilize soils on slopes, as specified in Element 5.
❑ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both
mulching and straw erosion control blankets.
The Natural Discharge location will be protected by BMP C233 Silt Fence.
ELEMENT 7: Protect Drain Inlets
❑ Protect all storm drain inlets made operable during construction so that stormwater runoff does not
enter the conveyance system without first being filtered or treated to remove sediment.
❑ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available
storage (unless a different standard is specified by the product manufacturer).
❑ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the
Version Date: December 19, 2018
conveyance system without first being filtered or treated to remove sediment.
❑ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains
without prior and adequate treatment unless treatment is provided before the storm drain discharges to
waters of the State.
❑ Inlets should be inspected weekly at a minimum and daily during storm events.
Inlets will be protecting using BMP C220. A Supplement detail will WSDOT Standard Detail I-40.20-00
Storm Drain Inlet Protection since DOE does not have an equivalent detail to use.
ELEMENT 8: Stabilize Channels and Outlets
❑ Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following
expected peak flows:
o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in
Element 6, above.
❑ Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent
streambanks, slopes, and downstream reaches at the outlets of all conveyance systems.
❑ The best method for stabilizing channels is to completely line the channel with a blanket product first,
then add check dams as necessary to function as an anchor and to slow the flow of water.
The Natural Discharge location will be protected by BMP C233 Silt Fence.
ELEMENT 9: Control Pollutants
❑ Design, install, implement, and maintain effective pollution prevention measures to minimize the
discharge of pollutants.
❑ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site
in a manner that does not cause contamination of stormwater.
❑ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum
products, and other materials that have the potential to pose a threat to human health or the
environment. On-site fueling tanks must include secondary containment. Secondary containment
means placing tanks or containers within an impervious structure capable of containing 110% of the
volume contained in the largest tank within the containment structure. Double-walled tanks do not
require additional secondary containment.
❑ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and
control measures. Clean contaminated surfaces immediately following any spill incident.
❑ Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents
discharge to surface water, such as closed-loop recirculation or upland land application, or to the
sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not
include wastewater from concrete washout areas.
❑ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of
chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and
procedures.
❑ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this
contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete
washing and curing waters, waste streams generated from concrete grinding and sawing, exposed
aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust
the pH of stormwater if necessary to prevent violations of the water quality standards.
❑ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas
only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or
streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete
spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land
applications for discharging wastewater from concrete washout areas.
❑ Obtain written approval from Ecology and provide to the City before using chemical treatment other
than CO2 or dry ice to adjust pH.
Version Date: December 19, 2018
❑ Woody debris may be chopped and spread on site.
❑ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel
tank drain down and removal, and other activities which may result in discharge or spillage of pollutants
to the ground or into stormwater runoff using spill prevention measures, such as drip pans.
❑ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs
may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle.
All chemicals, liquid products, petroleum products, solvents and other potentially environmental1
hazardous products will be locked in the site job trailer.
BMP C154 Concrete Washout Area will be utilized. A Concrete Washout area has been installed within
the Rock Ridge Phase IV and V subdivision.
No fueling or oil changes are being performed on-site. i
Contractor will be required to have a Spill Kit on-site that is accessible by all workers on the project.
ELEMENT 10: Control De-Watering
❑ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to
stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap
or sediment pond.
❑ Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to,
or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow
does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do
not route clean dewatering water through stormwater sediment ponds. Note that "surface waters of the
State" may exist on a construction site as well as off site; for example, a creek running through a site.
❑ Handle highly turbid or contaminated dewatering water separately from stormwater.
❑ Other treatment or disposal options may include:
1. Infiltration
2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that
does not pollute state waters.
3. Ecology-approved on-site chemical treatment or other suitable treatment technologies.
4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other
option.
5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized
dewatering.
❑ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam
can create highly turbid or contaminated dewatering water.
❑ Discharging sediment-laden (muddy) water into waters of the State likely constitutes a violation of water
quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration
and preserving vegetation.
Site is solid rock. No Dewatering is anticipated
ELEMENT 11: Maintain BMPs
❑ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to
assure continued performance of their intended function in accordance with BMP specifications.
❑ Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site
stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment
control BMPs are bio-degradable and designed to remain in place following construction such as
compost socks.
❑ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and
compaction. All BMPs that are to remain in place following completion of construction shall be
Version Date: December 19, 2018
examined and placed in full operating conditions. If sediment enters the BMPs during construction, it
shall be removed and the facility shall be returned to the conditions specified in the construction
documents.
❑ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from
removal of BMPs or vegetation.
See Element 3 above for additional BMP's that will be on hand for additional runoff measures.
BMP's will be reviewed and inspected daily and revised accordingly.
ELEMENT 12: Manage the Project— Projects subject to Minimum Requirements 1-9 must have a Certified
Erosion and Sediment Control Lead (CESCL) for site inspections. Projects subject to Minimum Requirements
1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the
CESCL or inspector, who shall be present on-site or on-call at all times.
❑ Phase development projects to the maximum degree practicable and take into account seasonal work
limits to prevent soil erosion and prevent transporting sediment from the site during construction.
❑ Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued
performance of their intended function.
❑ Maintain, update, and implement the SWPPP.
❑ Clearing and grading activities for developments shall be permitted only if conducted using an approved
site development plan (e.g., subdivision approval).
❑ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if
shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of
the following:
1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to
receiving waters.
2. Limit activities and the extent of disturbed areas.
3. Proposed erosion and sediment control measures.
Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has
the authority to take enforcement action per AMC 19.76 Stormwater.
❑ The following activities are exempt from the seasonal clearing and grading limitations:
1. Routine maintenance and necessary repair of erosion and sediment control BMPs;
2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or
result in the removal of the vegetative cover to soil
3. Activities where there is 100% infiltration of surface water runoff within the site in approved and
installed erosion and sediment control facilities.
Since this lot is part of a Common Plan of Development a qualified CESCL will be on-site.,"
A sign will be posted on-site with a name and 24-hour number.
ELEMENT 13: Protect Low Impact Development BMPS
❑ If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the
Manual for requirements.
There is no Low Impact Development BMP's proposed with this project.
ant ignat Date
Version Date: December 19, 2018
BMP C107: Construction Road/Parking Area
Stabilization
Purpose
Stabilizing subdivision roads, parking areas, and other on-site vehicle transportation routes
immediately after grading reduces erosion caused by construction traffic or runoff.
Conditions of Use
Roads or parking areas shall be stabilized wherever they are constructed, whether permanent or
temporary, for use by construction traffic.
• High Visibility Fencing (see BMP C103: High Visibility Fence) shall be installed, if necessary, to
limit the access of vehicles to only those roads and parking areas that are stabilized.
Design and Installation Specifications
• On areas that will receive asphalt as part of the project, install the first lift as soon as possible.
• A 6-inch depth of 2- to 4-inch crushed rock, gravel base, or crushed surfacing base course
shall be applied immediately after grading or utility installation. A 4-inch course of asphalt
treated base (ATB) may also be used, or the road/parking area may be paved. It may also be
possible to use cement or calcium chloride for soil stabilization. If cement or cement kiln dust is
used for roadbase stabilization, pH monitoring and BMPs (BMP C252: High pH Neutralization
Using CO2 and BMP C253: pH Control for High pH Water) are necessary to evaluate and
minimize the effects on stormwater. If the area will not be used for permanent roads, parking
areas, or structures, a 6-inch depth of hog fuel may also be used, but this is likely to require
more maintenance. Whenever possible, construction roads and parking areas shall be placed
on a firm, compacted subgrade.
• Temporary road gradients shall not exceed 15 percent. Roadways shall be carefully graded to
drain. Drainage ditches shall be provided on each side of the roadway in the case of a
crowned section, or on one side in the case of a super-elevated section. Drainage ditches shall
be directed to a sediment control BMP.
• Rather than relying on ditches, it may also be possible to grade the road so that runoff sheet-
flows into a heavily vegetated area with a well-developed topsoil. Landscaped-areas are not
adequate. If this area has at least 50 feet of vegetation that water can flow through, then it is
generally preferable to use the vegetation to treat runoff, rather than a sediment pond or trap.
Version Date: December 19, 2018
The 50 feet shall not include wetlands or their buffers. If runoff is allowed to sheetflow through
adjacent vegetated areas, it is vital to design the roadways and parking areas so that no
concentrated runoff is created.
• Storm drain inlets shall be protected to prevent sediment-laden water entering the storm drain
system (see BMP C220: Storm Drain Inlet Protection).
Maintenance Standards
Inspect stabilized areas regularly, especially after large storm events.
Crushed rock, gravel base, etc., shall be added as required to maintain a stable driving surface and to
stabilize any areas that have eroded.
Following construction, these areas shall be restored to pre-construction condition or better to prevent
future erosion.
Perform street cleaning at the end of each day or more often if necessary.
Version Date: December 19, 2018
TAB 5 (MINIMUM REQUIREMENT #5)
• Minimum Requirement#5—On-site Stormwater Management
All sites are required to utilize BMP T5.13— Post Construction Soil Quality and Depth.
For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that
is considered feasible. No other on-site Stormwater Management BMP is necessary for that surface.
Feasiblity shall be determined by evaluation against:
1. Design criteria, limitations and infeasiblity criteria identified for each BMP in this manual, and;
2. Competing needs criteria listed in Chapter V-5 — On-site Stormwater Management.
Lawn and Landscaped Area:
• BMP T5.13: Post-Construction Soil Quality and Depth. (Attach Detail in Report)
Refer to this site for requirements and specifications. All projects are required to utilize this BMP.
http://www.soilsforsalmon.orq/pdf/Soil BMP Manual.pdf
See below for the "Model Soil Management Plan for BMP T5.13" to be a deferred submitted
Version Date: December 19, 2018
PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age# of pages
Complete all information on page 1; only site address and permit number on additional pages.
Site Address/Lot No.:
Permit Type: Permit Number:
Permit Holder: Phone:
Mailing Address:
Contact Person: Phone:
Plan Prepared By:
ATTACHMENTS REQUIRED(Check off required items that are attached to this plan)
Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required)
New planting beds and turf areas(amendment required)
Type of soil improvement proposed for each area
Soil test results(required if proposing custom amendment rates)
Product test results for proposed amendments
AREA# (should match Area#on Site Plan)
PLANTING TYPE Turf Undisturbed native vegetation
Planting Beds Other:
SQUARE FOOTAGE OF THIS AREA: square feet
SCARIFICATION inches(depth)of scarification needed to achieve finished total 12"loosened depth.
Subsoil will be scarified
PRE-APPROVED inches of compost or imported topsoil applied
AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT:
Topsoil import =cu.yards per 1,000 sq. ft.
Amend with compost X ,000s sq.ft. in this area
Stockpile and amend =cubic yards of amendment —*—*—*—f—+ QUANTITY: CU.YDS.
( cu.yds. stockpiled) (needed to cover this area to designated depth)
CUSTOM AMENDMENT Attach test results and calculations.
Topsoil import inches organic matter or topsoil import PRODUCT:
Topsoil&compost lift X 3_1
Amend =cu.yards/ 1,000 sq. ft.
Stockpile and amend X ,000s sq.ft. in this area
( cu.yds. stockpiled) =cubic yards of amendment —*—*——>—> QUANTITY: CU.YDS.
MULCH ,000 sq.ft. PRODUCT:
X 6.2 (conversion, to give 2 inch mulch depth)
=cubic yards of mulch —*—*—*—*—>—> QUANTITY: CU.YDS.
TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only, totaling all areas/pages in this Plan)
❑ Product#1: ❑Quantity: cu.yds.
❑ Test Results: % organic matter C:N ratio<25:1(except mulch,or<35:1 for native plants) "stable"(yes/no)
❑ Product#2: ❑ Quantity: cu.yds.
❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no)
❑ Product#3: ❑ Quantity: cu.yds.
❑ Test Results: %organic matter C:N ratio<25:1 (except mulch,or<35:1 for native plants) "stable"(yes/no)
Date: Inspector: Approved: Revisions Required:
Date: Inspector: Approved: Revisions Required:
Version Date: December 19, 2018
APPENDIX 1 — Survey performed by a Professional Land Surveyor
Note: Submitted with permit application
Version Date: December 19, 2018
APPENDIX 2 — Model Soil Management Plan for BMP T5.13
Note: Document is provided under Minimum Requirement 5 in this document. Soil report attached below.
Version Date: December 19, 2018
PAP-Accredited
Northwest Agricultural Consultants RR SUMMIT NW, LLC
2545 West Falls PO BOX 319
Kennewick, WA 99336 ANACORTES, WA 98221
(509) 783-7450 Fax: (509) 783-5305 NAPT
2016 SOIL
Client No.: 11396 Date Received: 03-13-2017
Report No.: 40544 Page: 1 of 1
33251 f-58756
Grower Sampler Field No. Field Name Crop Year Crop Yield Goal
Strandberg
Depth Available NO3-N NH4-N Sulfur pH Soluble Organic P(bic) K(bic) P(ace) K(ace) Calcium Magne- Sodium Eff. Boron Zinc Manga- Iron Copper CEC %Base Chloride Bray 1 P Total Sample)
(ft.) Inches lbs/acre lbs/acre ppm Salts Matter ppm ppm ppm ppm (meq. slum (meq. ppm ppm nese ppm ppm (meq. Sat. lbs.per. ppm Bases D
(mmhos Percent per 100 (meq. per 100 ppm per 100 acre (meq.
/cm) grams) per 100 grams) grams) per 100
grams) grams)
1 7.69 24.5
Total 0.00
Estimated Nitrogen Release from Organic Matter Estimated Total Nitrogen Available to Crop Last Year's Crop Fertilizer
Comments
CEC Method : EPA 9081
OM Method: Loss on Ignition
APPENDIX 3 - Determining Construction Site Sediment Damage Potential (Appendix 7 - NPDES Phase
II Permit)
Note: See attached
Version Date: December 19, 2018
Western Washington Phase II Stormwater Permit
APPENDIX 7 - Determining Construction Site
Sediment Damage Potential
The following rating system allows objective evaluation of a particular development site's potential to
discharge sediment. Permittees may use the rating system below or develop alternative process
designed to identify site-specific features which indicate that the site must be inspected prior to clearing
and construction. Any alternative evaluation process must be documented and provide for equivalent
environmental review.
Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development
site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is
a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to
determine the construction site sediment transport potential.
STEP 1 —Sediment/Erosion Sensitive Feature Identification
Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of
sediment deposition or erosion. Special protection must be provided to protect them.
Sediment/erosion sensitive features include but are not limited to:
i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that
would be Salmonid bearing if not for anthropogenic barriers;
ii. Lakes;
iii. Category I, II, and III wetlands;
iv. Marine near-shore habitat;
v. Sites containing contaminated soils where erosion could cause dispersal of
contaminants; and
vi. Steep slopes (25% or greater) associated with one of the above features.
Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment
is complete.
STEP 2 — Hydraulic Nearness Assessment
Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not
be naturally attenuated before entering the feature. The conditions that render a site hydraulically near
to a feature include, but are not limited to, the following:
i. The feature or a buffer to protect the feature is within 200 feet downstream of the site.
ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel
or ditch.
August 1, 2013, Modified January 16, 2015 Appendix 7- Determining Sediment Damage
Potential Page 1 of 3
Version Date: December 19, 2018
A site is not hydraulically near a feature if one of the following takes place to provide attenuation
before runoff from the site enters the feature:
iv. Sheet flow through a vegetated area with dense ground cover
v. Flow through a wetland not included as a sensitive feature
vi. Flow through a significant shallow or adverse slope, not in a conveyance
channel, between the site and the sensitive feature.
Identify any of the sediment/erosion sensitive features from step one that are hydraulically near
the site, and proceed to step three. If none of the sediment/erosion sensitive features are
hydraulically near the site, the assessment is complete.
vii. STEP 3— Construction Site Sediment Transport Potential
Using the worksheet below, determine the total points for each development site. Assign points
based on the most critical condition that affects 10% or more of the site.
If soil testing has been performed on site, the results should be used to determine the
predominant soil type on the site. Otherwise, soil information should be obtained from the
county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties
for step 1.D) and Erosion Potential (Table of Water Features for step 1.E)
When using the county soil survey, the dominant soil type may be in question, particularly when
the site falls on a boundary between two soil types or when one of two soil types may be present
on a site. In this case, the soil type resulting in the most points on the rating system will be
assumed unless site soil tests indicate that another soil type dominates the site.
Use the point score from Step 3 to determine whether the development site has a high potential
for sediment transport off of the site.
Total Score Transport Rating
<100 Low
❑100 High
A high transport rating indicates a higher risk that the site will generate sediment contaminated
runoff.
Construction Site Sediment Transport Potential Worksheet
A. Existing slope of site (average, weighted by aerial extent): Points 2%
or less ...0
>2-5% 5
>5-10% 15
>10-15% 30
>15% 50
B. Site Area to be cleared and/or graded:
<5,000 sq. ft 0
5,000 sq. ft. — 1 acre 30
>1 acres 50
C. Quantity of cut and/or fill on site:
<500 cubic yards 0
500 —5,000 cubic yards 5
>5,000— 10,000 cubic yards 10
>10,000—20,000 cubic yards 25
>20,000 cubic yards 40
D. Runoff potential of predominant soils (Natural Resources Conservation Service):
Hydrologic soil group A 0
Hydrologic soil group B 10
Hydrologic soil group C 20
Hydrologic soil group D 40
E. Erosion Potential of predominant soils (Unified Classification System): GW,
GP, SW, SP soils 0
Dual classifications (GW-GM, GP-GM, GW-GC,
GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) 10
GM, GC, SM, SC soils 20
ML, CL, MH, CH soils 40
F. Surface or Groundwater entering site identified and intercepted1:
Yes 0
No 25
G. Depth of cut or height of fill >10 feet:
Yes 25
No 0
H. Clearing and grading will occur in the wet season (October 1 — May 1): Yes 50
No 0
TOTAL POINTS >100
1 If no surface or groundwater enters site, give 0 points.
APPENDIX 4— Site Plan with all applicable information (Minimum Size 11x17 at a legible scale)
Note: Submitted with permit application
APPENDIX 5 — Documented Site Photos (Show all directions of the site, including frontage)
400mio,
•
t
PV
j
Location: South side of lot.
Description of the photo: South side of lot looking towards north side of lot.
Photo taken by: Jason Sterling
•
Location: East side of lot.
Description of the photo: East Side looking up towards the west side.
Photo taken by: Jason Sterling
If
t_,,-,I ® r I ® /�� rj M . '• .i laT, 11111 ,• {; , .1 ...
U..] �( �\)) I 1_-).� CD (t . F, ' j4 11.� •1 rl . T y •,r •
4!
Y " - / M1 ,•415 r . l'. V. ft • I - ik �+ ;'• ` l +
41
•
y1w !
I:. 4
��� mo ' l� •� •fitAI►• "sit ; ( l�tt. , � � 71 �V+ I �t ��.�{ + J r‘�
`�J ° ■ , • wti ° 1 . :tr v• � 1.4� :by' }L1fb ; ih Grdit� 1 �M' w
�7 t ' r / i �, u� r(�' ® •� t 1ii•JA / . ,/'► kl\� j I .* • ' r'i�St(')11'�n1'-
I`JSfy �jr ,' 'Vlt—urt� t •,x ; • ` .i�.� f iA �1' 3`i ', Si,, 1� ' I ,yL ' 1 �'
•' •c • ♦ '(� ' i t 1 rt • 1 jIIKK��
t:, ._I oo . 1iffgr o ° ❑ ❑ I 1n ! TZ �11�^+E 1 : I . rlfy a Y T, •y�y i{ r t° = i ^ t ' 14 1 I t;
•
•
,, , i .
,.,
l A z , r ill ,•
3 . d•lT•,I yf rt r f+'44 � 11 �' r..i,
? �S1 1t—�! "y.alir1. ! [ ® 4A4 ' f sl�tJy`� rI iV I `� 'tha i `
tr�� Vie" r I r i .• A "L, Orr
1 T { !{ r 1 s p • '
0
`i �= _I .11
1`y , tor • � i+ r . , • r nq , +, r 4d J,1` ,i . CI ) •L,I{ '{ i
. ,r „t y„ ' Li X a 'rT , Y'1 p )- . - t >► f, ' '., 1 '•
G u�' 3 ��a}�4.!J'r'�1,�4KSi ❑ a �� = 4% ,�1 r S ,'y . t t•: &1" .l /A 11;',. - * ii. ;` 2,:llMkk�� , e ,' - --
❑ ❑ ; 1StW.5� s tlti����#yi+ii{}•. ..1- �� `� t a . ' . ' T /;!? } �I. rr••i w = i I { I
el ri• Jy +y]I•,r� f • _ 7f7A . 1t r Isi y 1,...,
n 1 ,' ,- 1 r �. . -
((�rInI���� �y, ,5y a•5c r ` f e rY
l 1 t a . • �; ,L ' ; L i vV oB � 'r Y 1 r•rii, JI,, rl '� f,L /t` i '•1 t I y :1
IV(IIVI'} ' • - , iF•'�yy`+ k,t J t'r- (- F (i111 'r+1 4:1/ ., . {: i 1I. -1, ]� r a. ,
n'Sl I 5 :. .ai ea ,t....w' • t� Lid `� , a1 �.J , j1�1�,(]!,L' f •,,,k .:�,`{ •Iy1 '1t.:F4 '�ir . • 71 '/
c—s �i� I t "--r' }. } Y : ' ø
ii . IF:7` 1A . l: st
, t�. IIt • II•
1 ���{] u0 1Fk/ ,,` C.'_ • LJ+Y • ,•
r �u V ® ►i . �'♦{� ,�11�y� r ,a�Nj,} �• 'CA
, }i1f l r � ' ,1}.1 T 1� �L,Y•1' 'tl l ' , 1 '!
' I L J]�\ , . t 1,•, , f _ -� i.� Imh 1 r i-4'r� t:,;.-?f `C &1 lr ye' i, i}:) j+•..a1 'jY1 , r5 /I rJ) pi,
Jt``` 'iCf
V VJI _ ���,� 7� (���) f '��11 t + " r (�/t` 1 ` I GGG „ s (S. a::l r ,
oe 4£. t • ,'refl
\J F/ v✓ �5� q � *�] , .1 wt ' t + , g]YrV. .� 1 � � J Mp t
:il
❑ ❑ tt.,f : • r u f_ ii. r t t bier!,.y' Yy , l„�y t , 7t0 ,r 5 _
tf�i-1 :. ' as r] I ; to ,J ��1�. �! .}A Y' . pA � irly� I' {i r� �,: rJl •r'..
iiti
(, � I } CD lip. :..:,....tili
r'' 4 .� /� ❑ t :' , 1 ' rz.l : 15 `l ' i,Jt ` F 1 t,;,�i'htA r+t -1 -
eir
•
•
on ,I I• . � a _ .a , 1 '�' 3Y 'In' '�a' ,,, y � . >.,tir •1 '� �i� �'� r}]' err i '1 • � r
•
��/ ' 'r, ••� y� _- I �l i • �'.. • l , a? 1lji rw...,lll t + ,,.,:.• r�
L 0 + v _ t+ t - ; M11 Y q{ • CJ '1 •
t I I�.�`'' • Y•Y �'�' 'r 1\� � ,r �] •i I:n •! t/ rl. 'JI • ,'1�}•r4 *TAN r r•. . 7 l
0 1 •� it'•' '•v t w]a RV�I+ �. • ],MI L^h �•• ' ' }�( >fr' ' f !v, f.�r�'f L,�i't a '•r�Il+tY,rlJ� 1•t . '• � l 1 •
• ^ �� �i �t. 4- - l pp S • r' r �wM >''L�' r[ ,17• ' iti l( 1-�. r! • 1d-, (+�t� ti/41}�yylt 1� I�rr - f4. ' - -
W I fr/1 ( 's ,' •
/\ 1 • . 4I� , , % • a �ti >t ,i1] iI{,titr, ! kf `: . •�}tIM`
�[/'+�� r t _ L[ )j " t , •r .f: • `. 1 , r .SYrI 4' r ArIv 11 Tf /��1I 4 ' ;3''''t)J rr • iL *10111 � A
•
V l"J 1 t' i1 • I ' .r r—�� l 1 • t\ 1/ , �bt 'to 1 }I,l f:. •, I' + 'i .1 . f it t'=r� 0,4 ry, l•rlJ r �l+ ir al. • _ I"
\/ � _ r Y � 1 \* � ' ' L, I� I • . i 1` `n ' Y ,1 .. .4 .'„S 'S+f � 01;.. Jnl Irlt` il. , " _
T r' 1 . s.
�w .f �� 'l .Y•l i . it Y,'Jy` l , . • 11 �: ., ' YF �'. r5 't t• ��(yt t iii,:r�1 tJ, �n 1 ��I � 1�•� ,��,1 �J lit •`ryT I. 1
•
1.41
r ' ' y. a, 11 _r . ,,.1� .�tlf��. '�R t ',A.. -t� + i• / l 4 ! t t ' {1r)]r'rft.. ;. 1 14'4.' trh tI!] dr ± I^ i r y _
' ' 1 °Si T, ' 1 ' . '' 1 ww . I1 • i 5 /' t 1� . 1 ' • /Y ll .. J • `v., - : y
s.
��(�)g 1 - 1 Ili
'ppp 1���j7 51 I ,1'. •!�'f 1r'.
V V p: ] • + r� t •I , lA1ryJ • yl, (Vr i . St
�, • /J t ,rYrr4f t ( - f'j�,'• .�^. hs •irLiTh I r6`r I ;� rS'., _ - - ^_ • _ -
Qv - r ' • S., '•{ i�j1,,1(1 ' I, 5 •1. � ' fi •.17( Zy 41 \ i� '' Ytl'JI rT , ..t. ...‘ r rl Y - ...•✓��+r r
r , , ' 1‘!! • el} v % r ® i ' 41 t. y }�/ ,{ h Jj�,l 't t/}j'� 11 t•� tYi ��°, r ' q J rlr • •I r
►1 wit'
' ai j+; !, ;,, 7r. 1 r t:, Pit ^I , y • `Pxi rl � Arrd1•1' j.A t x 1 ',t, Y 'rf ter �` et]s 1, �'r•7� . .
]s� rf ] { i 5 7; ,r 1 • ,,3Y. •' �r. •.I Q jl _• t :t R�,y�+: I./j1�1at ;5 • ` sj Isiy 7 1. \ 4!+ .r , y• �•
\ 6/ \ .0 ] • c j{ ��` . 1 l ¢I, ({O)) Pt
le' •i ♦• 1 •"/ 'w Y I �i, y { 1'r f r+ 1 L L ��•L, I�lr. !III!' yM •rt1 f 10
. -81- s; `'�A sea.
•
•
y ' „t " •
• .11y . . , :Sflr•i - ! �.1 �/ ;t i; " I L„t ' �", �` �r "_ J • +i, r 1 �11 I,{rr YF'i ' r 'u{trL . Y.j ' , � *59i�'.M�^• -J • _'
U 'v, �, '" 4• y N•. 1 t f'✓1 a11� •t 'it„ `I� \tfR• d•�`�.' rk , r, 14 _ ..
•
,��y�UJ '��{Y /�'� ..� j �•f i.i�., d ry(� 1 c ♦ i _ Tom _. . - -p / + ; ; L M -r '�ir +, .'a � • 0„' ! r^�3 Yid' � �,�,.r- r• !i) r , 1 . '� Ir . )r • • *.r r{ r'' t t'-`r [ 1 j • ii t,•S .I r .. JT--._ ... .a• }.y ♦ �. . 1 wee- . `� F • • r (,p Y71 ,•', y y l tor) l ,''11 fi
�t,a 15 op I5 .. • t. s' . n pri, •,.
cp ,.TJ".TAT r. <,.iy i>!' : : rl Gt , tot��1 I� l • �l •''y l'
.y 1 ' . "' Q 4• J N! .' + 1 �•• F1 •• `., /41 • 1 t� tie,
0 ♦ �yl q+r j t, }t ilt t� C� ' rt • A�`,1�.F •}�`, f wlfr • \ �!' • , ( Ir 1� a�f\Sr " r r ' - ! w. �.R.. .--4��.�r•• -- -.
p 1' 11 Ar � 1' f •. •
, rt ^ l { r '+ '�14j•N') '}���,• •! i _h 1y. it J1'+ It t1„1-0
f it I � luA 'J., ,•? t'y 'I� • ;� y: A1 \�t/V—l'11 La �l� r ( �).} �y } b l( -« _
•
I ..• ` 7�' - rl iI _ zn. 1 �� 1•. I': 1• . � ry y 1•f ` J fe 0{�, !1• i. 1 f '� - I: ,l .
N.
A. tit
t.
ril } f, II •i `�1 1 . .' ♦ r. ((�,1/) g c,u• ' 1>?• .�'x• C ti 't• ,l 'J•yL ,1. , 1 , • 11
``-JJ •
'�+ >} (, • ,'I rk 1{ 4R . ~ • • I �' +h ✓,t'� .�" ' r� k .t +11( t1'�r, ''� i 'L 't �t\_+!>.i `, t 1 CI r'ti a �, ` 1 �` •. an •r! i'►d,._�Aft . ,iv _f�' - '
•
••:1 !�. { i , ,. , -- >� r 'SSell t 5•, ` ;5�Ij _ -A r •• • 4 ,�. +-t I : ,P�' 1 S . I
•
,,r 11 f, ' . .�� 1 li . x �Y. �t� •• '/•f'�i3��- Jt 5. It-•' I. + • • .�,r d1 ,1 11, t ' I,- ,r it
.t • r• , I
J :t[, , .}(y. • t.? rR latlf µ� I. 1(1. ., .Sn'l 4 .i j 'r5 .. .f ) ' 4141 1 ' � , :_ Ad t} i t, I1, y1.4 I .
•
of I. ( , !• {, '• .•
pr 4 q� + I I i+ ^
O ° ] -'Y V 1 r et �'' ..4 I P k.. ), ' f§r] r.. / +1 vCt'r'' s 1 �' Til
' -ryRn .\
' y,,��IYL . f •
' , 0. 'Y , �'� ' t' i �r ' yi' h 5 I . I t41 �1'j1r� t, - .nr Q��j �
•v••`y" I�i �•t` � i. • l •
S _ rh ,' •It• It Ir ) • �! s +# ••qf t . 4 + ,)+}. J
. , i• Y} •'•' :If It /III ' , oJ1 `C(it; `1J r i ,ll •• ro . 1 t-1 t L y .•.
r � +1 - F r .'(r%, 1, ' { L \JV r ` •t� 1 rI /r�{ ( y��� }L f('{4 i. �r 1t1 ! . ...1 .,
J ,• 1 ; t fir' ' 1 rd t• �•
=!.:& .S ,� 1 \ II ,(D , ►a {�j.24M ti'!�• ` 7,I ? �t Fr14 ct rkl , ' 1� nl',I 'I ';' S t;,:
. 1.11;101'
}�: (4...r yli '. i Yi • 't•'n J v t +y�'} �': f t , r .\ ' 11 dal F>.:* >,' i-
. � ,'Y y Y , I r'� e .4.1.,
1 \ r, t CD
y•: y',', ,1 ?la 1 '. Fi F{{FY7f •r• It' r + t 't� ( ?, j
, � r�!'� �1i:1. rtly ' ' ' gt. 1•1 " 14. �t • * ' (� " l ei ) �' . • t.✓1F}, i� +�, ` ,1. [[f� • 1 ` • '�' ) '7lgt I S .y• .vr �/�, ; 1�) `Y. '! .•,4 t ° .S I J; t : .a9 t� > i.1 •i ;. Lr . ' } .. V. y r • •} r t` } a • ! .11.
•
•
M7 • .k lurk+I {I' Ir. CS.,J ,dr P { \ •�,- •..1�y``r,- 1Q f J♦ ) / ��f.�� ,,1 '{jw , J • 1 ylat ' , t•� - • .I ' '�'r y��i� ..,_�.
�.. Vlr' :Id . �^ ]i• � �' 'i; 5 st ;J� :rr. a « �E . t: 5e a •1`i ' rCY�-% ^ • A\ Ief I 1 1 I si '',
4.
1 4 T / ' r• ' ; �a+s t ^ 1 f► • •`�q •xxy I ,+1 'r p{t I, ri o .hf .r({/b'("� 'fl IJ 1 , .
ikv '� 5 /� , S. `( .` .1 r ,Y►�. r •5Jk J�itfF 'Tis r� 'r'a�j�Lj�l11j� •- •i ) ' ' v' ] • , p 'l . J � � '. '
fgift , Y. J 6 v �' r '� ;r T1t1I 4' 71 '
,} '} 1 r '?t' i,.a. t, Y, 1. • . 0 •t 't•} � • - r 1 IM• r 1. lR ► �i r . f�� }i7 �' >�j Sll�p. r rH
rP• l� if., ,�ti: i1k•CT. IN yl ( }'i ?at' ' \ F7 � k‘ t
t[1111 1} r1A.l. �11} ., ', . r •'.e .! • . •jl ,� J L r 'iA'p t` 1 �1` , Y� L�' r " i r ; r ,!, I e if ' , . �3 �j` "
4 T
edq
•
t : �t01 � �n i /d,c4 iilI v . Ij, •• t'1 t , f , "r Y w'�,{ v , t I ' " , 'Kt ! • + I
Q(�} A.g . It f ' . . . by r6 L\IS . id 11tK J , " YS � 1 , r (,S {I r� r, . �L Y . '_ ll •
I
�%v >± .. •a . 1. ' a� ! 1 .. l'Ff' y y y /t*' 1! •t 1 ?1 aif`� . 11 1rMr. k_,. r i K 3 I fp
� ❑ ,qi� l/l 'i`i t( `v4r s . r'f •* ,p t ® , �lre « .J 1 •.{i,I t *it , •, L 15 . . I ,
V r r4. �? (= '! FI f 0.0 Oa . a .�, t •
/f,T7r x i', r t i , :.
lJ • at h ;Y Y . + a•
.4
_}14 I ' ] F t i 5 i • . 1 1
•AA Al
•
•
i �� Ir r'�!' 7 ail. 1 t' r' J . - , , { I1.: I ' + ylY� } r
•
C I A '11 •'e 1 . • •• f ' A 1 rJ 3 1 11 'A• + ' I t ..
L ( 7 i � ;r - tit� r . t t , r .• 44..
1 { Itr +'1 I h 1 w
oi
•
•
ii
C: i •• i i the 1 ,Ir + r1s1 �1.�' t'�i11 +y• ,Y (r F.ti � ''1 "
❑ �` 4` t tom, ,: r r ' 14 ;rl ill �� �' il+{ �'� �i 51.
It �" , _ ' r � 5, t ( tle _I •fI . I fY IL "t Yt1i ee b
r]� v , • �• ( JI I � ' . I lt._ 1 d� I1f 11 •i • i 1 � L• 11,0 ,r t � f' , «, '�
1/4'
pitts. I I.
1 • 1 !r .�" I •r , r � ,
t1 �• '.•` P 4 - 7 � •' ,,• x� l s 1 ti , '; 1 , '.�8 t s t f I i. i , i i
At � ' t ..:, )1 f !
� . L. r LSD ' £' \� _ • -� I.Ipil,
} i , �7t� ,, lJL ,�, • ' t� •f `, .` tT}. . . I il•,.1 ' 41 t' III r. • p tt -) ` Lf J,
ill
•
I •
/ ! P•
if 40
Ail k t 7 I , r t. u lilt " P'' 1 " ff f . 'j
I • - • ,t,,,, kill'"_ 1 I,- ,,,,, tot I , lt. i. r ' , r f., l ti11 ✓
t' J
� . I . , R e' �' G 'l it 1 , + I !r. !1 0 •
-+ • ... r, . ; ) r r 'Pt . 1.1 ' 1••• I i r' ! •• 1 ' 11 SiJ :, . + ' "ttli • . ,, SI ,
/L y 7 � ".V. • Ot L, "1 1I I 11 , I� • �T \t h ] I �, Y ' I 1 !.
i.
•
I
I
I '
I.
r
4 ; .} +
4
1'M°
•
3 , ., A _ • �_ r tj�.
1 �' ' � . r ° r I B 1 f
yp
/ 1, „ • Cr9 1 �. •�..,-- .:'. x $} " _ 'r'tJf
,1<,-.- • l ' d . 1 Y(. •Vt1 lrrfre ' , I }
' / , Y dy * 51 �I ft. _j 1�},�r to I ! -
1!V••'t t f t O ` f / ' -i: ,, �i •
rr ' liter..
0.
tty
- It,fi l
•
fr
qq ( u. ,Q}
w 1
4 yf
r,.�r.. -.- ... +r-�Y•�•• r _ • , J
• 1 if p �., •- • r •
�ri.S _. =�
1 , t ,I�
I.
• 1 ; // t. • .."� / r ' - f•• t y ❑ tin d!.' y l _ '•: 9 '� o
4 .
i. . s i cg
'i . . •• : ,, i • 4, • � . f ! ' . 1 r` j.l . ,• �r� bL 3-I
M 'LW:1 r ( sir El 1 l I L r C�� • k (1r I I , __
•
ei Wig . :
•
re.r1 so, 4 4 St
- y e "'1lr '
t•,r , i ' �A ' • r .d - , r +S _ _ .... a lett . ,y - ' ! 'Ir
_ Vr ": � - , = � .\lf • t' �' ,•� • �I ,`,.., c } - 1 . rf } Y1,r ' " y \ cu, . , , x �. ' . Z4 �. 1.1A, 1� �. � ( •40 ,( ,f /� r :( y. r , a .y ' ' I ' f-� {,n���\]•
, L j' i 1 , .v-emu - " L • } '- • 1. • ^ ` �'' �d� 1 .. ' iJ • 1f%f1ilf,‘5,:elilli.)11;wt..,,,,..1,.1.i.jf
t ti�`[r� ,( 1} �/70 M ' ' llJ. , d � , - ' ` ,, r{`t,# r!DW • - �' r a t .� _ , , -� : rfit:::
•
Z. iltr,. j ' .iwer \'� � . , 'i '. • t "+a. � � tl -t. ( y ., 41 { o� . - ,1 (� 1,- .r Y- )y . % . -
tir •�w• 1 1' . . it % r, ,1,�1� .ft" r ,:- } ' y,* . ': t'i1® `� .. • • tj,- • • �M . t , ,, � y :ri- . , r +•
�tj F� C' ` ; 9 , + } r: D + ; 1 ♦5 " �j ♦)"" , ® ..4 Rt `,jff ',..� .� P.yl- t0 (' rIt 11 4 It
r ♦ r `H, 0
, , _ tS'. I, lr ,t ' try a.. yr ' , �'t PF qI.
r ,} - '. ( f �.� 7 � �' T Yt 1 Tr L'- ' (' r , , �f: ® 4 , � r- - 11 i _ 'I', � , �. Rt, ' fT' r , r.t1. V •.* .4� 1 1 , wrA' b: p. {. . •
•• t4 1 r 11 ;, + F r ,�•
Nit r
')T' h;,y 4( • •^. ,f l , '�- ,` tL . Y + .. 'I / �. _ !y ( } - .n+1.', }, ,.� Sr Ittle ♦ �, . ,r 11 � rr \ r4 17
•
A.
•
r.
•44 J. S1 r r ' / t ' ! '4• �� + ). r ; 1tI •JY x' ...,p?jes a � Ytr 1'11 - .' i , rLI" V .:.'� x ( .([� .]I[ ' !fit 0
i I ( 4
, •-x. .Q�,r yl• , I • S, A ' ® .. � v1 ^•"'• 'b - Y 9 ,}R� Fi UM 1 I Y . d
'rT/ '` . i. � y r°tt 1% .w x `d. /r I Sr •; �_ ,' ) V• l '' xr r i rr iO.t '
•
y 1 t..4.x S . fLs. 1l\IIJ/1
r �' "• a. 1.4
•
•
g
t „I iiiitt:,\,...... 4 i
F^
y �rrtyyytt1SJJ((rr ;�.14 1 ..` IFS fl I ,i L -� � �,� t y�. �r1rV' or ,Ir IH 1' ',�� �' ,, .,,E n
f," •'/ , �;, „f1Y ` r5a,1�r,+�. 1 � { !� S1 ' ,$."u� + "` ,1/4 it ' } i, 1 • `r 1,� r •y ,r 1
tr � ' • _ __ ` •1, l I4 {I ' ��I •
_ , 1� Tky ? ' t r•' If id
..j '�" Yr'a t C.
/z e • - 4•� 'r ,1 l k c?� I . t - Y . TIC - lir, f'' ° , , 7 ( 1 ,.'° r,
' , • 'gales•- •
J}r , J •tr,. • I '1 , R'. .iiptit ' 1! �' I J� r' .rr . ,M �'�,•,1' L• nl, t t �r1 Y� . {�,��/ '� . • 'I k•'7,iF fj�,��
4 Y L r'.tC r f `yr`f'r 1 1 r + n V . ) Y ( "i ft . E..-fro
' ;� •
s, .. i f x. } r ,fs•1 , - ! , //i ,� • 4 I , • .,,: -ri' ; � ;• t J � ' -.: ; , S ,I" S�'r !
t x sot l f �[
6• yrya ii, •Cy r 1 tI. o' ' aSC. 7 � ,: ,• .5 - - , �` ,w,�y��`. i 4' ,f ,1.�[/� a r , • ,1111 • A,i
.S .�r ''7rJt ` p�♦�7f . . . . / - , I,y r •
, �- r o f.K 1. �..,..-..r..^" _. _ ( j .' 1 Yt IA
� 'IAd .p � �' • 711� _n S❑1 Q
•
, la , R•, • • 1. l' - 4 • , , r) (• t ` �� 0 1. i , .. - 'f,il 1� • .; ' '7 J1L/ry� a. � � �Y Sdr 1 / f 1•, `•rJ�•�y `�'
W i
• `f` 1,
•t ': ' 't. r, , , - t 1 • ® ,'�--•.��� ',t' r1 ' 1 T►. y , , _ _ _-. — tht. r - ,e , ��'' {• '. ' O �J
�J 7Try
• t j �y y�
l - ey. /r : t. : ' " r , Jr ' ,"' 7 , ,� r f),'. E� rY' " S ',LI{kr_ �,^L,. 'r ., .1• I/� ♦ ' + r, ' ` 1 C�� L�
•
•
- settoi• # ' ' "if
•i 7� �. • .
, ,•,„r 1 '• ' ; h { f ® f • g�g • , - - �� ._ r. � r . t "r6944.
}�( j,�,�'�- , ' � • 4 •F � • /
•
•
ll
t sir • ' �.(r'Jr� I. ,� ) .� . 1 ).. v ,t ' - r •1 •Y ' '.!q' /�_ J } ' , H • "^� ❑ ❑ w=
s r •' • 44 %t rt 1, '� '.�. ,t t • �/{y l/ ' Y • - .'i 11 1 . .Ir• 1 j ^ [ •} 1}t f _r Y;(�.�, �/ Sv u' U
• v . ;�, 1 S ' • A. r}S,M.I. ` } �� • , ■tom Q \`. ,, r � M t _ - t x , • � L r 'rt1 / . , :/ • . / 'I * r, R /� c
•
r.
AO
i 1 ,r� :'/ I . t �Y �r`'j in cn� •SI [ , `" {'. y
r- ti
, 1 ) • t 'ftj 1 •� ti, i ��a •rp: F . y , ' 1 ' x '1 •3 I : r@
•
f '• ' 4;3,trr r a• 1° ? )4 1 `f"�F {? `i . q , it ", 1 ' 'I P• ' �ti.:. . < `- r ••• •) '• •i ' 0 r•. �z,I
Ilk• in vv
r jjj t •�. { ( .':1.4::,
� ) " J. �1 � '1 ,' Z -� .• 1. �, ' ' - b` . Y r t l.1 ' fftli 0 `1` � 44,
` ' -:r �' �� '/' I 1! ' RSpi
P r r [/e`■�1 ( A aa+r rf` •/ ,' It�' A ' •i ��'.� I '' s 1 ' - 111
F
•
�! f } } yy r•� Y ', xi1, "'+, � . • �a .} Y�' 1 {I . _' r� f •' - _ Y `� 1 rti . -...1 fir!' .\ ,, r r^ r4f{, 1 yr `r(��
V,} , 'f II � ^ t f�` .• r r ,ry/y t �, ) _ } I th:. ,�;-(� '1.•Si f- �"] CC//
%
)1 A
•'1 4 ( `,�. 1 " 1 Si e` I � ''� 'i II1 t''1 1 , #. . • . MC c^-7 ° ;. . t aY� r - '-� '� �:, +a I �'�Sy�•K , ,,, tr. - , s •, r II, 4
i a �. �"t f " , t S : " t A
4 �' S , '' k J.y 11 t
of, ,E w t " III r
► IS f / , 1, ii.- ,- • ' l 7 71. r .� i. r } S CO
• !' +. 4 3t 1 •. r o o ❑ o � , t % i•� j,. ((," .." ('' �l '' ' ' b 1. f ' t �* C° <.�r r
n It nI •
L �r� i) j S t � 7 � � . 1 4lJ
f.
r -wck , , , .t, A91:4 / I ji i (� f ! ii:II
f '' - ' ( ag ^i�11 ,t{.?: r M 1 i i �. C�^,�
,, 1 i' pd {''{^ t S •41 w � '3�' ' t f c;� 1> , • -f. r ? ?f F f {�( � 7 r ,t 1 '_ 0 0 /��
.} 1it
li , 1}',�ttR t '' yill, LLS 11 �'' VA 1 SUM
❑ � r'1 � 4i , • / , [S t • , `�•, Ir �1� a l) Yi1 2 \�J
A t `i t i .a'! , ,77, . s •;i 1 .11.+ 1 G . . . ` ,,; ( , 4 ,.. r
14 :J.lee. \
il
•
1 J; r j '`�' L •� } , A .l lfi r � , r t ` r . ..' �/ , . ..t i 1 t ' , �}� `•I. rtii . •. '.'I r 0